• Tidak ada hasil yang ditemukan

Program Integer Untuk Persoalan Perencanaan Terintegrasi Produksi Dan Distribusi Produk Ikan Dari Beberapa Plant

N/A
N/A
Protected

Academic year: 2017

Membagikan "Program Integer Untuk Persoalan Perencanaan Terintegrasi Produksi Dan Distribusi Produk Ikan Dari Beberapa Plant"

Copied!
8
0
0

Teks penuh

(1)

Abad, P. (2000). Optimal lot size for a perishable good under conditions of finite production and partial backordering and lost sale. Computers & Industrial Engineering, Vol. 38, pp 457-465.

Abad, P. (2003). Optimal pricing and lot-sizing under conditions of perishability, finite production and partial backordering and lost sale.European Journal of Operational Research, Vol. 144, pp 677-685.

Adam, F. and Sammon, D. (2004). The Enterprise Resource Planning Decade: Lessons Learned and Issues for the Future. USA: Idea Group Publishing, Idea Group Inc.

Akkerman, R., Farahani, P., and Grunow, M. (2010). Quality, safety and sustain-ability in food distribution: a review of quantitative operations management approaches and challenges. OR Spectrum, Vol. 32(4), pp 863-904.

Amorim, P., Antunes, C. H., and Almada-Lobo, B. Multi-objective lot-sizing and scheduling dealing with perishability issues.Industrial & Engineering Chem-istry Research, Vol. 50(6), pp 3371-3381.

Arbib, C., Pacciarelli, D., and Smriglio, S. (1999). A three-dimensional match- ing model for perishable production scheduling. Discrete Applied Mathematics, Vol. 92(1), pp 1-15.

Armtzen, B.C., G.G. Brown, T.P. Harrison, and L.L.Trafton. (1995). Global supply chain management at digital equipment corporation. Interfaces, Vol. 25, 69– 93.

Beamon, B. M. (1998). Supply chain design and analysis: Models and methods. International Journal of Production Economics, Vol. 55(3), pp 281-294.

Bilgen, B. and I. Ozkarahan. (2004). Strategic tactical and operational production-distribution models: a review. International Journal of Technology Mana-gement. Vol. 28(2), pp 151–171.

Cai, X., Chen, J., Xiao, Y., and Xu, X. (2008). Product selection, machine time allocation, and scheduling decisions for manufacturing perishable products subject to a deadline.Computers & Operations Research, Vol. 35(5), pp 1671-1683.

Chang, P.L. and Chou, Y.C. (2008). A Study of the Inventory Models for Perishable Products in Aerospace Industry. In H. Phan, & T. Nakagawa (Ed.), 14th ISSAT International Conference on Reliability and Quality in Design (pp. 219–223).

Chase, R.B. and F.R. Jacobs. (2010). Operations And Supply Chain Management: The Core, Second Edition. McGraw-Hill.

(2)

Chen, J.-M. and Chen, T.-H. (2005). Effects of joint replenishment and channel coordination for managing multiple deteriorating products in a supply chain. Journal of the Operational Research Society, Vol. 56(10), pp 1224-1234.

Chen, K. and Ji, P. (2007). A Mixed Integer Programming Model for Advanced Planning and Scheduling (APS). European Journal of Operational Research, Vol. 181, pp 515–522.

Chen, Z.L. (2010). Integrated Production and Outbound Distribution Scheduling: review and extension.Operations Research, Vol. 58. No.1, 130–148.

Chen, Z.L. and G. I. Varaktarakis. (2005). Integrated scheduling of production and distribution operations. Management Science, Vol. 51, no. 4, 614–628.

Chowdhury, M. R. and B. R. Sarker. (2001). Manufacturing batch size and ordering policy for products with shelf lives.Int. J. of Prod. Res. Vol. 39, pp 1405-1426.

Cohen, M.A. and H. L. Lee. (1988). Strategic analysis of integrated production-distribution systems -models and methods.Oper. Res.Vol. 36, pp 216-228.

Cohen, M.A. and S. Moon. (1991). An integrated plant loading model with economies of scale and scope. Eur. J. Oper. Res. Vol. 50, pp 266-279.

Corominas, A., Lusa, A. and Pastor, R. (2007). Planning Production and Working Time Whithin an Annualised Hours Sheme Framework.Annals of Operations Research, Vol. 155, pp 5-23.

Elmaghraby, S. (1978). The economic lot scheduling problem (ELSP): review and extension.Management Science, Vol. 24, pp 587-597.

Entrup, M.L., Gunther, H.O., Van Beek, P., Grunow, M. and Seiler, T. (2005). Mixed-Integer Linear Programming Approaches to Shelf- Life-Integrated Planning and Scheduling in Yoghurt Production. International Journal of Production Research, Vol. 43, pp 5071–5100.

Fahimnia, B., R. Zanjirani Farahani, R. Marian, and L. Luong. (2013). A review and critique on integrated production-distribution planning models and tech-niques. Journal of Manufacturing Systems, vol. 32, no. 1, pp 1–19.

Faulin, J. (2003). Applying MIXALG procedure in a routing problem to op- timize food product delivery.Omega, Vol. 31(5), pp 387-395.

Ferguson, M. and Koenigsberg, O. (2003). How should a firm manage deteri- orat-ing inventory?.Production and Operations Management, Vol. 16(3), pp 306-321.

Flapper, S., Fransoo, J., Broekmeulen, R., and Inderfurth, K. (2002). Pro-duction planning and control of rework in the process industry. Production Planning & Control, Vol.13(1), pp 26-34.

Floudas, C.A. and Lin, X. (2005). Mixed Integer Linear Programming in Process Scheduling: Modeling, Algorithms, and Applications. Annals of Operations Research, Vol. 139, 131–162.

(3)

Gawijnowicz, S. (2007). Scheduling deteriorating jobs subject to job or ma-chine availability constraints.European Journal of Operational Research, Vol. 180(1), pp 472-478.

Ghare, P. and Schrader, G. (1963). A model for an exponentially decaying.Journal of Industrial Engineering, Vol. 14, pp 238-243.

Goyal, S.K. and Viswanathan, S. (2002). Technical note: on manufacturing batch size and ordering policy for products with shelf lives. Int. J. of Prod. Res. Vol. 40, pp 1965-1970.

Goyal, S. (2003). The productioninventory problem of a product with time varying demand, production and deterioration rates.European Journal of Operational Research, Vol. 147(3), pp 549-557.

Hsu, V. (2003). An Economic Lot Size Model for Perishable Products with Age Dependent Inventory and Backorder Costs. IIE Transactions, Vol. 35(8), pp 775-780.

Hsu, C.-I., Hung, S., and Li, H.-C. (2007). Vehicle routing problem with time-windows for perishable food delivery.Journal of Food Engineering, Vol. 80, pp 465-75.

Indrajit, Richardus, E., and Djokropranoto. (2003). Konsep Manajemen Suppley Chain: Cara Baru Memandang Mata Rantai Penyediaan Barang, Cetakan ketiga, PT Gramedia Widiasarana Jakarta.

Jiang, J.C. and Chen, K. H. (2007). Development of a collaborative manufacturing, planning, and scheduling system: Integrating lean and agile manufacturing for the supply chain.Int. J. of Man. Vol. 24, pp 331–345.

Jolayemi, J.K. and F. O. Olorunniwo. (2004). A deterministic model for planning production quantities in a multi-plant, multi-warehouse environment with extensible capacities. International Journal of Production Economics, Vol. 87, pp 99–113.

Kallrath, J. (2002). Planning and Scheduling in the Process Industry.OR Spectrum, Vol. 24, pp 219–250.

Kallrath, J. (2005). Solving Planning and Design Problems in the Process In-dustry Using Mixed Integer and Global Optimization.Annals of Operations Research, Vol. 140, pp 339–373.

Kar, S., Bhunia, A., and Maiti, M. (2001). Inventory of multideteriorating items sold from two shops under single management.Journal of Food Engineering, Vol. 70, pp 2-9.

Kilcast, D. and Subramaniam, P. (2000).The stability and shelf-life of food. Wood-head: Cambridge.

Li, D., Kehoe, D., and Drake, P. (2006). Dynamic planning with a wireless prod-uct identification technology in food supply chains. International Journal of Advanced Manufacturing Technology, Vol. 30(9/10), pp 938-944.

(4)

Liu, X. and Tu, T. (2008). Production planning with limited inventory capacity and allowed stockout. International Journal of Production Economics, Vol. 111, pp 180–191.

Lutke Entrup, M., Gunther, H.-O., Van Beek, P., Grunow, M., and Seiler, T. (2005). Mixed-Integer Linear Programming approaches to shelf-life- integrat-ed planning and schintegrat-eduling in yoghurt production. International Journal of Production Research, Vol. 43(23), pp 5071-5100.

Manna, S. and Chaudhuri, K. (2001). An economic order quantity model for de-teriorating items with time-dependent deterioration rate, demand rate, unit production cost and shortages.International Journal of Systems Science, Vol. 32(8),1003-1009.

Marinelli, F., Nenni, M. E., and Sforza, A. (2007). Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company of Operations Research, Vol. 150(1), pp 177-192.

Matsatsinis, N. (2004). Towards a decision support system for the ready concrete distribution system: a case of a greek company. European Journal of Opera-tional Research, Vol. 152(2), pp 487-499.

Mawengkang, H. (2010). Production planning of fish processed product under un-certainy. Anziam J. 51 (EMAC2009) pp. C715-C733.

Michael, A.H, Ireland, R.D, and R.E. Hoskisson. (2001). Strategic Management Concepts, Amazon App.

Minner, S., and Transchel, S. (2010), Periodic review inventory-control for perish-able products under service-level constraints. OR Spectrum, Vol. 32(4), pp 979-996.

Mona, J., and Fitzsimmons. (2004).Service Management:Pperations, Strategy, and Information Technology. McGraw-Hill.

Moreno, M. and Montagna, J. (2009). A multiperiod model for production planning and design in a multiproduct batch enviroment.Mathematical and Computer Modelling, Vol. 49, pp 1372–1385.

Nahmias, S. (1982). Perishable Inventory Theory: A Review.Operations Research, Vol. 30, pp 680-708.

Naso, D., Surico, M., and Turchiano. (2007a). Reactive scheduling of a distributed network for the supply of perishable products. IEEE Transactions on Au-tomation Science and Engineering, Vol. 4(3), pp 407-423.

Naso, D., Surico, M., Turchiano, B., and Kaymak, U. (2007b). Genetic algo-rithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete.European Journal of Operational Research, Vol. 177(3), pp 69–99.

Newmann, K., Schwindt, C. and Trautmann, N. (2002). Advanced Production Scheduling for Batch Plants in Process Industries.OR Spektrum, Vol. 24, pp 251–279.

(5)

Osvald, A. and Stirn, L. (2008). A vehicle routing algorithm for the distribution of fresh vegetables and similar perishable food. Journal of Food Engineering, Vol. 85(2), pp 285-295.

Pahl, J. and Voβ, S. (2010). Discrete Lot-Sizing and Scheduling Including Dete-rioration and Perishability Constraints. In Dangelmaier, W., Blecken, A., Delius, R., and Kl opfer, S., editors, Advanced Manufacturing and Sus-tainable Logistics, volume 46 of Lecture Notes in Business Information Pro-cessing, pages 345-357. Springer Berlin Heidelberg.

Pahl, J., Voβ, S., and Woodruff, D. L. (2011). Discrete Lot-Sizing and Scheduling with Sequence-Dependent Setup Times and Costs including Deterioration and Perishability Constraints.In IEEE, HICSS-4.

Pujawan, I. Nyoman,Supply Chain Management. Surabaya, Penerbit Guna Widya.

Raafat, F. (1991). Survey of literature on continuously deteriorating inventory models. Journal of the Operational Research Society, Vol. 42, pp 27-37.

Rau, H. (2003). Integrated inventory model for deteriorating items under a multi-echelon supply chain environment.International Journal of Production Eco-nomics, Vol. 86(2), pp 155-168.

Riemann, M., R.T.Neto, and E. Bogendorfer. (2014). Joint Optimization of Pro-duction Planning and Vehicle Routing Problem: A review of existing strate-gies, Pesquisa Operacional, Vol. 34(2), 189–214.

Russel, R.S. and B.W. Taylor. (2011). Operations Management: Creating Value Along The Supply Chain, seventh edition, John Wiley&Sons.Inc.

Sarker, B. and Chowdhury, M. (2002). Response to technical note on “Manufactur-ing batch size and order“Manufactur-ing policy for products with shelf lives”.International Journal of Production Research, Vol. 40(8), pp 1971-1972.

Schmid, V., Doerner, K., Hartl, R., and Salazar-Gonz’alez, J.-J. (2010). Hybridiza-tion of very large neighborhood search for ready-mixed concrete delivery problems. Computers & Operations Research, Vol. 37(3), pp 559-574.

Seyedhosseini S.M. and Ghoreyshi, S.M. (2014). An Integrated Model for Produc-tion and DistribuProduc-tion Planning of Perishable Products with Inventory and Routing Considerations. Mathematical Problems in Engineering, Vol. 2014, Article ID 475606, Hindawi Publishing Corporation. shortage costs in emerg-ing markets.

Shulman, R. (2001). Perishable systems take center stage.Supermarket Busi-ness, Vol. 56(4), pp 47-48.

Soman, C.A., Van Donk, D.P. and Gaalman, G.J.C. (2004a). A basic period ap-proach to the economic lot scheduling problem with shelf life considerations. Int. J. of Prod. Res. Vol. 42, pp 1677-1689.

Soman, C.A., Van Donk, D.P. and Gaalman, G.J.C. (2004b). Combined make-to-order and make-to-stock in a food production system.Int. J. of Prod. Econ., Vol. 90, pp 223–235.

(6)

Tadei, R., Trubian, M., Avendano, J., Della Croce, F., and Menga, G. (2995). Ag-gregate planning and scheduling in the food industry: A case study.European Journal of Operational Research, Vol. 87, pp 564-573.

Tarantilis, C. and Kiranoudis, C. (2001). A meta-heuristic algorithm for the effi-cient distribution of perishable foods. em Journal of Food Engineering, Vol. 50(1), pp 1-9.

Tarantilis, C. and Kiranoudis, C. (2002). Distribution of fresh meat. Journal of Food Engineering, Vol. 51(1), pp 85-91.

Teunter, R. and Flapper, S. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives.OR Spec-trum, Vol. 25(1), pp 85-96.

Timpe, C. (2002). Solving Planning and Scheduling Problems With Combined Integer and Constraint Programming. OR Spectrum, 431–448.

Timpe, C.H. and J. Kallrat. (2000). Optimal planning in large multi-site production networks.Eur. J. Oper. Res. Vol. 126, pp 422-435.

Tiwari, M.K., N. Raghavendra, S. Agrawal, and S. K. Goyal. (2010). A hybrid Taguchi-immune approach to optimize an integrated supply chain design problem with multiple shipping. European Journal of Operations Research, Vol. 203, Issue 1, pp 95–106.

Tsiros, M. and Heilman, C. (2005). The effect of expiration dates and perceived risk on purchasing behavior in grocery store perishable categories.Journal of Marketing, Vol. 69, pp 114-129.

Turban et al. (2004). Information Technology For Management, John Wi-ley&Sons.Inc.

Wang, X., Li, D. and O’Brien, C. (2009). Optimisation of Traceability and Op-erations Planning: An Integrated Model for Perishable Food Production. International Journal of Production Research, Vol. 47, pp 2865–2886.

Wolsey, L.A., and Pochet, Y. (2006). Production Planning by Mixed Integer Pro-gramming. (T. V. Mikosch, S. I. Resnick, & S. M. Robinson, Eds.) New York, NY, USA: Springer Science and Business Media, Inc.

Xu, J, Y. He, and M. Gen. (2009). A class of random fuzzy programming and its application to supply chain design. Computers and Industrial Engineering, vol. 56, no. 3, pp 937–950.

Xu, Y. and Sarker, B. (2003). Models for a family of products with shelf life, and production shortage costs in emerging markets.Computers & Operations Research, Vol. 30, pp 925-938.

Yang, P. and Wee, H. (2003). An integrated multi-lot-size production inventory model for deteriorating item.Computers & Operations Research, Vol. 30(5), pp 671-682.

(7)
(8)

Referensi

Dokumen terkait

Plafond (Rp) Realisasi Pengembalian Tunggakan

Peningkatan ekspresi COX-2 telah dilaporkan pada berbagai macam tumor, seperti kanker kolon, kanker paru, kanker payudara, kanker lambung, kanker esofagus, kanker kepala dan

Pada hari ini Senin tanggal satu bulan Juni tahun dua ribu lima belas, kami yang bertanda tangan dibawah ini selaku POKJA ULP Pembangunan Gedung Kantor Tahap I Pengadilan Agama

Foto Lokasi Pemunguta suara dengan cara noken gantung... Foto Lokasi pemungutan suara dengan

Setelah melihat kondisi actual lapangan ada beberapa titik jalan lurus maupun tikungan yang mempunyai lebar kurang dari perhitungan teori yaitu segment W4,T1 dan T2 dan

Metode Analisis Energy Perhitungan Metode Direct and Indirect (Heat Rate/ Tara Kalor) Bahan Bakar Batu Bara Dan Pengaruhnya.. Pada Performance

[r]

Apabila Dewan Komisaris tidak setuju dengan Komite Audit namun Komite Audit tetap pada pendiriannya, Komite Audit dapat mencantumkan pendapatnya pada laporan