• Tidak ada hasil yang ditemukan

PENERAPAN REKAYASA NILAI (VALUE ENGINEERING) PADA KONSTRUKSI BANGUNAN

N/A
N/A
Protected

Academic year: 2018

Membagikan "PENERAPAN REKAYASA NILAI (VALUE ENGINEERING) PADA KONSTRUKSI BANGUNAN"

Copied!
10
0
0

Teks penuh

(1)

PENERA PA N REKA YA SA NILA I (VALUE ENG INEERING ) PA DA KO NSTRUKSI BA NG UNA N

Ma stura La b o mb a ng *

Ab strac t

The g o a l o f this re se a rc h is to o b ta ine d the c he a p e rt a nd the b e st so lutio n tha t c o uld b e a p p lie d in p ub lic he a lth p a ntry in Kre mb a ng a n Ba ru Sura b a ya .

Be se d o n a sse ssing o f va lue e ng ine e ring a t the p a ntry wo rk re sulte d the hig he st c o st we re o n fo und a tio n, wa ll a nd the struc tura l wo rks. The a lte rna tive d e sig n will b e c o nsid e re d to Life C irc le C o st (LC C ) a nd Initia l C o st with ma trix no n b ud g e t ze ro o ne c rite ria n a nd c o rre la te d ma trix. The ne w d e sig n fo und the d ime nsio n o f fo und a tio n c o uld b e sma lle r tha n b e fo re , the sa me a s the wa ll will b e e xc a ng e b y using g yp sum b o a rd with p a inte d .

This a lte rna tive is the b e st so lutio n a nd d e c re a se d the c o st to 19,6% fro m the to ta l b ud g e t.

Ke y wo rd: Va lue Eng ine e ring , d e sig n

A b stra k

Tujua n d a ri p e ne litia n ini a d a la h untuk m e nc a ri so lusi ya ng te rb a ik d a n te rm ura h ya ng d a p a t d ila ksa na ka n p a d a b a g ia n ko nstruksi d a p ur (p a ntry) Puske sm a s Kre m b a ng a n Ba ru Sura b a ya . Se te la h d ia d a ka n re ka ya sa nila i (va lue e ng ine e ring ) m a ka d ip e ro le h ite m b e rb ia ya ting g i d ia nta ra nya p o nd a si, d ind ing d a n struktur. Ke m ud ia n d ic a ri a lte rna tive d e sa in d e ng a n c rite ria b ia ya ya itu Life C irc le C o st (LC C ) d a n Initia l C o st se rta d e ng a n c rite ria no n b ia ya m a triks ze ro o ne d a n m a triks b e rp a sa ng a n.

Ha silnya d ip e ro le h d e sa in ya ng m e m e nuhi sya ra t untuk p o nd a si ya itu d e ng a n m e ng e c ilka n d im e nsinya te ta p i te ta p m e m e nuhi p e rsya ra ta n ke a m a na n, d ind ing d id a la m d ib ua t g yp sum b o a rd d a n d i c a t ka p ur g a m p ing

De ng a n a lte rna tive te rse b ut d ip e ro le h p e ng he m a ta n se b e sa r 19,6% d a ri to ta l b ia ya .

Ka ta kunc i: Re ka ya sa nila i, p e ra nc a ng a n

* Sta f Pe ng a ja r Jurusa n Te knik Sip il Fa kulta s Te knik Unive rsita s Ta d ula ko , Pa lu 1. Pe nd a hulua n

Da la m ko nd isi p e re ko no m ia n se p e rti se ka ra ng ini ya itu krisis ya ng b e rke p a nja ng a n d ib e rb a g a i se kto r, jum la h p e nd ud uk ya ng se m a kin b e rta m b a h, m e nurunnya d a ya b e li m a ya ra ka t, m a ka untuk m e ring a nka n b e b a n m a sya ra ka t p e m e rinta h p e rlu m e nye d ia ka n sa ra na d a n p ra sa ra na , sa la h sa tunya sa ra na p e la ya na n ke se ha ta n ya itu Puske sm a s.

Re ka ya sa nila i (va lue e ng ine e ring ) a d a la h e va lua si siste m a tis a ta s d e sa in e ng ine e ring sua tu p ro ye k untuk m e nd a p a tka n nila i ya ng p a ling

ting g i b a g i se tia p ua ng ya ng d ike lua rka n d a n m e ng ka ji d a n m e m ikirka n b e rb a g a i ko m p o ne n ke g ia ta n d a la m ka ita nnya a nta ra b ia ya te rha d a p fung sinya d e ng a n tujua n untuk m e nd a p a tka n p e nuruna n b ia ya p ro ye k se c a ra ke se luruha n.

Pe ne litia n ini m e ng a m b il lo ka si p a d a Puske sm a s Kre m b a ng a n Ba ru Sura b a ya d a n ha nya m e nfo c uska n re ka ya sa nila i p a d a p e ke rja a n ko nstruksi d a p ur sa ja .

(2)
(3)
(4)
(5)

4.1.2 Ana lisa Fung si Ite m b e rb ia ya Ting g i Ana lisa Fung si se tia p ite m b ia ya je nis p e ke rja a n (p o nd a si, d ind ing ,

fung si struktur d isa jika n d a la m Ta b e l 3, Ta b e l 4, Ta b e l 5.)

Ta b e l 2. Bre a kd o wn Bia ya

No . Ite m Pe ke rja a n Bia ya Kum ula tif

Rp . % Rp . %

1 Po nd a si 6,083,812.95 40.241 6,083,812.95 40.451

2 Dind ing 2,993,850.74 19.803 9,077,663.69 60.043

3 Struktur 2,249,413.15 14.879 11,327,076.84 74.922

4 Pintu d a n je nd e la 1,761,196.26 11.649 13,088,273.10 86.571

5 Pla fo n 1,046,226.80 6.92 14,134,499.90 93.491

6 La nta i 716,527.50 4.739 14,851,027.40 98.231

7 Insta la si listrik 267,483.00 1.769 15,118,510.40 100

15,118,510.40 100 15,118,510.40 100

40.451

60.043

74.922

86.571 93.491

98.231 100

0 20 40 60 80 100 120

1 2 3 4 5 6 7

% item pekerjaan

%

i

tem

b

iay

a

G a m b a r 1. Kurva hub una n % Ite m p e ke rja a n vs % Ite m b ia ya

Ta b e l 3. Ana lisa fung si p o nd a si

Ko nstruksi d a p ur TA HA P INFO RMA SI

Puske sm a s A NA LISA FUNG SI

Kre m b a ng a n Ba ru Ite m : PO NDA SI

Fung si : Me na ha n b e b a n b a ng una n

No . Ko m p o ne n

Fung si

C o st Wo rth Ka ta

ke rja

Ka ta

b e nd a B/ S

1 Po nd a si b t. ka li Me na ha n b e b a n B 2,713,429.70 1,789,111.30

2

Po nd a si stra uss

p ile Me na ha n b e b a n B 3,370,383.25 3,370,383.25

Jum la h 6,083,812.95 5,159,494.55

(6)

Ta b e l 4. Ana lisa fung si d ind ing

Ko nstruksi d a p ur TA HA P INFO RMA SI

Puske sm a s A NA LISA FUNG SI

Kre m b a ng a n Ba ru Ite m : Dind ing

No . Ko m p o ne n

Fung si : Pe m b a ta s rua ng

Fung si

Ka ta ke rja Ka ta b e nd a B/ S C o st Wo rth

Dind ing b a tu

b a ta Pe m b a ta s b e b a n B 1,748,140.14 1,748,140.14

2 Dind .b t.b a ta

tra ssra m Pe m b a ta s b e b a n B 431,571.60 431,571.60

3 Ple ste ra n Me nutup p e rm uka a n S 216,891.00

4 Ple ste ra n

tra ssra m Me nutup p e rm uka a n S 92,926.00

5 C a t Me m p e rind a h p e rm uka a n S 504,322.00

Jum la h 2,993,850.74 2,179,711.74

C o st/ wo rth 1.4

Ta b e l 5. Ana lisa fung si struktur

Ko nstruksi d a p ur TA HA P INFO RMA SI

Puske sm a s A NA LISA FUNG SI

Kre m b a ng a n Ba ru Ite m : Struktur

No . Ko m p o ne n

Fung si : m e na ha n/ m e ne rim a d a n m e nya lurka n b e b a n

b a ng una n a ta s ke p o nd a si

Fung si

C o st Wo rth Ka ta

ke rja

Ka ta

b e nd a B/ S

1 Slo o f 15/ 25 Me ne rim a b e b a n B 641,655.30 641,655.30

2 Ko lo m 20/ 20 Pe ng ika t d ind ing S 966,102.55

3 Ring b a lk 15/ 25 Me ne rim a b e b a n B 641,655.30 641,655.30

Jum la h 2,249,413.15 1,283,310.60

C o st/ wo rth 1.75

Ka re na ra sio c o st/ wo rth untuk p o nd a si, d ind ing d a n struktur le b ih d a ri 1 m a ka te rd a p a t b ia ya ya ng tid a k d ip e rluka n p a d a ite m te rse b ut d a n a ka n d ila kuka n re ka ya sa nila i.

4.2 Ta ha p kre a tif

Se te la h ta ha p info rm a si, ke m ud ia n d ila njutka n ke ta ha p kre a tif d e ng a n m e ng a m b il ite m p e ke rja a n ya ng m e m p unya i nila i c o st/ wo rth le b ih d a ri 1 ya itu:

1) Pe ke rja a n p o nd a si C / W = 1.2

2) Pe ke rja a n d ind ing C / W = 1.4

3)Pe ke rja a n struktur C / W = 1.75

Pa d a ta ha p kre a tif m e rup a ka n ta ha p m e nc a ri so lusi a lte rna tif d e ng a n b ra insto rm in. Untuk m e m ud a hka n b e rp ikir kre a tif d a n m e nc a ri so lusi a lte rna tif m a ka a d a 2 c a ra ya itu:

a . m e ng hila ng ka n fung si se kund e r

ya ng m ung kin

b . g a nti fung si d a sa r/ b a sic a ta u g a nti

siste m

4.3 Ta ha p Ana lisa

(7)
(8)

Ta b e l 9. (la njuta n)

No . Pe ke rja a n

Vo lum e

Sa t.

Ha rg a

sa tua n Ha rg a

Rp . Rp .

4 Urug a n p a sir 3.08 m 3 79,700.00 245,476.00

5 Urug a n ta na h 11.36 m 3 7,035.00 79,917.60

6

G a lia n ta na h

stra ussp ile 4.00 m 3 27,200.00 108,800.00

7 Po nd a si stro ussp ile 1.98 m 3 1,645,270.00 3,261,583.25

Jum la h to ta l 6,083,812.95

Ta b e l 10. RAB so lusi d e sa in a lte rna tif p o nd a si

No .

Pe ke rja a n

Vo lum e

Sa t.

Ha rg a

sa tua n Ha rg a

Rp . Rp .

1 G a lia n ta na h 7.03 m 3 14,073.00 98,933.19

2 Aa nsta m p ing 22.01 m 3 38,364.00 844,391.64

3 Po nd a si b a tu ka li 3.08 m 3 294,625.00 907,445.00

4 Urug a n p a sir 1.13 m 3 79,700.00 89,662.50

5 Urug a n ta na h 6.08 m 3 7,035.00 42,772.80

6

G a lia n ta na h

stra ussp ile 4.00 m 3 27,200.00 108,800.00

7 Po nd a si stro ussp ile 1.98 m 3 1,645,270.00 3,257,634.60

Jumlah total 5,349,639.73

b . Dind ing

De sa in a wa l

:

Ta b e l 11. RAB d e sa in a wa l p e ke rja a n d ind ing

No . Pe ke rja a n Vo lum e Sa t. Ha rg a

sa tua n Ha rg a

Rp . Rp .

1 Dind ing b a tu b a ta 4.08 m 3 428,781.00 1,748,140.14

2 Dind . Ba ta tra ssra m 1.01 m 3 425,613.00 431,571.60

3 Ple ste ra n 10.97 m 2 19,780.00 216,891.00

4 Ple ste ra n tra sra m 4.21 m 2 22,098.00 92,926.00

5 C a t ka p ur g a m p ing 47.60 m 2 1,000.00 504,322.00

Jum la h to ta l 2,993,850.74

Ta b e l 12. RAB d e sa in So lusi a lte rna tif p e ke rja a n d ind ing

No.

Pekerjaan

Volume

Sat.

Harga

satuan Harga Rp. Rp.

1 Dind ing b a tu b a ta 3.29 m 3 428,781.00 1,409,831.93

2 Dind . Ba ta tra ssra m 0.88 m 3 425,613.00 374,539.44

3 G yp sum b o a rd 5.28 m 2 22,000.00 116,160.00

(9)
(10)

Ka ufm a n J.J, 1985, Va lue Eng ine e ring fo r

the Pra c titio ne r, No rth C a ro lina

Sta te Unive rsity.

Mud g e A.E,1989, Va lue Eng ine e ring , A

Syste ma tic Ap p ro a c h, J.Po hl

Asso c ia te s

So e ha rto Im a m ,1995, Ma na je me n

Pro ye k Da ri Ko nse p tua l Sa mp a i

O p e ra sio na l, Erla ng g a .

Zim m e rm a n, 1982, Va lue Ana lysis,

Referensi

Dokumen terkait

108 Modul Paket Keahlian IPA Terapan Sekolah Menengah Kejuruan (SMK) Berikut ini adalah beberapa teknik untuk mengembangkan potensi psikomotorik pada peserta didik..

Tujuan dari pelaksanaan tugas akhir ini adalah implementasi dan evaluasi kinerja routing protokol wireless sensor wireless berbasis efisiensi daya dengan

Penelitian ini hanya membahas tentang sistem penimbunan batubara di stockpile shimeipheng, parameter penyebab swabakar dan perilaku temperatur timbunan batubara pada

[r]

Adapun kondisi tersebut adalah sebagai berikut: (1) Kurang berfungsinya unit produksi sebagai tempat latihan bagi siswa, (2) Kurang berjalannya fungsi guru sebagai

Pengendalian Hama Tanaman dengan Manggunakan Pestisida Nabati Salah satu alternatif untuk menggantikan penggunaan pestisida kimia yang banyak menimbulkan dampak

Data sekunder adalah sumber informasi yang secara tidak langsung memberikan data kepada pengumpul data. Data sekunder dalam penelitian ini meliputi buku-buku, makalah,

Ada dua proses utama yang dibahas dan dikerjakan dalam proyek ini, yaitu proses pengolahan sinyal menggunakan modulasi delta sebagai salah satu metode pengolahan sinyal analog