H ARGA
PASI R BETON CI MALAKA/ SPLI T/ PC TI GA RODA
c Kolom 15/ 15 BETON BERTULANG / BESI TULANGAN BESI SNI 4.00 m ' 66,850 267,400 PASI R BETON CI MALAKA/ SPLI T/ PC TI GA RODA
d Ringbalk 15/ 20 BETON BERTULANG / BESI TULANGAN BESI SNI 10.00 m ' 66,850 668,500 PASI R BETON CI MALAKA/ SPLI T/ PC TI GA RODA
Daun pint u RANGKA ALUMUNI UM 3.60 m ² 147,510 531,036
1 TOWER BESI TOREN KETI NGGI AN 6M KAPASI TAS KEKUATAN 1000 LI TER
H ARGA
SATUAN
JM L
SAT
( Rp.)I .
PEKERJAAN GALI AN da n URUGAN
1
Galian pondasi bat u kali
48.38 m
³
40,680
1,967,895
2
Urugan pasir baw ah pondasi bat u kali
4.84 m
³
88,870
429,909
3
Lant ai kerj a baw ah pondasi t elapak
2.42 m
³
49,660
120,115
Su bt ot a l I
2 ,5 1 7 ,9 1 9
I I .
PEK. PON D ASI D AN BETON
1
Sloof 15/ 20
2.42 m
³
3,594,800
8,694,923
2
Pondasi bat u kali
23.22 m
³
588,050
13,654,521
3
Kolom KP 15/ 15
0.99 m
³
5,067,970
5,035,535
4
RB 1 15/ 20
64.50 m '
78,360
5,054,220
Su bt ot a l I I
3 2 ,4 3 9 ,1 9 8
N O.
KOD E
D ESKRI PSI PEKERJAAN
V OLUM E
JUM LAH
H ARGA
( Rp.)
REN CAN A AN GGARAN BI AYA
PEKERJAAN PEM BUATAN RUM AH D I N AS M ED I S
Ta h u n An gga r a n 2 0 1 2
PEKERJAAN PEM BUATAN RUM AH D I N AS M ED I S
Ta h u n An gga r a n 2 0 1 2
A PEKERJAAN AIR BERSIH
INSTALASI PEMIPAAN AIR BERSIH
a PEKERJAAN PLUMBING AIR BERSIH AS 3-6 KOLOM I-J Pipa PVC, Class AW
a PEKERJAAN PLUMBING AIR KOTOR AS 3-6 KOLOM I-J
Pemipaan Air Kotor, Air bekas & Vent dengan pipa PVC AW" Standard , 5kg/cm2
C PEKERJAAN ELEKTRIKAL
I INSTALASI PENERANGAN & STOP KONTAK
~MCB 1.00 bh 160,000.00 160,000.00
~Lampu Downlight Essential 25W 10.00 bh 67,000.00 670,000.00 ~Stop Kontak 1P,10A 6.00 bh 21,250.00 127,500.00 ~Saklar ganda 2.00 bh 17,000.00 34,000.00 ~Saklar tunggal 4.00 bh 11,000.00 44,000.00 ~ Instalasi Penerangan dgn kabel NYA 3X(1X2.5 mm2) dlm PVC conduit 20 mm 6.00 ttk 75,000.00 450,000.00 ~ Instalasi Stop kontak dgn kabel NYA 3X(1X2.5 mm2) dlm PVC conduit 20 mm 6.00 ttk 75,000.00 450,000.00
II PEKERJAAN KABEL FEEDER
~Dari Panel Utama ke Panel lighting LP-A
NYY3X2.5mm2 15.00 m' 21,000.00 315,000.00 ~Dari Panel Utama ke Panel lighting PP-A
NYY3X2.5mm2 15.00 m' 21,000.00 315,000.00 ~Dari Panel Utama ke Panel lighting PP-POMPA
NYY3X2.5mm2 15.00 m' 21,000.00 315,000.00
III PEKERJAAN PANEL LISTRIK
~ Panel Utama Dari PLN 1.00 unit 1,750,000.00 1,750,000.00
Grounding Panel lengkap Bak kontrol 50x50x50 1.00 unit 250,000.00 250,000.00
V BIAYA PERIZINAN
Penyambungan daya 75kVA terdiri dari:
Biaya penyambungan 220 VA 1,400.00 308,000.00
Uang jaminan langganan 220 VA 450.00 99,000.00
VI TEST COMMISSIONING 220.00 VA 605.00 133,100.00
11,420,600.00
NO. URAIAN PEKERJAAN VOL SAT HARGA SAT.
( Rp )
TOTAL HARGA ( Rp )
TOTAL PEKERJAAN ELEKTRIKAL