• Tidak ada hasil yang ditemukan

Analyst Meeting Presentation FY 2011 Results

N/A
N/A
Protected

Academic year: 2017

Membagikan "Analyst Meeting Presentation FY 2011 Results"

Copied!
20
0
0

Teks penuh

(1)

1

Analyst Meeting

PT Krakatau Steel (Persero) Tbk.

KANTOR PUSAT

Jl. Industri No. 5 P.O. Box 14 Cilegon, Banten 42435 Telepon : (+62 254) 392159, 392003 (Hunting)

Faksimili : (+62 254) 372246 KANTOR JAKARTA Gedung Krakatau Steel, Lantai 4

Jl. Jend. Gatot Subroto Kav. 54 Jakarta Selatan 12950 Telepon : (+62 21) 5221255 (Hunting) Faksimili : (+62 21) 5200876, 5204208, 5200793

PABRIK

(2)

2

Disclaimer

This document has been prepared by PT Krakatau Steel (Persero) Tbk. (“Krakatau Steel” or the “Company”) and may not be taken away, reproduced or redistributed, in whole or in part, to any other person without the prior written consent of the Company.

This document is intended for financial institutions and professional investors only and is not intended for distribution to, or use by, retail investors. This document is also not intended for distribution to, or use by, any person or entity in any jurisdiction or country where such distribution or use would be contrary to law or regulations. This document is directed only at relevant persons and any investment or activity to which the document relates is available only to relevant persons. Other persons should not act upon this document or any of its contents.

The information in this document is given in confidence and reproduction of this document, in whole or in part, or disclosure of any of its contents, without prior consent of the Company, is prohibited. This document should be read in its entirety. This document remains the property of the Company and on request must be returned and any copies destroyed.

This document is for information and convenient reference and does not constitute or form part of, and should not be construed as, any offer for sale or subscription of, or solicitation of any offer to buy or subscribe for, any securities of the Company nor should it or any part of it form the basis of, or be relied on in connection with, any contract or commitment whatsoever. This document does not constitute a recommendation regarding the securities of the Company and should not be treated as giving investment advice. The information in this document is subject to verification, completion and change without notice and the Company is not under any obligation to update or keep current the information contained herein. Accordingly, no representation or warranty, express or implied, is made or given by or on behalf of the Company as to the accuracy, completeness or fairness of the information or opinions contained in this document. The Company does not accept any liability whatsoever for any loss however arising from any use of this document or its contents or otherwise arising in connection therewith.

(3)

3

1. Overview

2. 2011 Results

3. Strategic Projects

4. Indonesian Steel Market

(4)

4

S

ECTION

1

(5)

5

Unit

FY2010

FY2011

Chg (%)

Highlights

Source: Company

Revenue

14,940

17,915

19.9

Sales volume

Million tons

1.914

2.068

8.0

Production (HRC)

Million tons

1.504

1.761

17.1

EPS

Rp/share

81.2

64.8

20.1

Net profit

EBITDA

Rp bn

1,061

1,023

3.6

1,781

1,152

35.3

Cash

Net debt

4,194

3,594

14.3

2,039

3,718

82.4

Equity

9,426

10,355

9.9

Assets

17,584

21.512

22.3

(6)

6

Iron ore pellets prices increased 41.5%

Year-on-Year (YoY), resulting in higher cost of revenues

by 28.8% YoY. Uncertainties arising from the

pricing of iron ore pellets, which is conducted on

a quarterly basis, have continued to put pressure

on the

company’s

margins.

Key Issues

Iron Ore Pellets and Gas Prices

Net revenue in FY 2011 was Rp 17.9 trillion, up 19.9% YoY as average selling price of HRC rose 8.9% YoY

and steel sales volume grew 8.0% YoY, respectively.

Krakatau Steel completed the revitalization of the Hot Strip Mill in April 2011. The Hot Strip Mill resumed

production in April 2011 after passing the performance test and is currently working at full production

capacity of 2.4 million tons/year. Furthermore, the revitalization of the Direct Reduction Plant and the Slab

Steel Plant has reached 96.7% and 82.1%, respectively, as of February 2012.

(7)

7

S

ECTION

2

(8)

8

Financial results

Description FY 2010 FY 2011 Change (%) Income Statement

Net Revenues 14,940 17,915 19.9

Cost of Revenues 12,672 16,317 28.8

Gross Profit 2,269 1,599 -29.5

Operating Profit 1,027 359 -65.1

EBITDA 1,781 1,152 -35.3

Net Income 1,061 1,023 -3.6

Earnings per Share 81 65 -20.1

Balance Sheet

Current Assets 12,288 13,213 7.5

Total Assets 17,584 21,512 22.3

Current Liabilities 6,931 9,205 32.8

Total Liabilities 8,159 11,157 36.7

Equity 9,426 10,355 9.9

(9)

9

Capacity Utilization

Operating results

Production

Production

Product

FY 2010

FY 2011

Change (%)

Sponge Iron

1,274

1,228

-3.6

Slab Steel

1,084

1,014

-6.5

Hot Rolled Coil

1,504

1,761

17.1

Cold Rolled Coil

415

414

-0.2

Wire Rod

201

238

18.4

Steel Bar

114

121

5.9

Steel Section

76

81

7.7

ERW & Spiral Pipes

56

75

34.1

(10)

10

Marketing results

Sales Volume

Average HRC Price

(1)

(1) Currency conversions based on average exchange rates in each respective period

Sales Volume

Hot Rolled Coil

958,041

1,053,784

10.0

Cold Rolled Coil

421,508

405,435

-3.8

Wire Rod

201,318

227,399

13.0

Steel Bar

174,601

186,421

6.8

Steel Section

98,360

100,008

1.7

ERW & Spiral Pipes

60,304

94,531

56.8

Total

1,914,132

2,067,578

8.0

Product

FY 2010

FY 2011

Change (%)

(11)

11

S

ECTION

3

(12)

12

Progress of strategic projects

No. Project Status Progress

1. Revitalization of Existing Production Facilities

a. Hot Strip Mill (HSM) - Work is conducted by Pomini, Tenova, and Consortium SMS Demag AG, Siemens AG, Siemens Indonesia, Lykmas Jaya.

100.0% - The revitalization project was completed in May 2011.

- Production capacity increases to 2.4 mtpy from 2.0 mtpy.

b. Direct Reduction Plant (DRP)

- Work is conducted by HYL Technologiest S.A de C.V,

Krakatau Engineering, and Honeywell Indonesia. 96.7%, completion in March 2012

- Activities include instrument control, pipe installation, and civil works. Shipment of instruments started in October 2011. c. Slab Steel Plant (SSP)

- Work is conducted by Consortium Siemens VAI and PT Weltes Energi Nusantara.

82.1%, completion in first quarter of 2012

- Activities include water treatment plant and dedusting works, civil works, and installation of oxygen, nitrogen, and natural gas pipes.

2. Ironmaking Project – Kalsel (JV KS - Antam)

a. Rotary Kiln - Work is conducted by Krakatau Engineering, Prosys Bangun

Persada, and Outotec. 96.8%, completion in first quarter of 2012

- Construction of rotary kiln is completed.

b. Power Plant - Work is conducted by BTB (China) 74.1%, completion in first quarter of 2012

- Installation of boiler. 3. Blast Furnace Project and

Modernisation of Steel Making Facilities

- Work is conducted by Consortium MCC-CERI. Completion in 2014

- EPS contract was signed on November 15, 2011.

4. Expansion of Hot Strip Mill (2.4 mtpy to 3.5 mtpy)

- Technical review. Completion in 2014

(13)

13

Progress of strategic projects (cont’d)

No. Project Status Progress

5. Infrastructure Development

a. Port development to support Blast Furnace and JV Krakatau – POSCO

- Technical review. Completion in 2013

b. Power plant development - Work is conduted by Consortium Imeco and PP. 21.5%, completion in 2013

c. Water supply development phase I (Krenceng Reservoir capacity increase)

- Work is conducted by Consortium PT Krakatau Engineering and PT LMA.

100.0%

- Increase in water reservoir.

6. JV Krakatau POSCO

a. Land preparation - Work is conducted by PT Waskita Karya. 91.8%, completion in 2012

- Land clearing.

b. Plant construction - Work is conducted by Consortium POSCO EC and PT. Krakatau Engineering.

13.4%, completion in December 2013 - Pile driving.

(14)

14

S

ECTION

4

(15)

15

The ongoing debt crisis in Europe had no significant impact on the Asian steel market but eventually

depressed international prices. Nonetheless, steel demand in Indonesia remained strong last year and is

expected to continue growing in 2012, triggered by the

country’s

economic growth which is estimated to

reach 6.5% this year. The demand growth is derived mainly from significant expansion of steel related

sectors such as construction and automotive industry. Domestic steel prices have been increasing in the first

quarter of 2012 and are expected to remain strong following the pattern of regional prices.

Most Asian economies are likely to pick up and remain on target for reasonable growth rates, after a sluggish

period at the end of last year. Asian producers will try to build on the positive sentiment and seek higher price

levels in the second quarter.

Key producers in Asia appear to be matching real demand, while the sharp production cuts in China at the

end of last year meant that exports into the region were not excessive. Inventories are below usual and may

be rebuilt in the next few months.

(16)

16

Indonesia’s steel demand

Finished steel consumption in Indonesia

Indonesia’s steel demand drivers

Mining Sector

Local supply shortage

Total finished steel consumption

tonnes (m)

Construction Sector

Transportation &

Manufacturing Sector

Indonesian steel consumption has grown and demand drivers remain strong

Source: SEAISI

Source: SEAISI

47% 56% 46% 54%

% of imports

Domestic supply gap

53%

Mining, oil & gas development which

requires plates, pipes and tubes

Steel intensive infrastructure, housing

and building construction

(17)

17

HRC

CRC

Wire rod

Mar

ke

t

shar

e

in

Indo

nesia

(201

1

)

Prod

ucti

on

ca

pacit

y

(201

1

)

(mtpy) (mtpy) (mtpy)

Source: CRU Strategies, Company

Total demand: 3.6 million tons Total demand: 1.7 million tons Total demand: 0.9 million tons

Leader in market position across major steel products in Indonesia

Leadership in the Indonesian market

(18)

18

Strong and diversified customer base

HRC

CRC

Wire

 Automotive

 Coil Centers

 Drum

 Pipes, tube packaging, tin plates

 Home-office appliance

 Enamel

 Galvanized steel sheet

 Automotive

 Mechanical

engineering and boiler pressure vessels

 General structure

 Oil and gas pipes

 Shipbuilding

Diverse end-markets

(1) Direct sales refer to sales made by the company and not through stockists and steel centers

 Automotive

 Appliances

 Bolts and nuts, nails

 Construction, welding

 Cable wires, wire rope

 Spring bed’ electrode

 Nails, welding

Our customer and distribution mix provides us with leverage in the market

High proportion of direct sales(1) Low customer concentration

Top 5 customers of steel sales in 2011

A

6% B

5% C 5% D 4% E 4% Other customers 76%

(19)

19

Enhance marketing channel and trade barriers

New Market Focus

Shipbuilding projects

Infrastructure projects

port and bridge

construction

More Services

Increase in product sales to

automotive segment through

IndoJapan steel center (JV with

Nippon Steel Trading, Adyawinsa,

Dwijaya)

Increase in product sales to

automotive and projects segments

through establishment of coil

center in Cikarang

Consignment sales (shipbuilding)

Branded plate

Geographical Scope

Establishment of existing

representative in Batam

Establishment of future

representatives in

Banjarmasin, Balikpapan, and

Makassar to strengthen

presence of KS’ products in

shipbuilding and general

construction segments

Branch & warehouse in

Surabaya

Planned Distribution Hub

Construction of warehousing

railway links in Cikarang and

Surabaya

Construction of warehousing

shipping links in Banjarmasin and

Balikpapan

Enhance marketing channel

Trade barriers

Existing barriers

SNI

mandatory standard (HRC, CRC, Rebar,

galvanised sheet, galvalume sheet)

HRC antidumping (China, India

Russia,Taiwan,Thailand, Korea and Malaysia)

Import permit (Regulation of Trade Minister No.

8/2012)

Regulation of Energy and Mineral Resources

Minister No. 7/2012 on Improvement of Additional

Value of Mineral through Mineral Processing and

Purifying Process

Future barriers

(20)

20

Referensi

Dokumen terkait

Setiap Negara harus menetapkan peraturan perundang-undangan yang diperlukan untuk menjamin bahwa pemilik kapal yang dapat membuktikan bahwa mereka telah mengorbankan

Battery dan Instalasi Solar Cell Pada Jalan Tol Cawang Tomang Cengkareng Tahun. 2016, dengan ini kami sampaikan Nilai Akhir Evaluasi Dokumen

[r]

[r]

Menguasai materi, struktur, konsep, dan pola pikir Mengelola reklamasi hutan Menentukan metode reklamasi hutan berdasarkan keilmuan yang mendukung mata pelajaran yang pertimbangan

Kertas karya yang berjudul An Analysis of the Language Style in Catherine Cookson’s Selected Poemsini mendeskripsikan tentang gaya bahasa yang terdapat pada lirik dari 4

ULP_Pokja Barang Pengadaan Buku Ilmu Pengetahuan Umum SMK pada Unit Layanan Pengadaan (ULP) Kota Cirebon akan melaksanakan Pelelangan Sederhana dengan

Mata kuliah ini membahas tentang hakikat perilaku dan kemampuan dasar anak usia 3–4 tahun; prinsip dasar pengembangan dan strategi umum