Council Meeting Date: Thursday 19 March 2015

Replacement Report

Page 1

REPORTS FROM THE DIRECTOR ENGINEERING

26 [E-CM] RFP2015-031 Installation of Concrete Piles for Construction of New Bridge over Dunbible Creek Mistral Road Murwillumbah

SUBMITTED BY: Infrastructure Delivery

Valid

LINKAGE TO INTEGRATED PLANNING AND REPORTING FRAMEWORK:

2 Supporting Community Life

2.4 An integrated transport system that services local and regional needs

2.4.3 Ensure local streets, footpaths and cycleways are provided, interconnected and maintained

SUMMARY OF REPORT:

Tender RFP2015-031 Installation of concrete bridge piles for the construction of a new bridge over Dunbible Creek Mistral Road Murwillumbah was called to engage a suitably qualified and experienced Contractor to provide all plant, labour and materials to carry out the installation of Council supplied prestressed bridge piles at Dunbible Creek, Mistral Road Murwillumbah.

Tenders were officially invited in accordance with the provisions of the Local Government Act 1993 and the NSW Local Government (General) Regulation 2005. Tender submissions will close at 4.00pm (local time) on 16 March 2015 in the Tender Box located in the foyer at the Tweed Shire Council Civic and Cultural Centre, Murwillumbah NSW 2484.

RECOMMENDATION:

That in respect to Contract RFP2015-031 Installation of Concrete Bridge Piles for the Construction of a New Bridge over Dunbible Creek Mistral Road, Murwillumbah:

1. Council awards the Contract RFP2015-031 to Davbridge Properties Pty Ltd T/A Davbridge Constructions ABN 23 065 240 002, ACN 065 240 002 for the amount of $107,700.00 (Exclusive of GST).

2. The General Manager be granted delegated authority to approve appropriately deemed variations to the contract and those variations be reported to Council at finalisation of the contract.

(2)

Council Meeting Date: Thursday 19 March 2015

Replacement Report

Page 2

3. ATTACHMENTS 1 and 2 are CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, because it contains:-

(d) commercial information of a confidential nature that would, if disclosed:

(i) prejudice the commercial position of the person who supplied it, or (ii) confer a commercial advantage on a competitor of the council, or (iii) reveal a trade secret.

(3)

Council Meeting Date: Thursday 19 March 2015

Replacement Report

Page 3

REPORT:

Tender Background

Tender RFP2015-031 Installation of concrete bridge piles for the construction of a new bridge over Dunbible Creek Mistral Road Murwillumbah was called to engage a suitably qualified and experienced Contractor to provide all plant, labour and materials to carry out the installation of Council supplied prestressed bridge piles at Dunbible Creek, Mistral Road Murwillumbah.

Tenders were officially invited in accordance with the provisions of the Local Government Act 1993 and the NSW Local Government (General) Regulation 2005. Tender submissions closed at 4.00pm (local time) on 16 March 2015 in the Tender Box located in the foyer at the Tweed Shire Council Civic and Cultural Centre, Murwillumbah NSW 2484.

Works are being undertaken to replace the old timber bridge Tender Advertising

As per the requirements of the Local Government Regulation 2005, tenders were officially advertised for Tender RFP2015-031 Installation of concrete bridge piles for the construction of a new bridge over Dunbible Creek Mistral Road Murwillumbah on 21 February 2015 in Brisbane Courier Mail. The tender was also advertised in Sydney Morning Herald on 24 February 2015.

Evaluation Criteria

Tenders were evaluated based on the criteria items extracted from clause 24 of the Conditions of Tendering.

The evaluation was conducted by Council's Tender Assessment Panel, consisting of Construction Engineer, Contracts Engineer and Graduate Engineer.

Note that specific criteria & weightings were not detailed to potential tenderers during the tender period.

Criterion Document

Reference

Weighting (%) Tender Price (Assessed Tender Cost) Schedule 3 60

Experience and capability Schedule 4 5

Key Personnel Schedule 5 5

Methodology and Program Timing Schedule 6 5

WHS, Quality and Environmental Management

Schedule 7 5

Nominated Subcontractors Schedule 8 5

Sustainability Procurement Schedule 10 5

Local Content Schedule 11 10

Total 100

A copy of the Tender Evaluation Report Attachment 1 and Tender Evaluation Scoring Sheet Attachment 2 are attached to this report

ATTACHMENTS 1 and 2 are CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, because it contains:-

(4)

Council Meeting Date: Thursday 19 March 2015

Replacement Report

Page 4

(d) commercial information of a confidential nature that would, if disclosed:

(i) prejudice the commercial position of the person who supplied it, or (ii) confer a commercial advantage on a competitor of the council, or (iii) reveal a trade secret.

OPTIONS:

That Council:

1. Accepts the tender for RFP2015-031 from Davbridge Properties Pty Ltd T/A Davbridge Constructions for the amount of $107,700.00 (Exclusive of GST).

2. Accepts an alternative tenderer for RFP2015-031.

CONCLUSION:

Council awards the Contract RFP2015-031 to Davbridge Properties Pty Ltd T/A Davbridge Constructions for the amount of $107,700.00 (Exclusive of GST) as detailed in the tender evaluation report confidential Attachment 1 for the Installation of concrete bridge piles for the construction of a new bridge over Dunbible Creek Mistral Road Murwillumbah.

COUNCIL IMPLICATIONS:

a. Policy:

Procurement Policy v1.5.

In accordance with Local Government (General) Regulations 2005.

b. Budget/Long Term Financial Plan:

Funded from 2014/15 and 2015/16 Works Program and Federal Government Bridge Renewal Program.

c. Legal:

Not Applicable.

d. Communication/Engagement:

Inform - We will keep you informed.

UNDER SEPARATE COVER/FURTHER INFORMATION:

(Confidential) Attachment 1. RFP2015-031 Tender Evaluation Report (ECM 3622860).

(Confidential) Attachment 2. RFP2015-031 Tender Evaluation Scoring Sheet (ECM 362170).

Referensi

Dokumen terkait

Tweed Coast Reserve Trust Meeting: Tuesday 20 March 2012 Page 7 REPORTS THROUGH THE EXECUTIVE MANAGER OF THE TRUST/GENERAL MANAGER REPORTS FROM DIRECTOR PLANNING AND REGULATION

Tweed Coast Reserve Trust Meeting: Thursday 18 June 2015 Page 7 REPORTS THROUGH THE EXECUTIVE MANAGER OF THE TRUST REPORTS FROM DIRECTOR PLANNING AND REGULATION 2 [PR-TCRT]

Council Meeting Date: Thursday 10 April 2014 Late Addendum Report Page 3 Evaluation Criteria Tenders were evaluated based on the criteria noted in the table below: Criterion

Tweed Reserves Trust Meeting: Thursday 19 May 2016 Page 7 REPORTS THROUGH THE EXECUTIVE MANAGER OF THE TRUST REPORTS FROM DIRECTOR ENGINEERING 2 [E-RT] Proposed Parking Bay and

Council Meeting Date: THURSDAY 15DECEMBER 2016 Addendum Report Page 1 MAYORAL MINUTE a5 [MM-CM] Councillors - Payment of Expenses and Provision of Facilities for Mayor and

Council Meeting Date: THURSDAY 2MARCH 2017 LATE ADDENDUM REPORT Page 1 MAYORAL MINUTE a1 [MM-CM] Mayoral Minute - Floodplain Management Australia National Conference 16-19 May

Tweed Reserves Trust Meeting: Thursday 21 April 2016 Page 5 REPORTS THROUGH THE ACTING EXECUTIVE MANAGER OF THE TRUST REPORTS FROM DIRECTOR COMMUNITY AND NATURAL RESOURCES 1

CONFIRMATION OF MINUTES a2 [CONMIN-EXT] Confirmation of Minutes of Extraordinary Council Meeting held Thursday 15 March 2018 SUBMITTED BY: Corporate Governance mhm LINKAGE TO