Lampiran 1. Tabel dan grafik produksi minyak bumi di Indonesia (Kementrian ESDM, 2010)Tahun Minyak bumi (barrel) Kondensat (barrel) Total (barrel)
2000 465.354.004 52.061.690 517.415.694 2001 441.799.282 48.050.018 489.849.300 2002 407.770.073 47.968.842 455.738.915 2003 367.025.638 48.788.519 415.814.157 2004 353.945.229 46.541.005 400.486.234 2005 339.253.904 46.454.875 385.708.779 2006 315.919.775 43.369.562 359.289.337 2007 304.897.012 43.417.933 348.314.945 2008 311.103.057 45.333.729 356.436.786 2009 293.287.023 43.973.814 337.260.837 2010 145.552.236 21.480.341 167.002.577 TOTAL 3.745.877.233 487.440.328 4.233.317.561
62
Lampiran 2. Jenis-jenis teknologi EOR (Thomas, 2007)63
Lampiran 3. Peraturan Pemerintah Dalam Rangka Peningkatan Produksi Minyak Bumi64
Lampiran 3. Peraturan Pemerintah Dalam Rangka Peningkatan Produksi Minyak65
Lampiran 3. Peraturan Pemerintah Dalam Rangka Peningkatan Produksi Minyak66
Lampiran 3. Peraturan Pemerintah Dalam Rangka Peningkatan Produksi Minyak67
Lampiran 4. Penghitungan neraca energi Industri MES1. Kebutuhan air produksi
Unit Kebutuhan air (m3
Scrubber 0.4
2. Kebutuhan listrik produksi
Unit Jumlah Daya listrik Waktu operasi Kebutuhan energi/tahun
(kw) (kw/tahun)
Pompa gear tangki
masukan metil ester 1 2,2 24 jam/hari 15.840
Gear motor tangki
pematangan 2 0,75 24 jam/hari 10.800
Pompa centrifugal tangki
pematangan 1 0,37 24 jam/hari 2.664
Gear motor tangki
netralisasi 2 0,75 24 jam/hari 10.800
Pompa gear tangki
netralisasi 1 2,2 24 jam/hari 15.840
Pompa gear tangki scrubber
1 2,2 24 jam/hari 15.840
Pompa gear tangki
penyimpanan bahan baku 1 2,2 3 jam/7hari 283
Pompa gear tangki
penyimpanan NaOH 1 2,2 3 jam/7hari 283
Pompa gear tangki
penyimpanan produk 1 2,2 3jam/7hari 283
Total 72.350
3. Kebutuhan steam
Kebutuhan Steam Proses Produksi Jumlah Tangki Jumlah Steam Subtotal
Tangki masukan metil ester 2 4,47 8,95
Multi tube film reactor 1 1,11 1,11
Tangki pematangan 2 0,36 0,73
Tangki netralisasi 2 0,18 0,36
68
Lampiran 5. Penghitungan kebutuhan SteamTangki masukan metil ester
Kalor untuk menaikan suhu pada tangki masukan metil ester
Masa bahan per hari
m(kg)
7.000,00
Koefisien pindah panas
Cp
(Kj/kg
0C)
3,30
Perbedaan suhu awal dan akhir
∆T
50 (80-30)
Efisiensi panas
ɳ
0,85
Energi panas yang dibutuhkan
Q(kJ)
1.358.823,53 Q=(mxCpX∆T)/ɳ
Kalor bersih uap panas
λ (kJ/kg)
2.414,18
Jumlah uap panas yang dibutuhkan m(kg/hari)
562,85 Q=mxɳ
Multitube Falling Film Reactor
Kalor untuk mempertahankan suhu pada MTFR
Perbedaan suhu ∆T (0C)
20 (100-80)
Luas permukaan A(m2)
5,16
r
0=0,147 ; r
i=0,127 ;
L=6
Panas konveksi
Koefisien pindah panas h(W/m2 0C)
3000
Tahanan konveksi R1(0C/W)
6,46 x 10
5
R1=1/(hxA)
Panas konduksi stainless steel
Konduktivitas panas k(w/m0C)
17
Tebal ∆x (m)
0,01
Tahanan konduksi R2(0C/W)
1,14 x 10
4
R2=∆x/(kxA)
Panas konduksi isolator asbes
Konduktivitas panas k(w/m0C)
0,21
Tebal ∆x (m)0,01
Tahanan konduksi R3(0C/W)9,23x 10
3 R3=∆x/(kxA) Jumlah kalor q(W)2126,73
q=∆T/(R1+R2+R3)Jumlah kalor yang dibutuhkan per
hari q(kJ)
3062,49
Efisiensi panas ɳ(%)
85%
Energi panas yang dibutuhkan Q(kJ)
3602,93
Kalor bersih uap pemanas λ (kJ/kg)
2414,18
jumlah uap pemanas yang dibutuhkan
69
Tangki Pematangan
Kalor untuk mempertahankan suhu pada Tangki Pematangan
Perbedaan suhu ∆T (0C)
20 (100-80)
Luas permukaan A(m2)
4,83
r
0=0,52 ; r
i=0,5 ;
L=1,5
Panas konveksi
Koefisien pindah panas h(W/m2 0C)
3000
Tahanan konveksi R1(0C/W)
6,90 x 10
5
R1=1/(hxA)
Panas konduksi stainless steel
Konduktivitas panas k(w/m0C)
17
Tebal ∆x (m)
0,01
Tahanan konduksi R2(0C/W)
1,22 x 10
4
R2=∆x/(kxA)
Panas konduksi isolator asbes
Konduktivitas panas k(w/m0C)
0,21
Tebal ∆x (m)0,01
Tahanan konduksi R3(0C/W)9,86 x 10
3 R3=∆x/(kxA) Jumlah kalor q(W)1990,40
q=∆T/(R1+R2+R3)Jumlah kalor yang dibutuhkan per
hari q(kJ)
2866,18
Efisiensi panas ɳ(%)
85%
Energi panas yang dibutuhkan Q(kJ)
3371,98
Kalor bersih uap pemanas λ (kJ/kg)
2414,18
jumlah uap pemanas yang dibutuhkan
per hari m(kg/hari)
1,40
Q=mxλ70
Tangki Netralisasi
Kalor untuk mempertahankan suhu pada tangki netralisasi
Perbedaan suhu ∆T (0C)
20 (100-80)
Luas permukaan A(m2)
4,83
r
0=0,52 ; r
i=0,5 ;
L=1,5
Panas konveksi
Koefisien pindah panas h(W/m2 0C)
3000
Tahanan konveksi R1(0C/W)
6,90 x 10
5
R1=1/(hxA)
Panas konduksi stainless steel
Konduktivitas panas k(w/m0C)
17
Tebal ∆x (m)
0,01
Tahanan konduksi R2(0C/W)
1,22 x 10
4
R2=∆x/(kxA)
Panas konduksi isolator asbes
Konduktivitas panas k(w/m0C)
0,21
Tebal ∆x (m)0,01
Tahanan konduksi R3(0C/W)9,86 x 10
3 R3=∆x/(kxA) Jumlah kalor q(W)1990,40
q=∆T/(R1+R2+R3)Jumlah kalor yang dibutuhkan per
hari q(kJ)
2866,18
Efisiensi panas ɳ(%)
85%
Energi panas yang dibutuhkan Q(kJ)
3371,98
Kalor bersih uap pemanas λ (kJ/kg)
2414,18
jumlah uap pemanas yang dibutuhkan
per hari m(kg/hari)
1,40
Q=mxλ71
Lampiran 6. Daftar Produsen Biodiesel tahun 2011 (Aprobi 2011)No Nama Perusahaan Lokasi Kapasitas Produksi
(Ton/Tahun) Anggota Aprobi
1 Energi Alternatif Jakarta 7.000 2 Eterna Buana Chemical Industries Tanggerang 40.000 3 Indo Biofuels Energy Merak 60.000 4 Anugrah Inti Gemanusa Gresik 40.000 5 Eterindo Nusagraha Gresik 40.000 6 Wilmar Bioenergi Indonesia Dumai 1.000.000 7 Wilmar Nabati Indonesia Gresik 600.000 8 Sumi Asih Oleo Chemical Bekasi 100.000 9 Darmex Biofuels Bekasi 150.000 10 Pelita Agung Agri Industri Bengkalis 200.000 11 Musim Mas
Deli Serdang 70.000
Batam 350.000
12 Multikimia Intipelangi Bekasi 14.000 13 Cemerlang Energi Perkasa Dumai, Riau 400.000 14 Pasadena Biofuels Mandiri Cikarang 10.240 15 Kenzie Megapolitan Makasar 5.000 16 Ganesha Energi Medan 10.000
17 Bakri Sumatra Plantation
18 Sinar Mas Group
19 Marinda Agritama
20 Nusantara Bio Energi
Subtotal ~3.600.379
Belum menjadi anggota Aprobi
21 Sintong Abadi
Asahan,
Sumut 35.000
22 Primanusa Palma Energi Jakarta 24.000 23 Bioenergi Pratama Jaya Berau 6.000 24 Wahana Abdi Tritatehnika Sejati Bogor 132.200 25 Alia Mada Perkasa Tanggerang 11.000 26 Damai Sejahtera Sentosa Cooking Surabaya 120.000
Subtotal 328.200
Total ~ 3.928.579
72
Lampiran 7. Penyusutan dan nilai sisa (dalam ribuan rupiah)Komponen Nilai (Rp) Nilai sisa (Rp) Penyusutan (Rp) Mesin dan Peralatan
Tangki penyimpanan bahan baku 232.100 23.210 20.889
Tangki penyimpanan MES 835.000 83.500 75.150
Tangki masukan metil ester 261.400 26.140 23.526
Multitube falling film reactor 295.200 29.520 26.568
Tangki pematangan 151.800 15.180 13.662
Tangki netralisasi 224.400 22.440 20.196
Scrubber 223.700 22.370 20.133
Quencher 3.200 320 288
Oil & gas separator 6.500 650 585
Cyclone 3.100 310 279
Tangki penyimpanan NaOH 34.800 3.480 3.132
Subtotal 2.271.200 227.120 204.408 Pemipaan 1.544.416 154.442 138.997 Subtotal 1.544.416 154.442 138.997 Instalasi listrik 249.832 24.983 22.485 Subtotal 249.832 24.983 22.485 Bangunan Proses produksi 30.000 15.000 750 Laboratorium 40.000 20.000 1.000 Kontrol proses 15.000 7.500 375 Kantor 127.000 63.500 3.175 Pengolahan limbah 5.000 2.500 125
Penyimpanan bahan baku 54.000 27.000 1.350
Penyimpanan produk 96.000 48.000 2.400
Bengkel 30.000 15.000 750
Jalan dan parkir 200.000 100.000 5.000
73
Lampiran 7 Penyusutan dan nilai sisa (dalam ribuan rupiah) ...lanjutanKomponen Nilai (Rp) Nilai sisa (Rp) Penyusutan (Rp)
Perlengkapan
Perlengkapan kantor
Meja kursi pimpinan 3.000 300 270
Meja kursi manajer 7.500 750 675
Meja kursi superviser 6.000 600 540
Meja kursi tenaga pembantu 7.500 750 675
Meja kusi ruang meeting 3.500 350 315
Meja kursi tamu 3.300 330 297
File cabinet 9.600 960 864 Komputer 40.000 4.000 3.600 Printer 8.000 800 720 Telepon 1.000 100 90 Faksimili 1.500 150 135 AC 6.000 600 540 Perlengkapan laboratorium 30.000 3.000 2.700 Perlengkapan pemeliharaan 5.000 500 450 Perlengkapan keamanan/APD 2.000 200 180 Perlengkapan kebersihan 500 50 45 Subtotal 134.400 13.440 12.096 Kendaraan 1.050.000 105.000 94.500
Subtotal penyusutan kendaraan 1.050.000 105.000 94.500
74
Lampiran 8. Rincian Biaya Produksi (dalam ribuan rupiah)Komponen Tahun 1 2 3 4 5 Kapasitas 90% 90% 100% 100% 100% Biaya variabel Bahan baku 41.611.650 41.611.650 46.235.167 46.235.167 46.235.167 Bahan penolong 9.493.251 9.493.251 10.548.057 10.548.057 10.548.057 Utilitas produksi 14.073.106 14.073.106 15.636.784 15.636.784 15.636.784 Tenaga kerja langsung 747.000 747.000 830.000 830.000 830.000 Subtotal 65.925.007 65.925.007 73.250.008 73.250.008 73.250.008
Biaya tetap
Tenaga kerja tidak langsung 2.025.200 2.025.200 2.025.200 2.025.200 2.025.200 Kebutuhan administrasi kantor 60.000 60.000 60.000 60.000 60.000 Utilitas kantor 54.073 54.073 54.073 54.073 54.073 Laboratorium 49.800 49.800 49.800 49.800 49.800 Pemeliharaan 584.685 584.685 584.685 584.685 584.685 Asuransi 39.182 39.182 39.182 39.182 39.182 Pajak 7.082 7.082 7.082 7.082 7.082 Distribusi dan pemasaran 1.423.541 1.423.541 1.423.541 1.423.541 1.423.541 Depresiasi 487.411 487.411 487.411 487.411 487.411 Bunga investasi tetap 1.197.085 957.668 718.251 478.834 239.417 Bunga modal kerja 747.503 373.751 - - - Subtotal 6.675.560 6.062.392 5.449.224 5.209.807 4.970.390 Total 72.600.568 71.987.399 78.699.232 78.459.815 78.220.398
75
Lampiran 8. Rincian Biaya Produksi (dalam ribuan rupiah) ...lanjutanKomponen Tahun 6 7 8 9 10 Kapasitas 100% 100% 100% 100% 100% Biaya variabel Bahan baku 46.235.167 46.235.167 46.235.167 46.235.167 46.235.167 Bahan penolong 10.548.057 10.548.057 10.548.057 10.548.057 1054805700% Utilitas produksi 15.636.784 15.636.784 15.636.784 15.636.784 15.636.784 Tenaga kerja langsung 830.000 830.000 830.000 830.000 830.000 Subtotal 73.250.008 73.250.008 73.250.008 73.250.008 73.250.008
Biaya tetap
Tenaga kerja tidak langsung 2.025.200 2.025.200 2.025.200 2.025.200 2.025.200 Kebutuhan administrasi kantor 60.000 60.000 60.000 60.000 60.000 Utilitas kantor 54.073 54.073 54.073 54.073 54.073 Laboratorium 49.800 49.800 49.800 49.800 49.800 Pemeliharaan 584.685 584.685 584.685 584.685 584.685 Asuransi 39.182 39.182 39.182 39.182 39.182 Pajak 7.082 7.082 7.082 7.082 7.082 Distribusi dan pemasaran 1.423.541 1.423.541 1.423.541 1.423.541 1.423.541 Depresiasi 487.411 487.411 487.411 487.411 487.411 Bunga investasi tetap - - - - -
Bunga modal kerja - - - - -
Subtotal 4.730.973 4.730.973 4.730.973 4.730.973 4.730.973 Total 77.980.981 77.980.981 77.980.981 77.980.981 77.980.981
76
Lampiran 9. Rincian modal kerja (dalam ribuan rupiah)Komponen Hari 1 2 3 4 5
Account Receivable 45 produk 10.367.663 10.367.663 11.519.625 11.519.625 11.519.625 Inventory 15 produk 5.183.831 5.183.831 5.759.813 5.759.813 5.759.813 Account Payable 45 bahan baku (5.201.456) (5.201.456) (5.779.396) (5.779.396) (5.779.396) Total 10.350.037 10.350.037 11.500.042 11.500.042 11.500.042
Komponen Hari 6 7 8 9 10
Account Receivable 45 produk 11.519.625 11.519.625 11.519.625 11.519.625 11.519.625
Inventory 15 produk 5.759.813 5.759.813 5.759.813 5.759.813 5.759.813
Account Payable 45 bahan baku (5.779.396) (5.779.396) (5.779.396) (5.779.396) (5.779.396)
77
Lampiran 10. Proyeksi arus kas (dalam ribuan rupiah)Komponen Tahun 0 1 2 3 4 5 Penerimaan bersih Laba bersih - 7.755.549 8.215.426 10.093.326 10.272.889 10.452.452 Depresiasi - 487.411 487.411 487.411 487.411 487.411 Nilai sisa - - - - Subtotal - 8.242.961 8.702.837 10.580.737 10.760.300 10.939.863 Pengeluaran bersih
Investasi + bunga sebelum pembangunan 17.830.701 - - - - -
Modal kerja - 11.500.042 - - - -
Angsuran modal investasi tetap - 2.394.169 2.394.169 2.394.169 2.394.169 2.394.169
Angsuran modal kerja - 3.737.514 3.737.514 - - -
Subtotal 17.830.701 17.631.724 6.131.683 2.394.169 2.394.169 2.394.169
Arus kas bersih (17.830.701) (9.388.764) 2.571.154 8.186.568 8.366.131 8.545.694
Discount Factor 1 0,91 0,83 0,75 0,68 0,62
Present value (17.830.701) (8.535.240) 2.124.921 6.150.690 5.714.180 5.306.203
78
Lampiran 10. Proyeksi arus kas (dalam ribuan rupiah) .... lanjutanKomponen 6 7 8 9 10 Penerimaan bersih Laba bersih 10.632.014 10.632.014 10.632.014 10.632.014 10.632.014 Depresiasi 487.411 487.411 487.411 487.411 487.411 Nilai sisa - - - - 823.485 Subtotal 11.119.426 11.119.426 11.119.426 11.119.426 11.942.910 Pengeluaran bersih
Investasi + bunga sebelum pembangunan - - - - -
Modal kerja - - - - -
Angsuran modal investasi tetap - - - - -
Angsuran modal kerja - - - - -
Subtotal - - - - -
Arus kas bersih 11.119.426 11.119.426 11.119.426 11.119.426 11.942.910
Discount Factor 0,56 0,51 0,47 0,42 0,39
Present value 6.276.626 5.706.023 5.187.294 4.715.722 4.604.509 Present value kumulatif (793.321) 4.912.703 10.099.997 14.815.719 19.420.228
79
Lampiran 11. Fund Flow statement (dalam ribuan rupiah)Komponen Tahun 0 1 2 3 4 5 CASH INFLOW Penerimaan - 72.573.638 72.573.638 80.637.375 80.637.375 80.637.375 Account receivable - 10.367.663 10.367.663 11.519.625 11.519.625
Equity investasi tetap 5.859.855 - - - - -
Equity modal kerja - 4.025.015 - - - -
Pinjaman investasi tetap 11.970.846 - - - - -
Pinjaman modal kerja - 7.475.027 - - - -
Total cash inflow 17.830.701 84.073.679 82.941.300 91.005.038 92.157.000 92.157.000
CASH OUTFLOW
Capital expenditure 16.742.442 - - - - -
Cash expenses (exp:depresiasi dan interest) - 64.967.113 64.967.113 71.714.174 71.714.174 71.714.174
Account payable - - 5.201.456 5.201.456 5.779.396 5.779.396
Angsuran pinjaman investasi tetap - 2.394.169 2.394.169 2.394.169 2.394.169 2.394.169
Angsuran pinjaman modal kerja - 3.737.514 3.737.514 - - -
Bunga investasi tetap - 1.197.085 957.668 718.251 478.834 239.417
Bunga modal kerja - 747.503 373.751 - - -
Pajak - 2.585.183 2.738.475 3.364.442 3.424.296 3.484.151
Inventori - 5.183.831 - 575.981 - -
Total cash inflow 16.742.442 80.812.397 80.370.146 83.968.473 83.790.869 83.611.306
NET CASHFLOW 1.088.259 3.261.282 2.571.154 7.036.564 8.366.131 8.545.694
Kas awal tahun - 1.088.259 4.349.541 6.920.695 13.957.259 22.323.390
80
Lampiran 11. Fund Flow statement (dalam ribuan rupiah) ...lanjutanKomponen Tahun 6 7 8 9 10 CASH INFLOW Penerimaan 80.637.375 80.637.375 80.637.375 80.637.375 80.637.375 Account receivable 11.519.625 11.519.625 11.519.625 11.519.625 11.519.625
Equity investasi tetap - - - - -
Equity modal kerja - - - - -
Pinjaman investasi tetap - - - - -
Pinjaman modal kerja - - - - -
Total cash inflow 92.157.000 92.157.000 92.157.000 92.157.000 92.157.000
CASH OUTFLOW
Capital expenditure - - - - -
Cash expenses (depresiasi dan interest) 71.714.174 71.714.174 71.714.174 71.714.174 71.714.174 Account Payable 5.779.396 5.779.396 5.779.396 5.779.396 5.779.396 Angsuran pinjaman investasi tetap - - - - -
Angsuran pinjaman modal kerja - - - - -
Bunga investasi tetap - - - - -
Bunga modal kerja - - - - -
Pajak 3.544.005 3.544.005 3.544.005 3.544.005 3.544.005 Inventori - - - - - Total cash inflow 81.037.574 81.037.574 81.037.574 81.037.574 81.037.574
NET CASHFLOW 11.119.426 11.119.426 11.119.426 11.119.426 11.119.426
Kas awal tahun 30.869.084 41.988.509 53.107.935 64.227.360 75.346.786 Kas akhir tahun 41.988.509 53.107.935 64.227.360 75.346.786 86.466.211
81
Lampiran 12. Neraca (dalam ribuan rupiah)Komponen Tahun
0 1 2 3 4 5
ASSET
Current asset
- Kas akhir tahun 1.088.259 4.349.541 6.920.695 13.957.259 22.323.390 30.869.084 - Account receivable 10.367.663 10.367.663 11.519.625 11.519.625 11.519.625 - Inventory 5.183.831 5.183.831 5.759.813 5.759.813 5.759.813 Total current asset 1.088.259 19.901.035 22.472.189 31.236.697 39.602.827 48.148.521
Fixed investment 16.742.442 16.742.442 16.742.442 16.742.442 16.742.442 16.742.442 Less accum depreciation 487.411 974.823 1.462.234 1.949.645 2.437.057 Net fixed asset 16.742.442 16.255.031 15.767.620 15.280.208 14.792.797 14.305.386
Total Asset 17.830.701 36.156.065 38.239.808 46.516.905 54.395.624 62.453.907
LIABILITIES DAN EQUITY
Liabilities
- Account payable 5.201.456 5.201.456 5.779.396 5.779.396 5.779.396 - Pinjaman modal tetap 11.970.846 9.576.677 7.182.508 4.788.338 2.394.169 - - Pinjaman modal kerja 3.737.514 - - - - Total liabilities 11.970.846 18.515.647 12.383.964 10.567.734 8.173.565 5.779.396
Equity
-Share capital 5.859.855 5.859.855 5.859.855 5.859.855 5.859.855 5.859.855 -Share modal kerja 4.025.015 4.025.015 4.025.015 4.025.015 4.025.015 -Laba bersih 7.755.549 15.970.975 26.064.301 10.272.889 10.452.452 Total equity 5.859.855 17.640.419 25.855.844 35.949.170 46.222.059 56.674.511
82
Lampiran 12. Neraca (dalam ribuanh rupiah)....lanjutanKomponen Tahun
6 7 8 9 10
ASSET
Current asset
- Kas akhir tahun 41.988.509 53.107.935 64.227.360 75.346.786 86.466.211 - Account receivable 11.519.625 11.519.625 11.519.625 11.519.625 11.519.625 - Inventory 5.759.813 5.759.813 5.759.813 5.759.813 5.759.813 Total current asset 59.267.947 70.387.372 81.506.798 92.626.223 103.745.649
Fixed investment 16.742.442 16.742.442 16.742.442 16.742.442 16.742.442 Less accum depreciation 2.924.468 3.411.879 3.899.291 4.386.702 4.874.113 Net fixed asset 13.817.974 13.330.563 12.843.152 12.355.740 11.868.329
Total Asset 73.085.921 83.717.935 94.349.949 104.981.964 115.613.978
LIABILITIES DAN EQUITY
Liabilities
- Account Payable 5.779.396 5.779.396 5.779.396 5.779.396 5.779.396 - Pinjaman modal tetap - - - - -
- Pinjaman modal kerja - - - -
Total liabilities 5.779.396 5.779.396 5.779.396 5.779.396 5.779.396
Equity
-Share capital 5.859.855 5.859.855 5.859.855 5.859.855 5.859.855 - Share modal kerja 4.025.015 4.025.015 4.025.015 4.025.015 4.025.015 - Laba bersih 10.632.014 10.632.014 10.632.014 10.632.014 10.632.014 Total equity 67.306.525 77.938.539 88.570.554 99.202.568 109.834.582
83
Lampiran 13. Pengaruh nilai tukar terhadap laba bersih dan aset industri MESTahun ke Basis Depresiasi 5% Depresiasi 10% Apresiasi 5% Apresiasi 10%
Laba bersih Aset Laba bersih Aset Laba bersih Aset Laba bersih Aset Laba bersih Aset
1 7.755.549 36.156.065 6.179.397 34.645.347 4.601.247 33.132.252 9.335.696 37.671.537 10.910.354 39.181.285 2 8.215.426 38.239.808 6.632.239 35.239.688 5.047.042 32.235.363 9.802.633 41.248.338 11.384.323 44.246.016 3 10.093.326 46.516.905 8.329.853 41.782.224 6.564.131 37.041.090 11.861.298 51.264.493 13.623.114 55.995.139 4 10.272.889 54.395.624 8.509.416 47.897.471 6.743.694 41.390.614 12.040.861 60.911.185 13.802.677 67.403.646 5 10.452.452 62.453.907 8.688.979 54.192.280 6.923.256 45.919.701 12.220.423 70.737.439 13.982.239 78.991.716 6 10.632.014 73.085.921 8.868.541 63.060.822 7.102.819 53.022.520 12.399.986 83.137.425 14.161.802 93.153.518 7 10.632.014 83.717.935 8.868.541 71.929.363 7.102.819 60.125.339 12.399.986 95.537.411 14.161.802 107.315.320 8 10.632.014 94.349.949 8.868.541 80.797.904 7.102.819 67.228.158 12.399.986 107.937.397 14.161.802 121.477.122 9 10.632.014 104.981.964 8.868.541 89.666.446 7.102.819 74.330.977 12.399.986 120.337.383 14.161.802 135.638.924 10 10.632.014 115.613.978 8.868.541 98.534.987 7.102.819 81.433.796 12.399.986 132.737.369 14.161.802 149.800.726
Lampiran 14. Pengaruh nilai tukar terhadap laba bersih dan aset industri MES dalam persen
Tahun ke Basic Depresiasi 5% Depresiasi 10% Apresiasi 5% Apresiasi 10% Laba bersih Aset Laba bersih Aset Laba bersih Aset Laba bersih Aset Laba bersih Aset
1 100% 100% -20% -4% -41% -8% 20% 4% 41% 8% 2 100% 100% -19% -8% -39% -16% 19% 8% 39% 16% 3 100% 100% -17% -10% -35% -20% 18% 10% 35% 20% 4 100% 100% -17% -12% -34% -24% 17% 12% 34% 24% 5 100% 100% -17% -13% -34% -26% 17% 13% 34% 26% 6 100% 100% -17% -14% -33% -27% 17% 14% 33% 27% 7 100% 100% -17% -14% -33% -28% 17% 14% 33% 28% 8 100% 100% -17% -14% -33% -29% 17% 14% 33% 29% 9 100% 100% -17% -15% -33% -29% 17% 15% 33% 29% 10 100% 100% -17% -15% -33% -30% 17% 15% 33% 30%