PERENCANAAN TAMBANG

(MINE PLANNING)

PERENCANAAN TAMBANG MERUPAKAN BAGIAN DARI TAHAPAN PERTAMBANGAN,

(MULAI DR PROSPEKSI S.D PEMASARAN BHN GALIAN).

TUJUAN MINE PLANNING

AGAR KEGIATAN MINING (TAMKA, TBT, TAMBANG BAWAH AIR) DPT BERLANGSUNG DGN : EFEKTIF, EFISIEN, MEMPERHATIKAN FAKTOR K3LH SERTA DPT MEMENUHI ASPIRASI STAKE HOLDER .

(2)

(STAKE HOLDERS : KARYAWAN TAMBANG,

PENGUSAHA TAMBANG, MASYARAKAT SEKITAR TAMBANG, PEMERINTAH,LEMBAGA SWADAYA).

FAKTOR-FAKTOR UTAMA (DASAR) MINE PLANNING 1 MINERAL EVALUATION 2. MINING ENGINEERING. 3. OPERATION 4. GEOTECHNICAL ENGINEERING 5. ENVIRONMENTAL 6. OTHERS (LAINNYA).

POINT 1. MINERAL EVALUATION,

(3)

JUMLAH CAD.YG DIDAPAT DR HSL

EKSPLORASI, TINGKAT KESALAHAN 20 % (CAD.TDK TERUKUR TDK AKURAT).

B. CADANGAN TERTAMBANG

JUMLAH CAD.YG DPT DITAMBANG DLM LOKASI KP/IUP.

C. QUALITY (KUALITAS) BHN GALIAN. D. STRIPPING RATIO (SR , WASTE/ORE RATIO))

E. VARIABILITAS KADAR DAN RATA-RATA

(4)

ETC (BACK UP). CONTOH :

1. CADANGAN TERUKUR 3.000.000 MT.

2. CADANGAN TERTAMBANG 2.400.000 MT. 3. STRIPPING RATIO 1/7,6.

4. QUALITY Fe 61 % - 67 %, (IRON ORE). REJECT 59 %

5. PETA SEBARAN, GMB 3 DIMENSI ETC, ADA.)

CONTOH 2

(5)

2. KADAR Au RATA-RATA 9,8 GRAM/TON. 3. KADAR Ag RATA-RATA 22 GRAM/TON. 4. CAD.TERTAMBANG 1.600.000 MT.

4. MINING RECOVERY 80 %.

5. STRIPPING RATIO 1/11,6 (TOTAL).

6. PETA SEBARAN, GMBR 3 DIMENSI ETC ADA.

FAKTOR II MINING ENGINEERING (PERENCANAAN TEKNIK PENAMBANGAN TERBUKA).

1. KAP.PROD DAN SR YG OPTIMAL. ( MULAI DR KAP.KECIL, DGN SR PENYEBUTNYA KECIL)

(6)

START DARI UJI COBA TAMBANG 15.000 MT/BLN, SR 1/3,2 – 1,3,7) 2. PERALATAN YG DIGUNAKAN ALAT GALI ALAT MUAT ALAT ANGKUT. CONTOH KAP.TAMBANG 25.000 MT/BULAN, SR 1/4,4, EXCAVATOR/ DOZER. 275M3 /JAM, F.EFISIENSI 0,81 (EXCV/DOZER); JAM KERJA 225 JAM/BULAN, DT 58

(7)

M3/JAM (F.E = 1), 1 TON BHN GALIAN = 0,79 M3.

DITANYA :

BERAPA UNIT EXCAVATOR/DOZER/DT. EXCAVATOR…….

= (25.000 )(0,79) + (4,4)(25.000) (275)(0,81)(225)

129.750/ 50.118 UNIT = 2,588 UNIT…3 UNIT.

DT = 129.750/(58)(1)(225) = 9,94 UNIT 10 UNIT 3. RENCANA PRODUKSI (TON & OB)

(8)

PADA SR TOTAL 1/7,74. MT OB THN I 180.000 MT, OB 630.000 M3 THN II 300.000 MT,OB 1.350.000 M3 THN III 300.000 MT,OB 1.650.000 M3. THN IV 400.000 MT,OB 3.250.000 M3. THN V 400.000 MT,OB 3.750.000 M3. THN VI 250.000 MT,OB 3.150.000 M3. THN VII 170.000 MT,OB 1.700.000 M3. TOTAL 2.000.000 MT OB 15.480.000 M3 4. WASTE DUMP (DISPOSAL AREA).

(9)

PADA DASARNYA, DISPOSAL AREA HRS BERADA DLM LOKASI KP/TAMBANG, AGAR BIAYA

EKONOMIS.

YG PALING EKONOMIS IALAH SISTEM

PENAMBANGAN BACK FILLING (GALI DAN TIMBUN KEMBALI).

TETAPI ADA SELANG WKT KITA BUTUH DISPOSAL AREA SBLM BACK FILLING DILAKSANAKAN.

MIS.DARI TOTAL OB SEBESAR 1.500.000 M3, YG DILAKUKAN BACK FILLING HANYA 800.000 M3, SISANYA DITIMBUNKAN PD DISPOSAL

(10)

CATATAN

MISALNYA WAKTU MUAT 2 MENIT WAKTU BONGKAR 2 MENIT

JARAK ANGKUT 2,5 KM

KECEPATAN DT = 25 KM/JAM (PERGI/PULANG) KAPASITAS DT = 10 M3 OB

FAKTOR EFISIENSI DIANGGAP 1,0 JAM KERJA 200 JAM/BULAN.

BERAPA KAPASITAS DT/UNIT/BULAN JAWAB :

WAKTU SIKLUS = 2 MENIT + 2 MENIT + (WAKTU PERGI+WAKTU PULANG) = 4 MENIT + (2,5/25

(11)

+2,5/25)(60 MENIT) = 4 MENIT + (2/10)(60)= 16 MENIT

KAPASITAS/UNIT/BULAN =

= (JAM KERJA)/WAKTU SIKLUS))x KAP/UNIT = ((200)(60)/16)(10 M3) = 7.500 M3.

JIKA JARAK KE DISPOSAL AREA JADI 5 KM, PARAMETER/VARIABEL LAINNYA SAMA

MAKA WAKTU SIKLUS

= 2 MENIT + 2 MENIT + ((5/25 + 5/25)(60)) = 28 MENIT

KAP. 1 UNIT /BULAN= ((200)(60)/28)) x 10 = 4.285,71 M3

(12)

KITA ANGGAP 1 M3 HARGANYA =

Rp.8.000,-MAKA NILAI KERJA 7.500 M3 = Rp 60.000.000,-. SEBAGAI PENYESUAIAN UNTUK PEKERJAAN

YANG BERJARAK ANGKUT OB KE DISPOSAL AREA 5,0 KM

HARGANYA JADI

Rp.60.000.000,-/4.285,71 = Rp. 14.000,01/M3.

5. SKEDUL WKT OPERASI

BANYAKNYA HR KERJA/THN, SHIFT KERJA ,LEMBUR ETC

TOTAL HR DLM SETAHUN 365 …. HARI KERJA 315 ……

(13)

HARI TDK HUJAN 190 ….. HARI HUJAN 125 …..

HJ SEDIKIT 40………. HJ BANYAK 85………

SHIFT KERJA

DIKENAL SBG SHIFT NORMAL 8.00-16.00 SHIFT II

16.00-24.00 SHIFT III 24.00-8.00 SHIFT I LONG SHIFT

(14)

18.30-7.00 SHIFT I

JIKA ADA KETERLAMBATAN (DELAY) DALAM OPR.TAMKA, MIS HANYA MAMPU 30.000 BCM DALAM SHIFT II MAKA AKAN DITAMBAHKAN

(KALAU PERLU DGN OVER TIME) PADA SHIFT III DAN I (SHIFT II LONG SHIFT) AGAR TARGET

PROD OB TERCAPAI.

PERCOBAAN PENAMBANGAN

SUATU PERCOBAAN PENAMBANGAN DIPERLUKAN AGAR SISTEM

PENAMBANGAN YG AKAN DITERAPKAN DALAM KAP.MAX DAPAT BERJALAN DGN EFEKTIF DAN EFFISIEN. SEBELUM

(15)

DIBUAT DULU MINIATURNYA (L.K 25 %) DARI SKALA SESUNGGUHNYA AGAR DPT MENGUJI KESIAPAN DAN UNJUK KERJA

ALAT, MANAJEMEN LAPANGAN, STRUKTUR ORG, LOGISTIK DLL, SHG TDK AKAN

MENGALAMI KENDALA DLM OPR.MAX NANTINYA.

CONTOH SOAL KERJA 2 SHIFT/LEBIH

SUATU TAMKA LOGAM DASAR DGN

TINGKAT PRODUKSI 30.000 MT/BULAN, PADA SR 1/6,8; DGN KAP.DOZER 285

M3/JAM, EXCAVATOR SETARA DAN DT 58 M3/JAM/UNIT HANYA 65 % OB DAN BIJIH DITAMBANG PADA SHIFT II 200 JAM,

(16)

SISANYA PADA SHIFT III, SEBANYAK 35 % LAGI. 1 TON BHN GALIAN = 0,28 M3.

DITANYA :

BERAPA UNIT EXCAVATOR, DOZER DAN DT YG DIPERLUKAN PD SHIFT II DAN III.

JWB :

KAP.DOZER/UNIT =285x200 M3= 57.000 M3

UNIT DOZER/BLN=138.060/57.000=2,422 UNIT SETARA DGN 2 UNIT.

EXCAVATOR = 2 UNIT.

(17)

=.11,9 UNIT= 12 UNIT.

PADA SHIFT III

DOZER = 74.340/57.000 = 1,3

UNIT

JADI UNIT DOZER DAN

EXCAVATOR TETAP 2 UNIT PD

SHIFT II DAN 2 UNIT PD SHIFT III

(PEMBULATAN) DAN DT 12 UNIT

PD SHIFT II DAN DT = 6 UNIT PD

SHIFT III.

(18)

JALAN TAMBANG

JALAN TAMBANG YG DIBUAT

DISESUAIKAN

DGN KAP.TAMBANG (DGN ALAT

TAMBANG

UTAMA/DT)

JALAN TAMBANG BISA DLM 3

JALUR

JALUR I…..LEBAR DT 2,5 M, JALAN TAMBANG 5 M,

(19)

JALUR 2….LEBAR DT 2,5 M, JALAN TAMBANG 8,8 M.

JALUR 3, LEBAR DT 2,5 M, JALAN TAMBANG 12,5 M.

(20)

PERENCANAAN TAMBANG SEDANG BERJALAN

(MINING IN PROGRESS)

PERENCANAAN TAMBANG SDG BERJALAN DIBUAT KETIKA OPR.TAMKA/TBT/TAMBANG BW AIR SEDANG DALAM PELAKSANAAN. UTK ITU DIPAKAI ACUAN PERENCANAAN

TAMBANG AWAL (PD TAHAP KONSTRUKSI) DGN PEMBARUAN DATA SESUAI DGN

KONDISI TERBARU/TERKINI.

BIASANYA ADA RAPAT MINGGUAN (KAMIS SORE) UTK MEMBAHAS RENCANA KERJA PERENCANAAN TAMBANG SDG BERJALAN,

(21)

YG DIHADIRI OLEH UNSUR MANAJEMEN TAMBANG.

PADA PRINSIPNYA ADA 4 POKOK BAHASAN (SUBJECT) PADA PERENCANAAN TAMBANG SDG BERJALAN.

1.RENCANA KEGIATAN PENAMBANGAN 2.REALISASI KEGIATAN PENAMBANGAN 3.KENDALA DALAM OPR.PENAMBANGAN 4.UPAYA MENGATASI KENDALA..

RENCANA MINGGU I JAN 2009 RENCANA MINGGU II JAN 2009

(22)

REALISASI MINGGU I JAN 2009 REALISASI MINGGU II JAN 2009 DST… REALISASI JAN 2009

KENDALA DLM MINGGU I JAN 2009 KENDALA DLM MINGGU II JAN 2009

UPAYA MENGATASI KENDALA DLM MINGGU I MINGGU II

(23)

MANAJEMEN TAMBANG YG IKUT RAPAT MULAI DARI

DIR.OPERASIONAL/DIR.TEKNIK/GENERAL MANAGER/MANAGER PIT/ MINE

SUPERINTENDENT/ SUPERVISOR /FOREMAN. CONTOH :

PIT A

CADANGAN TERTAMBANG BATUBARA 800.000 MT

(PIT A) STRIPPING RATIO 1/9,8…….OB = 7.840.000 BCM

(24)

JANUARI 2009………TONASE BATUBARA (RENCANA) 60.000 MT ( 1 TON=0,79 M3). (MINGGU I 15.000 MT, MINGGU II 15.000 MT… DST) OB TOTAL (SR RATA) ….588.000 M3 OB MINGGU I …………..147.000 M3(BCM) … RENCANA OB MINGGU II…………147.000 M3 (BCM) OB MINGGU III…………..147.000 M3

(25)

DOZER 300 M3/JAM (AKTUAL) , SHIFT II 200 JAM , SHIFT III 200 JAM. …..

RENCANA UNIT DOZER (SHIFT

II)=( (588.000)/2 +(60.000)(0,79))2 / (200) (300) =

( 294.000 +23.700)/60.000 = 5,295…. 5 UNIT

PADA SHIFT III…….5 UNIT JUGA EXCAVATOR JUGA 5 UNIT

DUMP TRUCK……60 M3/JAM, JAM KERJA 200 JAM

DT = (294.000+23.700)/(60)(200) = 26,475 UNIT.

(26)

REALISASI

(MINGGU I, II, III DAN IV)

DOZER TERNYATA HANYA DPT DIPAKAI 4

UNIT, SATU UNIT OVER HAUL, MAKA DOZER 1 UNIT DR RENTAL.

EXCAVATOR JUGA RUSAK SATU UNIT, TETAPI ADA YANG SDH PERBAIKAN DR

WORKSHOP…..5 UNIT.

DT……..HANYA TERSEDIA 20 UNIT, 6 UNIT

DARI PIHAK RENTAL, ADA RENCANA BELI DT BEKAS.

PRODUKSI OB…. BULAN JAN 2009 = 550.000 BCM

(27)

(TEKOR = 588.000 – 550.000 BCM) = 38.000 BCM

PRODUKSI BATUBARA…….= 51.000 MT

(TEKOR) = 60.000 – 51.000 MT = 9.000 MT KENDALA DALAM OPERASIONAL

1. BANYAK CURAH HUJAN (DIATAS RATA-RATA)

2. ALAT DLM PERBAIKAN (A.GALI/MUAT/ANGKUT)

3. BBM SERING TERLAMBAT

4. OPR.TRAMPIL ADA YG BERHENTI SHG PERLU

(28)

DIGANTI DAN BERAKIBAT KAP. KERJA TURUN.

5. POMPA SUBMERSIBLE RUSAK SHG DEWATERING TERHAMBAT.

6. CRUSHING PLANT RUSAK GENSET NYA ( 4 HARI)

UPAYA MENGATASI KENDALA

1. MENAMBAH JAM KERJA/ALAT PD SHIFT BERIKUTNYA.

2. PERBAIKAN DIPERCEPAT/MEKANIK DITAMBAH

(29)

PADA PEMBUATAN BENCH…. JANGAN

SAMPAI ADA BIDANG BEBAS (FREE FACE)

CONTOH SOAL

SUATU TAMBANG TERBUKA LOGAM DASAR DENGAN

KAP.TAMBANG 35.000 MT/BULAN, SR 1/7,8 1 TON BHN GALIAN = 0,27 M3

(30)

KAP.DOZER 250 M3/JAM (SATU UNIT) DAN 320

M3/JAM (2 UNIT), JAM KERJA PADA SHIFT II 225 JAM

JIKA AKAN DITAMBANG SEBANYAK 65 % DARI

KAP.TOTAL/BULAN PADA SHIFT II , HITUNGLAH

PENAMBAHAN UNIT PADA SHIFT II DGN KAP.320

M3/JAM/UNIT. JAWAB :

(31)

= (250)(225)(1) + (320)(225) (2)=56.250+144.000=200.250 BCM KAP.PENAMBANGAN DLM SHIFT II = (0,65)((35.000)(0,27)+(35.000)(7,8)) =(0,65) (9.450+273.000) BCM = 183.592,5 BCM

(32)

SUATU PIT TAMKA DENGAN BAGIAN PIT A, B DAN C DATANYA SBB PIT A KAP.22.000 MT, SR 1/8,6 PIT B, KAP 31.000 MT, SR 1/8,4 PIT C, KAP 25.000 MT, SR 1/9,2 KAP.DOZER/UNIT = 290 M3, FAKTOR EFISIENSI 0,84

JAM KERJA PADA SHIFT III 290 JAM

65 % OB DIANGKUT KE DISPOSAL AREA, SISANYA BACK

(33)

KAP. DT 63 M3/JAM,

1 TON BHN GALIAN = 0,79 M3 HITUNG:

UNIT DOZER PADA PIT A, B DAN C

UNIT DT UNTUK MENGANGKUT OB DAN BATUBARA

(34)

CONTOH SOAL

SUATU BLOK TAMBANG (MINING BLOCK) BATUBARA

DENGAN DIMENSI PANJANG SEARAH JURUS 160

METER, LEBAR SEARAH KEMIRINGAN 75 M, DAN

KETEBALAN RATA-RATA 4,5 METER, BJ NYA 1,29 TON/M3. JIKA KAP.DOZER 325 M3/JAM DAN 275 M3/JAM, DENGAN FAKTOR

EFISIENSI 0,81 DAN 0,75. JAM KERJA 270 JAM/BLN, HITUNGLAH BERAPA LAMA

(35)

PENGGALIAN OB DAN BATUBARA AKAN DILAKSANAKAN. SR = 1/5,7.

JAWAB :

TOTAL VOL.PENAMBANGAN

TOTAL VOL.BATUBARA + TOTAL VOL OB

= (160)(75)(4,5) + (5,7)(160)(75)(4,5)(1,29) M3

= (54.000) + (5,7) (54.000)(1,29) M3 = 54.000 +397.062 M3. = 451.062 M3.

TOTAL KAP.2 DOZER/BLN

= (325)(270)(0,81) + (275)(270)(0,75) M3

(36)

LAMA PENGGALIAN BERLANGSUNG

TOTAL VOL YG AKAN DITAMBANG/TOTAL KAP./BLN

= 451.062 /126.765 BLN = 3,56 BULAN ATAU = 3,56 x 270 JAM = 961,2 JAM.

PERUBAHAN HARGA JUAL DAN

PENGARUHNYA PADA RENCANA FINANSIAL TAMKA

(37)

SUATU TAMBANG TERBUKA YANG DIBUAT PERENCANAANNYA KETIKA TAMBANG

BELUM BERJALAN, MEMPUNYAI ANALISIS FINANSIAL YANG DIMASUKKAN DALAM “FEASIBILITY STUDY”, WALAU KADANG KALA ADA YANG TERGABUNG DALAM

PERENCANAAN TAMBANG.

DALAM SKENARIO FINANSIAL, ADA 3 KATEGORI

- SKENARIO TINGGI/OPTIMIS

- SKENARIO SEDANG/MODERAT

(38)

KETIGA SKENARIO DIBUAT, TETAPI DALAM KERANGKA GLOBAL, YG IMPLEMENTASINYA SECARA RINCI PADA SAAT TAMKA SEDANG BERJALAN (MINING IN PROGRESS ).

HARGA JUAL PRODUK SANGAT

BERPENGARUH PD AKTIVITAS TAMKA, JIKA HARGA TURUN SIGNIFIKAN, TAMKA BISA BERHENTI BEROPERASI.

CONTOH SOAL

SUATU TAMKA EMAS PRIMER, DENGAN TINGKAT PRODUKSI SEBESAR 200

TON/HARI, DENGAN KADAR RATA-RATA 5,7 GRAM/TON, MEMPUNYAI MARGIN

(39)

RATA-RATA 22 %/GRAM. PROCESSING RECOVERY = 0,68.

HARGA JUAL = Rp. 340.000,-/GRAM. ASUMSI SEMUA PRODUK TERJUAL.1 BULAN = 25

HARI KERJA.

JIKA HARGA JUAL NAIK 12 % DAN BIAYA

PRODUKSI NAIK 6 %, BIAYA NON PRODUKSI JUGA NAIK 8 %, HITUNGLAH MARGIN YANG BARU DARI TAMKA TSB.

BIAYA PRODUKSI = 1,8 x BIAYA NON PRODUKSI.

JAWAB :

(40)

KAP./HARI x HARI KERJA x PROC.RECVx HARGA/GRAM

= (200)(25)(5,7)(0,68) (Rp.340.000,-) = Rp.

6.589.200.000,-NET MARGIN AWAL = 0,22

xRp.6.589.200.000,-=

Rp.1.449.624.000,-TOTAL BIAYA PRODUKSI & BIAYA NON PRODUKSI

= Rp.6.589.200.000,- (- ) Rp.1.449.624.000,-=

(41)

Rp.5.139.576.000,-= 1,8 BIAYA NON PRODUKSI + BIAYA NON PRODUKSI

= 2,8 BIAYA NON PRODUKSI BIAYA NON PRODUKSI =

Rp.5.139.576.000,-/2,8 =

BIAYA PRODUKSI = 1,8 x Rp.1.835.562.857,-= Rp.

(42)

TOTAL PENJUALAN YG BARU – (BIAYA

PROD.YG BARU+BIAYA NON PRODUKSI YG BARU) = = (1,0 + 0,12)(Rp.6.589.200.000,-) – ((1,0 + 0,06)(Rp.3.304.013.143) + (1,0 +0,08) (Rp.1.835.562.857,-) = Rp.7.379.904.000,- - (Rp.3.502.253.932 +Rp.1.982.407.886) = Rp.1.895.242.182,-/BLN.

TOTAL PENJUALAN BIJIH TIMAH HITAM/BLN = (4.000)(Rp.1.050.000,-)= Rp.

(43)

NET MARGIN AWAL/BLN = (0,18) (Rp.4.200.000.000,-)

= Rp. 756.000.000,-.

TOTAL BIAYA PRODUKSI + BIAYA NON PRODUKSI

= Rp.4.200.000.000,- - Rp.756.000.000,-=

Rp.3.444.000.000,-= 1,75 BIAYA NON PRODUKSI + 1 BIAYA NON PRODUKSI

BIAYA NON PRODUKSI = Rp.3.444.000.000,-/2,75 = Rp.

(44)

1.252.363.636,-BIAYA PRODUKSI = 175 % x

Rp.1.252.363.636,-= Rp. 2.191.636.363,-NET MARGIN YG BARU

= 1,15 xRp.4.200.000.000,- - ((1,06)

(2.191.637.363,-) + 1,06 (1.252.363.636,-) CONTOH SOAL

APLIKASI PERENCANAAN TAMBANG (BATUBARA)

CADANGAN TERTAMBANG = 2.000.000 MT

KUALITAS 60 % BERKALORI RATA-RATA 6100 KKAL/KG

(45)

40 % BERKALORI RATA-RATA 5800 KKAL/KG. UMUR TAMBANG SELAMA 6 TAHUN.

SR TOTAL = 1/10.

KAP.ALAT GALI/JAM = 300 M3 AKTUAL KAP.ALAT MUAT/JAM = 300 M3 AKTUAL BUATLAH PERENCANAAN TAMBANG

1.UNTUK RENCANA PRODUKSI DAN OB/TAHUN

2.RENCANA ALAT GALI DAN ALAT MUAT/BULAN

3.RENCANA BLENDING JIKA KALORI RA TA-RATA 5900 KKAL/KG

(46)

JAWAB :

1.RENCANA PRODUKSI DAN OB/TAHUN TAHUN PERTAMA 200.000 MT, SR = 1/5 OB = 1.000.000 M3 TAHUN KEDUA 300.000 MT, SR = 1/7, OB = 2.100.000 M3 TAHUN KETIGA 450.000 MT SR = 1/8,5 OB = 3.825.000 M3 TAHUN KEEMPAT

(47)

450.000 MT, SR = 1/9,5 OB = 4.275.000 M3 TAHUN KELIMA 300.000 MT, SR = 1/14,67 OB = 4.400.000 M3 TAHUN KEENAM 300.000 MT, SR = 1/14,67 OB = 4.400.000 M3 2.000.000 MT OB = 20.000.000 M3 (BCM) SR TOTAL = 1/10.

(48)

1 TON BATUBARA = 0,79 M3

TAHUN PERTAMA = 200.000 MT DAN OB = 1.000.000 M3

TOTAL VOLUME YG AKAN DITAMBANG = 200.000 (0,79) + 1.000.000 M3 = 1.158.000 M3/TAHUN

JAM KERJA 200 JAM/BULAN

KAP.ALAT GALI/JAM = 200 (300) = 60.000 M3/BULAN

VOL.PENAMBANGAN/BULAN = 1.158.000/12 = 96.500 M3.

(49)

JUMLAH UNIT ALAT GALI YG DIPERLUKAN/BULAN

= 96.500/60.000 = 1,608 UNIT = 2 UNIT. 3. RENCANA BLENDING JIKA KALORI RATA-RATA = 5900 KKAL/KG PERSAMAAN MATEMATIKA KAL.AKHIR = ((J1)(K1) + (J2)(K2))/J1 + J2 5900 = ((6100)(1200) + (5800)(X))/(1200 + X) X = 2400

(50)

BERARTI HARUS DITAMBAHKAN BATUBARA DARI TEMPAT LAIN AGAR SEMUANYA MASUK SPECS DAN LAKU DIJUAL

ATAU DICARI PASAR YG LAIN

JIKA DUMPTRUCK KAP./JAM RATA-RATA = 12 M3, JAM KERJA = 240 JAM/BULAN, DENGAN FAKTOR EFISIENSI = 0,8. HITUNGLAH

KEBUTUHAN UNIT DT/BULAN PD TAHUN PERTAMA

VOL.PENAMBANGAN/BULAN = 96.500 M3 KAP.DT/UNIT/BULAN = (FAKTOR EFF)

(KAP/UNIT)(JAM KERJA) = (0,8)(12)(240) = 2.304 M3/BULAN.

(51)

JUMLAH UNIT DT/BULAN = 96.500/2.304 = 41,88 = 42 UNIT

UNIT DT = 4 ATAU 5 X JUMLAH UNIT ALAT GALI/MUAT

UNIT DT = 10………KAP/UNIT/BULAN = 9.650 M3

FAKTOR EFISIENSI = 0,8

(FAKTOR EFF)(JAM KERJA) (KAP/UNIT/JAM) = 9.650 M3

(0,8)(240)(KAP/UNIT/JAM ) = 9.650 M3 KAP/UNIT/JAM = 50,26 M3.

(52)

VOLUME PENAMBANGAN TOTAL/BULAN (40.000/4,2) + (40.000)(7)= 289.523 M3 TOTAL KAPASITAS 3 UNIT DOZER/BULAN = (320)(0,7)(200)(3) = 134.400 M3

VOLUME PENAMBANGAN YG TERSISA

= 289.523 M3 – 134.400 M3 = 155.123 M3 KAP.3 UNIT DOZER/JAM

Referensi

Dokumen terkait

Hasil: Uji hipotesis I dan II menggunakan paired sample t-test diperoleh nilai p=0,000 (p<0,05), yang berarti kedua kelompok perlakuan memiliki pengaruh

Sekaligus beliau selaku dosen pembimbing Tugas Akhir penulis yang sudah meluangkan waktunya untuk senantiasa membantu dan membimbing penelitian laporan dari awal penelitian

Konsentrasi yang digunakan dalam pengujian ini adalah 20%, 40%, 60%, 80% dan 100% dimana pada konsentrasi tersebut hasil zona hambat ekstrak aur bunga dan daun kecombrang

dapat mengetahui dan memahami situasi stres yang dialami.. c) Berpaling pada orang lain. Misal orang tua, saudara, sahabat. d) Menerima dengan pasrah, yaitu berusaha

Kuersetin digunakan sebagai standar pembanding dalam mengukur NDQGXQJDQ ÀDYRQRLG WRWDO PHQJJXQDNDQ 6SHNWURIRWRPHWHU 89 9LV $QDOLVLV KDVLO GLODNXNDQ GHQJDQ PHPEDQGLQJNDQ NDGDU

3. Students are asked to listen to the teacher's reading the text. Studerrts are asked to read the text aloud paragraph by paragraph. Students are asked to answer

Gambar 4.1 Viskositas Minuman Jeli Sayur Berdasarkan Interaksi Perbandingan Konsentrasi Pare Putih Dengan Tomat Apel Dengan Konsentrasi Pemanis

Puji syukur penulis ucapkan kehadirat Allah SWT karena berkat rahmat dan hidayah-Nya sehingga penulis dapat menyelesaikan skripsi ini dengan judul : “PENGARUH INTERNAL