Arsi M.Raras dan Partiwi G. S.Analisis Beban Kerja untuk Menentukan Jumlah Optimal Karyawan dan Pemetaan Kompetensi Karyawan Berdasar Pada Job Description (Studi Kasus: Jurusan Teknik Industri, ITS, Surabaya).
Jurnal Teknik ITS Vol. 1, No. 1 (Sept. 2012) ISSN: 2301-9271.
Chai Yilin, dkk. A Tree-Based Tabu Search Algorithm for the Manpower Allocation Problem with TimeWindows and Job-Teaming Constraints. Journals of Computers & Operations Research, 36(4):1145 – 1157, 2012.
Chandra V. P. An Effort To Apply Work And Time Study Techniques In A Manufacturing Unit For Enhancing Productivity. International Journal of Innovative Research in Science, Engineering and Technology (ISO 3297:
2007 Certified Organization) Vol. 2, Issue 8, August 2013.ISSN: 2319-8753.
Dhon Anders, dkk. The Manpower Allocation Problem with Time Windows and Job-Teaming Constraints. Journal of Informatics and Mathematical Modelling, Technical University of Denmark.
Freivalds. 2009. Methods Standards, And Work Design. New York. Mc Grow Hill.
Gilmez G dan Suer G. (2011). Stochastic Manpower Allocation And Cell Loading In CellularManufacturing Systems. Computers & Operations Research 40 (2013) 2569–2584.
GobelM.Analisis Efisiensi Biaya Operasional Melalui Pengelolaan Tunjangan Makan dan Jaminan Pemeliharaan Kesehatan Pada Perusahaan Jasa Outsourcing. Jurnal EMBA Vol.1 No.4 Desember 2013, Hal. 1868-1878.
ISSN 2303-1174.
Groover P. M. 2007. Work system and The Methods, Measurement, And Management Of Work. Pearson Prentice Hall.
Helianty Y. Analisis Kebutuhan Jumlah Pegawai Berdasarkan Analisis Beban Kerja.
Jurnal Online Institut Teknologi Nasional. April 2014 Vol. 1. ISSN: 2338-5081.
Hidayati A dan Partiwi G. S. Perhitungan Jumlah Tenaga Kerja Yang Optimal Pada Cleaning Pabrik Personal Wash PT. Unilever Indonesia. Jurnal Teknik ITS
139
Noname. Job Design And Work Measurement. Ebook. www.ateneonline.it
Ozcan S. Dan Hornby P. Determining Hospital Workforce Requirements. A Methodology For Decision Support. JOSCM. Volume 4 Number 1 January - Jun 2011.
Mello. Work Allocation In Complex Production Processes: A Methodology For Decision Support. JOSCM. Volume 4 Number 2 July - December 2011.
Ridha dkk. Usulan Kebutuhan Jumlah Tenaga Kerja di Bagian Water Based PT.X Berdasarkan Analisis Beban Kerja. Jurnal Online Institut Teknologi Nasional vol. 1 Oktober 2013. ISSN: 2338-5081.
Rinawati dkk.(2012). Penentuan Waktu Standar Dan Jumlah Tenaga Kerja Optimal Pada Produksi Batik Cap. Jurnal Teknik IndustriUndip, Vol. VII, No 3.
September 2012.
Salvendy Gavriel. 2012. Handbook of Human Factors and Ergonomics. 3rd Ed. Jhon Willey and Sons, Inc. United States of America.
Sinulingga Sukaria. 2014. Rekayasa Produktivitas. USU Press.
_______, 2014. Metode Penelitian. Edisi Ketiga. USU Press.
Sugiyono. 2012. Memahami Penelitian Kualitatif. Bandung. ALFABETA.
Suryabrata, Sumadi. 2008. Metode Penelitian. Jakarta. PT. Raja Grafindo Persada.
Wibawa dkk. Analisis Beban Kerja Dengan Metode Workload Analysis Sebagai Pertimbangan Pemberian Insentif Pekerja (Studi Kasus Di Bidang PPIP PT. Barata Indonesia (Persero) Gresik). Jurnal Universitas Brawijaya Vol.
VII, No 3. September 2012.
Wignojosoebroto Sritomo, 2008. Ergonomi Studi Gerak dan Waktu. Guna Widya.
Surabaya.
140
LAMPIRAN
141
Lampiran 1. Tabel Bilangan Random
1003 1047 1134 1327 1411
1005 1048 1135 1329 1413
1008 1049 1136 1331 1414
1009 1050 1137 1332 1415
1010 1051 1138 1333 1416
1012 1052 1142 1334 1417
1013 1053 1143 1335 1418
1015 1054 1144 1336 1419
1017 1056 1147 1337 1420
1019 1059 1148 1338 1422
1021 1101 1150 1340 1423
1022 1103 1151 1343 1424
1023 1104 1156 1344 1429
1024 1105 1158 1346 1431
1025 1106 1159 1347 1433
1026 1107 1301 1349 1434
1027 1108 1302 1350 1438
1028 1109 1304 1353 1439
1031 1114 1305 1354 1441
1032 1116 1306 1356 1442
1033 1117 1307 1357 1443
1034 1118 1309 1358 1446
1035 1119 1311 1403 1449
1037 1123 1315 1404 1451
1038 1124 1318 1404 1452
1039 1125 1319 1406 1453
1040 1126 1321 1407 1454
1042 1127 1322 1408 1455
1043 1130 1323 1411 1458
1045 1131 1324 1411 1459
142
Lampiran 2. Tabel Rating Factor Westinghouse
Faktor Kelas Lambang Penyesuaian
Keterampilan Superskill Kondisi Kerja Ideal
Excellently
143
Lampiran 3. Tabel Allowance
Faktor Contoh pekerjaan Kelonggaran (%)
A.Tenaga yang dikeluarkan
1. Dapat diabaikan
2. Sangat ringan
3. Ringan
4. Sedang
5. Berat
6. Sangat berat
7. Luar-biasa berat
Bekerja dimeja, duduk Bekerja dimeja, berdiri Menyekop, ringan Mencangkul
Mengayun palu yang berat Memanggul beban Memanggul karung berat
Ekivalen
Diatas 50 kg Pria
B.Sikap kerja
1. Duduk
2. Berdiri diatas dua kaki
3. Berdiri diatas satu kaki
4. Berbaring
5. membungkuk
Bekerja duduk, ringan Badan tegak, ditumpu dua kaki
Satu kaki mengerjakan alat kontrol
Pada bagian sisi, belakang atau depan badan
Badan dibungkukkan bertumpu pada kedua kaki
0,00 –
C.Gerakan kerja
1. Normal
2. Agak terbatas
Ayunan bebas dari palu Ayunan terbatas pada palu
0 0 – 5
3. Sulit
4. Pada anggota-anggota badan terbatas
5. Seluruh anggota badan terbatas
Membawa beban berat dengan satu tangan
Bekerja dengan tangan diatas kepala
Bekerja dilorong
pertambangan yang sempit
0 – 5 5 – 10 10 – 15
D.Kelelahan mata *)
1. Pandangan yang terputus-putus
2. Pandangan yang hampir terus menerus
3. Pandangan terus menerus dengan fokus berubah-ubah
4. Pandangan terus menerus dengan fokus tetap
Membawa alat ukur Pekerjaan-pekerjaan yang teliti
Memeriksa cacat-cacat pada kain
Pemeriksaan yang sangat teliti
Pencahayaan baik
144
Tabel Allowance
Faktor Contoh pekerjaan Kelonggaran (%)
E. Keadaan temperatur tempat kerja **) 1. Beku
2. Randah 3. Sedang 4. Normal 5. Tinggi 6. Sangat tinggi
Temperatur (C) F. Keadaan atmosfer ***)
1. Baik Ruang yang berventilasi baik, udara segar 0
2. Cukup 3. Kurang baik 4. Buruk
Ventilasi kurang baik, ada bau-bauan (tidak bercahaya)
Adanya debu-debu beracun, atau tidak beracun tetapi banyak
Adanya bau-bauan berbahaya yang mengharuskan menggunakan alat-alat pernapasan
0 – 5 5 – 10 10 – 20
G.Keadaan lingkuangan yang baik
1. Bersih, sehat, cerah dengan kebisingan rendah 2. Siklus kerja berulang-ulang antara 5 – 10 detik 3. Siklus kerja berulang-ulang antara 0 – 5 4. Sangat bising
5. Jika faktor – faktor yang berpengaruh dapat menurunkan kwalitas
6. Terasa adanya getaran lantai
7. Keadaan-keadaan yang luar biasa (bunyi, kebersihan, dll.)
*) Kontras antara warna hendaknya diperhatikan
145
Catatan pelengkap : kelonggaran untuk kebutuhan pribadi bagi : Pria = 0 – 25
146
Lampiran 4. Data Pengamatan Work Sampling Tabel 1. Data Pengamatan Persiapan Persiapan Balok
No Jam Keterangan Work Idle
1 10:03 Memilih balok
-2 10:05 Memilih balok
-3 10:08 Memindahkan balok ke area kosong
-4 10:09 Memindahkan balok ke area kosong
-5 10:10 Memilih balok
-6 10:12 Memindahkan balok ke area kosong
-7 10:13 Memindahkan balok ke area kosong
-8 10:15 Memilih balok
-9 10:17 Memilih balok
-10 10:19 Memindahkan balok ke area kosong
-11 10:21 Memindahkan balok ke area kosong
-12 10:22 Memindahkan balok ke area kosong
-13 10:23 Memindahkan balok ke area kosong
-14 10:24 Menerima telepon -
15 10:25 Menerima telepon -
16 10:26 Menerima telepon -
17 10:27 Membawa balok ke drydock
-18 10:28 Membawa balok ke drydock
-19 10:31 Membawa balok ke drydock
-20 10:32 Membawa balok ke drydock
-21 10:33 Membawa balok ke drydock
-22 10:34 Meletakkan balok di drydock
-23 10:35 Berjalan menuju tumpukan balok
-24 10:37 Berjalan menuju tumpukan balok
-25 10:38 Berjalan menuju tumpukan balok
-26 11:01 Berjalan menuju tumpukan balok
-27 11:03 Berjalan menuju tumpukan balok
-28 11:04 Berjalan menuju tumpukan balok
-29 11:05 Berjalan menuju tumpukan balok
-30 11:06 Membawa balok ke drydock
-31 11:07 Membawa balok ke drydock
-32 11:08 Membawa balok ke drydock
-33 11:09 Membawa balok ke drydock
-34 11:14 Membawa balok ke drydock
-147
Tabel 2. Data Pengamatan Persiapan Persiapan Balok (Lanjutan)
No Jam Keterangan Work Idle
35 11:16 Membawa balok ke drydock
-36 11:17 Membawa balok ke drydock
-37 11:18 Membawa balok ke drydock
-38 11:19 Berjalan menuju tumpukan balok
-39 11:23 Berjalan menuju tumpukan balok
-40 11:24 Berjalan menuju tumpukan balok
-41 11:25 Berjalan menuju tumpukan balok
-42 11:26 Berjalan menuju tumpukan balok
-43 11:27 Membawa balok ke drydock
-44 11:30 Membawa balok ke drydock
-45 11:31 Membawa balok ke drydock
-46 11:34 Membawa balok ke drydock
-47 11:35 Membawa balok ke drydock
-48 11:36 Membawa balok ke drydock
-49 11:37 Menyusun balok di tumpukan kapal
-50 11:38 Menyusun balok di tumpukan kapal
-51 13:01 Berjalan menuju tumpukan balok
-52 13:02 Berjalan menuju tumpukan balok
-53 13:04 Berjalan menuju tumpukan balok
-54 13:05 Berjalan menuju tumpukan balok
-55 13:06 Memilih balok
-56 13:07 Memilih balok
-57 13:09 Membawa balok ke drydock
-58 13:11 Membawa balok ke drydock
-59 13:15 Membawa balok ke drydock
-60 13:18 Membawa balok ke drydock
-61 13:19 Membawa balok ke drydock
-62 13:21 Menyusun balok di tumpukan kapal
-63 13:22 Menyusun balok di tumpukan kapal
-64 13:23 Menyusun balok di tumpukan kapal
-65 13:24 Berjalan menuju tumpukan balok
-66 13:27 Berjalan menuju tumpukan balok
-67 13:29 Berjalan menuju tumpukan balok
-68 13:31 Berjalan menuju tumpukan balok
-69 13:32 Memilih balok
-70 13:33 Memilih balok
-71 13:34 Memilih balok
-72 13:35 Memilih balok
-73 13:36 Membawa balok ke drydock
-148
Tabel 2. Data Pengamatan Persiapan Persiapan Balok (Lanjutan)
No Jam Keterangan Work Idle
74 13:37 Membawa balok ke drydock
-75 13:38 Membawa balok ke drydock
-76 14:03 Membawa balok ke drydock
-77 14:04 Berjalan menuju tumpukan balok
-78 14:06 Berjalan menuju tumpukan balok
-79 14:07 Berjalan menuju tumpukan balok
-80 14:08 Berjalan menuju tumpukan balok
-81 14:11 Berjalan menuju tumpukan balok
-82 14:13 Memilih balok
-83 14:14 Memilih balok
-84 14:15 Memilih balok
-85 14:16 Membawa balok ke drydock
-86 14:17 Membawa balok ke drydock
-87 14:18 Membawa balok ke drydock
-88 14:19 Membawa balok ke drydock
-89 14:20 Membawa balok ke drydock
-90 14:22 Membawa balok ke drydock
-91 14:23 Membawa balok ke drydock
-92 14:24 Membawa balok ke drydock
-93 14:29 Menyusun balok di tumpukan kapal
-94 14:31 Menyusun balok di tumpukan kapal
-95 14:33 Menyusun balok di tumpukan kapal
-96 14:34 Menyusun balok di tumpukan kapal
-97 14:38 Menyusun balok di tumpukan kapal
-98 14:39 Menyusun balok di tumpukan kapal
-99 14:41 Menyusun balok di tumpukan kapal
-100 14:42 Menyusun balok di tumpukan kapal
-Total 97 3
Volume 14 Batang
Tabel 2. Data Pengamatan PenyiapanWire rope
No Jam Keterangan Work Idle
1 10:03 Berjalan menuju wire rope
-2 10:05 Berjalan menuju wire rope
-3 10:08 Berjalan menuju wire rope
-4 10:09 Berjalan menuju wire rope
-5 10:10 Berjalan menuju wire rope
-149
Tabel 2. Data Pengamatan Penyiapan Wire rope
No Jam Keterangan Work Idle
7 10:13 Berjalan menuju wire rope
-8 10:15 Merarik wire rope ke sisi drydock
-9 10:17 Merarik wire rope ke sisi drydock
-10 10:19 Merarik wire rope ke sisi drydock -11 10:21 Merarik wire rope ke sisi drydock -12 10:22 Merarik wire rope ke sisi drydock -13 10:23 Merarik wire rope ke sisi drydock -14 10:24 Merarik wire rope ke sisi drydock -15 10:25 Merarik wire rope ke sisi drydock -16 10:26 Merarik wire rope ke sisi drydock -17 10:27 Merarik wire rope ke sisi drydock -18 10:28 Merarik wire rope ke sisi drydock -19 10:31 Merarik wire rope ke sisi drydock -20 10:32 Merarik wire rope ke sisi drydock -21 10:33 Merarik wire rope ke sisi drydock
-22 10:34 Berjalan menuju wire rope
-23 10:35 Berjalan menuju wire rope
-24 10:37 Berjalan menuju wire rope
-25 10:38 Berjalan menuju wire rope
-26 11:01 Berjalan menuju wire rope
-27 11:03 Berjalan menuju wire rope
-28 11:04 Berjalan menuju wire rope
-29 11:05 Merarik wire rope ke sisi drydock -30 11:06 Merarik wire rope ke sisi drydock -31 11:07 Merarik wire rope ke sisi drydock -32 11:08 Merarik wire rope ke sisi drydock -33 11:09 Merarik wire rope ke sisi drydock -34 11:14 Merarik wire rope ke sisi drydock -35 11:16 Merarik wire rope ke sisi drydock -36 11:17 Merarik wire rope ke sisi drydock -37 11:18 Merarik wire rope ke sisi drydock -38 11:19 Merarik wire rope ke sisi drydock
-39 11:23 Berjalan menuju wire rope
-40 11:24 Berjalan menuju wire rope
-41 11:25 Berjalan menuju wire rope
-42 11:26 Berjalan menuju wire rope
-43 11:27 Merarik wire rope ke sisi drydock -44 11:30 Merarik wire rope ke sisi drydock -45 11:31 Merarik wire rope ke sisi drydock
-150
Tabel 2. Data Pengamatan Penyiapan Wire rope
No Jam Keterangan Work Idle
46 11:34 Merarik wire rope ke sisi drydock -47 11:35 Merarik wire rope ke sisi drydock -48 11:36 Merarik wire rope ke sisi drydock
-49 11:37 Minum
50 11:38 Pergi ke toilet
51 13:01 Pergi ke toilet
52 13:02 Pergi ke toilet
53 13:04 Pergi ke toilet
54 13:05 Berjalan menuju wire rope
-55 13:06 Berjalan menuju wire rope
-56 13:07 Berjalan menuju wire rope
-57 13:09 Berjalan menuju wire rope
-58 13:11 Berjalan menuju wire rope
-59 13:15 Merarik wire rope ke sisi drydock -60 13:18 Merarik wire rope ke sisi drydock -61 13:19 Merarik wire rope ke sisi drydock -62 13:21 Merarik wire rope ke sisi drydock -63 13:22 Merarik wire rope ke sisi drydock -64 13:23 Merarik wire rope ke sisi drydock -65 13:24 Merarik wire rope ke sisi drydock -66 13:27 Merarik wire rope ke sisi drydock
-67 1329 Merarik wire rope ke sisi drydock
-68 13:31 Merarik wire rope ke sisi drydock -69 13:32 Merarik wire rope ke sisi drydock -70 13:33 Merarik wire rope ke sisi drydock
-71 13:34 Berjalan menuju wire rope
-72 13:35 Berjalan menuju wire rope
-73 13:36 Berjalan menuju wire rope
-74 13:37 Berjalan menuju wire rope
-75 13:38 Berjalan menuju wire rope
-76 14:03 Berjalan menuju wire rope
-77 14:04 Berjalan menuju wire rope
-78 14:06 Berjalan menuju wire rope
-79 14:07 Merarik wire rope ke sisi drydock -80 14:08 Merarik wire rope ke sisi drydock -81 14:11 Merarik wire rope ke sisi drydock -82 14:13 Merarik wire rope ke sisi drydock
-151
Tabel 2. Data Pengamatan Penyiapan Wire rope
No Jam Keterangan Work Idle
85 14:16 Merarik wire rope ke sisi drydock -86 14:17 Merarik wire rope ke sisi drydock -87 14:18 Merarik wire rope ke sisi drydock -88 14:19 Merarik wire rope ke sisi drydock -89 14:20 Merarik wire rope ke sisi drydock -90 14:22 Merarik wire rope ke sisi drydock -91 14:23 Merarik wire rope ke sisi drydock -92 14:24 Merarik wire rope ke sisi drydock -93 14:29 Merarik wire rope ke sisi drydock -94 14:31 Merarik wire rope ke sisi drydock -95 14:33 Merarik wire rope ke sisi drydock -96 14:34 Merarik wire rope ke sisi drydock -97 14:38 Merarik wire rope ke sisi drydock -98 14:39 Merarik wire rope ke sisi drydock -99 14:41 Merarik wire rope ke sisi drydock -100 14:42 Merarik wire rope ke sisi drydock
-Total 95 5
Volume 1 Gulung
Tabel 3. Data Pengamatan Docking Kapal
No Jam Keterangan Work Idle
1 1403 Menerima telepon
2 1404 Mengamati kapal yang sedang diikat dengan wire rope -3 1406 Mengamati kapal yang sedang diikat dengan wire rope -4 1407 Mengamati kapal yang sedang diikat dengan wire rope -5 1408 Mengamati kapal yang sedang diikat dengan wire rope -6 1411 Mengamati kapal yang sedang diikat dengan wire rope -7 1413 Mengamati kapal yang sedang diikat dengan wire rope -8 1414 Mengamati kapal yang sedang diikat dengan wire rope -9 1415 Mengamati kapal yang sedang diikat dengan wire rope -10 1416 Mengamati kapal yang sedang diikat dengan wire rope -11 1417 Menarik kapal dengan bantuan mesin slinger -12 1418 Menarik kapal dengan bantuan mesin slinger -13 1419 Menarik kapal dengan bantuan mesin slinger -14 1420 Menarik kapal dengan bantuan mesin slinger -15 1422 Menarik kapal dengan bantuan mesin slinger -16 1423 Menarik kapal dengan bantuan mesin slinger -17 1424 Menarik kapal dengan bantuan mesin slinger -18 1429 Menarik kapal dengan bantuan mesin slinger
-152
Tabel 3. Data Pengamatan Docking
No Jam Keterangan Work Idle
19 1431 Menarik kapal dengan bantuan mesin slinger -20 1433 Menarik kapal dengan bantuan mesin slinger -21 1434 Menarik kapal dengan bantuan mesin slinger -22 1438 Menarik kapal dengan bantuan mesin slinger -23 1439 Menarik kapal dengan bantuan mesin slinger -24 1441 Menarik kapal dengan bantuan mesin slinger -25 1442 Menarik kapal dengan bantuan mesin slinger -26 1501 Menarik kapal dengan bantuan mesin slinger -27 1504 Menarik kapal dengan bantuan mesin slinger -28 1505 Menarik kapal dengan bantuan mesin slinger -29 1506 Menarik kapal dengan bantuan mesin slinger -30 1508 Menarik kapal dengan bantuan mesin slinger -31 1509 Menarik kapal dengan bantuan mesin slinger -32 1511 Menarik kapal dengan bantuan mesin slinger -33 1512 Menarik kapal dengan bantuan mesin slinger -34 1513 Menarik kapal dengan bantuan mesin slinger -35 1514 Menarik kapal dengan bantuan mesin slinger -36 1516 Menarik kapal dengan bantuan mesin slinger -37 1517 Menarik kapal dengan bantuan mesin slinger -38 1518 Menarik kapal dengan bantuan mesin slinger -39 1519 Menarik kapal dengan bantuan mesin slinger -40 1521 Menarik kapal dengan bantuan mesin slinger -41 1522 Menarik kapal dengan bantuan mesin slinger -42 1523 Menarik kapal dengan bantuan mesin slinger -43 1525 Menarik kapal dengan bantuan mesin slinger -44 1526 Menarik kapal dengan bantuan mesin slinger -45 1527 Menarik kapal dengan bantuan mesin slinger -46 1529 Menarik kapal dengan bantuan mesin slinger -47 1530 Menarik kapal dengan bantuan mesin slinger -48 1533 Menarik kapal dengan bantuan mesin slinger -49 1534 Menarik kapal dengan bantuan mesin slinger -50 1536 Menarik kapal dengan bantuan mesin slinger
-Total 49 1
Volume : 1 unit
Tenaga kerja aktual : 10 orang Lama pengerjaan : 1 hari
153
Tabel 4. Data Pengamatan Pengeringan Drydock
No Jam Keterangan Work Idle
1 10:26 Menyekop lumpur ke alat pengangkut -2 10:27 Menyekop lumpur ke alat pengangkut -3 10:28 Menyekop lumpur ke alat pengangkut -4 10:31 Menyekop lumpur ke alat pengangkut -5 10:32 Menyekop lumpur ke alat pengangkut -6 10:33 Menyekop lumpur ke alat pengangkut -7 10:34 Menyekop lumpur ke alat pengangkut
-8 10:35 Menuangkan lumpur ke exavator
-9 10:37 Menuangkan lumpur ke exavator
-10 10:38 Menuangkan lumpur ke exavator
-11 10:39 Menuangkan lumpur ke exavator
-12 10:40 Menyekop lumpur ke alat pengangkut -13 10:42 Menyekop lumpur ke alat pengangkut -14 10:43 Menyekop lumpur ke alat pengangkut -15 10:45 Menyekop lumpur ke alat pengangkut -16 10:47 Menyekop lumpur ke alat pengangkut -17 10:48 Menyekop lumpur ke alat pengangkut -18 10:49 Menyekop lumpur ke alat pengangkut -19 10:50 Menyekop lumpur ke alat pengangkut -20 10:51 Menyekop lumpur ke alat pengangkut -21 10:52 Menyekop lumpur ke alat pengangkut -22 10:53 Menyekop lumpur ke alat pengangkut -23 10:54 Menyekop lumpur ke alat pengangkut -24 10:56 Menyekop lumpur ke alat pengangkut -25 10:59 Menyekop lumpur ke alat pengangkut
-26 11:17 Menuangkan lumpur ke exavator
-27 11:18 Menuangkan lumpur ke exavator
-28 11:19 Menuangkan lumpur ke exavator
-29 11:23 Menuangkan lumpur ke exavator
-30 11:24 Menyekop lumpur ke alat pengangkut -31 11:25 Menyekop lumpur ke alat pengangkut -32 11:26 Menyekop lumpur ke alat pengangkut -33 11:27 Menyekop lumpur ke alat pengangkut -34 11:30 Menyekop lumpur ke alat pengangkut -35 11:31 Menyekop lumpur ke alat pengangkut -36 11:34 Menyekop lumpur ke alat pengangkut -37 11:35 Menyekop lumpur ke alat pengangkut -38 11:36 Menyekop lumpur ke alat pengangkut -39 11:37 Menyekop lumpur ke alat pengangkut
-154
Tabel 4. Data Pengamatan Pengeringan Drydock
No Jam Keterangan Work Idle
40 11:38 Menyekop lumpur ke alat pengangkut
-41 11:42 Menuangkan lumpur ke exavator
-42 11:43 Menuangkan lumpur ke exavator
-43 11:44 Menuangkan lumpur ke exavator
-44 11:47 Menyekop lumpur ke alat pengangkut -45 11:48 Menyekop lumpur ke alat pengangkut -46 11:50 Menyekop lumpur ke alat pengangkut -47 11:51 Menyekop lumpur ke alat pengangkut -48 11:56 Menyekop lumpur ke alat pengangkut -49 11:58 Menyekop lumpur ke alat pengangkut -50 11:59 Menyekop lumpur ke alat pengangkut -51 13:01 Menyekop lumpur ke alat pengangkut -52 13:02 Menyekop lumpur ke alat pengangkut -53 13:04 Menyekop lumpur ke alat pengangkut -54 13:05 Menyekop lumpur ke alat pengangkut -55 13:06 Menyekop lumpur ke alat pengangkut -56 13:07 Menyekop lumpur ke alat pengangkut -57 13:09 Menyekop lumpur ke alat pengangkut -58 13:11 Menyekop lumpur ke alat pengangkut -59 13:15 Menyekop lumpur ke alat pengangkut -60 13:18 Menyekop lumpur ke alat pengangkut -61 13:19 Menyekop lumpur ke alat pengangkut -62 13:21 Menyekop lumpur ke alat pengangkut -63 13:22 Menyekop lumpur ke alat pengangkut
-64 13:23 Menuangkan lumpur ke exavator
-65 13:24 Menuangkan lumpur ke exavator
-66 13:27 Menyekop lumpur ke alat pengangkut -67 13:29 Menyekop lumpur ke alat pengangkut -68 13:31 Menyekop lumpur ke alat pengangkut -69 13:32 Menyekop lumpur ke alat pengangkut
-70 13:33 Minum -
71 13:34 Minum -
72 13:35 Menyekop lumpur ke alat pengangkut -73 13:36 Menyekop lumpur ke alat pengangkut -74 13:37 Menyekop lumpur ke alat pengangkut -75 13:38 Menyekop lumpur ke alat pengangkut -76 13:40 Menyekop lumpur ke alat pengangkut
-155
Tabel 4. Data Pengamatan Pengeringan Drydock
No Jam Keterangan Work Idle
79 13:46 Menyekop lumpur ke alat pengangkut -80 13:47 Menyekop lumpur ke alat pengangkut -81 13:49 Menyekop lumpur ke alat pengangkut -82 13:50 Menyekop lumpur ke alat pengangkut -83 13:53 Menyekop lumpur ke alat pengangkut
-84 13:54 Menuangkan lumpur ke exavator
-85 13:56 Menuangkan lumpur ke exavator
-86 14:14 Menyekop lumpur ke alat pengangkut -87 14:15 Menyekop lumpur ke alat pengangkut -88 14:16 Menyekop lumpur ke alat pengangkut -89 14:17 Menyekop lumpur ke alat pengangkut -90 14:18 Menyekop lumpur ke alat pengangkut -91 14:19 Menyekop lumpur ke alat pengangkut -92 14:20 Menyekop lumpur ke alat pengangkut -93 14:22 Menyekop lumpur ke alat pengangkut -94 14:23 Menyekop lumpur ke alat pengangkut -95 14:24 Menyekop lumpur ke alat pengangkut -96 14:29 Menyekop lumpur ke alat pengangkut -97 14:31 Menyekop lumpur ke alat pengangkut -98 14:33 Menyekop lumpur ke alat pengangkut -99 14:34 Menyekop lumpur ke alat pengangkut -100 14:38 Menyekop lumpur ke alat pengangkut
-Total 98 2
Volume 11,25 m3
Tabel 7. Data Pengamtan Scarapping
No Jam Keterangan Work Idle
1 10:10 Membersihkan benda yang menempel di badan kapal dengan scrap
-2 10:12 Membersihkan benda yang menempel di
badan kapal dengan scrap
-3 1013 Membersihkan benda yang menempel di
badan kapal dengan scrap
-4 10:15 Membersihkan benda yang menempel di
badan kapal dengan scrap
-5 10:17 Membersihkan benda yang menempel di
badan kapal dengan scrap
-6 10:19 Membersihkan benda yang menempel di
badan kapal dengan scrap
-7 10:21 Membersihkan benda yang menempel di
badan kapal dengan scrap
-156
Tabel 7. Data Pengamtan Scarapping
No Jam Keterangan Work Idle
8 10:22
Membersihka n benda yang menempel di badan kapal dengan scrap
-9 10:23 Memeriksa
bagian yang sudah discrap
-10 10:24 Memeriksa
bagian yang sudah discrap
-11 10:25 Memeriksa
bagian yang sudah discrap
-12 10:26 Memeriksa
bagian yang sudah discrap
-13 10:27 Memeriksa
bagian yang sudah discrap
-14 10:28
Membersihka n benda yang menempel di badan kapal dengan scrap
-15 10:31
Membersihka n benda yang menempel di badan kapal dengan scrap
-16 10:32
Membersihka n benda yang menempel di badan kapal dengan scrap
-17 10:33
Membersihka n benda yang menempel di badan kapal dengan scrap
-18 10:34
Membersihka n benda yang menempel di badan kapal dengan scrap
-19 10:35
Membersihka n benda yang menempel di
-157
20 10:37
Membersihka n benda yang menempel di badan kapal dengan scrap
-21 10:38
Membersihka n benda yang menempel di badan kapal dengan scrap
-22 10:39
Membersihka n benda yang menempel di badan kapal dengan scrap
-23 10:40
Membersihka n benda yang menempel di badan kapal dengan scrap
-24 10:42 Membersihkan benda yang menempel
di badan kapal dengan scrap
-25 10:43 Membersihkan benda yang menempel
di badan kapal dengan scrap
-26 10:45 Membersihkan benda yang menempel
di badan kapal dengan scrap
-27 10:49 Membersihkan benda yang menempel
di badan kapal dengan scrap
-28 10:50 Membersihkan benda yang menempel
di badan kapal dengan scrap
-29 10:51 Membersihkan benda yang menempel
di badan kapal dengan scrap
-30 10:52 Membersihkan benda yang menempel
di badan kapal dengan scrap
-31 10:53 Membersihkan benda yang menempel
di badan kapal dengan scrap
-32 10:54 Membersihkan benda yang menempel
di badan kapal dengan scrap
-33 10:56 Membersihkan benda yang menempel
di badan kapal dengan scrap
-34 10:59 Membersihkan benda yang menempel
di badan kapal dengan scrap
-158
Tabel 7. Data Pengamtan Scarapping
No Jam Keterangan Work Idle
35 11:16 Membersihkan benda yang menempel di
badan kapal dengan scrap
-36 11:17 Membersihkan benda yang menempel di badan kapal dengan scrap
-37 11:18 Minum
38 11:19 Pergi ke kamar kecil
39 11:23 Pergi ke kamar kecil
40 11:24 Pergi ke kamar kecil
41 11:25 Pergi ke kamar kecil
42 11:26 Membersihkan benda yang menempel di
badan kapal dengan scrap
-43 11:27 Membersihkan benda yang menempel di
badan kapal dengan scrap
-44 11:30
Membersihkan benda yang menempel di badan kapal dengan scrap
-45 11:31
Memeriksa bagian yang sudah discrap
-46 11:34
Memeriksa bagian yang sudah discrap
-47 11:35
Membersihkan benda yang menempel di badan kapal dengan scrap
-48 11:36
Membersihkan benda yang menempel di badan kapal dengan scrap
-49 11:37
Membersihkan benda yang menempel di badan kapal dengan scrap
-50 11:38
Membersihkan benda yang menempel di badan kapal dengan scrap
-51 13:01
Membersihkan benda yang menempel di
-159
52 13:02
Membersihkan benda yang menempel di badan kapal dengan scrap
-53 13:04
Membersihkan benda yang menempel di badan kapal dengan scrap
-54 13:05
Membersihkan benda yang menempel di badan kapal dengan scrap
-55 13:06
Membersihkan benda yang menempel di badan kapal dengan scrap
-56 13:07
Membersihkan benda yang menempel di badan kapal dengan scrap
-57 13:09
Membersihkan benda yang menempel di badan kapal dengan scrap
-58 13:11
Membersihkan benda yang menempel di badan kapal dengan scrap
-59 13:15
Membersihkan benda yang menempel di badan kapal dengan scrap
-60 13:18
Membersihkan benda yang menempel di
Membersihkan benda yang menempel di