DEVELOPMENT

ASSESSMENT UNIT

Tuesday, 16 February 2021

T O ST R IV E F O R B E T T ER T H IN G S

(2)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ITEM SUBJECT PAGE

ITEM-1 CONFIRMATION OF MINUTES 3

ITEM-2 DA 395/2021/LD - TWO STOREY DWELLING AND RETAINING WALLS - LOT 60 DP 270885, NO. 6 BIMANGA PLACE, NORTH KELLYVILLE

5

(3)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

MINUTES OF THE DEVELOPMENT ASSESSMENT UNIT MEETING HELD AT THE HILLS SHIRE COUNCIL ON TUESDAY, 9 FEBRUARY 2021

PRESENT

Cameron McKenzie Group Manager – Development & Compliance (Chair) Paul Osborne Manager – Development Assessment

Ben Hawkins Manager – Subdivision & Development Certification Angelo Berios Manager – Environment & Health

Craig Woods Manager – Regulatory Services Nicholas Carlton Manager – Forward Planning Kristine McKenzie Principal Executive Planner APOLOGIES

Nil

TIME OF COMMENCEMENT 8:30am

TIME OF COMPLETION 8:39am

ITEM-1 CONFIRMATION OF MINUTES RESOLUTION

The Minutes of the Development Assessment Unit Meeting of Council held on 2 February 2021 be confirmed.

ITEM-2 DA 1434/2020/ZD - INTEGRATED HOUSING DEVELOPMENT AND SUBDIVISION CREATING ONE RURAL RESIDENTIAL LOT, FIVE COMMUNITY TITLE RURAL RESIDENTIAL LOTS AND ONE ASSOCIATION LOT (RURAL CLUSTER) OVER TWO STAGES INCLUDING A DWELLING HOUSE ON EACH COMMUNITY TITLE RURAL RESIDENTIAL LOT IN STAGE TWO – 62 OLD POST OFFICE ROAD, CATTAI NSW 2756

PUBLIC NOTIFICATION OF THE DETERMINATION PURSUANT TO ITEM 20(2)(c) AND (d) OF SCHEDULE 1 OF THE ENVIRONMENTAL PLANNING & ASSESSMENT ACT, 1979

DECISION

The Development Application be approved subject to conditions outlined in the report.

(4)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

REASONS FOR THE DECISION

• Section 4.15 (EP&A Act) – Satisfactory.

• The Hills LEP 2019 – Satisfactory.

• SEPP Infrastructure – Satisfactory.

• State Environmental Planning Policy No 55—Remediation of Land – Satisfactory.

• DCP Part B Section 1 – Rural – Variation, see report.

HOW COMMUNITY VIEWS WERE TAKEN INTO ACCOUNT IN MAKING THE DECISION The Development Application was notified on two occasions. Three submissions were received during the first notification period and two submissions were received during the second notification period. The issues raised in the submissions have been addressed in the report and do not warrant refusal of the application.

(5)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ITEM-2 DA 395/2021/LD - TWO STOREY DWELLING AND RETAINING WALLS - LOT 60 DP 270885, NO. 6 BIMANGA PLACE, NORTH KELLYVILLE

THEME: Shaping Growth

OUTCOME:

5 Well planned and liveable neighbourhoods that meets growth targets and maintains amenity.

STRATEGY:

5.1 The Shire’s natural and built environment is well managed through strategic land use and urban planning that reflects our values and aspirations.

MEETING DATE: 16 FEBRUARY 2021

DEVELOPMENT ASSESSMENT UNIT

AUTHOR: SENIOR BUILDING SURVEYOR

SEAN RYAN

RESPONSIBLE OFFICER: PRINCIPAL COORDINATOR KRISTINE MCKENZIE

Applicant Wisdom Homes

Owner Suresh Kumar

Notification 1st Notification : 14 days

2nd Notification: Forty six days (over the Christmas/New Year period)

Number Advised 1st Notification: Five 2nd Notification: Five Number of Submissions 1st Notification: Two

2nd Notification: Nil Zoning E4 Environmental Living

Site Area 612.4m2

List of all relevant s4.15(1)(a) matters

Section 4.15 (EP&A Act) – Satisfactory

SEPP (Sydney Region Growth Centres) – Satisfactory SEPP (BASIX) – Satisfactory

North Kellyville Precinct Development Control Plan 2018 – Variations required, see report

Political Donation None Disclosed

Reasons for Referral to DAU 1. Variations to DCP 2. Submissions received.

Recommendation Approval subject to conditions

(6)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

EXECUTIVE SUMMARY

The Development Application is for the construction of a two storey dwelling and retaining walls.

The proposal is satisfactory in regards to the requirements of the North Kellyville DCP with the exception of cut and fill. The DCP limits cut and fill to 500mm. The development proposes a maximum cut of 1.115m and maximum fill of 675mm. The extent of the works is considered reasonable given the sloping nature of the site and will not result in unreasonable amenity impacts to the adjoining properties.

The application was notified on two occasions, with two submissions being received during the first notification period. The issues raised in the submissions relate to the irregular front setback of the development compared to the existing streetscape, potential impacts as a result of the overshadowing from the development and visual privacy concerns. The proposal has been amended in regard to the front setback and will provide an appropriate streetscape outcome. The proposed dwelling will not result in unreasonable shadow impacts or loss of privacy.

There were no submissions received during the second notification period The application is recommended for approval subject to conditions.

BACKGROUND

The Development Application was lodged on 22 September 2020. Additional information was requested from the applicant on 16 October 2020 to address works within the easement, plan inconsistencies and the issues raised in the submissions with respect to the front setback, privacy and overshadowing.

The applicant submitted amended plans on 17 November 2020 which increased the front setback, and addressed other matters as outlined in Council’s letter.

On 19 November 2020, copies of the amended plans were sent informally to both objectors, with one the two parties raising issues that the plans were not formally notified. The application was formally renotified for a second time on the 18 December 2020. No submissions were received.

PROPOSAL

The Development Application is for the construction of a two storey dwelling and retaining walls. The dwelling will contain five bedrooms and attached garage.

The proposed dwelling has incorporated a modern facade using a combination of materials including rendered brickwork, cladding and skillion roof construction.

The external façade of the proposal has a contrasting colour scheme with light white render walls, silver metallic cladding, yellow-green colorbond roof and grey tone rear lower pitch tiled roof.

(7)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ISSUES FOR CONSIDERATION

1. Compliance with the North Kellyville Precinct Development Control Plan 2018 The proposal has been assessed against the provisions of The North Kellyville Development Precinct Control Plan. Given the proposal is an under size lot within the E4 Environmental Living zoned land, the DCP includes provisions to allow use of the relevant DCP requirements for lot with widths 9 ≤15m in the assessment of the application.

The proposed development achieves compliance with the relevant requirements of the above Development Controls with the exception of the following:

DEVELOPMENT CONTROL

DCP

REQUIREMENTS

PROPOSED DEVELOPMENT

COMPLIANCE Cut and fill Excavation shall not

exceed 500mm or fill exceed 500mm from the present surface level of the land.

Maximum cut 1.115m.

Maximum fill 675mm.

No, however the extent of earthworks

is considered satisfactory given the

slope of the site and that the extent of works do not impact on the amenity of the adjoining properties.

a) Cut and Fill

The DCP requires a site responsive design and to minimise the extent of cut and fill within residential allotments by limiting cut and fill to 500mm.

The proposal includes a maximum cut of 805mm for the building platform and external cut of 1.115m to the north eastern side of the dwelling to facilitate side access, with a maximum fill height of 675mm for the proposed dwelling. The cut is associated with the area adjacent to the eastern side of the allotment and fill to the western side of the proposal to achieve a level building platform and to provide a usable means for access and external amenity.

Attachments 3, 5 and 6 show the extent of cut and fill.

The applicant has provided the following justification for the variation.

The topography of the site is such that there is a diagonal cross fall of approximately 2.0m across the building platform. As such, the northern eastern side boundary has proposed a maximum excavation height of 1.115m to achieve a level building platform and usable area.

The split level design for the dwelling has minimised the required cut and fill with an internal step down of 680mm from the front to the rear of the dwelling.

The proposal has a maximum cut within the building footprint of 805mm and maximum fill height of 675mm.

The finished ground floor level complies with the development control plan requirement of being no higher than 1.0m above existing ground level (maximum 955mm).

(8)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

The site has a 1.4m cross fall, running east to west across the width of the subject lot.

Comment:

The relevant objectives of this clause of the DCP are:

1. To minimise the extent of cut and fill within residential allotments.

2. To protect and enhance the aesthetic quality of the area by controlling the form, bulk and scale of land forming operations.

3. To ensure that filling material is satisfactory and does not adversely affect the fertility or salinity of the soil, or the quality of surface water or groundwater.

4. To ensure that the amenity of adjoining residents is not adversely affected by any land forming operation;

The dwelling has incorporated a split level design to account for the topography and constraints of the subject allotment which reduces the extent of required earthworks and bulk of the development.

The proposal has minimised earthworks by using the excavation material throughout the site as a fill material, both behind the ground floor slab deepened edge beams and for site levelling.

Despite the minor departure to the fill and cut provisions, the proposal does not unreasonably impact on the amenity to the existing adjoining dwellings.

Limited fill has been provided along the side boundaries and is generally contained within the building envelope via deepened edge beams. Where fill is proposed externally from the building platform, the minimisation and location of the fill satisfies and meets the DCP controls.

The proposed variation to the cut and fill control is considered to be supportable in this instance.

3. Issues Raised in Submissions

The proposal was notified on two occasions to the adjoining property owners. Two submissions were received during the first notification period. There were no submissions were received during the second notification period.

The issues raised in the submissions are summarised below.

ISSUE/OBJECTION COMMENT

Front setback irregular and not in keeping with the existing streetscape.

The DCP requires a minimum 4.5m setback. The proposal originally provided a front setback of 4.98m. In response to the concerns, the applicant submitted amended plans to increase the setback to 5.93m to be more in keeping with the existing streetscape by repositioning the dwelling further back on the allotment.

(9)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ISSUE/OBJECTION COMMENT

Overshadowing and loss of sunlight. The shadow diagrams have been reviewed and they are compliant with the North Kellyville Growth Centre DCP 2018 controls, which state that at least 50% of the area of the required principal private open space (of both the proposed development and adjoining properties) should receive at least 3 hours of sunlight between 9am and 3pm at the winter solstice (21 June).

Privacy to rear yard and swimming pool area impacted by rear upper right side window (Bed 3 window).

The upper floor window on the southern (rear) elevation is considered satisfactory given the window has only oblique views to the rear private open space of the two adjoining properties to the east and west. There are no direct sightlines from the rear window to a habitable room window in an adjoining dwelling. It is also noted that the window is to a bedroom which is a secondary living area.

Cut and fill along shared boundaries A maximum cut of 1.115m is proposed along the eastern side boundary and filling of up to 675mm along the western side boundary.

All earthworks are proposed to be retained within the subject site, and there will be minimal impacts to the adjoining properties in this respect. The additional excavation works will allow for a reduced building height, less shadowing and bulk overall with the additional fill contained and concealed within deepened edge beams.

CONCLUSION

The Development Application has been assessed against the relevant heads of consideration under Section 4.15 of the Environmental Planning and Assessment Act, 1979, State Environmental Planning Policy (Sydney Region Growth Centres) 2006 and the North Kellyville Precinct Development Control Plan 2018 and is considered satisfactory. The issues raised in the submissions have been addressed in the report and do not warrant refusal of the application.

Approval is recommended subject to conditions.

IMPACTS Financial

This matter has no direct financial impact upon Council's adopted budget or forward estimates.

The Hills Future Community Strategic Plan

The proposed development is consistent with the planning principles, vision and objectives outlined within “Hills 2026 – Looking Towards the Future” as the proposed development provides for satisfactory urban growth without adverse environmental or social amenity impacts and ensures a consistent built form is provided with respect to the streetscape and general locality.

RECOMMENDATION

Approval subject to conditions.

(10)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

GENERAL MATTERS

1. Development in Accordance with Submitted Plans

The development being carried out in accordance with the following approved plans and details, stamped and returned with this consent except where amended by other conditions of consent.

REFERENCED PLANS AND DOCUMENTS DRAWING

NO.

DESCRIPTION SHEET REVISION DATE

190154 Cover Sheet 1 B-18 16/12/2020

190154 Site Plan 2 B-18 16/12/2020

190154 Benching Plan 3 B-18 16/12/2020

190154 Stormwater Concept Plan 4 B-18 16/12/2020

190154 Ground Floor Plans 5 B-18 16/12/2020

190154 First Floor Plans 6 B-18 16/12/2020

190154 North Front & East left Elevations

7 B-18 16/12/2020

190154 South Rear & West Right Elevations

8 B-18 16/12/2020

190154 Section A-A & B-B 9 B-18 16/12/2020

190154 Window & Door Schedules 11 B-18 16/12/2020

190154 Site Analysis Plan 12 B-18 16/12/2020

190154 Shadow Projections 21st June

13 B-18 16/12/2020

190154 Landscape Plan 1 B4 09/12/20

190154 Landscape Specification 2 B4 09/12/20

190154 Landscape Elevations 3 B4 09/12/20

190154 Landscape Details 4 B4 09/12/20

190154 Landscape Details 5 B4 09/12/20

No work (including excavation, land fill or earth reshaping) shall be undertaken prior to the issue of the Construction Certificate, where a Construction Certificate is required

2. Bushfire Requirements – Residential i) Asset Protection Zones

At the commencement of building works and in perpetuity the entire property shall be managed as an Inner Protection Area (IPA) as outlined within section 3.2 and Appendix 4 of Planning for Bush Fire Protection 2019 and the NSW Rural Fire Service's document Standards for asset protection zones.

The Inner Protection Area shall comprise of the following:

● minimal fine fuel at ground level;

● vegetation that does not provide a continuous path to building/s for the transfer of fire;

(11)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

● shrubs and trees that do not form a continuous canopy and vegetation is planted/cleared into clumps rather than continuous rows;

● species that retain dead material or deposit excessive quantities of ground fuel are avoided;

● shrubs and trees are pruned or removed so they do not touch or overhang the building/s; and

● vegetation is located far enough away from the building/s so that plants will not ignite the building/s by direct flame contact or radiant heat emission.

ii) Water Supply and Utilities

a) Water, electricity and gas are to comply with section 7.4 of Planning for Bush Fire Protection 2019.

b) Where the rear or most distant part of the building is greater than 70 metres from the nearest hydrant, a new hydrant is required to be installed as per Australian Standard AS 2419.1– 2005 'Fire Hydrant Installations'. Locations of fire hydrants are to be delineated by blue pavement markers offset 150mm from the centre of the road. The direction of offset shall indicate on which side of the road the hydrant is located.

iii) Design and Construction

a) New construction to the entire roof, north, west and south shall elevations shall comply with section 3 and section 6 (BAL 19) Australian Standard AS3959 ''Construction of buildings in bush fire-prone areas' and the additional construction requirements contained within Sections 7.5, 7.5.1, 7.5.2, 7.5.4 (where applicable), and 7.6 (where applicable) of Planning for Bush Fire Protection 2019. Any retaining structures or free- standing walls shall also meet the requirements of Section 7.6.

b) New construction to the east elevations shall comply with section 3 and section 5 (BAL 12.5) Australian Standard AS3959 ''Construction of buildings in bush fire-prone areas' and the additional construction requirements contained within Sections 7.5, 7.5.1, 7.5.2, 7.5.4 (where applicable), and 7.6 (where applicable) of Planning for Bush Fire Protection 2019.

c) All Class 10a structures as defined per the ''Building Code of Australia'' attached to or within 6 metres of the habitable building shall comply with section 6 (BAL 19) Australian Standard AS3959 ''Construction of buildings in bush fire-prone areas' and the additional construction requirements contained within Sections 7.5, 7.5.1, 7.5.2, 7.5.4 (where applicable), and 7.6 (where applicable) of Planning for Bush Fire Protection 2019.

d) Where fitted, leaf protection to stop the accumulation of debris to new roofing valleys and guttering shall be non-combustible.

iv) Landscaping

Landscaping to the site is to comply with the principles of Appendix 4 of Planning for Bush Fire Protection 2019. In this regard the following landscaping principles are to be incorporated into the development:

● Grassed areas/mowed lawns/ or ground cover plantings being provided in close proximity to the building;

● Restrict planting in the immediate vicinity of the building which may over time and if not properly maintained come in contact with the building;

● Planting should not provide a continuous canopy to the building (i.e. trees or shrubs should be isolated or located in small clusters);

(12)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

● When considering landscape species consideration needs to be given to estimated size of the plant at maturity;

● Avoid species with rough fibrous bark or which retain/shed bark in long strips or retain dead material in their canopies;

● Use smooth bark species of trees species which generally do not carry a fire up the bark into the crown;

● Avoid planting of deciduous species that may increase fuel at surface/ ground level (i.e. leaf litter);

● Avoid climbing species to walls and pergolas;

● Locate combustible materials such as woodchips/mulch, flammable fuel stores away from the building;

● Use of low flammability vegetation species.

3. Construction Certificate

Prior to construction of the approved development, it is necessary to obtain a Construction Certificate. A Construction Certificate may be issued by Council or a Registered Certifier.

Plans submitted with the Construction Certificate are to be amended to incorporate the conditions of the Development Consent.

4. Building Work to be in Accordance with BCA

All building work must be carried out in accordance with the provisions of the Building Code of Australia.

5. Adherence to Waste Management Plan

All requirements of the Waste Management Plan submitted as part of the Development Application must be implemented except where contrary to other conditions of consent. The information submitted regarding construction and demolition wastes can change provided that the same or a greater level of reuse and recycling is achieved as detailed in the plan.

Any material moved offsite is to be transported in accordance with the requirements of the Protection of the Environment Operations Act 1997 and only to a place that can lawfully be used as a waste facility. Receipts of all waste/recycling tipping must be kept onsite at all times and produced in a legible form to any authorised officer of the Council who asks to see them.

Transporters of asbestos waste (of any load over 100kg of asbestos waste or 10 square metres or more of asbestos sheeting) must provide information to the NSW EPA regarding the movement of waste using their WasteLocate online reporting tool

www.wastelocate.epa.nsw.gov.au.

6. Management of Construction and/or Demolition Waste

Waste materials must be appropriately stored and secured within a designated waste area onsite at all times, prior to its reuse onsite or being sent offsite. This includes waste materials such as paper and containers which must not litter the site or leave the site onto neighbouring public or private property. A separate dedicated bin must be provided onsite by the builder for the disposal of waste materials such as paper, containers and food scraps generated by all workers. Building waste containers are not permitted to be placed on public property at any time unless a separate application is approved by Council to locate a building waste container in a public place.

Any material moved offsite is to be transported in accordance with the requirements of the Protection of the Environment Operations Act 1997 and only to a place that can lawfully be used as a waste facility. The separation and recycling of the following waste materials is required: metals, timber, masonry products and clean waste plasterboard. This can be achieved by source separation onsite, that is, a bin for metal waste, a bin for timber, a bin for bricks and so on. Alternatively, mixed waste may be stored in one or more bins and sent to a waste contractor or transfer/sorting station that will sort the waste on their premises for

(13)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

recycling. Receipts of all waste/recycling tipping must be kept onsite at all times and produced in a legible form to any authorised officer of the Council who asks to see them.

Transporters of asbestos waste (of any load over 100kg of asbestos waste or 10 square metres or more of asbestos sheeting) must provide information to the NSW EPA regarding the movement of waste using their WasteLocate online reporting tool www.wastelocate.epa.nsw.gov.au.

7. Commencement of Domestic Waste Service

A domestic waste service must be commenced with Council and its Contractor. The service must be arranged no earlier than two days prior to occupancy and no later than seven days after occupancy of the development. All requirements of Council’s domestic waste management service must be complied with at all times. Contact Council’s Resource Recovery Team on (02) 9843 0310 to commence a domestic waste service.

8. Provision of Domestic Waste Storage Area(s)

A bin storage area sized for a minimum of 3 x 240 litre bins must be provided within the lot boundaries. Two areas are required where there is a secondary dwelling. The area(s) must be screened from view from public land and neighbouring residential property and are to be located behind the building line in the rear courtyard, side access path or a dedicated area in the garage. A flat or ramped bin transfer path must be provided leading directly from the bin storage area(s) to the approved bin collection point along the kerbside. The path must have a minimum clear floor width of 820mm, must not exceed a grade of 7% (1:14), be free of steps and must be external to the dwelling (excludes garage). An associated clear nature strip length of 1.66m must be dedicated along the kerbside for each dwelling for bin presentation. The dimensions of a 240 litre bin are 735mm deep, 580mm wide and 1080mm high.

9. Air Conditioner Location

The air-conditioning unit location is to be as shown on the approved plans or is to comply with the criteria of exempt development as outlined in the SEPP - Exempt & Complying Development Codes 2008.

You are reminded that the air conditioning must be designed so as not to operate:

(i) between 7am and 10pm — at a noise level that exceeds 5 dB(A) above the ambient background noise level measured at any property boundary, or

(ii) Between 10pm and 7am — at a noise level that is audible in habitable rooms of adjoining residences.

10. Separate Construction Certificate Required for Retaining Walls

A separate Construction Certificate Application is required for all retaining walls shown on the approved plans.

11. Surface Drainage

Stormwater, surface water or seepage from the development shall be collected by a subsurface/surface drainage system which is to be connected to a suitable system of disposal.

The development, either during construction or upon completion, must not impede or divert natural surface water and the system of drainage must not cause a nuisance to adjoining properties.

(14)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

12. External Finishes

External finishes and colours shall be in accordance with the details submitted with the development application and approved with this consent.

13. Rain Garden and Rainwater Reuse Tank

A rain garden and rainwater reuse tank is required to be constructed in accordance with the following documents and requirements:

• Council’s Typical Rain Garden Plan and Details (Standard Drawing 44)

• Council’s Rain Garden Installation Guide and Specifications

The area/ volume of the rain garden must comply with the restriction that appears on the title of the subject site.

PRIOR TO THE ISSUE OF A CONSTRUCTION CERTIFICATE 14. Rain Garden and Rainwater Reuse Tank

The Construction Certificate issued for this dwelling must include the rain garden and rainwater reuse tank conditioned earlier in this consent.

PRIOR TO WORK COMMENCING ON THE SITE

15. Details and Signage - Principal Contractor and Principal Certifier Details

Prior to work commencing, submit to the Principal Certifier notification in writing of the principal contractor’s (builder) name, address, phone number, email address and licence number.

No later than two days before work commences, Council is to have received written details of the Principal Certifier in accordance with Clause 103 of the Environmental Planning and Assessment Regulations 2000.

Signage

A sign is to be erected in accordance with Clause 98A(2) of the Environmental Planning and Assessment Regulations 2000. The sign is to be erected in a prominent position and show – a) the name, address and phone number of the Principal Certifier for the work,

b) the name and out of working hours contact phone number of the principal contractor/person responsible for the work.

The sign must state that unauthorised entry to the work site is prohibited.

16. Management of Building Sites

The erection of suitable fencing or other measures to restrict public access to the site and building works, materials or equipment when the building work is not in progress or the site is otherwise unoccupied.

The erection of a sign, in a prominent position, stating that unauthorised entry to the site is not permitted and giving an after hours contact name and telephone number.

17. Consultation with Service Authorities

Applicants are advised to consult with Telstra, NBN Co and Australia Post regarding the installation of telephone conduits, broadband connections and letterboxes as required.

Unimpeded access must be available to the electricity supply authority, during and after building, to the electricity meters and metering equipment.

(15)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

18. Approved Temporary Closet

An approved temporary closet connected to the sewers of Sydney Water, or alternatively an approved chemical closet is to be provided on the land, prior to building operations being commenced.

19. Erosion and Sedimentation Controls

Erosion and sedimentation controls shall be in place prior to the commencement of site works; and maintained throughout construction activities until the site is landscaped and/or suitably revegetated. The controls shall be in accordance with the details approved by Council and/or as directed by Council Officers. These requirements shall be in accordance with Managing Urban Stormwater – Soils and Construction produced by the NSW Department of Housing (Blue Book).

20. Stabilised Access Point

A stabilised all weather access point is to be provided prior to commencement of site works, and maintained throughout construction activities until the site is stabilised.

The controls shall be in accordance with the requirements with the details approved by Council and/or as directed by Council Officers. These requirements shall be in accordance with Managing Urban Stormwater – Soils and Construction produced by the NSW Department of Housing (Blue Book).

21. Sydney Water Building Plan Approval

A building plan approval must be obtained from Sydney Water Tap in™ to ensure that the approved development will not impact Sydney Water infrastructure.

A copy of the building plan approval and receipt from Sydney Water Tap in™ (if not already provided) must be submitted to the Principal Certifier upon request prior to works commencing.

Please refer to the website http://www.sydneywater.com.au/tapin/index.htm, Sydney Water Tap in™, or telephone 13 20 92.

DURING CONSTRUCTION 22. Hours of Work

Work on the project to be limited to the following hours: - Monday to Saturday - 7.00am to 5.00pm;

No work to be carried out on Sunday or Public Holidays.

The builder/contractor shall be responsible to instruct and control sub-contractors regarding the hours of work.

23. Survey Report and Site Sketch

A survey report and site sketch signed and dated (including contact details) by the registered land surveyor may be requested by the Principal Certifier during construction. The survey shall confirm the location of the building/structure in relation to all boundaries and/or levels.

As of September 2018 the validity of surveys has been restricted by legislation to 2 years after issue.

24. Compliance with BASIX Certificate

Under clause 97A of the Environmental Planning and Assessment Regulation 2000, it is a condition of this Development Consent that all commitments listed in BASIX Certificate No.1121962S is to be complied with. Any subsequent version of this BASIX Certificate will supersede all previous versions of the certificate.

(16)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

25. Deepened Edge Beam

All fill is to be contained within the deepened edge beam as shown on the approved plans.

The deepened edge beam is to extend to natural ground level. No fill is to be placed to the exterior of the building unless otherwise shown on the approved plans.

26. Subsoil Drainage

The retaining walls are to be provided with an appropriate system of subsoil drainage which is to drain via gravity to a suitable system of disposal. The system of subsoil drainage is not to cause nuisance or impact on the amenity of the adjoining allotments.

27. Critical Stage Inspections and Inspections Nominated by the Principal Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires critical stage inspections to be carried out for building work as prescribed by Clause 162A of the Environmental Planning and Assessment Regulation 2000. Prior to allowing building works to commence the Principal Certifier must give notice of these inspections pursuant to Clause 103A of the Environmental Planning and Assessment Regulation 2000.

An Occupation Certificate cannot be issued and the building may not be able to be used or occupied where any mandatory critical stage inspection or other inspection required by the Principal Certifier is not carried out. Inspections can only be carried out by the Principal Certifier unless agreed to by the Principal Certifier beforehand and subject to that person being a registered certifier.

28. Roof Water Drainage

Gutter and downpipe and/or rainwater tank overflow, to be provided and connected to an approved lawful discharge point (ie. kerb, inter-allotment drainage easement or OSD) upon installation of roof coverings.

29. Rain Garden – Construction Checklist Compliance

During construction of the rain garden Council’s Rain Garden Installation Guide and Specifications must be followed, a copy of which is available on Council’s website.

The Construction Checklist (Appendix A) included with the installation guide/ specifications must be completed by the person constructing the rain garden and a copy submitted to Council.

30. Dust Control

The emission of dust must be controlled to minimise nuisance to the occupants of the surrounding premises. In the absence of any alternative measures, the following measures must be taken to control the emission of dust:

• Dust screens must be erected around the perimeter of the site and be kept in good repair for the duration of the construction work;

• All dusty surfaces must be wet down and suppressed by means of a fine water spray.

Water used for dust suppression must not cause water pollution; and

• All stockpiles of materials that are likely to generate dust must be kept damp or covered.

(17)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

PRIOR TO ISSUE OF AN OCCUPATION CERTIFICATE 31. Retaining Walls

All retaining walls shown on the approved plans shall be completed prior to the issue of a

“Whole” Occupation Certificate.

32. Rain Garden and Rainwater Reuse Tank

An Occupation Certificate must not be issued prior to the completion of the rain garden and rainwater reuse tank required by this consent. A copy of the completed Construction Checklist (Appendix A) included with Council’s Rain Garden Installation Guide and Specifications must be submitted to Council.

(18)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENTS 1. Locality Plan 2. Aerial Photograph 3. Site Plan

4. Elevations (North and South) 5. Elevation (West)

6. Elevation (East) 7. Shadow Diagrams

(19)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 1 – LOCALITY PLAN

(20)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 2 – AERIAL PHOTOGRAPH

(21)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 3 – SITE PLAN

(22)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 4 – ELEVATIONS (NORTH AND SOUTH)

(23)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 5 – ELEVATION (WEST)

(24)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 6 – ELEVATION (EAST)

(25)

DEVELOPMENT ASSESSMENT UNIT MEETING 16 FEBRUARY, 2021

ATTACHMENT 7 – SHADOW DIAGRAMS