Development Application Checklist

Residential Development A New dwelling single occupation

DAChecklist01.docx / Development Assessment/ Mar-23/ Page 1 of 3

01

The following checklist will help you prepare your application. Please confirm that your application contains all the information listed within the table below by placing a crossing in the appropriate Yes/No/NA column titled

‘Applicant’. Incomplete applications will not proceed past the pre-lodgement stage on the NSW Planning Portal.

Council reserves the right to request further information, if necessary, upon formal assessment of the proposal.

Item Guide See DA Applicant

ALWAYS REQUIRED Y N NA

Owners Consent - signed form required. 5.6

Genuine estimate of demolition/construction cost of works. - Plans

a) Site Plan to scale of 1:100 or 1:200 (for rural allotments scale may be reduced). 3.3 b) Survey Site Plan with Contours from a Registered Surveyor with specific site

levels in the location of the proposed works depicting property boundaries. If your property falls within a rural zoning please call Council to see if this survey is necessary. However, any works within 1.5m of a residential boundary or 10m of a rural boundary or a structure on sloping land will require a site survey upfront.

-

c) Floor Plans to scale of 1:100 or 1:200. 3.3

d) Site Analysis Plan(s) to scale of 1:100 or 1:200 (existing condition and design

response). Refer appendix 7.2 Tweed DCP A1 - Part A. 3.2

e) Elevations to scale of 1:100 or 1:200. 3.3

f) Sections to scale of 1:50, 1:100 or 1:200. 3.3

g) Landscape Plans to scale of 1:100 or 1:200 (when vegetation is proposed for

removal). 3.4

h) Demolition Work Plan (where demolition of structures are proposed). A.32 i) Shadow Diagram to scale of 1:100 or 1:200 (when dwellings greater than one

storey where the proposal may result in adverse overshadowing to adjacent properties OR for any dwelling where the proposed structure will cast a shadow onto any adjoining foreshore land).

3.7

Statement of Environmental Effects - refer to DA preparation guide. 4

Response to Tweed DCP Section A1 Part A. -

BASIX Certificate (http://www.basix.nsw.gov.au)

Note: BASIX certificates are only valid for 3 months from the date of issue. A.7 Detail to address DCP A15 - Waste Minimisation and Management. A.4

REQUIRED IN CERTAIN CIRCUMSTANCES Y N NA

Written request to vary a development standard under Clause 4.6 of the relevant Tweed LEP (or Clause 59 of TLEP 2000) demonstrating -

(a) compliance with the development standard is unreasonable or unnecessary in the circumstances of the case, and

(b) there are sufficient environmental planning grounds to justify contravening the development standard.

When: a variation to the development standards is proposed e.g. to the minimum lot size, building height or floor space ratio.

4.14

DA Guide LEP & DCP Save Reset

(2)

Development Application Checklist 01

Residential Development A New dwelling single occupation

Page 2 of 3 DAChecklist01.docx / Development Assessment / Mar-23

Item Guide See DA Applicant

REQUIRED IN CERTAIN CIRCUMSTANCES Y N NA

Advertising and Notification - see Community Engagement and Participation Plan. - DCP Part A1 - Variation Statement(s) and supporting diagrams

When: a variation is sought to controls. -

Swimming Pools if the application includes a swimming pool details of the pool location and a separate BASIX certificate is to be provided for pools with a capacity greater than

40,000 litres. -

Geo-Technical Report

When: construction/bulk excavation works are proposed on or adjacent to a boundary or

the site/area has a history of land slip instability. A.13

Contamination Reports

When: land is contaminated or potentially contaminated. A.15 Acid Sulfate Soils Management Plan

When: land is identified as being within classes 1-5 on the Acid Sulfate Soils Map. A.16 Flood Impact Assessment

When: the land is identified as being located within flood liable or located within a known

flood prone area. -

On-site Sewage Management System Management Plan

When: where effluent disposal is to be undertaken on the site. A.23 Noise Attenuation Report

When: a) land is located within the Aircraft Noise Exposure Forecast (ANEF) contour plan,

b) Dwellings are proposed within 30 metres to a classified road

c) Dwellings proposed within 32 metres of the centre line of road at Casuarina Way, “Salt” Kingscliff.

A.22

A.28 Coastal Hazard Erosion Assessment

When: where land adjoins the coastal foreshore and is within the maximum 100 year

hazard line. A.31

Casuarina Beach 7(f) zone Landscape Plan

When: where land adjoins the foreshore areas within the Casuarina locality and part of the

privately owned land zoned 7(f). A.29

Architectural Review Committee Consent

When: where requirement is specified within the 88B Instrument applicable to the land. - Heritage Impact Assessment

When: proposal is within a Heritage Conservation Area or is associated with a heritage

item. 4.9

Aboriginal Heritage – Cultural Heritage Assessment Report

When: a proposal is on land of known or potential Aboriginal heritage significance. 4.9 Bushfire Management Assessment Report

When: land is identified as being bushfire prone. If clearing is required for Asset

Protection Zones also refer to the Biodiversity Conservation Act 2016 requirements. A.26

(3)

Development Application Checklist 01

Residential Development A New dwelling single occupation

Page 3 of 3 DAChecklist01.docx / Development Assessment / Mar-23

Item Guide See DA Applicant

REQUIRED IN CERTAIN CIRCUMSTANCES Y N NA

Biodiversity Conservation Act 2016 requirements

When: if a proposal includes clearing of native vegetation or prescribed impacts on biodiversity. The following information must be provided with an application at a minimum:

- Printout of the Biodiversity Values Map and Threshold Tool signed and dated the day of or day before submission of application; and

- Access NSW BioNet (free online tool) to see if any threatened species have been recorded on the lot and provide a comment in the application; and

- Plan showing the clearing threshold calculations including incidental required clearing e.g. driveways, Land Application Areas (LAA) and Asset Protection Zones (APZ).

A Biodiversity Development Assessment Report (BDAR) may be required in certain circumstances.

-

Koala Habitat Assessment

When: a proposal is located within a Koala Management Precinct as identified in the Tweed Coast Comprehensive Koala Plan of Management.

4.15 Statement of Political Donations and Gifts (only if applicable). 5.9

OTHER APPLICATIONS THAT CAN BE SUBMITTED WITH YOUR APPLICATION Y N NA Construction Certificate - prior to commencement of any building work:

- Structural details ie: footing and floor slab design framing and bracing details addressing relevant Building Code of Australia requirements.

- Specifications of the work.

5.2

Long Service Levy

When: any construction work valued at $250,000 or more. - Driveway Application - Section 138 of the Roads Act 1993

Required prior to issue of Construction Certificate. See driveway form for required

plans/attachments. 5.3

Plumbing and Drainage Application – (Sewer and Septic) On-site Sewerage management and Hydraulic Work - Section 68 of the Local Government Act 1993 Required prior to issue of Construction Certificate. See plumbing and drainage form for required plans/attachments.

5.3 Stormwater and/or erosion and sediment control works - Section 68 of the Local

Government Act 1993

Required prior to issue of Construction Certificate. See stormwater/erosion form for required plans/attachments.

5.3

Referensi

Dokumen terkait

31/01/14 ISSUE: D Client: Rutherford Avenue Village Green • Kellyville S13-0072 SK 7 LANDSCAPE MASTER PLAN 1:500 @B1 0 10 20 30 50m SUNLAND RESIDENTIAL DEVELOPMENT UNDER

DEVELOPMENT ASSESSMENT UNIT MEETING 23 MARCH, 2021 ITEM-3 DA 896/2021/LD – TWO STOREY DWELLING AND RETAINING WALLS ON PROPOSED LOT 2 IN A SUBDIVISION OF LOT 25 DP 883498 BRECON

ITEM-2 DA 365/2019/HA - DETACHED SECONDARY DWELLING UNDER SEPP AFFORDABLE RENTAL HOUSING 2009 - LOT 401 DP 242751, 49 PEEL ROAD, BAULKHAM HILLS PUBLIC NOTIFICATION OF THE

1000/- Rest of the countries Fee - US$ 60 or British £ 50 Last Date for Registration : February 15, 2022 Scientific Computations and GUI Development using MATLAB Mar 21 – Apr 01,

The Application of Item Response Theory for Development of a Students’ Attitude Scale Toward Mathematics DOI: 10.15804/tner.2020.60.2.09 Abstract Mathematics Education Study

Development Applications Determined Application Number Application Description Address Status 923/2023/LD Two Storey Dwelling 3 Wakefield Rise KELLYVILLE NSW 2155 Approved

VOTING: Unanimous ITEM 3: DA 826/2019/HA – MULTI DWELLING HOUSING COMPRISING 40 TOWNHOUSES AND ASSOCIATED WORKS ON PROPOSED LOT 2 – LOT 217 DP 1239622, DEVELOPMENT LOT MACKILLOP

Development of Mathematical Textbook Analysis Model in Term of Connection based on the Didactic Transposition by Dyana Wijayanti Submission date: 04-Mar-2021 01:56PM UTC+0800