PERENCANAAN ULANG SABO DAM PA-C3 KALI PABELAN MAGELANG, JAWA TENGAH

Pujiono, Andika Dwi Saputra Robert J Kodoatie, Sugiyanto

Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro Jln. Prof. Soedarto, Tembalang, Semarang 50239

Telp: (024) 7474770 ; Fax : (024) 7460060

ABSTRAK

Paska letusan Gunung Merapi pada akhir Tahun 2010, hampir seluruh sabo dam di lereng Gunung Merapi hancur tak terkecuali sabo dam yang berada di Kali Pabelan. Hal ini mengakibatkan rusaknya beberapa jembatan dan lumpuhnya Jalan Magelang – Yogyakarta. Perencanaan ulang sabo dam di Kali Pabelan merupakan salah satu cara untuk menanggulangi kerusakan dan kerugian tersebut serta meningkatkan fungsi dan kualitas dari

sabo dam sebelumnya. Salah satu perencanaan ulang sabo dam berada pada site Sabo Dam

PA-C3 Kali Pabelan Desa Gondowangi Kecamatan Sawangan dengan lebar sekitar 150 meter. Data-data yang digunakan untuk perencanaan ulang desain Sabo Dam PA-C3 ini merupakan data sekunder yang diperoleh dari Balai Besar Wilayah Serayu Opak dan Balai Sabo Yogyakarta yang beralamat di Jalan Maguwoharjo, Yogyakarta. Setelah data diolah, maka diperoleh hasil berupa tinggi total main dam 11,1 meter, tinggi total sub dam 7,5 meter, dan panjang apron 22 meter. Total biaya yang dibutuhkan sebesar Rp. 27.046.000.000,00 (termasuk PPN) dan masa konstruksi selama 38 minggu. Berdasarkan hasil desain datas maka diperlukan perubahan desain pada bangunan yang sudah ada.

Kata kunci : Sabo Dam, Kali Pabelan, Gunung Merapi, Lahar Dingin.

ABSTRACT

After the eruption of Mount Merapi at the end of 2010, nearly all sabo dams on the slopes of Merapi were destroyed, include of sabo dam located in Pabelan River. Several bridges

collapse and Magelang – Yogyakarta route were paralysed. Re-planning sabo dam in

Pabelan River is one way to cope with the loss and damage and improve function and quality of sabo dam to its initial condition. One of the re-planning of sabo dam is located on the site Sabo Dam PA-C3 Pabelan River Village Gondowangi District of Sawangan with a width of approximately 150 meters. The data used to re-design the planning Sabo Dam

PA-C3 is a secondary data obtained from the Balai Besar Wilayah Serayu Opak dan Balai Sabo

Yogyakarta which is located at Maguwoharjo Street, Yogyakarta. The results show a 11.1 meters height of main dam, a 7.5 meters height of sub dam, and a 22 meter length of apron. The total cost needed Rp. 27,046,000,000.00 (including PPN) and a construction period of 38 weeks. Based on the results of the design data, it is necessary to redesign changes of the existing building.

Referensi

Dokumen terkait

Dalam satu tipe echo untuk tapis yang sama, tampak bahwa semakin banyak jumlah ucapan maka MSE yang diperoleh semakin bertambah pula karena dengan semakin

Hasil analisis regresi menunjukkan bahwa secara variabel kepemilikan kapal berpengaruh negatif yang tidak signifikan terhadap kesejahteraan nelayan di Kecamatan Percut Sei

tercantum dalam Lampiran yang merupakan bagian tidak. terpisahkan dari Peraturan

Hasil analisis regresi menunjukkan bahwa secara variabel kepemilikan kapal berpengaruh negatif yang tidak signifikan terhadap kesejahteraan nelayan di Kecamatan Percut Sei

Menurut berbagai literatur yang ada sebagai berikut, Menurut UU No.10 Tahun 1998, Pembiayaan adalah penyediaan uang tagihan yang dapat dipersamakan dengan itu berdasarkan

Tinggi (Berita Negara Republik Indonesia Tahun 2015.

Berdasarkan hasil diskusi dengan ADB selaku lender dalam rangkaian Mid-Term Review Mission, dalam rangka optimalisasi anggaran TA 2018, lokasi yang akan difasilitasi pada. TA

Mengingat lebih rendahnya hasil gabah kering dan ada kecenderungan lebih tingginya jumlah anakan produktif pada kondisi stres air ringan selama fase reproduktif, maka perlu dicari