STUDI ALOKASI BIAYA, WAKTU DAN SUMBER DAYA MANUSIA PADA

PROYEK PEMBANGUNAN RUMAH SAKIT UMUM DAERAH WLINGI

KABUPATEN BLITAR

Oleh: ANDRI PRASTYO ( 03520034 )

Civil Engineering

Dibuat: 2010-10-15 , dengan 7 file(s).

Keywords: Alokasi Biaya, Waktu Dan Sumber Daya Manusia

Manajemen Konstruksi atau manajemen proyek adalah suatu kegiatan merencanakan,

mengorganisir, memimpin dan mengendalikan sumber daya yang berupa manusia, dana, waktu, teknologi dan material untuk mencapai sasaran yang telah didefinisikan dan ditentukan dengan jelas, seefisien mungkin. Biaya adalah jumlah keseluruhan pengeluaran yang dibutuhkan dalam suatu pembangunan proyek mulai dari tahap awal pelaksanaan sampai proyek tersebut selesai dibangun. Durasi waktu adalah jumlah hari yang dibutuhkan untuk menyelesaikan suatu proyek pembangunan. Sumber Daya Manusia adalah jumlah pekerja yang dibutuhkan untuk

menyelesaikan suatu proyek pembangunan.

Proyek yang menjadi studi kasus dalam skripsi ini adalah proyek pembangunan gedung Rumah Sakit Umum Daerah Wlingi yang berlokasi di jalan Dr. Sucipto Kecamatan Wlingi Kabupaten Blitar Propinsi Jawa Timur. Proyek pembangunan gedung tersebut mempunyai luas tanah sebesar 3240 m2 dengan ukuran panjang 60 m dan lebar 54 m yang terdiri dari tiga lantai Dari perhitungan biaya yang berdasarkan analisa harga bahan Kabupaten Blitar tahun anggaran 2008 diperoleh total biaya sebesar Rp.27,208,482,117.93 (sudah termasuk PPN 10%).Hasil dari perhitungan durasi waktu menunjukkan bahwa perencanaan pelaksanaan proyek dapat

diselesaikan 330 hari. Hasil analisa menunjukkan bahwa cara mengatur dan menempatkan sumber daya manusia agar tidak terjadi fluktuasi secara besar-besaran adalah dengan meratakan pemakaian tenaga kerja (recource leveling), yaitu dengan menggeser jadwal pekerjaan yang memiliki float sedemikian rupa, sehingga tidak mengganggu penyelesaian proyek secara

keseluruhan. Dari perhitungan di dapatkan bahwa sumber daya manusia yang di gunakan selama proyek berlangsung adalah 3528,02 orang.

Construction Management or project management is an activity of planning, organizing,

directing and controlling resources in the form of man, money, time, technology and materials to achieve the defined objectives and clearly defined, as efficient as possible. Cost is the total amount of expenditure required in a development project from the early stages of

implementation until the project is completed. Length of time is the number of days required to complete a construction project. Human Resources is the number of workers required to

complete a construction project.

Projects under study in this thesis is a building site District General Hospital located on the road Dr. Sucipto Wlingi Blitar district of East Java Province. The building project has a land area of 3240 m2 with the length of 60 m and 54 m wide consisting of three floors

(2)

fluctuations is to flatten the use of labor (recource leveling), namely by shifting the work schedule which has a float in such a way that does not interfere with the overall project

Referensi

Dokumen terkait

Setiap mahasiswa PPL UNY diwajibkan untuk mengajar minimal 8 kali tatap muka dengan materi yang berbeda dengan 4 kali mengajar mandiri dan 4 kali mengajar

Sehubungan dengan Perusahaan Saudara masuk sebagai Calon Pemenang dan Calon Pemenang Cadangan Pelelangan Sederhana Pengadaan Benih Kakao Untuk Perluasan Tanaman Kakao

dan Lapangan Upacara Rujab Gubernur , maka dengan ini Pokja III Bidang Peningkatan dan Pengembangan Kawasan Permukiman pada Dinas Perumahan, kawasan Permukiman dan

Sehubungan dengan Perusahaan Saudara masuk sebagai Calon Pemenang dan Calon Pemenang Cadangan Pelelangan Sederhana Pengadaan Benih Kakao Untuk Perluasan Tanaman Kakao di

Jika grafik menghadap ke atas maka titik puncaknya adalah titik puncak minimum, dan jika grafiknya menghadap ke bawah, maka titik puncaknya adalah titik puncak maksimum...

Memandangkan minat terhadap politik oleh generasi muda di Malaysia semakin meningkat dan kaitan mereka dengan penggunaan Internet juga adalah tinggi maka kajian untuk

Berdasarkan pengertian di atas maka PKn memiliki arti penting dalam rangka pembinaan dan pembentukkan manusia Indonesia yang berjiwa Pancasila, khususnya bagi generasi

2 berikut menunjukkan bahwa jika suatu modul adalah small cover dari modul tersuplemen lemah, maka modul tersebut juga modul tersuplemen lemah. Jika small