Monthly Progress Report No. 12

Covering Project Activities During

(2)

PT. PERENTJANADJAJAin subcansultancywith ~ Yangma Engineering Ca. Ltd and §IPT. Epadascan Permata Engineering ConsultantzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA ercOffice:JI.Ciniru VII No. 25,Kebayoran Baru, Jakarta Selatan, 12180

Phone /Fax: (021) 7229823

I I

Cc:

1. Acting Director.of Planning,DGH

2. Head of Sub Directorateof Financing and Foreign Cooperation

3. Kasatker PembinaanAdministrasi dan Pelaksanaan Pengendalian PHLN

4. Head of Section for Foreign Cooperation, Sub Directorate Financing and Foreign Cooperation Directorate of Planning;Directorate General of Highways (Sina Marga), Ministry of Public Works

5. File

,

,I

1 ~

Thank you for your kind attention.

Hereby we submit December Monthly Progress Report WINRIP Loan IBRD No 8043-ID (document attached).

Dear Sir,

Submission of December Monthly Progress Report; WINRIP Loan IBRD No. 8043-ID Subject

I

Attention: Ir. Agusta Ersada Sinulingga , MT Officer In Charge PMU WINRIP Directorate General of Highways

Department of Public Works JI. Patimura 20 Kebayoran Baru Jakarta Selatan

Indonesia

Jakarta January 10, 2013 Our Ref.No. :zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA03_02/PW P/O/M-12.2013

Enclosure : 20 (twenty) sets

DIRECTORATE GENERAL OF HIGHWAYS

DIRECTORATE OF PLANNING

Core Team Consultant for

(3)

Table of Contents

1 EXECUTIVE SUMMARY... 1

2 PROJECT DESCRIPTION ... 5

2.1 Background... 5

2.2 Project Development... 5

Project Component 3 : Road Sector Institutional Development... 9

2.3 Project Objective ... 9

3 CONSULTANCY SERVICES ...10

3.1 CTC Consultants...10

3.1.1 Scope of Services...10

3.1.2 CTC Manning ...11

3.1.3 CTC Contract...12

3.2 DSC Consultants...13

4 CIVIL WORKS...14

4.2 Procurements ...14

4.3 Civil Works Implementation ...15

4.4 Civil Works Progress ...16

4.5 Quality Assurance ...16

4.6 Environmental and Social Considerations ...16

4.7 Anti Corruption Issues ...22

4.7.1 Anti‐Corruption Action Plan (ACAP) ...22

4.7.2 Community Representative Observers (CRO) ...22

4.7.3 Publication / Disclosure ...23

4.7.4 Complaints Handling Mechanism (CHS)...27

4.7.5 Third Party Monitoring (TPM) ...28

4.8 Road Safety Audit ...28

5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS ...29

5.3 Management Information System ...30

6 PROJECT PERFORMANCE ...36

6.1 World Bank and GOI Compliance...36

6.1.1 World Bank Missions...36

6.1.2 Performance Indicators ...36

6.2 Implementation Support Components ...36

6.2.1 Core Team Consultant (CTC)...36

6.2.2 Design and Supervision Consultant (DSC) ...37

(4)

6.3 Training ...38

6.4 Anti‐Corruption Issues...40

6.4.1 Anti Corruption Action Plan (ACAP)...40

6.4.2 Community Representative Observers (CRO) ...41

6.4.3 Third Party Monitoring (TPM)...41

6.4.4 Complaint Handling System (CHS)...42

6.4.5. Publication / Disclosure ...43

6.5 Road Safety Audit ...43

6.6 Environmental and Social Impact Issues ...46

6.6 Environmental and Social Impact Issues...46

6.6.1 Package No. 01: Krui – Biha...46

6.6.2. Package No. 02: Padang Sawah – Simpang Empat. ...46

6.6.3. Package No. 03: Manggopoh – Padang Sawah...46

6.6.4. Package No. 04: Ipuh – Bantal ...47

6.6.5. Package No. 05: Sp. Rampa – Poriaha ...47

6.6.6. Package No. 06: Psr. Pedati – Kerkap...48

6.6.7. Package No. 07: Indrapura – Tapan ...48

6.6.8. Package No. 08: Bts Kota Pariaman – Manggopoh ...48

6.6.9. Package No. 09: Rantau Tijang – Kota Agung...48

6.6.10. Package No. 10: Sp. Empat – Air Balam ...49

6.6.11. Package No. 11: Bantal - Mukomuko ...49

6.6.12. Package No. 12: Kambang – Indrapura...49

6.6.13. Package No. 13: Sp. Rukis – Tj. Kemuning ...49

6.6.14.Package No. 14: Painan – Kambang ...50

6.6.15. Package No. 15: Sibolga – Bts. Tapsel ...50

6.6.16. Package No. 16: Sebelat – Ipuh ...50

6.6.17. Package No. 17: SP. Gunung Kemala – Pg. Tampak...51

6.6.18. Package No. 18: Mukomuko – Bts. Sumbar ...51

6.6.19. Package No. 19: Lais - Bintunan ...51

6.8 Quality Assurance...59

6.9 Project Risks and Mitigation Measures...59

6.9.1 Risks Related to Delays...59

6.9.2 Financial Risks ...59

6.9.3 Risks Related to Quality...60

7 ISSUES and RECOMMENDATIONS ...61

7.1 Current Situation ...61

(5)

ABBREVIATIONS AND ACRONYMS

ACAP : Anti-Corruption Action Plan

AER : Application Evaluation Report

AIP : Australian Indonesia Partnership

AMDAL : Environmental Management (Analisis Mengenai Dampak

Lingkungan)

ANDAS : AnalisisDampakSosial

AWPs : Annual Work Programs

Balai : Regional Office for National Roads Implementation

BAPPENAS : Badan Perencanaan Pembangunan Nasional (National

Development Planning Agency of GOI)

Bappedalda : Regional Environmental Impact Agencies

BBPJN : Balai Besar PelaksanaanJalanN asional (Regional Office for

National Roads Implementation)

BER : Bid Evaluation Report

BLH : Badan Lingkungan Hidup

BPK : Badan Pemeriksaan Keuangan (Audit Board of the

Government of Indonesia)

CAD : Computer Aided Design

CHS : Complaint Handling System

CTC : Core Team Consultant

CHU : Complaint Handling Unit

CRO : Community Representative Observer ( = WPM)

DIA : Directorate of Implementing Affairs

DOP : Directorate of Planning

DGH : Directorate General of Highways

DMS : Document Management System

DTA : Directorate of Technical Affairs

DGH : Directorate General of Highway

DMS : Document Management System

DSC : Design and Supervision Consultants

EA : Executing Agency

EINRIP : Eastern Indonesian National Roads Improvement Project

(6)

ESAMP : Environmental and Social Assessment Plan

ESS : Environmental and Social Safeguards

FMIS : Financial Management Information System

FIDIC : Federation Internationale des Ingenieur Conseils

FMIS : Financial Management Information System

GIS : Geographic Information System

GOI : Government of Indonesia

IA : Implementation Agency

IBRD : International Bank for Reconstruction and Development

IFR : Internal Financial Report

IRMS : Integrated Road Management System

Kabupaten : Regency

KPIs : Key Performance Indicators

KPPN : Kantor Pelayanan Perbendaharaan Negara (Indonesian: State

Treasury Service Office)

LAN : Local Area Network

LARAP : Land Acquisition and Resettlement (Rencana Tindak

Pengadaan Tanah dan Pemukiman Kembali)

MIS : Management Information System

MOF : Ministry of Finance

MPW : Ministry of Public Work

MPRs : Monthly Progress Reports

P2JN : Perencanaan Pengawasan Jalan dan Jembatan Nasional

PDF : Portable Document Format

PMU : Project Management Unit

PAPs : Project Affected Peoples

PMM : Project Management Manual

PMU : Project Management Unit (WINRIP)

POKJA : Bina Marga Project Managers and Procurement Committes

PPC : Project Preparation Consultants

PP3 : Pemantau Pihak ke 3

PPK : Sub Project Manager

PPR : Project Progress Report

QPRs : Quarterly Progress Reports

RKL/RPL : Rencana Pengelolaan/Pemantauan Lingkungan

(7)

Satker : Satuan Kerja (Work Unit for Road Project Implementation)

SPPL : Surat Pernyataan Pengelolaan Lingkungan

SRIP : Strategic Road Infrastructure Project

TA : Technical Assistance

TOR : Terms of Reference

UKL/UPL : Upaya Pengelolaan Lingkungan dan Upaya Pemantauan

Lingkungan (Site Specific Environmental and Monitoring Plan)

WINRIP : Western Indonesia Roads Improvement Project

WB : World Bank

WP : Work Program

WPs : Works Programs

WPM : Wakil Pengamat dari Masyarakat (or Community

(8)

APPENDICES

Appendix A

:

Overall Loan Progress

Appendix B

:

Highway Design Progress

Appendix C

:

Financial Progress

Appendix D

:

Quality Assurance Progress

Appendix E

:

Environmental and Social Progress

Appendix F

:

Procurement Plan and Progress

Appendix G

:

WINRIP Website Progress

Appendix H

:

ACAP Training/Dissemination Progress

Appendix I

:

Performance Indicator

(9)

1 EXECUTIVE SUMMARY

Loan 8043-ID Progress

1.45

4.35 4.35

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

Month

%

Co

m

pl

et

e

Actual Expenditure USD 2.20 mil (0.88 %)

WINRIP ACTUAL PROGRESS UP TO DECEMBER 2013 AND FORECAST UP TO DECEMBER 2017

ACTUAL December 2013

Forecast December 2013 Forecast Expenditure USD

79.75 mil (31.90%)

(10)

Loan Vs disbursement (%)

The loan amount disbursed until December 2013 end is USD 2,207,915.00 i.e. approximately 0.88% of loan.

Below table summarizes the individual category disbursements.

Category Description Loan Restructure Amount

(US$)

Total disbursed until end of December

2013 (US$)

% Disbursed

1 Part 1Betterment and Capacity Expansion of

National Roads.

220,400,000.00 0 0

2 Part 2

Implementation Support

16,000,000.00 1,568,287.79 9.80

3 Part 3

Road Sector Institutional Development

1,000,000.00 0 0

4 Part 4

Contingency for Disaster Risk Response

0 0 0

Unallocated 12,600,000.00 0 0

LN 8043 DA-A

639,627.21 0

Original Loan Amount

(11)

Project Status to End December 2013

Length WidthEstimated Cost(PIP Mar 2012) (excl. VAT) DED

(Km) (m) (IDR Million) Status RequiremDoc ent Status

Doc Requirem

ent Status Budget

Allocation Status Est'd.Start (months)Duration SUMATERA UTARA

5 Sp. Rampa - Poriaha 11.1 6 55,126.60 Review byCTC UKL/UPL Balai IOK 2011 SLARAP

Consultant recruitment

(Balai 1) Balai 1 100% Not yet started Dec-13 18.00

15 Sibolga - Bts Tap Sel 36 7 129,228.00 Review byCTC UKL/UPL Balai IOK 2011 LARAP

Consultant recruitment

(Balai 1) Balai 1 Inventory Not yet started Apr-14 21.00

SUMATERA BARAT

Padang Sawah - Sp Empat 40.9 7

Including Air Gadang Bridge 100 m 7

3 Manggopoh - Padang Sawah 32 7 152,434.90 Completed SPPL P2JNOK 2010

1. LARAP 2. Monit. LARAP Report

1. NOL WB 13 Dec 12

2. Process Dinas PUProp 100%

NOL for AERs issued on 22

April 2013 Oct-13 24.00

7 Indrapura - Tapan 19.5 7 96,921.00 AwaitingDSC AMDAL ANDALBaru SLARAP recruitmentConsultant

(Balai 2) Balai 2 Staking Out Not yet started Feb-15 21.00

8 Bts. Kota Pariaman - Manggopoh 46.8 7 183,268.80 AwaitingDSC AMDAL ApprovalProcess LARAP CompletedP2JN

2011 Balai 2 Inventory Not yet started Dec-14 24.00

10 Sp Empat - Sp Air Balam 61.7 7 241,617.20 AwaitingDSC AMDAL ApprovalProcess LARAP CompletedP2JN

2011 Balai 2 Inventory Not yet started Dec-14 24.00

12 Kambang - Indrapura 55.2 6 171,948.00 AwaitingDSC AMDAL conveneIn SLARAP recruitmentConsultant

(Balai 2) Balai 2 Staking Out Not yet started Feb-15 24.00

14 Painan -Kambang 31.5 7 118,993.00 AwaitingDSC AMDAL conveneIn SLARAP recruitmentConsultant

(Balai 2) Balai 2 Staking Out Not yet started Jul-15 21.00

20 Lubuk Alung - Sicincin 14.6 7 54,557.00 AwaitingDSC UKL/UPL TLKJOK 2011 SLARAP

Consultant recruitment

(Balai 2) Balai 2 Inventory Not yet started Oct-15 18.00

21 Lubuk Alung -Kurataji 16.8 7 65,788.00 AwaitingDSC UKL/UPL TLKJOK 2011 SLARAP

Consultant recruitment

(Balai 2) Balai 2 Inventory Not yet started Oct-15 18.00

BENGKULU

4 Ipuh- Bantal 42.4 7 226,275.10 Completed SPPL P2JNOK 2010

1. LARAP 2. Monit. LARAP Report

1. NOL WB 10 Dec 12 2. Not yet prepared

SAL 2013 Process forAdministr Lamd Acq.

NOL for AERs issued on 22

April 2013 Oct-13 24.00

6 Ps Pedati - Kerkap 25 7 72,018.80 Review byCTC UKL/UPL TLKJOK 2011 LARAP

Under

preparation Balai 3 Inventory Not yet started Apr-14 18.00

11 Bantal - Mukomuko 50.1 6 157,820.00 Review byCTC AMDAL Preparation LARAP preparationUnder Balai 3 Inventory Not yet started Apr-14 24.00

13 Sp Rukis - Tj Kemuning 56.3 7 225,481.50 Review byCTC UKL/UPL P2JNOK 2011 LARAP

Under

preparation Balai 3 Inventory Not yet started Apr-14 21.00

Seblat - Ipuh including 34.5 6

Air Lalang & Air Guntung Bridge 64 m 6

18 Mukomuko - Bts. Sumbar 25.8 6 69,233.00 AwaitingDSC UKL/UPL TLKJOK 2011 SLARAP

Consultant recruitment

(Balai 3) Balai 3 Inventory Not yet started Oct-15 18.00

19 Lais- Bintunan 11.6 7 37,558.00 AwaitingDSC UKL/UPL TLKJOK 2011 LARAP

Consultant recruitment

(Balai 3) Balai 3 Inventory Not yet started Oct-15 18.00

LAMPUNG

1 Krui - Bha 25 7 146,668.00 Completed SPPL P2JNOK 2010

1. LARAP 2. Lap Mon LARAP

1. NOL WB 4 Jan 13

2. NOL WB Satker PJNProp 100% NOL for AERsissued on 22

April 2013 Oct-13 24.00

36.8 6 30 m 6

9 Rantau Tijang - Kota Agung 42 7 149,831.50 AwaitingDSC UKL/UPL TLKJOK 2011 LARAP

Consultant recruitment

(Balai 3) APBN 2014 Not yet started Jul-15 21.00

2,776,633.60

Sp.Gunung Kemala - Pg. Tampak

Pack.

No. Loan Package Name

Environment Social Land Acquisition

Procuremen t Status OK P2JN 2010 1. LARAP 2. Monit. LARAP Report

1. NOL WB 13 Dec 12

2. Process Dinas PUProp 80%

NOL for AERs issued on 22 April 2013

Contract Implementation

Plan

24.00 2 207,390.20 Completed SPPL&UKL/UPL Bridge

21.00 Oct-13

Inventory Not yet started Jul-15

17 104,238.00 Review byCTC AMDAL TLKJOK 2011 16 110,237.00 Prepared by P2JN Consultants since March 2013

AMDAL conveneIn SLARAP recruitmentConsultant (Balai 3) Balai 3

Apr-14 21.00

(12)

Visits

World Bank mission visited Indonesia starting from 9 December – 18 December 2013 to review overall aspect of project including physical work progress. Mission also discussed replacement Package No. 18 : Mukomuko – Bts Sumbar and Package No. 9 : Rantau Tijang – Kota Agung of WINRIP Work Program (WP’s).

Procurement

The pre-qualification for under mentioned four sub-projects has started by the end of December 2013.

Package 17: Sp. Gunung Kemala – Pugung Tampak, prequalification had announced in UNDB Online and Ministry of Public Works Website on November 11, 2013 and 12 Applicants from 68 applicants registered in MPW Website had submitted the application proposal on December 30, 2013 (the last date for submitting the application);

Package 05: Sp. Rampa – Poriaha, prequalification had announced in UNDB Online and; Ministry of Public Works Website on December 23, 2013;

Package 11: Bantal – Mukomuko, prequalification had announced in UNDB Online and Ministry of Public Works Website on December 23, 2013;

Package 13: Sp. Rukis – Tj. Kemuning, prequalification had announced in UNDB Online and Ministry of Public Works Website on December 23, 2013.

Action Required

(13)

2 PROJECT DESCRIPTION

2.1 Background

The Government of Indonesia wishes to continue strengthening of the National Road system in Indonesia while the Eastern Indonesia National Roads Improvement Project (EINRIP which is assisted by AusAID through the Australian Indonesia Partnership or AIP), is providing support program of National road and bridge improvement works in Eastern Indonesia. The Western Indonesia National Road Improvement Project (WINRIP) will provide similar support for National road and bridge in the Sumatra region of Indonesia. The focus of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as National roads. In addition, provision will be made for major bridge repair works, rehabilitation, duplication and replacement as necessary to complement road betterment works.

2.2 Project Development

The loan effectiveness date for the WINRIP is 12 March 2012 and key project data is shown in the following detail.

Key Project Data WINRIP Loan No. 8043-ID

Project Cost US$350 million

Original Loan Amount US$250 million

Revised Loan Amount N/A

Board Approval Date 26 May 2011

Loan Signing Date 14 December 2011

Effectiveness Date 12 March 2012

Disbursement (as of 31 December 2013)

US$ 2.2 million (0.88%)

Original Closing Date 31 December 2017

Environmental Category B-Partial Assessment

The IBRD loan amount is US$250 million. The Project is intended to finance a part of the DGH investment program for national roads with a particular focus on the Western corridor of Sumatra. The corridor is one of the three main corridors in Sumatra and connects the city of Padang (with a population of around one million) to major towns along the west coast (Bukittinggi, Sibolga and Bengkulu). It also connects through connector roads on the West coast to Medan in the northeast and to Pekanbaru in the centre of the island. The project has four components:

Project Component 1: Betterment and Capacity Expansion of National Roads

(14)
[image:14.595.76.523.86.211.2]

Table 2.1 Proposed Physical Works by DGH Program

Type of Works

AWP-1 AWP-2 AWP-3

Km US$ mill Km US$ mill Km US$ mill

Road Betterment - - 53.10 22.77 -

-Capacity Expansion 137.10 79.70 314.60 127.67 207.60 74.58

Bridge works 0.100 1.94 - - 0.08 2.06

TOTAL

(excluding tax @ current prices) 137.20 81.64 367.70 150.45 207.68 76.65

* Contingency costs not included - ** including 194 meters of bridges

The batches of projects are termed Annual Work Programs (AWPs) in line with terminology used in other Bina Marga projects. They are not in fact “annual” programs as such but rather a series of multi-year programs, each commencing in consecutive years. Hence, hereinafter it will call as just Work Programs (WPs). It is expected that implementation of the first Works Program (WP-1) will commence in the third quarter of 2013 and be completed by third quarter or late 2015. The second Work Program (WP-2) is expected to commence in early 2014 and be completed by late 2015 or middle 2016. The third Work Program (WP-3) is expected to commence in early 2015 and be completed by mid-2017. The loan will be closed onDecember 2017.

Table 2.2presents details of the First Works Program (WP-1). The four packages in this

group should have been free from any land acquisition issues, but in fact two packages (Krui – Biha and Manggopoh – Padang Sawah) had land issues which were solved by the DGH properly. Thus, there are no foreseeable impediments to implementation.

Table2.2 IBRD Assisted WINRIP Civil Work WP-1

No Province Link No. Link Name C la s s R o a d T y p e

Road Works Bridge Works Total Cost

F ro m T o L e n g th T re a tm e n t C o s t (2 0 1 0 ) No L e n g th C o s t (2 0 1 0 ) 2 0 1 0 P ri c e s E q u iv a le n t

Km Km Km Rp mill m Rp

mill Rp mill US$ mill

1 Lampung 053.0Krui –

Biha K1 IU 221.5 246.5 25.0

Bett’nt

to 7 m. 148,668 148,668 16.52

2 West Sumatra 047.2 Padang Sawa – Simpang Empat

K1 IU 0.0 40.9 40.9Bett’nt

to 7 m. 189,810 189,810 21.09

2a West

Sumatra 34.1

AirGadan

gBridge K1 IU

New

Bridge 1 100 17.580 17,580 1.95

3 West Sumatra 047.1 Manggop oh – Padang Sawah

K1 IU 102.2 134.2 32.0Bett’nt

to 7 m. 152,435 152,435 16.94

4 Bengkulu 015.3Ipuh

-Bantal K1 IU 0.0 49.7 49.7

Bett’nt

(15)

It should be noted that all road sub-projects have been subject to economic appraisal and have estimated Economic Internal Rates of Return (EIRR) in excess of 15%. These were selected for inclusion and are subject to completion of environmental and social screening, to confirm that there is no land acquisition or resettlement requirements remain outstanding.

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for all projects proposed for WP-1.

Sub-projects to be included in WP-2 and WP-3 have also been determined as listed in

Table 2.3. Final Engineering Designs and Engineer’s Estimates for all WP-2 and WP-3

proposed works require preparation or finalization. In the cases of some projects, preliminary Engineering Designs were prepared during Project preparation which will require review and possible amendment by the Design and Supervision Consultant prior to procurement.

The costs presented in Table 2.3 are planning estimates only, and the overall scope and contents of WP-2 and WP-3 may need to be revised as when revised costs and budgets are determined.

Table2.3 : IBRD Loan WINRIP Civil Work WP-2 and WP-3

NO. SUBPROJECT LINK NO. AND NAME LENGTH (KM)

COST (RP. MILL)

WIDTH (M)

IMPLEMENTATION PLAN

START DURATION (MONTHS) WP-2

5. Sumut : Link No. 015.xx,

Sp. Rampa – Poriaha 11.1 55,126.6 6.0 May 2013 18

6. Bengkulu : Link No. 010.0,

Ps. Pedati – Kerkap 25.0 72,018.8 7.0 May 2013 18

7. Sumbar : Link No. 019.0,Indrapura – Tapan 19.5 96,921.0 7.0 Oct.2013 21

8. Sumbar : Link No. 024.0,

Bts. Pariaman – Manggopoh 46.8 183,286.8 7.0 Oct. 2013 24

9. Lampung : Link No. 026.1,

Rantau Tijing - Kota Agung 42.0 149,831.5 7.0 Oct. 2013 21

10. Sumbar : Link No. 034.1,Sp. Empat - Sp. Air Balam 61.7 241,617.2 7.0 Oct.2013 24

11. Bengkulu : Link No. 015.2,

Bantal – Mukomuko 50.1 157,820.0 6.0 Dec. 2013 24

12. Sumbar : Link No. 017.2,

Kambang – Indrapura 55.2 171,948.0 6.0 Dec. 2013 24

13. Bengkulu : Link No. 006.1,

Simpang Rukis - Tanjung Kemuning 56.3 225,481.5 7.0 Dec. 2013 21

WP-3

14. Sumbar : Link No. 017.1,

Painan – Kambang 31.5 118,993.0 7.0 March. 2014 21

(16)

NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM) (RP. MILL)COST WIDTH(M)

IMPLEMENTATION PLAN

START DURATION (MONTHS)

16.

Bengkulu : Link No. 009.4,

Seblat – Ipuh, including Air Galang and Air Guntung Bridges

34.5

0.052 110,237.0 6.0 March 2014 21

17. Lampung : Link No. 061.1,Sp. Gunung Kemala - Pugung Tampak 0.0336.8 104,238.0 6.0 March 2014 21

18. Bengkulu : Link No. 015.3,

Mukomuko - Bts. Sumbar 25.8 69,233.0 6.0 May 2014 18

19. Bengkulu : Link No. 009.1,

Lais – Bintuan 11.6 37,558.0 7.0 May 2014 18

20. Sumbar : Link No. 002.0,

Lubuk Alung – Sicincin 14.6 54,557.0 7.0 May 2014 18

21. Sumbar : Link No. 027.0

Lubuk Alung – Kuraitaji 16.8 65,788.0 7.0 May 2014 18

Project Component 2 : Implementation Support

This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of training of DGH staff and for incremental operating costs for the project. This will provide support to the MPW for the implementation of the civil works, including: (a) provision of Core Team Consultants (CTC), Design and Supervision Consultants (DSC) and road safety audits; (b) Project management support and technical audits. This is directly related to the implementation of the civil works and covers consulting services for design and supervision of the civil works in Component 1; management support and technical audits to help improve the quality of construction and support to governance improvements during procurement and implementation; and a series of systematic road safety audits of road designs for all project roads in Component 1. This is to ensure compliance with road safety standards and regulations, identify road hazards and undertake remedial treatments for safety improvements.

Project Management Core Team Consultants (CTC). The CTC will provide support to

the PMU and DGH in the management of the Project, based in Jakarta. Their tasks include financial and progress monitoring and reporting, information management and dissemination, quality assurance and performance review for the Design and Supervision Consultants, implementation and monitoring of the anti-corruption action plan, support for project monitoring and evaluation, and support for implementation of a training program to support project management and implementation. TheCTCcontract

No.06-20/CTC/TA/LN/8043/1112was signed on5 November 2012 by bothDGHand a

Joint Venture of PT. PerentjanaDjaja, Yongma Engineering Co,Ltd, and PT.

Epadascon Permata Engineering Consultant.

Design and Supervision Consultants (DSC). A Design and Supervision Consultant

(17)

include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office(Balai II),and will be based in Padang, West Sumatra.

Project Component 3 : Road Sector Institutional Development

This component will provide technical assistance and support to strengthen disaster risk mitigation in the road sector, including capacity building support for the new environment/risk mitigation and road safety unit of DGH to conduct disaster risk assessments and planning, risk mapping of land-slides, coastal erosion, earthquake and floods, and analysis of alternative designs for road segments that pass through critical environmental assets and vulnerable areas.The procurement for consultants under this component has not yet been started. Preparation for the procurement would be coordinated soon by the PMU WINRIP, the CTC and the DGH.

Project Component 4 : Contingency for Disaster Risk Response

This special component will provide preparedness and rapid response to disaster, emergency and/or catastrophic events as needed. This provisional zero dollar component will be added under this project to allow for rapid reallocation of loan proceeds from other components under streamlined procurement and disbursement procedures.

2.3 Project Objective

The main objective of the program will be to increase the effective use of selected sections of National roads along the Western Sumatra Corridor by reducing road

user costs, through improving the National road network especially in 4 (four)

(18)

3 CONSULTANCY SERVICES

3.1 CTC Consultants

3.1.1 Scope of Services

The CTC contract services originally were structured in its different project management elements.

• Inception Phase

A key activity during the inception phase will be to establish lines of communication with PMU-WINRIP and DSC’s Team Leader as well as with all Provincial Project Managers (Satkers) where the first works are to be constructed under WP-1.

• Project Management and Support to PMU, including acting DSC until the DSC is established

The Terms of reference identify a number of sub-items to be performed by CTC. The key factor that will ensure success is that the CTC must work pro-actively and alongside PMU counterparts and with DSC team in a professional manner based on mutual respect and trust.

• Preparation of Work Programs

The tendering process for WP 1 sub-projects began as soon as procurement committees have been formed and received appropriate training in the procurement procedures required. The indicative work programs and cost estimates identified for WP-2 and WP-3 are subject to verification, and are likely to change following more detailed investigations. Further preparation for WP-2 and WP-3 will be managed by the PMU supported by the CTC.

• Financial Monitoring

It will be the role of the CTC to first assess the level of understanding of the financial management, monitoring and reporting procedures by the finance staff at the provincial and central level and subsequently devise an appropriate training program and assist the PMU in training delivery.

• Project Progress and Performance Monitoring

CTC will monitor the loan project progress and prepare the report in monthly basis. In the meantime, GOI and the World Bank have agreed on a set of Key Performance Indicators (KPIs) to measure the project’s performance in achieving its stated development objectives. CTC will therefore first concentrate on the establishment of precise definitions, calculation methods and data collection procedures to monitor the KPIs.

• Support for the Implementation of the ACAP

The CTC will assist PMU be responsible for ensuring the ACAP is properly implemented and for revising the Project Management Manual on an annual basis to incorporate necessary improvements to processes and procedure.

• ESAMP and LARAP Implementation Monitoring

(19)

• Training to Support Project Implementation

CTC is responsible for preparation and management of all training program required under WINRIP.

• Reporting

CTC is responsible for all reports required under the contract agreement with standardize forms, charts and tables.

3.1.2 CTC Manning

CTC professional staffs involved in the project as at the end of December 2013 are listed in the following table:

Position MM Name

Assignment Time Used to End of December

2013

Contract Time Remaining Start End

Team Leader 40 Mahbub ur Rahman - - - *

-35.25 Per Weiss Pedersen Apr-2013 Mar-2016 7.50 27.75

Senior Highway Eng. 12.5 Moon, Sung Hyun Mar-2013 Mar-2014 9.00 3.50

Senior Road Safety

Audit Engineer 11 Cho, Woo Sung

Jun-2013 Mar-2014 6.54 2.46

Jan-2016 Feb- 2016 - 2.00

Senior Procurement Specialist

18 Wasim ur Rahman - - - ** 18.00

16 Sanjeev Kumar

Agarwal Jan-2014 May-2015 -** 18.00

Assistant Team Leader 40 Besar Afiat Bowo Nov-2012 Sep-2013 9.67 30.33 26 Agus Setiawan Sep-2013 Feb-2016 3.67 22.33

Highway Engineer 36 Whiliyanto Nov-2012 Jun-2013 7.37 28.63 36 Lebiyartono Jul-2013 Nov-2015 5.97 30.03

Quality Assurance

Engineer 30 Uray Abdul Manaf Jul-2013 Jun-2016 5.97 24.03

Financial Management Specialist

36 Uus Martawijaya Nov-2012 Oct-2015 12.33 23.67

26 YD Tarwanto Oct-2013 Nov-2015 2.97 23.03

Environmental

Specialist 30 Leti Hermawati Dec-2012 Jun-2015 12.43 17.57

Social Impact Specialist

36 M. Sutopo Nov-2012 Oct-2015 11.33 24.67

26 Witono Sept-13 Nov-2015 3.93 22.07

Procurement Specialist-1

12 Darmansiri - - - * 12.00

12 Muhdi - - - **

-Procurement Specialist-2

12 Rudi Rungkat Nov-2012 Mar-2013 4.10 *

-17 M. Edi Fachri Mar-2013 Aug-2014 9.17 7. 83

Management Information Specialist

30 Agung Lukito - - - * 30.00

25 Sony Thamrin May-2013 Apr-2015 7.97 17.03

Community

(20)

Notes: * : Resigned ** : Not yet mobilized = Amandment No. 1

International experts (Senior Highway Engineer and Senior Road Safety Audit Engineer) have been assigned for CTC achieving his duration mentioned in the original contract. DGH requested them to continue their assignment and have been accommodated in the contract amendment.

In parallel with the instruction to speed up the process, detailed engineering design (DED) of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and 19). These conditions imply to the need of changing the CTC scope of works which will be included in CTC contract amendment and the need to extend the Senior Highway Engineer assignment.

3.1.3 CTC Contract

The CTC contract for “Western Indonesia National Roads Improvement Project” (Contract No. 06-20/CTC/TA/LN/8043/1112) was signed on 05 November 2012. The contract is between the Government of Indonesia represented by Directorate General of Highways in the Ministry of Public Works and PT. Perentjana Djaya in joint venture with Yongma Engineering Co.Ltd. and PT. Epadascon Permata Engineering Consultant.

The notice to proceed was issued by letter dated 6 November 2012 from the PPK, and the official starting date of the contract was set at 6 November 2012.

The following table shows a list of approved contract amendment for the CTC services with DGH.

Contract

Date

USD (Excl. VAT) IDR (Excl. VAT)

Original Contract 5-Nov-2012 1,276,700 21,415,400,000

Amendment No.1 21-Oct-2013 1,315,925 22,426,175,000

The Amendment No.1 is covering all requirements of the CTC services at the moment as summarized below.

• Replacement of the Team Leader.

• Extending the assignment of the Senior Highway Engineer.

• Extending the assignment of the Senior Road Safety Audit Engineer.

• Extending the assignment of the Procurement Specialist 2 and replacement of the Procurement Specialist 1.

• Adding the new position of Bridge Engineer.

• Adding the new position of Training Specialist, and

(21)

3.2 DSC Consultants

A Design and Supervision Consultant (DSC) will be responsible for design of WP-2 and WP-3 civil works and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office (Balai II), and will be based in Padang, West Sumatra.

DSC has been established in Balai II Padang following the contract signing on 11 June 2013 between Balai II and Renardet SA in joint venture with PT. Cipta Strada, PT. Daya Creasi Mitrayasa, PT. Seecons and PT. Yodya Karya. The Notice To Proceed was issued by the Balai II on 19 June 2013.

(22)

4 CIVIL WORKS

4.1 Detailed Design Preparation

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for all projects proposed for WP-1.

WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the construction supervision of all the works programs will be performed by the DSC. In parallel with the instruction to speed up the process, detailed engineering design (DED) of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and 19). These conditions imply to the need of changing the CTC scope of works which will be included in CTC contract amendment.

The CTC team(Team leaders, senior highway engineer, senior road safety auditor) joined the world bank kick-off and wrap up meeting to discuss about subject implementation review mission World Bank WINRIP Program which is review all aspects of the project WINRIP against the project development objectives (PDOs) and performance Monitoring Indicators (PMIs). The meeting was held with the Directorate General of Highways (DGH) in the Ministry of Public Works (MPW) and project consultants at the Bappenas office on 13th and 17th December 2013 in Jakarta.

The senior road safety audit engineer was invited and attended the coordination meeting for the Implementation Review Mission Aid Memoire for WINRIP on 20th December 2013, at the Ministry of Public Works. The objective of the meeting is to discuss about progress in components 3 and 4 which is road sector institutional development and contingency for disaster risk response in aspect of road safety. In addition, the road safety audit guidelines which is including general consideration and checklist during construction phase also had discussed and requested to be made by senior road safety engineer from road safety and environmental division at this meeting. The purpose of this guidelines is to hand over assistant road safety engineer in order to be used as a reference which is for identifying potential safety issues and make ensure that they do not overlook something important in aspect of RSA under construction phase.

This Guideline will be submitted in response to request from MPW in the middle of january 2014.

Progress of Technical Design Reviewing and Road Safety Audit is included as Appendix B.

4.2 Procurements

(23)

the construction estimated cost more than IDR 10 Billion. Review from previous procurement process, the World Bank in the Aide Memoire requested to GOI, for next 4 ICB subprojects qualification still used Pre-Qualification and for remaining sub-project must be process with Post Qualification. As well as for all NCB the World Bank also requested to follow Post Qualification in procurement process.

All subprojects for WP-1 have been started with prequalification since 30 December 2011 for ICB multiple contract. This was an advanced procurement action agreed by both DGH and the World Bank prior to the CTC establishment. In this month all AWP-1 sub-projects had signed the contract. The last 2 sub-sub-projects, Package 02: Pd. Sawah – Simpang Empat and Package 03: Manggopoh – Padang Sawah, signed the contract on December 6, 2013 and NOL for disbursement for all 4 packages had been issued by the World Bank on December 10, 2013.

Untill this month, there are additional 4 sub-projects started the bidding, all ICB following Pre-Qualification. The sub-projects are:

1. Package 17: Sp. Gunung Kemala – Pugung Tampak, prequalification had announced in UNDB Online and Ministry of Public Works Website on November 11, 2013 and 12 Applicants from 68 applicants registered in MPW Website had submitted the application proposal on December 30, 2013 (the last date for submitting the application).

2. Package 05: Sp. Rampa – Poriaha, prequalification had announced in UNDB Online and Ministry of Public Works Website on December 23, 2013.

3. Package 11: Bantal – Mukomuko, prequalification had announced in UNDB Online and Ministry of Public Works Website on December 23, 2013.

4. Package 13: Sp. Rukis – Tj. Kemuning, prequalification had announced in UNDB Online and Ministry of Public Works Website on December 23, 2013.

CTC had also involved in Selection of DSC WINRIP since March 2013, started by attend the opening of Financial Proposal on March 5, 2013. The contract for this assignment was signed on June 11, 2013.

There are 3 (three) consultancy packages under Component 3:

- Capacity Building for Disaster Risk Reduction; - Capacity Building for Environment Management; - Capacity Building for Road Safety.

These packages are under procurement process. TOR has been prepared by DGH which shall be finalized at the earliest. It is scheduled to start procurement in first quarter of 2014.

The WINRIP Procurement Plan is shown inAppendix E.

4.3 Civil Works Implementation

Under mentioned civil works Contracts under AWP -1 have been signed.

(24)

signed on December 6, 2013

3. Package Manggopoh – Padang Sawah, West Sumatera Province, which was signed on December 6, 2013

4. Package Ipuh – Bantal, Bengkulu Province, which was signed on November 14, 2013

The above packages have been forwarded for disbursement by the World Bank on December 10, 2013 (form 384 s).

4.4 Civil Works Progress

No civil works progress for subprojects is reported as they are recently signed.

4.5 Quality Assurance

The DSC will be responsible for Quality Assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the Quality Assurance Plan (QAP). They will prepare a Quality Assurance system covering all aspects of quality in all subprojects, and continuously monitor the effectiveness of their supervision procedures.

Quality Assurance Engineer of the CTC has been mobilized on July 01, 2013. On 11 December 2013, an interaction meeting with the DSC CO-Team Leader and Project Officer of PMU to discuss Quality Assurance Plan (QAP)/Quality Assurance System. DSC shall develop Quality Assurance Plan/ Quality Assurance System and subsequently report to the Balai for approval. Quality Assurance Engineer had also scheduled to visit site which could not take place

4.6 Environmental and Social Considerations

4.6.1 Current Overall Situation

A project category A, B or C is assigned to each package depending on the likely degree of influence on environmental issues with a brief explanation as follows (Appendix E).

Category A project is one which will have a significant negative impact on the environment and may have an influence on areas outside the actual project area. A project classified as such requires an AMDAL (ANDAL, RKL/RPL) study.

Category B project is one which affects the people or the environment to some extent but with a smaller impact than a Category A. The required environmental analysis is a UKL/UPL study only.

Category C project has minimal effect on the people or environment and an environmental analysis is not required. Standard operational procedures (SOP or SKPPL) are used to handle any minor problem which may arise.

(25)

Works Program

No of Packages

No of Investigations Approval by Remarks

BLH World Bank

AWP-1 4 8 SPPL x 4

Full LARAP x 4

4 (SPPL)

4 (Full LARAP)

Approved – NOL issued by WB, except for SPPL

AWP-2 8 17

Simple LARAP x 1 Full LARAP x 8 AMDAL Study x 4 UKL&UPL x 4

4 UKL&UPL

3 AMDAL

1 SLARAP

1 (one) Study AMDAL for threes packages, are Packages No.7, 12 and 14 /packages on AWP2 &AWP3.

1 (one) Study AMDAL for two packages, are Packages No.11 & 16. /packages on AWP2 &AWP3.

AWP-3 9 14 Full LARAP x 8

AMDAL Study x 1 UKL/UPL x 5

5 UKL&UPL

2 Full LARAP

Approved – NOL issued by WB, except for AMDAL and UKL/UPL

Total 21 39 Env=18, Soc=21 16 7

Note: UKL & UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB.

Out of 21 packages, 18 Packages requires environmental impact studies and approval of the Environmental Agency (BLH). Up to the end of December 2013, 16 packages (88%) has received BLH approval. The details of packages with year of approval are given in following para.

Environmental studies for packages No.1, 2 and 3 was issued approval by BLH on 2010, packages No.4,5,6,9,13,15,18,19,20 and 21 was approved on 2011 and BLH approved on 2012 for package No.17 then BLH approved for packages No.8 & 10 on 2013.

Similarly all 21 Packages require social studies (SLARAP and LARAP) and approval of the World Bank. 7 out of 21 social studies or 33% has received approval from the World Bank.

Social studies (LARAP and SLARAP) were sent to WB for NOL for package No. 5: Sp.Rampa-Poriaha (SLARAP) and package No.17: Sp.Gunung Kemala-Pugung Tampak (LARAP) on 16 September 2013 and package No. Sibolga-Bts Tapsel on 22 Oct 2013. These sub projects are ready for bidding process.

4.6.2 Environmental and Social Issues

This section outlines the activities of Social Impact Specialist and Environmental Specialist during December 2013.

4.6.2.1 Environmental Issues

(26)

and another cover the packages of No. 11 and 16 in Bengkulu Province. CTC has asked the AMDAL Consultant to finalize the AMDAL studies.

CTC is preparing module for training of the RKPPL/CPEMP (Contractor Program for Environmental Management Plan) and Environmental Impact Management And Mitigation Measures for the construction. CTC assisted Subdit Environmental Affairs to make coordination and discuss to produce that module.

1. Monitoring of Environmental Aspects During Construction

CTC will circulate monitoring form to DSC. This set of forms focused on environmental and social impacts, and amounted to 7 pages. These forms were intended to be used every month by the DSC Environmental Specialist.

CTC’s environmental staff actively advise DSC on environmental monitoring, but have not directly carried out monitoring, despite the CTC TOR requirement to “to implement the Environmental and Social Analysis Management Plan for WINRIP”, which involves monitoring of environmental plans and studies.

After finalising the Standard Environmental Clauses, CTC assisted Subdit Environmental Affairs to produce monitoring forms covering all aspects of the technical specifications, and introduced them to participants of environmental training including P2JN, Project Manager, DSC, Contractors, Team Work (Pokja) etc. There are 69 pages of forms, covering all aspects of construction.

2. Design Integration, Road Safety aspects and Monitoring of

Environmental Studies

Task 5.8.0 of CTC-2 TOR (Implement the Environmental and Sosial Analysis Management Plan/ESAMP) and Para 10.9 of the PMM requires ensuring that environmental management aspects of contracts have been implemented in accordance with AMDAL, UKL&UPL, SPPL studies and Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor (Contractor Program for Executing Environmental Managemen Plan CPEMP/RKPPL). Therefore CTC will proposed that staff visit the site of projects subject to studies or issues, and ensure that the plans are being implemented. A schedule for these visits on process.

4.6.2.2 Social Issues

1. Monitoring Report of the Larap for Krui - Biha

(27)

2. Monitoring Report of the Larap for Padang Sawah – Sp. Empat

Larap report of the package for Padang Sawah – Sp. Empat in West Sumatera Province already approved the World Bank dated 13 January 2013, and approval the monitoring report dated 19 July 2013. The pending issue is the remaining of 21 affected people not yet received compensation from Local Government. Now the compensation payment for 21 affected people is being resolved by local government. A monitoring report will be submitted to WB if ready prior to contract signing.

3. Monitoring Report of the LARAP for Manggopoh – Padang Sawah

Larap report of the package for Manggopoh – Padang Sawah in West Sumatera Province already appoved the World Bank dated 4 January 2013, and approval the monitoring reports dated 18 April 2013. A report for the remaining of 22 affected people is under preparation by Local Government. The pending issue is the remaining of 15 affected people not yet received compensation from Local Government. Now the compensation payment for 15 affected people is being resolved by local government. A monitoring report will be submitted to WB if ready prior to contract signing.

4. Monitoring Report of the LARAP for Ipuh – Bantal

LARAP report of the package for Ipuh – Bantal in Bengkulu Province was approved the World Bank dated 10 December 2012. Up to the end of December 2013 CTC just receive a proof of compensation payment for 19 of the total 217 affected peoples. A monitoring report will be submitted to WB if ready prior to contract signing.

5. Monitoring Report of the LARAP for Sp. Gunung Kemala – Pugung

Tampak

LARAP report of the package for Sp. Gunung Kemala – Pugung Tampak in Lampung Province has reviewed by the World Bank Ref.WINRIP/133 dated 16 September 2013 and need revision as follows:

a. The value of the appraisal for the affected lands for the Krui – Biha was already more than two years old. WB request the Larap should provide land appraisal value for the Sp Gunung Kemala – Pugung Tampak links. Likewise the established price standard for the building compensation should refer to the current data (updated data).

b. Action plan table should include a) formation of the land apprasing team, b) moving 83 units of electricity utilities.

c. Grievance redressed mechanism should refer to LAR Framework for WINRIP. d. Provide explanantion some data with no name in the nominative list.

e. Action plan signewd by the relevan local government as a commitment that the local government will provide proper budget for the action plan

(28)

According to World Bank letter, PMU via Ref. 1286/Bp.11/MD/2013 dated 23 September 2013 has requested the Director of Implementation Affairs Region I via the Satker/PPK to prepare the addressed above.

Follow up the World Bank review and PMU letter, CTC revised the Larap report for Sp. Gunung Kemala – Pugung Tampak. A revision of the LARAP report already submitted to the WB from PMU dated 6 November 2013, and response from the world bank dated 12 November 2013 stated that the LARAP document could been disclosed at PMU website.

6. Report of LARAP for Sp. Rampa - Poriaha

LARAP report for Sp. Rampa – Poriaha in North Sumatera Province has reviewed by the World Bank Ref. WINRIP/134 dated 16 September 2013 and need revision as follows:

a. Moving and providing compensation for one person (kiosk owner) affected must including to the action plan.

b. Action plan signed by the relevant local government as a commitment that the local government will provide proper budget for the action plan

c. Implementation monitoring report by using the form provided in the LARAP.

According to World Bank letter, PMU via Ref. 1286/Bp.11/MD/2013 dated 23 September 2013 has requested the Director of Implementation Affairs Region I via the Satker/PPK to prepare the addressed above.

Follow up the World Bank review and PMU letter, CTC revised the LARAP report for Sp. Rampa – Poriaha. A revision of the LARAP report already submitted to the WB from PMU dated 6 November 2013, and response from the world bank dated 12 November 2013 stated that the LARAP document could been disclosed at PMU website.

7. Report of Five LARAP in Bengkulu

CTC recieved Larap Reports for five (5) packages in Bengkulu Province from the BBPJN III Palembang dated 30 September 2013. The five of Larap reports consists Larap for Package No. 13: Sp. Rukis – Tanjung Kemuning, Larap for Package No. 6: Psr Pedati – Kerkap, Larap for Package No. 11: Muko-muko – Bantal, Larap for Package No. 16: Seblat – Ipuh, Larap for Package No. 16: Bintunan – Lais.

CTC reviewed the five (5) Larap Reports, and already submitted to the world bank from PMU dated 13 November 2013. All of the five Larap reports in Bengkulu Province has reviewed by the World Bank Ref.WINRIP/144 dated 20 November 2013 and need revision as follows:

a. All five Larap reports that that there are some assets (land and building) that will be affected entirely. Following the LARPF WINRIP should be covered on land acquisition and resettlement and need to budgeted.

(29)

the inventory table do not show the situasion.

According to world bank letter, PMU via Ref. 1476/Bp.11/MD/2013 dated 27 November 2013 has requested the Director of Implementation Affairs Region I via the Satker/PPK to prepare the addresed above.

Follow up the world bank review and PMU letter, now five Larap reports is being revision process by CTC. A revision for five Larap reports will be submitted to the world bank on the end of December 2013.

8. Report of LARAP for Sibolga – Bts Tapsel

CTC received Draft Final Larap report for Sibolga – Bts Tapsel from Balai dated 30 September 2013. The Larap report already submitted to the world Bank from PMU dated 22 October 2013, and approval the world bank dated 28 October 2013

Larap report for Sibolga – Bts Tapsel in North Sumatera Province has reviewed by the World Bank Ref.WINRIP/140 dated 28 October 2013 and need revision as follows:

a. There are some renters will be affected by the project which is also categoized as project affected people so must be recorded in the affected people list.

b. There is a private grave will be affected by the project which eligible to get moving cost and ritual ceremony cost.

c. There are 64 units of kiosks occupied side drain need to be displaced which get moving assistance in addition the compensation provided for their affected assets.

According to world bank letter, PMU via Ref. 1404/Bp.11/MD/2013 dated 31 October 2013 has requested the Director of Implementation Affairs Region I via the Satker/PPK to prepare the addresed above.

Follow up the world bank review and PMU letter, now Larap reports is being revision process by CTC. A revision Larap reports will be submitted to the world bank on the end of December 2013.

9. Report of Three (3) LARAPS in West Sumatera

CTC received from Balai II Padang Draft Final of 3 Larap reports in West Sumatera consist Larap report of packages for Kambang - Indrapura, Bts Kota Pariaman – Manggopoh, and Sp Empat – Air Balam dated 01 August 2013. Review and comment from CTC has been sent to PMU dated 9 September 2013, and PMU has forwarded to P2JN/ Local Consultant with request to revise the LARAP report based on the CTC comment. However up to the end of November 2013 the revison of the 3 Larap reports has not been received CTC. CTC will suggest to PMU/Director of Implementation Affairs Region I to remind P2JN/Local Consultas to provide the revision for 3 Larap reports.

(30)

Up to end of November 2013, CTC not yet received from Balai II/P2JN Padang 4 Larap reports in West Sumatera consist Larap report of packages for Indrapura – Tapan, Painan – Kambang, Lubuk Alung – Sicincin, and Lubuk Alung – Kuraitaji. CTC will suggest to PMU/Director of Implementation Affairs Region to remind Balai II/P2JN to provide the 4 Larap reports.

4.7 Anti-Corruption Issues

4.7.1 Anti Corruption Action Plan (ACAP)

ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers (CRO) in the bid opening and Third Party Monitoring (TPM) during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below

a)

Community Representative Observers (CRO)

b)

Publication / Disclosure

c)

Complaints Handling System (CHS)

d)

Third Party Monitoring (TPM)

4.7.2 Community Representative Observers (CRO)

The Community Representative Observers, required to observe the actual bid opening, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities.

CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP’s management, and not a member of any political party.

CROs selection procedures:

a. Review the criteria and qualifications of candidates for the CRO.

b. Director of Planning, DGH/ as Chairman of the Project Management Unit, delegated of the authority to the selection of the CRO to the Head of National Roads Implementation Agency (BBPJN) / Head of Procurement Services Unit (Unit Layanan Pengadaan - ULP),hereinafter referred to as Head of Balai. c. Head of Balai invited CRO candidates from the local universities or colleges. d. Selection of CRO facilitated by Balai (BBPJN) / Procurement Services Unit (Unit

Layanan Pengadaan - ULP).

e. Elected CRO and substituted CRO must follow the one day training held by the PMU / CTC WINRIP.

(31)

g. Based on the report and a written request from the Head of Balai above, the Director of Planning DGH as the Chairman of PMU signed a Letter of Agreement and the Decree of the Establishment of CROs.

The duties and obligations of CRO are:

a. CRO must be present in any procurement activity (Pre-Bid Meeting + Site Visit, Bids Submission and Opening of Bids, and Announcement of Bids Winner) by invitation of the Procurement Committee, and are required to sign the attendance list

b. If the elected CRO unable to attend on procurement activities, then Substituted CRO appointed have to attend these activities.

c. In discharging the Substituted CRO have the same responsibilities as elected CRO.

d. The CRO / Substituted CRO, after attending the Procurement activities, required to make a report of his/her activities and submit them to the PMU and CC to the related Head of Balai.

CRO as the representative of the community is to be independent observers and in performing their duties voluntarily and not demanding benefits of their works.

In the performance of its duties, the CROs receive transportation cost from their home / office to the location of procurement meeting, and also he / she also receives per diem or Out Station Allowance (OSA) and hotel accommodation if necessary to stay. CROs also got additional charged for their reporting costs. The financing standards adjusted to the General Cost Standard (Standar Biaya Umum) issued by the Ministry of Finance.

The CRO’s financing charged to the Contract for Consulting Services for Technical Assistance for Core Team Consultants (CTC) No: 06-20/CTC/TA/LN/8043/1112, dated 5 November 2012.

4.7.3 Publication / Disclosure

The second task under ACAP is publication of related ACAP documents for public disclosure with easy access to the general public and this is mainly manifest in the ACAP segment of the WINRIP website. This ACAP section has been being designed to attain the best possible transparency of the project.

Ministry of Public Work (MPW) will provide necessary information in the Project Implementation Plan (PIP), Project Management manual (PMM) on its website, and in the bidding documents, such as contact point for complaint (mail and e-mail address, phone, fax, text message). The contact will also include the Bank’s Fraud and Corruption Hotline. MPW will hold Annual Accountability Meetings to enhance accountability and project information sharing with civil society. The PMM will provide guidelines on disclosure of information related to the project. MPW official website will display critical information on WINRIP to enhance both internal and external monitoring of the project:

(32)

• Quarterly newsletter containing information on the list of contracts, implementation progress, projects related activities, number, types and status of complaints in each location. The newsletter will also be made available to civil society in hard copy and through electronic mailing system.

• Mid-Term Review Report, promptly after completion of the mid-term review implementation support is carried out in accordance with the loan agreement;

• All final audit reports (financial or otherwise, including qualified audit reports) prepared in accordance with the loan agreement and all formal responses of the government in relation to such reports. The publication should be done within one month after the report is accepted as final.

• Contracts awarded with information on general scope of work (with location), value, and summary information of the awarded firms/ contractors. The practice in other projects demonstrates that disclosure of contracts awarded will help in reducing fraudulent practices

Ministry of Public Works (PU) maintains a website: http://www.pu.go.id/, with a link to ’eproc.pu.go.id’ for information on semi e-procurement or e-procurement. PMU WINRIP supported by CTC will develop his own website: http://www.winrip-ibrd.com, and with it all the information and data about WINRIP be inputted or uploaded on this site.

In the application of one of the components of ACAP, the public disclosure and transparency, it is necessary to spread information and increase the capacity of all stakeholders involved in the implementation of this WINRIP project, through a variety of relevant training. The trainings have been expressed in the ToR of CTC WINRIP and described in the Project Implementation Plan (PIP).

One of the major risks to effective project implementation and management derives from the likelihood that project management staff does not have adequate training in or experience of the management of large-scale projects.

Procedures to mitigate these risks include the need to conduct comprehensive training of staff in all participating entities involved with the procurement, financial management and supervision of the project.

In response to this need, an Annual Training Program has been prepared, which identifies the major training requirements to be addressed. This program builds on previous training programs prepared and implemented by DGH to strengthen management staff and support the implementation of loan programs like WINRIP.

Activity of training will be carried out and supported in CTC contract, including the budget which use provisional sum budgets

(33)

Training will be provided an extension of normal DGH training program as outlined in table below:

No Training Topic Purpose Target Agencies/Units EstimatedTrainees/

Year

1 Procurement Training

(Including Provision of ACAP) Special Training in procurementfor members of Procurement Committees

Detailed provision of ACAP

Procurement Committees at Provincial Level

30

2 Training In Project

Management Required civil service training

Prospective staff for

Satkrer (Work Units) 20 3 Refresher Training in Project

Management Feedback to Projectmanagement staff from wider experience

Satkrer (Work Units) in

Provinces 60

4 Application of PMM

(including other provisions of ACAP)

Familiarization with Project Management requirements

Awareness of particular requirements of ACAP

Senior Staff of Provincial Agencies

Administrative Staff

Technical Staff

60

5 Financial Management Reporting Training (IFR) follows on from PMM Training

Procedures for monthly data collection, consolidation and reporting for procurement, Disbursment; Physical Progress

Staff of Satkers

Staff of Provincial Financial Agencies

Technical Staff

30

6 Environmental Monitoring

Workshops Review of Results ofEnvironmental Special Clauses (ESCs)to be provided by DSC

Provincial Works Agencies

Supervision Consultants

Contractors

30

7 Training of Treasurers

(Bravate A Cource) Basic civil service training frofinancial officers

Project Units (Satker) in

Provinces 20

Total Trainees Estimated 250

WINRIP project implementation is planned for 3 (three) years (2013 -2015), the number of trainees is 3 x 250 = 750. It is also possible on the way of time, type or duration of training may change tailored to the needs.

The Training Program summarized and described below:

1. Procurement Training: For the Procurement Working Group Committees

(POKJA Pengadadaan) of each entity.

To make sure that members of Procurements Committees in each participating entity are fully familiar with requirements of Presidential Regulation (Perpres) 54/2010 and Presidential Regulation (Perpres) 70/2012 and the World Bank Procurement Guidelines, plus provisions of Project Management Manual (PMM) regarding procurement (including the Anti-Corruption Action Plan, ACAP).

The intention is to provide in-depth training once a year, before the main tendering activity, and timed to ensure that this is not delayed.

2. Training in Project Management: Annual course for prospective key staff.

Purpose of Training is to train the candidates for future appointments as key project staff in all aspects of Project Management.

(34)

candidates will be selected from officials of the public works agencies (National/Provinces) in the 3 / 4 provinces with WINRIP Subprojects

3. Refresher Training in Project Management: Annual refresher course for key

staff of project units.

Training purpose is to give staff currently occupying key position in Work Units a brief updating in latest developments in project management.

Training target is Key staff: Heads of Work Units, Commitment Officers and Treasurers.

4. Project Management Manual (PMM) Training: Initial training / annual refresher

training in use of PMM.

To introduce provisions in the PMM to all the elements that are responsible for the implementation of WINRIP, in order to carry out their duties in accordance with the need to properly and fully observed during project implementation WINRIP.

All groups participating in project implementation should be included in the audience addressed by this component

5. Training in Reporting for FMR: Initial training / subsequent refresher training in

the details of monthly financial and other reporting requirements for FMR and other financial management aspects of the project.

The purpose is to provide staff at project level with training in the preparation and submission of monthly reports on disbursements, procurement activities and project progress.

The recipients of this training will include but not limited

• Staff of the units involved in recording and reporting project performance information of each project (2 persons per project).

• The Chief Financial Officer (Kepala Bagian Keuangan) in each Province (2 per entity).

6. Environmental Workshop: Annual workshops to disseminate environmental

management and monitoring procedures to contractors, consultants and key project staff.

The training is intended to provide staff and consultants with information on the Environmental Special Clauses in works contracts and to enhance their awareness of their responsibilities both under the project and in the wider context of all works implementation.

7. Training in Treasury (Brevet A): Annual training for financial staff of project

(35)

To provide staff currently occupying key financial positions in Work Units with full understanding of financial record keeping and compliance with Ministry of Finance and Treasury standards and procedures.

The training target is the key financial staffs (Treasurers, SPM Issuing Officers, and Accountants).

4.7.4 Complaints Handling Mechanism (CHS)

The ACAP as adopted by the Ministry of Public Works for WINRIP states on the subject of “Complaints handling system”. The Community Development Specialist and the Management Information Specialist will play a crucial role in the set-up of the Complaints Handling System (CHS) within PMU, in cooperation with the PMU officer(s) in charge of the Complaints Handling Unit (CHU).

CHS essentially has four main components as follows:

Data Entry.

All complaints were expected to be submitted through the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or email. However, to attain the best possible transparency of the project, complaints submitted manually through letter, facsimile, telephone, e‐ mail or visit to the Public Works regional offices will be entered in the WINRIP website by the CHS team of CTC. The possibility of using the ‘short message service’ (SMS) from a cell phone for complaints was considered and it was decided that all SMS messages, although not treated as formal complaints, will be recorded as additional information.

Complaint Registration.

Every submitted complaint is registered and stored into the CHS database, categorized

Gambar

Table 2.1 Proposed Physical Works by DGH Program
table summarizes the individual disbursements as calculated by CTC but retaining
Table 6.3.1. Person in charge of updating PMM’s Training Materials

Referensi

Dokumen terkait

Cirinya dalam model hanYa ada satu variabel akibat dan satu atau beberapa

The Representation of Black and White Relationship in The Blind.

Tanggal 4 Januari 2015 tepatnya pada tanggal 12 Rabiul Awwal 1436 Hijriah adalah hari besar yang penting dan bersejarah bagi Ummat Islam di seluruh dunia. Hari itu merupakan hari lahirnya Nabi Besar bagi Ummat Islam, Nabi Muhammad

Christian School in Memphis, Tennessee), his adoption by Sean and Leigh Anne.. Tuohy, to his position as one of the most highly coveted prospects in

Tandakan (√) pada aktiviti fizikal yang dapat meningkatkan kapasiti aerobik dan (X) pada aktiviti yang sebaliknya..

Data yang digunakan adalah klausa kompleks dalam artikel Indonesia naval captain says may have located missing plane tail’s section surat kabar New Straits Times (Teks A)

Data yang digunakan adalah klausa kompleks dalam artikel Indonesia naval captain says may have located missing plane tail’s section surat kabar New Straits Times (Teks A)

Bahan : Kad manila, gunting, warna air, pelekat (selotape), lidi atau batang ais krim.. Soalan : Hasilkan topeng mata