BAB 4 IMPLEMENTASI DAN PENGUJIAN
4.2 Pengujian
4.2.4 Pengujian Running Time Sistem
Hasil running time sistem dalam bentuk tabel dan grafik dapat dilihat pada tabel 4.34 dan gambar 4.13.
Tabel 4.74. Hasil Running Time Sistem
Pengujian Jumlah Alternatif Running Time (ms)
1 4 0,090122223
Si Ri Qi Jumlah Alternatif
4 4 0,074863434
5 5 0,14591217
6 5 0,081062317
7 5 0,082015991
8 6 0,075101852
9 6 0,087976456
10 6 0,091075897
11 7 0,108003616
12 7 0,12588501
13 8 0,107049942
14 8 0,105142593
15 9 0,110149384
16 9 0,155925751
17 9 0,128030777
18 10 0,107049942
19 10 0,113010406
20 11 0,161886215
21 11 0,112056732
22 12 0,123977661
23 12 0,149965286
24 13 0,128030777
25 14 0,146150589
26 15 0,16283989
27 16 0,164031982
28 17 0,178098679
29 19 0,176906586
30 20 0,180006027
Gambar 4.13. Grafik Running Time Sistem
Berdasarkan tabel 4.34 dan gambar 4.13 terlihat bahwa jumlah alternatif yang diproses oleh sistem memiliki pengaruh terhadap running time sistem. Jika jumlah alternatif yang diproses semakin banyak, maka running time sistem akan cenderung meningkat dan juga sebaliknya walaupun pengaruh tersebut tidak selalu konsisten. Pengaruh running time sistem juga tergantung pada spesifikasi dan kinerja pada perangkat yang digunakan.
0 5 10 15 20 25
0 0,04 0,08 0,12 0,16 0,2
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930
Jumlah Alternatif
Running Time(ms)
Pengujian
Running Time Sistem
Running Time (ms) Jumlah Alternatif
BAB 5
KESIMPULAN DAN SARAN
5.1 Kesimpulan
Kesimpulan yang dapat diambil berdasarkan penelitian yang mencakup analisis, perancangan, implementasi, dan pengujian sistem penetuan tempat evakuasi bencana gempa bumi dengan gabungan metode AHP dan VIKOR adalah sebagai berikut:
1. Berdasarkan hasil pengujian hipotesis dengan uji-t, diketahui bahwa persentase hipotesis nol (H0) diterima adalah sebesar 100% dari seluruh pengujian sebanyak 30 kali untuk masing-masing hasil uji-t utility measure (Si), regret measure (Ri) maupun nilai indeks VIKOR (Qi) yang berarti tidak terdapat perbedaan yang signifikan antara perhitungan dengan meggunakan aplikasi dan secara manual yang berarti bahwa penerapan gabungan metode AHP dan VIKOR dapat digunakan untuk menentukan rekomendasi tempat evakuasi bencana gempa yang paling optimal.
2. Jika jumlah alternatif yang diproses oleh sistem lebih banyak, maka running time akan cenderung meningkat. Sedangkan jika jumlah alternatif yang diproses lebih sedikit, maka running time akan cenderung menurun.
5.2 Saran
Saran untuk penelitian berikutnya adalah :
1. Sistem yang dibuat tidak memiliki fitur untuk menambah, mengupdate, dan menghapus terhadap data alternatif maupun kriteria sehingga diharapkan pada penelitian selanjutnya dapat mengembangkan sistem dengan fitur yang berkaitan terhadap pengelolaan data alternatif dan kriteria agar sistem menjadi lebih dinamis.
2. Untuk penelitian selanjutnya diharapkan sistem dapat dikembangkan sehingga dapat menilai pengaruh populasi, magnitudo, bencana sekunder, kondisi geografis, dan objek di sekitar terhadap alternatif dalam penentuan rekomendasi tempat evakuasi.
3. Untuk pengembangan selanjutnya diharapkan dapat menerapkan optimasi jalur evakuasi pada sistem.
4. Untuk kedepannya diharapkan untuk menggunakan wilayah studi kasus yang lebih luas terutama pada daerah yang rawan bencana gempa bumi.
5. Penelitian ini tidak melakukan perbandingan proses dengan metode lain sehingga kedepannya diharapkan dapat menerapkan metode lainnya sebagai pembanding dalam pengembangan sistem.
DAFTAR PUSTAKA
Bevans, Rebecca. (2020), An Introduction to T-Test.
https://www.scribbr.com/statistics/t-test/ (diakses tanggal 26 Desember 2020)
BNPB. 2017. Buku Pedoman Latihan Kesiapsiagaan Bencana. Membangun Kesadaran, Kewaspadaan dan Kesiapsiagaan Dalam Menghadapi Bencana.
Jakarta: Direktorat Kesiapsiagaan Badan Nasional Pencegahan dan Kesiapsiagaan Badan Nasional Penanggulangan Bencana.
Chamid, A. A., & Murti, A. C. (2017). Kombinasi Metode Ahp Dan Topsis Pada Sistem Pendukung Keputusan. Prosiding SNATIF, 115-119.
Chu, J. Y., & Su, Y. P. (2011). Comprehensive Evaluation Index System in The Application for Earthquake Emergency Shelter Site. In Advanced Materials Research (Vol. 156, pp. 79-83). Trans Tech Publications Ltd.
Dewi, L. C., Prihantono, J., Purbani, D., & Pradono, M. H. (2014). Respon Spektrum Desain Pada Lokasi Tempat Evakuasi Sementara Tsunami Di Kota Pariaman. Pusat Penelitian dan Pengembangan Sumberdaya Laut dan Pesisir Badan Penelitian dan Pengembangan Kelautan dan Perikanan Kementerian Kelautan dan Perikanan, 165.
Djalante, R., Matthias Garschagen, Frank Thomalla, & Rajib Shaw. (2017).
Introduction: Disaster Risk Reduction in Indonesia: Progress, Challenges, and Issues. Disaster Risk Reduction in Indonesia, pp 1-17.
Faisal, A. (2007). Estimasi Respon Tanah Sedang di Beberapa Lokasi di Kota Medan Akibat Skenario Terburuk Gempa Sumatera. Jurnal Teknik Sipil ITB, 14(1), 15-26.
Geng, S., Hou, H., & Yang, J. (2020). Optimization of Urban Emergency Refuge Location Based on the Needs of Disaster Victims. In LISS2019 (pp. 485-497). Springer, Singapore.
Iskandar, M., Henry, C. C., & Aulia, A. (2011). Perancangan Database Sistem Informasi Akuntans Menggunakan Kombinasi REA Model, ERD, dan Normalisasi Data. Bina Ekonomi, 15(2).
Kenton, Will. (2020). T-Test. https://www.investopedia.com/terms/t/t-test.asp (diakses tanggal 26 Desember 2020).
Kristanto, I. H. (1994). Konsep & Perancangan Database. Penerbit Andi.
Lengkong, S. P., Permanasari, A. E., & Fauziati, S. (2015). Implementasi Metode VIKOR untuk Seleksi Penerima Beasiswa. In Proc. 7 th Natl. Conf. Inf.
Technol. Electr. Eng (Vol. 33, pp. 107-112).
Mann, R. I., & Watson, H. J. (1984). A Contingency Model for User Involvement in DSS Development. MIS Quarterly, 27-38.
Natapraja, G.R. (2014). Pengaturan Sarana dan Prasarana pada Kebijakan Regrouping Sekolah di SD Negeri Umbulharjo 2 Cangringan Selatan.
Yogyakarta: Universitas Negeri Yogyakarta.
Nur, A. M. (2010). Gempa Bumi, Tsunami Dan Mitigasinya. Jurnal Geografi:
Media Informasi Pengembangan dan Profesi Kegeografian, 7(1).
ONU, EIRD, CECC, EU, & UNICEF. (2008). Albergues en Escuelas, ¿Cuándo?,
¿Cómo?, ¿Pór Que?.
Opricovic, S., & Tzeng, G. H. (2004). Compromise solution by MCDM methods:
A comparative analysis of VIKOR and TOPSIS. European journal of operational research, 156(2), 445-455.
Ouenniche, J., Bouslah, K., Perez-Gladish, B., & Xu, B. (2019). A new VIKOR-based in-sample-out-of-sample classifier with application in bankruptcy prediction. Annals of Operations Research, 1-18.
Parrangan, Y. J., dkk. (2018). The Implementation of VIKOR Method to Improve the Effectiveness of Sidi Learning Graduation. Int. J. Eng. Technol, 7(3.4).
Ren, Z., Xu, Z., & Wang, H. (2019). The Strategy Selection Problem on Artificial Intelligence with an Integrated VIKOR and AHP Method Under Probabilistic Dual Hesitant Fuzzy Information. IEEE Access, 7, 103979-103999.
Saaty, T. L. (1986). Axiomatic Foundation of the Analytic Hierarchy Process.
Management science, 32(7), 841-855.
Şentürk, E., & Erener, A. (2017). Determination of Temporary Shelter Areas in Natural Disasters by GIS: A Case Study, Gölcük/Turkey. International Journal of Engineering and Geosciences, 2(3), 84-90.
Shi, Y., Zhai, G., Xu, L., Zhu, Q., & Deng, J. (2019). Planning Emergency Shelters for Urban Disasters: A Multi-Level Location–Allocation Modeling Approach. Sustainability, 11(16), 4285.
Simon, H. A. (1960). The New Science of Management Decision.
Soltani, A., Ardalan, A., Boloorani, A. D., Haghdoost, A., & Hosseinzadeh-Attar, M. J. (2014). Site selection criteria for sheltering after earthquakes: A systematic review. PLoS currents, 6.
Soltani, A., Allan, A., & Heydari, M. (2019, July). A Two-Stage Process for Emergency Evacuation Planning: Shelter Assignment and Routing. In International Conference on Computers in Urban Planning and Urban Management (pp. 443-462). Springer, Cham.
Sugiyono, D. R. (2006). Statistika untuk penelitian. Bandung: CV. Alfabeta.
Suryani, & Hendriyadi. (2016). Metode Riset Kuantitatif: Teori dan Aplikasi pada Penelitian Bidang Manajemen dan Ekonomi Islam.
Suwardika, G., & Suniantara, I. K. P. (2018). Penerapan Metode VIKOR pada Pengambilan Keputusan Seleksi Calon Penerima Beasiswa Bidikmisi Universitas Terbuka. INTENSIF: Jurnal Ilmiah Penelitian dan Penerapan Teknologi Sistem Informasi, 2(1), 24-35.
Syaifullah. (2010). Pengenalan Metode AHP (Analytical Hierarchy Process).
Dokumen. syaifullah08.wordpress.com
Trivedi, A., & Singh, A. (2017). A Hybrid Multi-Objective Decision Model for Emergency Shelter Location-Relocation Projects Using Fuzzy Analytic Hierarchy Process and Goal Programming Approach. International Journal of Project Management, 35(5), 827-840.
Trivedi, A., & Singh, A. (2020). A Multi-Objective Approach for Locating Temporary Shelters Under Damage Uncertainty. International Journal of Operational Research, 38(1), 31-48.
Watson, H. J. (2018). Revisiting Ralph Sprague’s Framework for Developing Decision Support Systems. Communications of the Association for Information Systems, 42(1), 13.
Yuwono, B. (2015). Image Smoothing Menggunakan Mean Filtering, Median Filtering, Modus Filtering dan Gaussian Filtering. Telematika: Jurnal Informatika dan Teknologi Informasi, 7(1).
LAMPIRAN
Lampiran A: Listing Program
hasil.php
$result = query("SELECT * FROM tbl_alternatif WHERE ukuran>=$luas AND aksesParam>=$akses AND aksesInfraParam>=$infra AND
jarakBahaya>=$jrkBhy AND bahayaGeoParam>=$bhyGeo AND kemiringan<=$kemiringan AND jarakMedis<=$medis AND jarakKeamanan<=$keamanan");
} else{
$result = query("SELECT * FROM tbl_alternatif WHERE
subWilayahID=$wilayah AND ukuran>=$luas AND aksesParam>=$akses AND aksesInfraParam>=$infra AND jarakBahaya>=$jrkBhy AND
bahayaGeoParam>=$bhyGeo AND kemiringan<=$kemiringan AND jarakMedis<=$medis AND jarakKeamanan<=$keamanan");
}
$kriteria = query("SELECT * FROM tbl_kriteria");
$count = 0;
//pemasukan data dari table ke array
$i=0;
foreach ($result as $row) {
$idLok[$i]=$row["idLok"];
foreach ($kriteria as $rowK) {
$f[$j] = $rowK["tipeKriteria"];
$j++;
}
$time_start = microtime(true);
//---Proses AHP dan VIKOR dimulai //---Metode AHP
$k= [ [1,1,1,1/3,1/3,1/3,1,3],
[1,1,1,1,1,1,3,3],
[1,1,1,1,1/3,1,1,3],
if ($f[$i]=="benefit") {
if ($sMin-$sMax==0 || $rMin-$rMax==0) {
$skorQ[0]=0;
}
$kompromi = "Tidak ada alternatif yang sesuai kriteria yang diinput";
}
elseif ($count==1) {
$kompromi = "Alternatif ranking 1 adalah pilihan terbaik";
}
elseif ($sorted[1]["skorQ"]-$sorted[0]["skorQ"]>=$dq) {
if ( $sorted[0]["skorS"] == $sMax && $sorted[0]["skorR"] ==
$rMax) {
$kompromi = "Alternatif ranking 1 adalah pilihan terbaik";
} else{
$kompromi = "Alternatif ranking 1 dan 2 adalah pilihan terbaik";
} }
else{
for ($i=0; $i < $count ; $i++) {
if ($sorted[$i]["skorQ"]-$sorted[0]["skorQ"] < $dq) {
$m = $i;
} }
if ($m != 0) {
$kompromi = "Alternatif ranking 1 sampai ".($m+1)." adalah pilihan terbaik";
} }
//---Proses AHP dan VIKOR selesai
$time_end = microtime(true);
$execution_time = ($time_end - $time_start)*1000;
?>
Lampiran B: Curriculum Vitae Data Diri
Pendidikan Formal
Kemampuan
Pengalaman Organisasi
Pengalaman Kepanitiaan
Nama : Purwandita
Tempat, Tanggal lahir : Medan, 18 Juni 1998 Jenis Kelamin : Laki-laki
Agama : Islam
Kewarganegaraan : Indonesia
Alamat Sekarang : Jl. Anggaran VII No. 5 Marindal 1, Patumbak
Nomor HP : 085260044554
E-mail : [email protected]
2016-2021 : S-1 Ilmu Komputer, Universitas Sumatera Utara 2013-2016 : SMA Swasta Harapan Medan
2010-2013 : SMP Swasta Harapan 2 Medan 2004-2010 : SD Swasta Harapan 2 Medan
Bahasa Pemrograman : PHP, C++
DBMS : MySQL
Lainnya : HTML, CSS, Adobe Photoshop, Photopea, Adobe Illustrator, Adobe XD, Figma, Vegas Pro, Blender
2019-2020 : Core Team Member
(Developer Student Club Universitas Sumatera Utara) 2018-2020 : Anggota Departemen Dana dan Usaha
(Ikatan Mahasiswa S-1 Ilmu Komputer Universitas Sumatera Utara)
2018 : Anggota Bidang Publikasi, Dekorasi dan Dokumentasi
Pengalaman Kerja
(Penyambutan Mahasiswa Baru 2018 Fakultas Ilmu Komputer dan Teknologi Informasi Universitas Sumatera Utara)
2018 : Anggota Bidang Publikasi, Dekorasi dan Dokumentasi (Ilmu Komputer Goes to School Ikatan Mahasiswa S-1 Ilmu Komputer Universitas Sumatera Utara
2017 : Koordinator Bidang Publikasi, Dekorasi dan Dokumentasi
(Mubes UKMI Al-Khuwarizmi 2017)
2019 : Praktik Kerja Lapangan di PT. Harian Tribun Medan