Appendix F: Flood Difference Modelling Maps

RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 142 of 266

(2)

BOYLE ST

CLIFTON CK ELLIS CK

ELLISCK

BARTLETT CK

KOHIKIKO PL

EASTERN DRAIN SELWYN ST

ABEL TASMAN DR

2D STUDY AREA EXENT TENNYSON ST

WATINO PL

SANDRIDGE TCE

BAY VISTA DR

POHUTUKAWA PL RICHM

OND RD SELWYN ST

LEGEND

Modelled Watercourses Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 1A TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Existing Situation with 1% AEP Modelled Flood Depths Location Plan

1:7,000 871018.3000

Figure 1A.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 75 150A3 SCALE 1:7,000225 300 375 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Pre Flood Levels\Figure 1A.mxd Date: 14/10/2019 Time: 11:19:16 a.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 143 of 266

(3)

CLIFTON CK

ELLIS CK

SELWYN ST Upgrade Boyle St culvert 4 m by 1.2 m

56 54 60

62

64

77 65 80

89 93

94

65A

50

59B

59A 84

87 85

83

42 48

61 53 63

72 66

73 78

82 82A

56A

46 52

67 68

69 74 70

76 88

90

95 97

81 44

55 71 59

79 75 91

92

59C

LEGEND

Modelled Watercourses Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 2A TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Existing Situation with 1% AEP Modelled Flood Depths Location Plan

1:1,330 871018.3000

Figure2.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 A3 SCALE 1:1,33010 20 30 40 50 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Pre Flood Levels\Figure 2A.mxd Date: 14/10/2019 Time: 11:23:58 a.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 144 of 266

(4)

ELLISCK

56 54 60

62

65

65A 51

718 15 13

27 21 31

50 35

59A

11

17 39

42 48

49

61 53

63 33B

56A

45

29 25 40

41

46 52

67

33 33A 44

37 43

47

55 59

19 23

LEGEND

Modelled Watercourses Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 3A TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Existing Situation with 1% AEP Modelled Flood Depths Location Plan

1:1,230 871018.3000

Figure2.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 A3 SCALE 1:1,23010 20 30 40 50 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Pre Flood Levels\Figure 3A.mxd Date: 14/10/2019 Time: 11:27:41 a.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 145 of 266

(5)

BARTLETT CK

KOHIKIKO PL

EASTERN DRAIN TENNYSON ST

LEGEND

Modelled Watercourses Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 4A TASMAN DISTRICT COUNCIL

0

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Existing Situation with 1% AEP Modelled Flood Depths Location Plan

1:1,750 871018.3000

Figure 4A.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 10 20 30 40 50 Meters

A3 SCALE 1:1,750

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Pre Flood Levels\Figure 4A.mxd Date: 14/10/2019 Time: 11:29:50 a.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 146 of 266

(6)

BOYLE ST

CLIFTON CK ELLIS CK

ELLISCK

BARTLETT CK

KOHIKIKO PL

EASTERN DRAIN SELWYN ST

ABEL TASMAN DR

Existing Dam

2D STUDY AREA EXENT Proposed Stopbank

Widening of confluence

Upgrade Boyle St 2x 1200 mm dia culvert pipes

TENNYSON ST

WATINO PL

SANDRIDGE TCE

BAY VISTA DR

POHUTUKAWA PL RICHM

OND RD Proposed Stopbank

Upgrade culvert to 4 m by 1.3 m SELWYN ST

Replace existing 900 mm dia culvert with 2x 1350 mm dia culvert pipes

Removal of soil stockpile orginally extracted from Creek after 2011 storm

Proposed infill of low point

LEGEND

Modelled Watercourses Proposed Stopbank Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 1B. TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Post Improvements 1% AEP Modelled Flood Depths Location Plan

1:7,000 871018.3000

Figure1B.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 75 150A3 SCALE 1:7,000225 300 375 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Post Flood Levels\Figure1B.mxd Date: 14/10/2019 Time: 2:40:42 p.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 147 of 266

(7)

CLIFTON CK

ELLIS CK

SELWYN ST Upgrade Boyle St culvert 4 m by 1.2 m

56 54 60

62

64

77 65 80

89 93

94

65A

50

59B

59A 84

87 85

83

42 48

61 53 63

72 66

73 78

82 82A

56A

46 52

67 68

69 74 70

76 88

90

95 97

81 44

55 71 59

79 75 91

92

59C

LEGEND

Modelled Watercourses Proposed Stopbank Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 2B TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Post Improvments 1% AEP Modelled Flood Depths Location Plan

1:1,330 871018.3000

Figure2.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 A3 SCALE 1:1,33010 20 30 40 50 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Post Flood Levels\Figure 2B.mxd Date: 14/10/2019 Time: 2:41:37 p.m.

Drain points to be installed to remove local flooding.

Widening of confluence

Low point on access road to be raised

RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 148 of 266

(8)

ELLISCK

56 54 60

62

65

65A 51

718 15 13

27 21 31

50 35

59A

11

17 39

42 48

49

61 53

63 33B

56A

45

29 25 40

41

46 52

67

33 33A 44

37 43

47

55 59

19 23

LEGEND

Modelled Watercourses Proposed Stopbank Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 3B TASMAN DISTRICT COUNCIL

1

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Post Improvements 1% AEP Modelled Flood Depths Location Plan

1:1,230 871018.3000

Figure2.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 A3 SCALE 1:1,23010 20 30 40 50 Meters

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Post Flood Levels\Figure 3B.mxd Date: 16/10/2019 Time: 9:15:56 a.m.

Proposed Stopbank Low point on access

road to be raised

RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 149 of 266

(9)

BARTLETT CK

KOHIKIKO PL

EASTERN DRAIN TENNYSON ST

Proposed Stopbank Proposed Stopbank

Proposed culvert upgrade

Proposed culvert upgrade LEGEND

Modelled Watercourses Proposed Stopbank Property Boundary Modelled Flood Depth (m)

0 - 0.1 0.1- 0.3 0.3 - 0.5 0.5 - 1.0 1.0 -1.5

> 1.5

! Figure 4B TASMAN DISTRICT COUNCIL

0

POHARA STORMWATER OPTIONS ASSESSMENT TDC IMPROVEMENTS

Post Improvements 1% AEP Modelled Flood Depths Location Plan

1:1,750 871018.3000

Figure 4B.mxd

EMCF Oct.19 1) Aerial photograph sourced from Top of the South Maps and licensed by LINZ

for re-use under the Creative Commons Attribution 3.0 NZ License (CC by 3.0 NZ).

2) Modelling based on 2011 LiDAR data supplied by Tasman District Council.

Lucas House, 51 Halifax Street, Nelson Notes:

www.tonkintaylor.co.nz

SCALE (AT A3 SIZE) PROJECT No.

ARCFILE DRAWN CHECKED APPROVED

FIGURE No. Rev.

0 10 20 30 40 50 Meters

A3 SCALE 1:1,750

Path: P:\871018\871018.3000\WorkingMaterial\GIS\FIGURES\Post Flood Levels\Figure 4B.mxd Date: 14/10/2019 Time: 2:45:24 p.m. RM190876 and ors-TDC Engineering Services-Pōhara Drainage Improvements-Resource consent application-page 150 of 266

Referensi

Dokumen terkait

Interventions by National Government Cont…  Funds and resources have mainly been reprioritized within the following departments;  Department of Agriculture, Fisheries and Forestry