• Tidak ada hasil yang ditemukan

PLAN OF MANAGEMENT

N/A
N/A
Protected

Academic year: 2024

Membagikan "PLAN OF MANAGEMENT"

Copied!
22
0
0

Teks penuh

Something wrong

Gambar

Figure 1: Locality Plan – Lot 13 DP 1014470, Casuarina
Figure 2 – Location of Lot 13 DP 1014470
Figure 3 – Detail showing Lot 15 DP 1198266   (Undeveloped Portion of Casuarina Town Centre)

Referensi

Dokumen terkait

Negara harus bekerjasama, dalam rentang waktu yang sama, dalam organisasi penilaian awal tentang kapasitas penangkapan ikan di tingkat regional (dalam organisasi perikanan

Heritage Buildings and Structures Schedule 16.13A of the Plan contains heritage buildings and structures that are recognised and listed by the Council, and also those that are

15 Figure 5: Linkage of the IDP and the DRM Plan Oudtshoorn Municipality Disaster Risk Management Oudtshoorn Municipality Integrated Development Plan National and Western Cape

Management 2.1 Environmental aspects to be managed There are a number of environmental aspects associated with the proposal that have the potential to affect the listed threatened

Project ID Project Title Project Owner Technical Project Manager Functional Project Manager Project Costs/Budget Source of Funds Project Duration Actual Start Date Estimated

• Communication of the plan: This section would also include a description of any communication strategy concerning the plan and/or the management of the fishery, including details of

Agencies responsible for Identified Activities Activity Primary Secondary Tertiary Monitoring Reviewing CMP DAC&FW MHA / NDMA NCMC Rainfall IMD States DAC&FW Temperature IMD

Operative Table of Contents 14 July 2018 Tasman Resource Management Plan: Volume 1 T ABLE OF C ONTENTS Page