In this case, the Council cannot refuse development consent on the basis of the density or scale of the proposal.” Is the appearance of the proposal in harmony with the buildings around it and the character of the street.

State Environmental Planning Policy No 55 - Remediation of Land Clause 7 of SEPP 55 provides the following

Promote medium-density residential development in locations close to population centers and public transport routes. The development offers affordable housing in a medium-density residential environment that meets the housing needs of the community.

Compliance with DCP 2012

The objectives of Section 3.1 “Site Requirements” of The Hills DCP Part B Section 4 – Multi-Dwelling Housing are as follows:. The objectives of Section 3.3 'Barriers' of the Hills Development Control Plan, Part B, Section 4 - Multi-Dwelling Housing are as follows:.

Issues Raised in Submissions

The scale and size of the development is in line with the expected character of residential buildings in the area. This information does not have to be submitted with the application and does not play a role in the assessment of the application.

Internal Referrals

It is assessed that the proposed development is compatible with the character of the local area with reference to the expected future character of the location, which will assume a comparable shape, density and scale as the current proposal. Applying the AHSEPP Car Parking rate to the 15 boarding rooms results in 7.5 parking spaces.

Development in Accordance with Submitted Plans (as amended)

The variation in the existing maximum floor area ratio as required by the SEPP has been addressed in the report and is considered satisfactory. No work (including excavation, pouring or soil deformation) may be carried out prior to the issuance of the building certificate, if a building certificate is required.

Construction Certificate

Building Work to be in Accordance with BCA

External Finishes

Tree Removal

Planting Requirements

Retention and Pruning of Neighbouring Trees

Tree Removal on Public Land

Protection of Public Infrastructure

Vehicular Access and Parking

All driveways and parking lots must be separated from landscaped areas by a low concrete curb or wall. All driveways and car parks must be graded, collected and drained by shafts and pipes to the appropriate point of legal discharge.

Vehicular Crossing Request

All driveways and car parking areas must be prominently and permanently marked, marked and maintained to ensure that access and egress are in a forward direction at all times and that parking and traffic circulation are appropriately controlled.

Minor Engineering Works

The entire site area must be graded, collected and drained by pits and pipes to a suitable point of legal discharge. e) Earthworks/ Site regrading. Retaining walls between lots must be located on the high side lot being retained, except for the need for easements for support on the low side lot next door.

Demolition Notification

This work must include the construction of any retaining walls necessary to ensure compliance with qualities within the edge area of ​​the footpath. Earthworks and retaining walls are limited to the locations and elevations shown on the concept architectural plans with job no.

Demolition Inspections

If grading, trimming, top soiling and/or turfing of the footpath edge fronting the development site is required, a slope of between 2% and 4% falling from the boundary to the top of the curb must be provided. Where earthworks are not shown on the approved plan, the topsoil within plots must not be disturbed.

Acoustic Requirements

Any necessary adjustment or relocation of services is also required in accordance with the requirements of the relevant service authority.

Provision of Kitchen Waste Storage Cupboard

Adherence to Waste Management Plan

Communal Composting Areas

Management of Construction and/or Demolition Waste

Disposal of Surplus Excavated Material

Commencement of Domestic Waste Service

Construction of Waste Storage Area

The finishes and colors of the waste storage area should complement the design of the development.

Property Numbering and Cluster Mail Boxes for Multi Dwelling Housing, Residential Flat Buildings, Mixed Use Development, Commercial Developments and

Boarding House

Stormwater Management – Upper Parramatta River Catchment Area

Stormwater Pump/ Basement Car Park Requirements

Security Bond – Road Pavement and Public Asset Protection

The bond is repayable on written application to the Council and is subject to all work being repaired to the Council's satisfaction.

Security Bond Requirements

Erosion & Sediment Control Plan

Section 7.12 Contribution

If the cost of repairing any damage exceeds the value of the bond, the Council will undertake the works and issue an invoice to cover these costs.

Clear Pedestrian Sight Lines

Tree Protection Fencing

Tree Protection Signage

Mulching within Tree Protection Zone

Trenching within Tree Protection Zone

Separate OSD Detailed Design Approval

Property Condition Report – Public Assets

Property Condition Report – Private Assets on 11 & 15 Torrs Street

Details and Signage - Principal Contractor and Principal Certifier Details

Management of Building Sites

Consultation with Service Authorities

Approved Temporary Closet

Stabilised Access Point

Erosion and Sedimentation Controls

Soil and Water Management Plan

Erosion & Sediment Control Plan Kept on Site

Notification of Asbestos Removal

Engagement of a Project Arborist

Demolition Works and Asbestos Management

Discontinuation of Domestic Waste Services

Hours of Work

Survey Report and Site Sketch

Compliance with BASIX Certificate

Critical Stage Inspections and Inspections Nominated by the Principal Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires critical stage

Rock Breaking Noise

Construction Noise

Stockpiles

Asbestos Removal

Dust Control

Project Arborist

Section 73 Certificate must be submitted to the Principal Certifier before the issuing of an Occupation Certificate

Landscaping Prior to Issue of any Occupation Certificate

Completion of Engineering Works

Property Condition Report – Public Assets

Pump System Certification

Stormwater Management Certification

Creation of Restrictions/ Positive Covenants

Section 73 Compliance Certificate

Property Condition Report – Private Assets

Acoustic Compliance Report

Clearance Certificate

Final Inspection of Waste Storage Area

Offensive Noise

Waste and Recycling Management

Ventilation for Basement Carpark

Use of the Outdoor Communal Area

Complaints Procedure

Number of Lodgers

Provision of the Plan of Management and House Rules to Lodgers

LOCALITY PLAN

AERIAL MAP

ZONING AND HEIGHT OF BUILDING MAP

SITE PLAN

FLOOR PLANS

ELEVATIONS

SECTIONS

PERSPECTIVES

MID-WINTER SHADOW DIAGRAMS (2 PAGES)

LANDSCAPE PLANS (2 PAGES)

PLAN OF MANAGEMENT (19 PAGES)

Compliance with SEPP No. 55 – Remediation of Land

Pursuant to point 7 of the SEPP, the consent giver may not issue consent for the implementation of any construction on the land, unless: a) he considered whether the land is contaminated, and. In addition, it should be noted that the site in question was recently created under subdivision application 496/2016/ZB.

Compliance with SEPP (Educational Establishments and Child Care Facilities) 2017

This clause applies to development for the purpose of a centre-based childcare facility if:. a) the floor area of ​​the building or site does not comply. space requirements) of the program and. Satisfactory – the presented landscape plan. has been reviewed by the Council's Landscape Assessment Officer and. consent has been recommended.

Compliance with LEP Savings Provisions Clause 1.8A(1) of LEP 2019 states the following

The use as a childcare facility in the center will promote a sense of community given the nature of such community land use. The proposal is considered to be consistent with the stated objectives of the area as the childcare center will provide facilities/services to meet the daily needs of residents and the proposal maintains the existing low density residential character of the area. iii) Development standards.

Compliance with DCP

This variation is minor and will not adversely affect the amenity value of the adjacent building to the north. The proposal is in line with the objectives of the audit and the variation is considered satisfactory in this case.

Streetscape and Character

It is clear that the scale of the proposed building is consistent with the expected character of residential development in the locality. The proposal is considered to be compatible with respect to the overall height of the built form.

Figure 1 – Original Building Façade of the Proposed Development
Figure 1 – Original Building Façade of the Proposed Development

Issues Raised in Submissions

The nursery is out of place and will significantly affect the character of the whole area. Concerns over the use of Parsons Circuit for parking in connection with the sports fields in the north of the district.

Figure 3 – Location of Subject Site and Placement of Noise Loggers  Concerns regarding the proposed hours of
Figure 3 – Location of Subject Site and Placement of Noise Loggers Concerns regarding the proposed hours of

Conciliation Conference

The provision of the rainwater tank will be reinforced through a condition of consent (refer to Condition 1). Property values ​​are not a matter for consideration under section 4.15 of the Planning and Environmental Assessment Act, 1979.

Internal Referrals

The proposal has been tested against Article 4.15 of the Environment Act 1979 and it is judged that the proposal is acceptable and will not lead to an unacceptable safety risk. The report's recommendations must be implemented as part of the development permit (see Condition 16).

External Referrals

Provided that the applicant complies with the Council's DCP parking requirements, no objection is raised to the proposal from a traffic and/or parking perspective. Furthermore, the crash fence must wrap around to the interface between the outdoor space and the Parsons runway view as marked.

External Finishes

Compliance with Natural Resource Access Regulator Requirements

Planting Requirements

Provision of Parking Spaces

Separate application for signs

Protection of Public Infrastructure

Structures Adjacent to Piped Drainage Easements

Vehicular Access and Parking

Vehicular Crossing Request

Minor Engineering Works

The driveway must be at least 6 meters wide for the first 6 meters of the site, measured from the boundary. A 1.2m wide concrete footway pavement is to be provided across the street frontage of the development on Parsons Circuit which merges into the existing adjacent footway in accordance with the above documents.

Excavation Near Boundaries

All disused driveways and driveways should be removed and replaced with curb and gutter along with the restoration and sod construction of the adjacent footpath verge area. The entire site must be leveled, collected and drained through pits and pipes to an appropriate legal discharge point.

Construction Certificate

The design, finish, slope and location of all driveway intersections must comply with the above documents and city driveway specifications. A separate fee for requesting vehicle crossings is payable as per the Board's Schedule of Fees and Charges.

Building Work to be in Accordance with BCA

Earthworks and retaining walls are limited to the locations and elevations shown on the Concept Engineering Plan prepared by Australian Consulting Engineers Revision F dated. Where earthworks are not shown on the approved plan, topsoil within lots must not be disturbed. e) Concrete path pavement.

Air Conditioner Location and Noise Level

Acoustic Requirements

Retention of Trees

Adherence to Waste Management Plan

Waste and Recycling Collection Contract

Management of Construction Waste

The separation and recycling of the following waste materials is required: metals, wood, masonry products and clean waste plasterboard. Receipts for all waste/recycling fees must be kept on site at all times and shown in a legible form to any authorized officer of the Council who asks to see them.

Disposal of Surplus Excavated Material

The finishes and colors of waste storage areas should complement the design of the development. The salinity assessment and report recommendations prepared by GeoEnviro Consultancy Pty Ltd, reference JC14223A, dated April 2015 and submitted as part of development application 496/2016/ZB are to be implemented as part of this approval.

Maximum Number of Staff and Children

The waste storage area must be equipped with internal lighting such as automatic sensor lamps. The waste storage area must have appropriate waste education signs (EPA Waste and Recycling Signs which can be found on the NSW EPA website), be mounted in a visible position on interior walls, and be permanently maintained by the owner.

Education and Care Services National Regulations

Retaining Walls

Front Fencing Height

Ventilation for Basement Carpark

Separate Nappy Collection Service

A special infrastructure contribution must be made in accordance with Environmental Planning and Assessment (Special Infrastructure Contribution - Western Sydney Growth Areas) 2011 which is in force when this consent comes into force. Please contact the Danish Planning and Environmental Agency regarding agreements on payment.

Security Bond – Road Pavement and Public Asset Protection

Section 7.12 Contribution

Irrigation

A building plan approval must be obtained from Sydney Water Tap in™ to ensure that the approved development will not impact on Sydney Water's infrastructure. A copy of the building plan approval and receipt from Sydney Water Tap in™ (if not already provided) must be submitted to the Lead Certifier on request prior to commencing works.

Property Condition Report – Public Assets

Please refer to the website http://www.sydneywater.com.au/tapin/index.htm, Sydney Water Tap in™, or telephone 13 20 92.

Property Condition Report – Private Assets

Management of Building Sites

Consultation with Service Authorities

Approved Temporary Closet

Erosion and Sedimentation Controls

Stabilised Access Point

Details and Signage - Principal Contractor and Principal Certifier Details

Erosion and Sedimentation Controls

Soil and Water Management Plan

Hours of Work

These requirements must be in accordance with Managing Urban Stormwater – Soils and Construction produced by the NSW Department of Housing (Blue Book). The builder/contractor is responsible for instructing and controlling subcontractors regarding working hours.

Roof Water Drainage

Survey Report and Site Sketch

Critical Stage Inspections and Inspections Nominated by the Principal Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires critical stage

Landscaping Works

Stockpiles

Additional Hand Wash Basin in Food Premises

Dust Control

Construction and Fit-out of Food Premises

Pipes and lines adjacent to the walls must be located at least 25 mm from the surface of the wall with supports. Pipes and lines entering floors, walls or ceilings must be flanged and all openings completely sealed.

Rock Breaking Noise

Floor intersections with walls and exposed plinths in food preparation, storage and service areas must be covered. The bottom of the kitchen cabinets must not be covered with a kicking board and must be open and easy to clean.

Construction Noise

Solid construction is defined as brick, concrete blocks, structural fiber cement, or preformed panels that are filled with the appropriate material. Note: Copies of AS 4674-2004 can be obtained from www.saiglobal.com at: www.saiglobal.com and copies of the Food Safety Standards Code (Australia) can be obtained from Food Standards Australia New Zealand at www. foodstandards.gov.au.

Contamination

Crash Barrier Installation

Section 73 Certificate must be submitted to the Principal Certifier before the issuing of an Occupation Certificate

Landscaping Prior to Issue of any Occupation Certificate

Completion of Engineering Works

Property Condition Report – Public Assets

Property Condition Report – Private Assets

Food Shop Registration Requirements

Emergency Evacuation Plan

Plan of Management

LOCAL PLANNING COMMITTEE MEETING 17 MARCH 2021 HILLS SHIRE. c) supervision of children during evacuation and at the safe assembly point, depending on the capacity of the childcare center and the ratio between children and staff.

Certification of Crash Barrier

Noise Management Plan

Staff members are not allowed to arrive more than 30 minutes before opening and must leave within 30 minutes after the childcare center closes. Any change to the above working hours will require further Council approval.

Work Within Building

Maintenance of Landscaping Works

Offensive Noise

Lighting

Final Acoustic Report

Hours Of Operation For Waste Collection, Delivery / Dispatch Of Goods

Waste and Recycling Management

Waste and Recycling Collection

Waste and recycling may not be placed on public property for collection without prior written approval from the Council.

Crash Barrier Maintenance

Acoustic – Maintenance

Annual Events and Parking Management

Offensive Noise - Acoustic Report

Noise Management Plan to Be Kept On Site

AERIAL PHOTOGRAPH

SITE PLAN

BASEMENT FLOOR PLAN

GROUND FLOOR PLAN

FIRST FLOOR PLAN

FRONT ELEVATION (PARSONS CIRCUIT)

SOUTH-WEST ELEVATION (FAIRWAY DRIVE)

NORTH-WEST (SIDE) ELEVATION

REAR ELEVATION

SECTION

SHADOW DIAGRAMS

RETAINING WALL PLAN

LANDSCAPE PLAN

PHOTOMONTAGE

NATURAL RESOURCE ACCESS REGULATOR – GENERAL TERMS OF APPROVAL

88B INSTRUMENT DP 1215150

PLAN OF MANAGEMENT

SEPP 55 – Remediation of Land

Based on the scope of work undertaken for this assessment, the site is considered to be suitable for more sensitive residential development subject to the additional investigations, general waste and asbestos removal activities described in this report being undertaken.

Despite para. 2, planning permission can be granted for development on a plot of land in a zone shown in column 2 of the table for subsection 2 for multi-dwelling or residential properties where the area of ​​the plot is less than the area. specified for this purpose and shown in column 3 of the table if the Council is satisfied that:. a) the shape of the proposed structures is compatible with adjacent structures in terms of their height to the street and building height, and. Planning permission may not be granted for development that contravenes a development standard, unless:. a) the consent authority is satisfied that: i) the applicant's written request has sufficiently dealt with the conditions that must be demonstrated in accordance with subsection 3, and.

Compliance with SEPP No. 65 – Design Quality of Residential Flat Buildings The proposal has been accompanied by a Design Verification Statement by a chartered

LOCAL PLANNING PANEL MEETING MARCH 17, 2021 THE HILLS SHIRE .. location and building typology have limited or no space for deep ground at ground level such as central business districts, restricted areas, high density areas high or in the center). The change is partly due to the limited nature of the site and.

Compliance with DCP Part D Section 6 – Rouse Hill Regional Centre

At least 25% or 50 m2 (whichever is greater) of open space on the ground floor must be provided on natural soil. The proposal provides for 801 m2 of common open space, of which 666 m2 as open space on the roof and 135 m2 as courtyards on the ground floor.

Gambar

Figure 1 – Original Building Façade of the Proposed Development
Figure 2 – Revised Building Façade of the Proposed Development
Figure 3 – Location of Subject Site and Placement of Noise Loggers  Concerns regarding the proposed hours of

Referensi

Dokumen terkait

Contents Executive Summary 1 Introduction Purpose of Strategy Developing the Strategy 3 3 2 Hierarchy and Benchmarks The Hills Shire Open Space & Recreation Provision of Open

INDEPENDENT AUDITOR’S REPORT Report on the general purpose financial statements The Hills Shire Council To the Councillors of The Hills Shire Council Opinion I have audited the

Client Signature: Date/Time: The Hills Shire Council West Ward By-Election Saturday 28 July 2018 A by-election will be held in the The Hills Shire West Ward local government area

The Hills Shire Council Development Applications & Public Notices DEVELOPMENT APPLICATIONS DETERMINED The following development applications have been determined by Council and in

PAGE 1 HILLS SHIRE COUNCIL – LOCAL PLANNING PANEL MINUTES MINUTES OF THE LOCAL PLANNING PANEL MEETING HELD AT THE HILLS SHIRE COUNCIL WEDNESDAY, 15 AUGUST 2018 PRESENT Julie

APPOINTER’S DECLARATION As the owner or person having the benefit of the Development Consent or Complying Development Certificate stated on this form, I appoint The Hills Shire

MINUTES OF THE DEVELOPMENT ASSESSMENT UNIT MEETING HELD AT THE HILLS SHIRE COUNCIL ON TUESDAY, 22 MARCH 2022 PRESENT Cameron McKenzie Group Manager – Development & Compliance Chair

PAGE 1 MINUTES OF THE DEVELOPMENT ASSESSMENT UNIT MEETING HELD AT THE HILLS SHIRE COUNCIL ON TUESDAY, 24 MARCH 2015 PRESENT Cameron McKenzie Group Manager – Environment & Planning