Monthly Progress Report No. 9

Covering Project Activities During

(2)

PT. PERENTJANAOJAJA in subconsultancywith 1;1,\ Yongma Engineering Co. ltd and 5iPT, Epadascon Pennata Engineering ConsultantzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

eTCOffice:JI. Ciniru VII No, 25, Kebayoran saru, Jakarta Selatan, 12180

Phone !Fax: (021)7229823

Cc:

1, Acting Director of Planning, DGH

2, Head of Sub Directorate of Financing and Foreign Cooperation

3. Kasatker Pernbinaan Administrasi dan Pelaksanaan Pengendalian PHLN

4, Head of Section for Foreign Cooperation, Sub Directorate Financing and Foreign Cooperation

Directorate of Planning, Directorate General of Highways (Bina Marga), Ministry of Public Works

5, File

Thank you for your kind attention.

:~

Hereby we submit September Monthly Progress Report WINRIP Loan IBRD No 8043-10

(document attached) .zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

.It;

Dear Sir,

Subject :' Submission of September Monthly Progress Report; WIN RIP Loan IBRD No. 8043-10 ....

'.

Attention: Ir. Agusta Ersada Sinulingga , MT

Officer In Charge PMU WINRIP Directorate General of Highways

Department of Public Works JI. Patimura 20 Kebayoran Baru Jakarta Selatan

Indonesia

Jakarta, October 10, 2013 Our Ref. No . : 03_02/PW P/O /M -9.2013

Enclosure : 20 (twenty) sets

DIRECTORATE GENERAL OF HIGHWAYS

DIRECTORATE OF PLANNING Core Team Consultant for

(3)

Table of Contents

1 EXECUTIVE SUMMARY ... 1

2 PROJECT DESCRIPTION ... 4

2.1 Background... 4

2.2 Project Development... 4

Project Component 3 : Road Sector Institutional Development ... 8

2.3 Project Objective... 8

3 CONSULTANCY SERVICES ... 9

3.1 CTC Consultants... 9

3.1.1 Scope of Services ... 9

3.1.2 CTC Manning ... 10

3.1.3 CTC Contract... 11

3.2 DSC Consultants ... 11

4 CIVIL WORKS ... 13

4.1 Detailed Design Preparation ... 13

4.2 Procurements ... 13

4.3 Civil Works Implementation ... 14

4.4 Civil Works Progress... 14

4.5 Quality Assurance... 14

4.6 Environmental and Social Considerations... 15

4.6.1 Current Overall Situation... 15

4.6.2 Monitoring of Environmental Aspects During Construction ... 16

4.6.3 Design Integration, Road Safety aspects and Monitoring of Environmental Studies... 16

4.6.4. CTC Site Visit : Public Consultation of LARAP Studies ... 17

4.7 Anti Corruption Issues ... 17

4.7.1 Anti‐Corruption Action Plan (ACAP)... 17

4.7.2 Community Representative Observers (CRO) ... 17

4.7.3 Publication / Disclosure ... 18

4.7.4 Complaints Handling Mechanism (CHS) ... 22

4.7.5 Third Party Monitoring (TPM)... 23

4.8 Road Safety Audit... 23

5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS ... 24

5.3 Management Information System ... 24

5.3.1 General Overview ... 24

6 PROJECT PERFORMANCE... 29

6.1 World Bank and GOI Compliance ... 29

6.1.1 World Bank Missions ... 29

6.1.2 Performance Indicators... 29

(4)

6.2.1 Core Team Consultant (CTC) ... 29

6.2.2 Design and Supervision Consultant (DSC) ... 30

6.2.3 Road Sector Institutional Development ... 30

6.3 Training ... 31

6.4 Anti‐Corruption Issues ... 32

6.4.1 Anti Corruption Action Plan (ACAP) ... 32

6.4.2 Community Representative Observers (CRO) ... 33

6.4.3 Third Party Monitoring (TPM) ... 33

6.4.4 Complaint Handling System (CHS) ... 34

6.4.5. Publication / Disclosure ... 35

6.5 Road Safety Audit ... 35

6.5.2 Current status of the project for technical field as of 30 September 2013. ... 37

6.6 Environmental and Social Impact Issues... 38

6.6.1 LARAP Study Report for Package No. 01 : Krui – Biha... 38

6.6.2 LARAP Study Report for Package No. 05 : Sp. Rampa – Poriaha... 38

6.6.3 LARAP Study Report for Package No. 06: Ps. Pedati – Kerkap ... 38

6.6.4 LARAP Study Report for Package No. 07 : Indrapura – Tapan under preparation by Balai II... 39

6.6.5 LARAP Study Report for Package No. 08 : Bts Kota Pariaman – Manggopoh... 39

6.6.6 LARAP Study Report for Package No. 09 : Rantau Tijang – Kota Agung... 39

6.6.7 LARAP Study Report for Package No. 10 : Sp. Empat – Air Balam... 39

6.6.8 LARAP Study Report for Package No. 12 : Kambang – Indrapura ... 39

6.6.9 LARAP Study Report for Package No. 15 : SP. Gunung Kemala – Pg. Tampak... 39

6.6.10 LARAP Study Report for Package No. 20 : Lubuk Alung – Sicincin ... 39

6.6.11 LARAP Study Report for Package No. 20: Lubuk Alung – Kuraitaji ... 39

6.7 Management Information Systems... 39

6.8 Quality Assurance... 40

6.9 Project Risks and Mitigation Measures ... 40

6.9.1 Risks Related to Delays ... 40

6.9.2 Financial Risks ... 40

6.9.3 Risks Related to Quality ... 40

7 ISSUES and RECOMMENDATIONS... 41

7.1 Current Situation ... 41

(5)

ABBREVIATIONS AND ACRONYMS

ACAP : Anti-Corruption Action Plan

AER : Application Evaluation Report

AIP : Australian Indonesia Partnership

AMDAL : Environmental Management (Analisis Mengenai Dampak

Lingkungan)

ANDAS : AnalisisDampakSosial

AWPs : Annual Work Programs

Balai : Regional Office for National Roads Implementation

BAPPENAS : Badan Perencanaan Pembangunan Nasional (National

Development Planning Agency of GOI)

Bappedalda : Regional Environmental Impact Agencies

BBPJN : Balai Besar PelaksanaanJalanN asional (Regional Office for

National Roads Implementation)

BER : Bid Evaluation Report

BLH : Badan Lingkungan Hidup

BPK : Badan Pemeriksaan Keuangan (Audit Board of the

Government of Indonesia)

CAD : Computer Aided Design

CHS : Complaint Handling System

CTC : Core Team Consultant

CHU : Complaint Handling Unit

CRO : Community Representative Observer ( = WPM)

DIA : Directorate of Implementing Affairs

DOP : Directorate of Planning

DGH : Directorate General of Highways

DMS : Document Management System

DTA : Directorate of Technical Affairs

DGH : Directorate General of Highway

DMS : Document Management System

DSC : Design and Supervision Consultants

EA : Executing Agency

EINRIP : Eastern Indonesian National Roads Improvement Project

(6)

ESAMP : Environmental and Social Assessment Plan

ESS : Environmental and Social Safeguards

FMIS : Financial Management Information System

FIDIC : Federation Internationale des Ingenieur Conseils

FMIS : Financial Management Information System

GIS : Geographic Information System

GOI : Government of Indonesia

IA : Implementation Agency

IBRD : International Bank for Reconstruction and Development

IFR : Internal Financial Report

IRMS : Integrated Road Management System

Kabupaten : Regency

KPIs : Key Performance Indicators

LAN : Local Area Network

LARAP : Land Acquisition and Resettlement (Rencana Tindak

Pengadaan Tanah dan Pemukiman Kembali)

MIS : Management Information System

MOF : Ministry of Finance

MPW : Ministry of Public Work

MPRs : Monthly Progress Reports

P2JN : Perencanaan Pengawasan Jalan dan Jembatan Nasional

PDF : Portable Document Format

PMU : Project Management Unit

PAPs : Project Affected Peoples

PMM : Project Management Manual

PMU : Project Management Unit (WINRIP)

POKJA : Bina Marga Project Managers and Procurement Committes

PPC : Project Preparation Consultants

PP3 : Pemantau Pihak ke 3

PPK : Sub Project Manager

PPR : Project Progress Report

QPRs : Quarterly Progress Reports

RKL/RPL : Rencana Pengelolaan/Pemantauan Lingkungan

RS : Road Safety

Satker : Satuan Kerja (Work Unit for Road Project Implementation)

(7)

SRIP : Strategic Road Infrastructure Project

TA : Technical Assistance

TOR : Terms of Reference

UKL/UPL : Upaya Pengelolaan Lingkungan dan Upaya Pemantauan

Lingkungan (Site Specific Environmental and Monitoring Plan)

WINRIP : Western Indonesia Roads Improvement Project

WB : World Bank

WP : Work Program

WPs : Works Programs

WPM : Wakil Pengamat dari Masyarakat (or Community

(8)

APPENDICES

Appendix A

:

Overall Loan Progress

Appendix B

:

Highway Design Progress

Appendix C

:

Financial Progress

Appendix D

:

Quality Assurance Progress

Appendix E

:

Environmental and Social Progress

Appendix F

:

Procurement Plan and Progress

Appendix G

:

WINRIP Website Progress

Appendix H

:

ACAP Training/Dissemination Progress

Appendix I

:

Performance Indicator

(9)

1 EXECUTIVE SUMMARY

Loan 8043-ID Progress

Loan Allocation and Disbursement % to Date

The total disbursement from the loan to the end of September 2013 was USD 2,207,915.00 equivalent to approximately 0.88% of the loan funds. The following table

summarizes the individual disbursements as calculated by CTC but retaining the total

disbursement fromClient Connectionat the end of September 2013.

Category Description Loan Restructuring

Amount US$

Totals Disbursed to End September in US$

% Disbursed

1

Part 1Betterment and Capacity Expansion of

National Roads.

220,400,000.00 0 0

2

Part 2

Implementation Support

16,000,000.00 714,755.81 4.47

3

Part 3

Road Sector Institutional Development

1,000,000.00 0 0

4

Part 4

Contingency for Disaster Risk

Response

0 0 0

Unallocated 12,600,000.00 0 0

LN 8043 DA-A 1,493,159.19 0

Original Loan Amount 250,000,000.00 2,207,915.00 0.88

1.45

4.35 4.35

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

Month

%

Co

m

pl

et

e

Actual Expenditure USD 2.20 mil (0.88 %)

WINRIP ACTUAL PROGRESS UP TO SEPTEMBER 2013 AND FORECAST UP TO DECEMBER 2017

ACTUAL September 2013 Forecast September 2013

Forecast Expenditure USD 68.87 mil (27.55%)

(10)

Project Status to End September 2013

World Bank Missions

No World Bank missions visited Indonesia during September 2013.

Procurement

The Bank has received as well as reviewed all the proposed Bid Evaluation Reports (BER). Approval of the BERs was issued by the Bank on 18September 2013. Next step, the

Length Width EE (PIP Mar2012) (excl. VAT)

OE (excl. VAT) DED

(Km) (m) (Rp Juta) (Rp Juta) Status RequiremDoc ent Status

Doc Requirem

ent Status Budget

Allocation Status Start Duration(months)

SUMATERA UTARA

5 Sp. Rampa - Poriaha Sumatera Utara 11.1 6 55,126.60 75,000.00 RevisiFinal UKL/UPL BBPJN IOK 2011 LARAP Proses preparation by consultant (50%) Satker PJN

II Sumut inventory X Dec-13 18.00

15 Sibolga - Bts Tap Sel Sumatera Utara 36 7 129,228.00 293,000.00Revisi tgl 5Final Juli 2013 UKL/UPL

OK BBPJN I 2011 LARAP Proses preparation by consultant (60%) Satker PJN

II Sumut inventory X Apr-14 21.00 SUMATERA BARAT

Padang Sawah - Sp Empat 40.9 7

Including Air Gadang Bridge 100 m 7

3 Manggopoh - Padang Sawah Sumatera Barat 32 7 152,434.90 OK SPPL P2JNOK 2010

1. LARAP 2. LARAP. Mon rpt.

1. NOL WB 13 Des 12 2. NOL WB 18 April 2013

Dinas PU Prop 100%

Pengumuman Hasil PQ 17

Mai 2013 Oct-13 24.00

7 Indrapura - Tapan Sumatera Barat 19.5 7 96,921.00

DSC kirim ke CTC tgl 30 Juli

2013

AMDAL 95% (diBLH) SLARAP Provide by P2JN, 2011 but not yet submit to

CTC Satker PJN

II Sumbar 0% X Feb-15 21.00

8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 46.8 7 183,268.80

DSC kirim ke CTC tgl 20 Juli

2013

AMDAL 98% LARAP Provide by P2JN, 2011 but not yet submit to

CTC Satker PJN

II Sumbar 0% X Dec-14 24.00

10 Sp Empat - Sp Air Balam Sumatera Barat 61.7 7 241,617.20

DSC kirim ke CTC tgl 20 Juli

2013

AMDAL 98% LARAP Provide by P2JN, 2011 but not yet submit to

CTC Satker PJN

II Sumbar 0% X Dec-14 24.00

12 Kambang - Indrapura Sumatera Barat 55.2 7 171,948.00

DSC kirim ke CTC tgl 30 Juli

2013

AMDAL 95% (diBLH) SLARAP Process Preparation by

Consultant BBPJN II

Satker PJN

II Sumbar 0% X Feb-15 24.00

14 Painan -Kambang Sumatera Barat 31.5 7 118,993.00

DSC kirim ke CTC tgl 15 Oct

2013

AMDAL 95% (diBLH) SLARAP Process Preparation by

Consultant BBPJN II

Satker PJN

II Sumbar 0% X Jul-15 21.00

20 Lubuk Alung - Sicincin Sumatera Barat 14.6 7 54,557.00

DSC kirim ke CTC tgl 15 Oct

2013

UKL/UPL TLKJOK 2011 SLARAP Process Preparation by Consultant BBPJN II Satker PJN

II Sumbar 0% X Oct-15 18.00

21 Lubuk Alung -Kurataji Sumatera Barat 16.8 7 65,788.00

DSC kirim ke CTC tgl 15 Oct

2013

UKL/UPL TLKJOK 2011 SLARAP Process Preparation by Consultant BBPJN II Satker PJN

II Sumbar 0% X Oct-15 18.00 BENGKULU

4 Ipuh- Bantal Bengkulu 42.4 7 226,275.10 230,635.10 OK SPPL P2JNOK 2010

1. LARAP 2. Lap Mon LARAP

1. NOL WB 10 Des 12

2. Belum Satker PJN IBengkulu Administra

tion process

Pengumuman Hasil PQ 17

Mai 2013 Oct-13 24.00

6 Ps Pedati - Kerkap Bengkulu 25 7 72,018.80 Review CTC30 Aug 2013 UKL/UPL OK TLKJ 2011 LARAP Revised by LARAP consultant (40%) Satker PJN I

Bengkulu 0% X Apr-14 18.00

11 Bantal - Mukomuko Bengkulu 50.1 6 157,820.00 Review CTC18 July 2013 AMDAL SK Kelayakan by BLH (95%) LARAP Revised by LARAP consultant (40%) Satker PJN I

Bengkulu 0% X Apr-14 24.00

13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 225,481.50 Review CTC18 July 2013 UKL/UPL OK P2JN 2011 LARAP Revised by LARAP consultant (40%) Satker PJN I

Bengkulu 0% X Apr-14 21.00

Seblat - Ipuh including 34.5 6

Air Lalang & Air Guntung Bridge 64 m 6

18 Mukomuko - Bts. Sumbar Bengkulu 25.8 6 69,233.00 Review CTC UKL/UPL TLKJOK 2011 SLARAP

Under preparation by local consultant

Satker PJN I

Bengkulu 0% X Oct-15 18.00

19 Lais- Bintunan Bengkulu 11.6 7 37,558.00 Review CTC30 Aug 2013 UKL/UPL OK TLKJ 2011 LARAP Revised by LARAP consultant (40%) Satker PJN I

Bengkulu 0% X Oct-15 18.00 LAMPUNG

1 Krui - Bha Lampung 25 7 146,668.00 148,668.05 OK SPPL P2JNOK

2010 1. LARAP 2. Lap Mon LARAP

1. NOL WB 4 Jan 13 2. NOL WB 18 April 2013

Satker PJN II Lampung 100%

Pengumuman Hasil PQ 17

Mai 2013 Oct-13 24.00

36.8 6 30 m 6

9 Rantau Tijang - Kota Agung Lampung 42 7 149,831.50 Review CTC UKL/UPLP2JN 2012 TLKJOK 2011 LARAP

Under preparation by local consultant

Satker PJN

II Lampung 0% X Jul-15 21.00 2,776,633.60

LARAP Review CTC (30%) II LampungSatker PJNmeasureneLand

nt by BPN X Apr-14 21.00

17 Lampung 104,238.00

OK Prepared

by PPC WINRIP

AMDAL TLKJOK 2012

16 Bengkulu 110,237.00

Konsultan P2JN mulai Maret 2013 AMDAL SK Kelayakan by BLH (95%)

SLARAP preparation byUnder local consultant

Satker PJN I

Bengkulu 0% X Jul-15 21.00

Oct-13 24.00 2 Sumatera Barat 207,390.20 OK SPPL&UKL/UPL Bridge 1. LARAP2. LARAP

Mon rpt 1. NOL WB 13 Des 12 2. Proses submit to WB

Dinas PU Prop 92%

Pengumuman Hasil PQ 17 Mai 2013

Implementation Plan WP1/WP2/WP3

Sp.Gunung Kemala - Pg. Tampak No

Pkt Loan Package Name PROVINSI

Environment SOCIAL Land Acquisition Procuremen

t Status

(11)

proposed contract awards must be approved by the Ministry of Public Work when the value of the contracts is more than IDR 100 billion as according to Perpres 70, 2013.

Potential Problems

The existing road conditions of the four packages under AWP-1, which are predicted being deteriorated rapidly by the traffic during almost a year, shall be anticipated.

Action Required

(12)

2 PROJECT DESCRIPTION

2.1 Background

The Government of Indonesia wishes to continue the strengthening of the National Road system in Indonesia while the Eastern Indonesia National Roads Improvement Project (EINRIP which is assisted by AusAID through the Australian Indonesia Partnership or AIP), is providing support program of National road and bridge improvement works in Eastern Indonesia. The Western Indonesia National Road Improvement Project (WINRIP) will provide similar support for National road and bridge in the Sumatra region of Indonesia. The focus of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as National roads. In addition, provision will be made for major bridge repair works, rehabilitation, duplication and replacement as necessary to complement the road betterment works.

2.2 Project Development

The Loan Effectiveness Date for the WINRIP is 12 March 2012 and the key project data is shown in the following detail.

Key Project Data WINRIP Loan No. 8043-ID

Project Cost US$350 million

Original Loan Amount US$250 million

Revised Loan Amount N/A

Board Approval Date 26 May 2011

Loan Signing Date 14 December 2011

Effectiveness Date 12 March 2012

Disbursement (as of 30 April 2013)

US$ 0.69 million (0.28%)

Original Closing Date 31 December 2017

Environmental Category B-Partial Assessment

The IBRD Loan amount is US$250 million. The Project is intended to finance a part of the DGH investment program for national roads with a particular focus on the Western corridor of Sumatra. The corridor is one of the three main corridors in Sumatra and connects the city of Padang (with a population of around one million) to major towns along the west coast (Bukittinggi, Sibolga and Bengkulu). It also connects through connector roads on the West coast to Medan in the northeast and to Pekanbaru in the centre of the island. The project has four components:

Project Component 1 : Betterment and Capacity Expansion of National Roads

According to the Loan Agreement, this component will cover three work programs of betterment and capacity expansion of approximately 715.6 km including replacement of 194 meters of bridges. This civil works program will be executed in three Annual Work

Programs (AWP), as summarized in Table 2.1. The table shows the IBRD assisted

(13)
[image:13.595.76.523.86.211.2]

Table 2.1 Proposed Physical Works by DGH Program

Type of Works

AWP-1 AWP-2 AWP-3

Km US$ mill Km US$ mill Km US$ mill

Road Betterment - - 53.10 22.77 -

-Capacity Expansion 137.10 79.70 314.60 127.67 207.60 74.58

Bridge works 0.100 1.94 - - 0.08 2.06

TOTAL

(excluding tax @ current prices) 137.20 81.64 367.70 150.45 207.68 76.65 * Contingency costs not included - ** including 194 meters of bridges

The batches of projects are termed Annual Work Programs (AWPs) in line with terminology used in other Bina Marga projects. They are not in fact “annual” programs as such but rather a series of multi-year programs, each commencing in consecutive years. Hence, hereinafter it will call as just Work Programs (WPs). It is expected that implementation of the first Works Program (WP-1) will commence in the third quarter of 2013 and be completed by third quarter or late 2015. The second Work Program (WP-2) is expected to commence in early 2014 and be completed by late 2015 or middle 2016. The third Work Program (WP-3) is expected to commence in early 2015 and be

completed by mid 2017. The loan will be closed onDecember 2017.

Table 2.2presents details of the First Works Program (WP-1). The four packages in this group should have been free from any land acquisition issues, but in fact two packages (Krui – Biha and Manggopoh – Padang Sawah) had land issues which were solved by the DGH properly. Thus, there are no foreseeable impediments to implementation.

Table2.2 IBRD Assisted WINRIP Civil Work WP-1

No Province Link No. Link Name C la s s R o a d T y p e

Road Works Bridge Works Total Cost

F ro m T o L e n g th T re a tm e n t C o s t (2 0 1 0 ) No L e n g th C o s t (2 0 1 0 ) 2 0 1 0 P ri c e s E q u iv a le n t

Km Km Km Rp mill m Rp

mill Rp mill US$ mill

1 Lampung 053.0Krui –

Biha K1 IU 221.5 246.5 25.0 Bett’nt

to 7 m. 148,668 148,668 16.52

2 West Sumatra 047.2 Padang Sawa – Simpang Empat

K1 IU 0.0 40.9 40.9Bett’nt

to 7 m. 189,810 189,810 21.09

2a West

Sumatra 34.1

AirGadan

gBridge K1 IU

New

Bridge 1 100 17.580 17,580 1.95

3 West Sumatra 047.1 Manggop oh – Padang Sawah

K1 IU 102.2 134.2 32.0Bett’nt

to 7 m. 152,435 152,435 16.94

4 Bengkulu 015.3Ipuh

-Bantal K1 IU 0.0 49.7 49.7 Bett’nt

(14)

It should be noted that all road sub-projects have been subject to economic appraisal and have estimated Economic Internal Rates of Return (EIRR) in excess of 15%. These were selected for inclusion and are subject to completion of environmental and social screening, to confirm that there is no land acquisition or resettlement requirements remain outstanding.

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for all projects proposed for WP-1.

Sub-projects to be included in WP-2 and WP-3 have also been determined as listed in

Table 2.3. Final Engineering Designs and Engineer’s Estimates for all WP-2 and WP-3 proposed works require preparation or finalization. In the cases of some projects, preliminary Engineering Designs were prepared during Project preparation which will require review and possible amendment by the Design and Supervision Consultant prior to procurement.

The costs presented in Table 2.1 are planning estimates only, and the overall scope

and contents of WP-2 and WP-3 may need to be revised as when revised costs and budgets are determined.

Table2.3 : IBRD Loan WINRIP Civil Work WP-2 and WP-3

NO. SUBPROJECT LINK NO. AND NAME LENGTH (KM)

COST (RP. MILL)

WIDTH (M)

IMPLEMENTATION PLAN

START DURATION

(MONTHS) WP-2

5. Sumut : Link No. 015.xx,

Sp. Rampa– Poriaha 11.1 55,126.6 6.0 May 2013 18

6. Bengkulu : Link No. 010.0,

Ps. Pedati – Kerkap 25.0 72,018.8 7.0 May 2013 18

7. Sumbar : Link No. 019.0,

Indrapura – Tapan 19.5 96,921.0 7.0 Oct.2013 21

8. Sumbar : Link No. 024.0,

Bts. Pariaman – Manggopoh 46.8 183,286.8 7.0 Oct. 2013 24

9. Lampung : Link No. 026.1,

Rantau Tijing - Kota Agung 42.0 149,831.5 7.0 Oct. 2013 21

10. Sumbar : Link No. 034.1,

Sp. Empat - Sp. Air Balam 61.7 241,617.2 7.0 Oct.2013 24

11. Bengkulu : Link No. 015.2,

Bantal – Mukomuko 50.1 157,820.0 6.0 Dec. 2013 24

12. Sumbar : Link No. 017.2,

Kambang – Indrapura 55.2 171,948.0 6.0 Dec. 2013 24

13. Bengkulu : Link No. 006.1,

Simpang Rukis - Tanjung Kemuning 56.3 225,481.5 7.0 Dec. 2013 21

WP-3

14. Sumbar : Link No. 017.1,

Painan – Kambang 31.5 118,993.0 7.0 March. 2014 21

15. Sumut : Link No. 016.0,

(15)

NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM) (RP. MILL)COST WIDTH(M)

IMPLEMENTATION PLAN

START DURATION

(MONTHS)

16.

Bengkulu : Link No. 009.4,

Seblat– Ipuh, including Air Galang and Air Guntung Bridges

34.5

0.052 110,237.0 6.0 March 2014 21

17. Lampung : Link No. 061.1,

Sp. Gunung Kemala - Pugung Tampak

36.8

0.03 104,238.0 6.0 March 2014 21

18. Bengkulu : Link No. 015.3,

Mukomuko - Bts. Sumbar 25.8 69,233.0 6.0 May 2014 18

19. Bengkulu : Link No. 009.1,

Lais – Bintuan 11.6 37,558.0 7.0 May 2014 18

20. Sumbar : Link No. 002.0,

Lubuk Alung – Sicincin 14.6 54,557.0 7.0 May 2014 18

21. Sumbar : Link No. 027.0

Lubuk Alung – Kuraitaji 16.8 65,788.0 7.0 May 2014 18

Project Component 2 : Implementation Support

This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of training of DGH staff and for incremental operating costs for the project. This will provide support to the MPW for the implementation of the civil works, including: (a) provision of Core Team Consultants (CTC), Design and Supervision Consultants (DSC) and road safety audits; (b) Project management support and technical audits. This is directly related to the implementation of the civil works and covers consulting services for design and supervision of the civil works in Component 1; management support and technical audits to help improve the quality of construction and support to governance improvements during procurement and implementation; and a series of systematic road safety audits of road designs for all project roads in Component 1. This is to ensure compliance with road safety standards and regulations, identify road hazards and undertake remedial treatments for safety improvements.

Project Management Core Team Consultants (CTC). The CTC will provide support to the PMU and DGH in the management of the Project, based in Jakarta. Their tasks include financial and progress monitoring and reporting, information management and dissemination, quality assurance and performance review for the Design and Supervision Consultants, implementation and monitoring of the anti-corruption action plan, support for project monitoring and evaluation, and support for implementation of a

training program to support project management and implementation. TheCTCcontract

No.06-20/CTC/TA/LN/8043/1112was signed on5 November 2012 by bothDGHand a

Joint Venture of PT. PerentjanaDjaja, Yongma Engineering Co,Ltd, and PT.

Epadascon Permata Engineering Consultant.

(16)

include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed

by DGH through the Bina Marga Regional Office(Balai II),and will be based in Padang,

West Sumatra.

Project Component 3 : Road Sector Institutional Development

This component will provide technical assistance and support to strengthen disaster risk mitigation in the road sector, including capacity building support for the new environment/risk mitigation and road safety unit of DGH to conduct disaster risk assessments and planning, risk mapping of land-slides, coastal erosion, earthquake and floods, and analysis of alternative designs for road segments that pass through critical

environmental assets and vulnerable areas.The procurement for consultants under this

component has not yet been started. Preparation for the procurement would be coordinated soon by the PMU WINRIP, the CTC and the DGH.

Project Component 4 : Contingency for Disaster Risk Response

This special component will provide preparedness and rapid response to disaster, emergency and/or catastrophic events as needed. This provisional zero dollar component will be added under this project to allow for rapid reallocation of loan proceeds from other components under streamlined procurement and disbursement procedures.

2.3 Project Objective

The main objective of the program will be to increase the effective use of selected

(17)

3 CONSULTANCY SERVICES

3.1 CTC Consultants

3.1.1 Scope of Services

The CTC contract services originally were structured in its different project management elements.

• Inception Phase

A key activity during the inception phase will be to establish lines of communication with PMU-WINRIP and DSC’s Team Leader as well as with all Provincial Project Managers (Satkers) where the first works are to be constructed under WP-1.

• Project Management and Support to PMU, including acting DSC until the DSC is

established

The Terms of reference identify a number of sub-items to be performed by CTC. The key factor that will ensure success is that the CTC must work pro-actively and alongside PMU counterparts and with DSC team in a professional manner based on mutual respect and trust.

• Preparation of Work Programs

The tendering process for WP 1 sub-projects began as soon as procurement committees have been formed and received appropriate training in the procurement procedures required. The indicative work programs and cost estimates identified for WP-2 and WP-3 are subject to verification, and are likely to change following more detailed investigations. Further preparation for WP-2 and WP-3 will be managed by the PMU supported by the CTC.

• Financial Monitoring

It will be the role of the CTC to first assess the level of understanding of the financial management, monitoring and reporting procedures by the finance staff at the provincial and central level and subsequently devise an appropriate training program and assist the PMU in training delivery.

• Project Progress and Performance Monitoring

CTC will monitor the loan project progress and prepare the report in monthly basis. In the meantime, GOI and the World Bank have agreed on a set of Key Performance

Indicators (KPIs) to measure the project’s performance in achieving its stated

development objectives. CTC will therefore first concentrate on the establishment of precise definitions, calculation methods and data collection procedures to monitor the KPIs.

• Support for the Implementation of the ACAP

The CTC will assist PMU be responsible for ensuring the ACAP is properly implemented and for revising the Project Management Manual on an annual basis to incorporate necessary improvements to processes and procedure.

(18)

CTC will closely work with BLH and DSC and will monitor and report the action of the Environmental Management Plan on a periodical basis and/or as required.

• Training to Support Project Implementation

CTC is responsible for preparation and management of all training program required under WINRIP.

• Reporting

CTC is responsible for all reports required under the contract agreement with standardize forms, charts and tables.

3.1.2 CTC Manning

CTC professional staffs involved in the project as at the end of September 2013 are listed in the following table:

Position MM Name

Assignment Time Used

to End of September

2013

Contract Time Remaining

Start End

Team Leader 40 Mahbub ur Rahman - - - *

-35.25 Per Weiss Pedersen Apr-2013 Mar-2016 5.90 29.35

Senior Highway Eng. 8 Moon, Sung Hyun Mar-2013 Oct-2013 6.23 1.77

Senior Road Safety

Audit Engineer 6 Cho, Woo Sung Jun-2013 Nov-2013 3.57 2.43

Senior Procurement

Specialist 18 Wasim ur Rahman - - - ** 18.00

Assistant Team Leader 40 Besar Afiat Bowo Nov-2012 Sept-2013 9.67 30.33

26 Agus Setiawan Sept-2013 Oct-2015 0.67 25.33

Highway Engineer 36 Whiliyanto Nov-2012 Jun-2013 7.37 28.63

36 Lebiyartono Jul-2013 Nov-2015 2.97 33.03

Quality Assurance

Engineer 36 Uray Abdul Manaf Jul-2013 Jun-2016 2.97 33.03

Financial Management

Specialist 36 Uus Martawijaya Nov-2012 Sept-2013 10.37 25.63

Environmental

Specialist 30 Leti Hermawati Dec-2012 Jun-2015 9.43 20.57

Social Impact Specialist

36 M. Sutopo Nov-2012 Aug-2013 9.33 25.67

25.70 Witono Sept-2013 Oct-2015 0.93 25.07

Procurement Specialist-1

12 Darmansiri - - - * 12.00

12 Muhdi - - - ***

-Procurement Specialist-2

12 Rudi Rungkat Nov-2012 Mar-2013 4.10 *

-17 M. Edi Fachri Mar-2013 Aug-2014 6.17 10.83

Management Information Specialist

30 Agung Lukito - - - * 30.00

25 Sony Thamrin May-2013 Apr-2015 4.97 20.03

Community

Development Officer 36 Yakobus Jan-2013 Dec-2015 8.90 27.10

Notes: * : Resigned ** : Not yet mobilized *** : Proposed replacement

Replacement has been approved by the Bank as follows :

(19)

In parallel with the instruction to speed up the process, detailed engineering design (DED) of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and 19). These conditions imply to the need of changing the CTC scope of works which will be included in CTC contract amendment and the need to extend the Senior Highway Engineer assignment.

3.1.3 CTC Contract

The CTC contract for “Western Indonesia National Roads Improvement Project” (Contract No. 06-20/CTC/TA/LN/8043/1112) was signed on 05 November 2012. The contract is between the Government of Indonesia represented by Directorate General of Highways in the Ministry of Public Works and PT. Perentjana Djaya in joint venture with Yongma Engineering Co.Ltd. and PT. Epadascon Permata Engineering Consultant.

The notice to proceed was issued by letter dated 6 November 2012 from the PPK, and the official starting date of the contract was set at 6 November 2012.

The following table shows a list of contract amendment for the CTC contract with DGH.

Contract

Date

USD (Excl. VAT) IDR (Excl. VAT)

Original Contract 5-Nov-2012 1,276,700 21,415,400,000

DraftAmendment No.1 - 1,324,725 23,885,900,000

The draft Amendment No.1 is still under preparation by CTC and reflects current requirement of the CTC services as summarized below.

• Replacement of the Team Leader.

• Extending the assignment of the Senior Highway Engineer.

• Extending the assignment of the Senior Road Safety Audit Engineer.

• Extending the assignment of the Procurement Specialist.

• Adding the new position of Bridge Engineer.

• Adding the new position of Training Specialist, and

• Adding the new position of Road Safety Engineer (local staff).

3.2 DSC Consultants

(20)

subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office (Balai II), and will be based in Padang, West Sumatra.

DSC has been established in Balai II Padang following the contract signing on 11 June 2013 between Balai II and Renardet SA in joint venture with PT. Cipta Strada, PT. Daya Creasi Mitrayasa, PT. Seecons and PT. Yodya Karya. The Notice To Proceed was issued by the Balai II on 19 June 2013.

During the month of September 2013, the DSC activity was design preparation for 4 packages under AWP-2 (package #7, #8, #10 and #12).

(21)

4 CIVIL WORKS

4.1 Detailed Design Preparation

Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for all projects proposed for WP-1.

WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the construction supervision of all the works programs will be performed by the DSC. In parallel with the instruction to speed up the process, detailed engineering design (DED) of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and 19). These conditions imply to the need of changing the CTC scope of works which will be included in CTC contract amendment.

The Technical Design and Road Safety Review reports For Package No.5 Sp.Rampa-Poriaha, Package No.6 Ps.Pedati-Kerkap, Package No.15 Sibolga-BTS.Tapsel, Package No.19 Lais-Bintuan are submitted on 17 Sepetember and on 18 September after post reviewing Drawings and Engineer’s Estimation, and discussing The reports with BINTEK and DED Consultants on 18 September.

The Technical Design and Road Safety Advisories for the Design Review Reports by DSC team for Package No.7 Indrapura-Tapan, Package No.8 Bts. Kota Pariaman-Manggopoh, No.10 Sp.Empat-Sp.Air Balam and No.12 Kambang-Indrapura are submitted after post reviewing Drawings and Engineer’s Estimation on 27 September.

The Revision of the design management in Project Mangaement Manual is submitted on 20 September after post updating the guidelines and design manuals in Indonesia.

4.2 Procurements

Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) will apply to the packages with the construction estimated cost more than US$ 10 Million to comply with the Bank’s threshold for ICB. According to the GOI regulation, a prequalification shall be applied for the packages with the construction estimated cost more than IDR 10 Billion.

All subprojects for WP-1 have been started with prequalification since 30 December 2011 for ICB multiple contract. This was an advanced procurement action agreed by both DGH and the World Bank prior to the CTC establishment. The Bank approved the AERs with

issuance letter Ref. No. WINRIP/122 dated May 1st, 2013.

Notification of Pre-Qualification Results had been announced to all PQ participants on Mei 17, 2013 and then invitation to bid was sent to to pre-qualified Bidder and issued of the bidding document on May 27, 2013. Pokja had conducted the Pre-Bid Meeting and Site Visit on June 2013. The last date for submission the bids and the bids opening was on July 18, 2013.

(22)

100 billion based on Perpres 70, th. 2013,

DGH has also completed the draft of consolidated multiple contract ICB Standard Bidding Document for four (4) packages under AWP-1. The draft had been submitted to the Bank on 8 March 2012. The Bank’s comments had been issued on 12 March 2012. The draft of consolidated SBD was revised by DGH accommodating the Bank’s comments and submitted to the Banks on 27 June 2012. Second revision of the draft consolidated SBD, as requested by the Bank regarding synchronization between drawings and Bill of Quantities by letter dated 1 August 2012, was then concurred by the Bank on 31 October 2012.

CTC had also involved in Selection of DSC WINRIP since March 2013, started by attend the opening of Financial Proposal on March 5, 2013. Procurement committee for Selection of DSC had sent Technical Evaluation Report (TER) to the Bank on December 20, 2013 and had received the approval from the Bank on February 21, 2013. The Final Evaluation Report including Technical and Financial Evaluation and completed with Notice of Negotiation and Draft Contract then was sent to Bank by the committee on April

3rd, 2013. NOL from the Bank was received on April 19, 2013 to Renardet, SA

(Switzerland) cs as the first rank of technical and financial evaluation result. Finally the contract for this assignment was sign on June 11, 2013.

The WINRIP Procurement Plan is shown inAppendix F.

4.3 Civil Works Implementation

Until the end of September 2013, there was no subproject contracted.

4.4 Civil Works Progress

No civil works progress can be reported since there was no subproject contracted until the end of September 2013.

4.5 Quality Assurance

The DSC will be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures.

On July 01, 2013 Quality Assurance Engineer of the CTC already mobilization.

Quality Assurance Engineer has been submitted “guidelines for use of Quality Assurance Plan to DSC Padang (on September 10, 2013)

In according with activity of Quality Assurance Engineer in September 2013, there are some comment for Quality Assurance Engineer, during site visit to Banadar Lampung, Lampung Province package Krui - Biha, about as:

 Explain the Quality Assurance Report who responsibility to made, preparing,

checking and approval with PPK Krui – Biha and explains the mean and purpose of visit.

(23)

Standard Operation Procedure (SOP) both for administration and technical works.

 Comment CTC after visit:

o There are urgent need for drainage construction including culvert

o Retaining walls should be constructed at landslide – prone area

o Routine Maintenance should be carried out

4.6 Environmental and Social Considerations

4.6.1 Current Overall Situation

A project category is assigned to each package as either Category A, B or C depending on the likely degree of influence on environmental issues with a brief explanation as follows (Appendix E).

Category A project is one which will have a significant negative impact on the environment and may have an influence on areas outside the actual project area. A project classified as such requires an AMDAL (ANDAL, RKL/RPL) study.

Category B project is one which affects the people or the environment to some extent but with a smaller impact than a Category A. The required environmental analysis is a UKL/UPL study only.

Category C project has minimal effect on the people or environment and an environmental analysis is not required. Standard operational procedures (SOP or SKPPL) are used to handle any minor problem which may arise.

Details of packages that require environmental safeguards are given inAppendix E.

The following table provides a summary of the work involved are 21 packages.

Works Programme

No of Packages

No of Investigations Approval by Remarks

BLH World Bank

AWP-1 4 8 SPPL x 4

Full LARAP x 4

4 (SPPL)

4 (Full LARAP)

Approved – NOL issued by WB, except for SPPL

AWP-2 8 17

Simple LARAP x 1 Full LARAP x 8 AMDAL Study x 4 UKL&UPL x 4

4 UKL&UPL 2 AMDAL

1 SLARAP

1 (one) Study AMDAL for threes packages, are Packages No.7, 12 and 14 /packages on AWP2 &AWP3.

1 (one) Study AMDAL for two packages, are Packages No.11 & 16. /packages on AWP2 &AWP3.

AWP-3 9 14 Full LARAP x 8

AMDAL Study x 1 UKL/UPL x 5

5 UKL&UPL 1 Full LARAP

Approved – NOL issued by WB, except for AMDAL and UKL/UPL

Total 21 39 15 6

(24)

social studies (LARAP) requiring approval of the World Bank. Now there are 15 packages (83%) has received BLH approval then the current have 6 of 19 social studies (LARAP) or 29% has received approval from World Bank.

Those packages that require action at present with respect to environmental or social considerations are:

• Environmental studies for packages No.1,2 and 3 was issued approval by BLH on 2010,

packages No.4.5,8,9,10, 13.18,19,20 and 21 was approved on 2011 and BLH approved on 2012 for package No.7.

• Social studies (LARAP and Monitoring) was issued NOL WB for packages No.5

:Sp.Rampa-Poriaha and package No.17 Sp.Gunung Kemala-Pugung Tampak on 16 September 2013, those sub projects can started for bidding process.

4.6.2 Monitoring of Environmental Aspects During Construction

CTC will circulate monitoring form to DSC. This set of forms focused on environmental and social impacts, and amounted to 7 pages. These forms were intended to be used every month by the DSC Environmental Specialist.

CTC’s environmental staff actively advises DSC on environmental monitoring, but have not

directly carried out monitoring, despite the CTC TOR requirement to “to implement the

Environmental and Social Analysis Management Plan for WINRIP”, which involves monitoring of environmental plans and studies.

After finalizing the Standard Environmental Clauses, CTC assisted Subdit Environmental Affairs to produce monitoring forms covering all aspects of the technical specifications, and introduced them to participants of environmental training including P2JN, Project Manager, DSC, Contractors, Pokja etc. There are 69 pages of forms, covering all aspects of construction.

4.6.3 Design Integration, Road Safety aspects and Monitoring of Environmental Studies

(25)

4.6.4. CTC Site Visit : Public Consultation of LARAP Studies

CTC, project (BBPJN & PJN) and the local consultant was conducted sozialitation of LARAP to PAPs in package No 17: Sp.Gunung Kemala-Pugung Tampak in Lampung Province and Packages No.6:Sp.Pedati-Kerkap, No.11: Bantal-Muko-Muko, No 13; Sp.Rukis-Tanjung Kemuning, No.16. Seblat-Ipuh and package No. 19: Lais-Bintunan in Bengkulu Province on Sep 2013. In the forum CTC explain concerning WB LARFramework, procedures, mechanism, LARAP process & compensation for lands asset of PAPs,

4.7 Anti Corruption Issues

4.7.1 Anti Corruption Action Plan (ACAP)

ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers (CRO) in the bid opening and Third Party Monitoring (TPM) during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below

a)

Community Representative Observers (CRO)

b)

Publication / Disclosure

c)

Complaints Handling System (CHS)

d)

Third Party Monitoring (TPM)

4.7.2 Community Representative Observers (CRO)

The Community Representative Observers, required to observe the actual bid opening, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities.

CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP’s management, and not a member of any political party.

CROs selection procedures:

a. Review the criteria and qualifications of candidates for the CRO.

b. Director of Planning, DGH/ as Chairman of the Project Management Unit, delegated of the authority to the selection of the CRO to the Head of National Roads Implementation Agency (BBPJN) / Head of Procurement Services Unit

(Unit Layanan Pengadaan - ULP),hereinafter referred to as Head of Balai.

c. Head of Balai invited CRO candidates from the local universities or colleges. d. Selection of CRO facilitated by Balai (BBPJN) / Procurement Services Unit (Unit

Layanan Pengadaan - ULP).

(26)

f. Head of Balai reported the result of CRO selection by attaching the Minutes of Election Meeting and send an approval application letter of the CRO to Director of Planning DGH as the Chairman of PMU.

g. Based on the report and a written request from the Head of Balai above, the Director of Planning DGH as the Chairman of PMU signed a Letter of Agreement and the Decree of the Establishment of CROs.

The duties and obligations of CRO are:

a. CRO must be present in any procurement activity (Pre-Bid Meeting + Site Visit, Bids Submission and Opening of Bids, and Announcement of Bids Winner) by invitation of the Procurement Committee, and are required to sign the attendance list

b. If the elected CRO unable to attend on procurement activities, then Substituted CRO appointed have to attend these activities.

c. In discharging the Substituted CRO have the same responsibilities as elected CRO.

d. The CRO / Substituted CRO, after attending the Procurement activities, required to make a report of his/her activities and submit them to the PMU and CC to the related Head of Balai.

CRO as the representative of the community is to be independent observers and in performing their duties voluntarily and not demanding benefits of their works.

In the performance of its duties, the CROs receive transportation cost from their home / office to the location of procurement meeting, and also he / she also receives per diem or Out Station Allowance (OSA) and hotel accommodation if necessary to stay. CROs also got additional charged for their reporting costs. The financing standards adjusted to the General Cost Standard (Standar Biaya Umum) issued by the Ministry of Finance.

The CRO’s financing charged to the Contract for Consulting Services for Technical Assistance for Core Team Consultants (CTC) No: 06-20/CTC/TA/LN/8043/1112, dated 5 November 2012.

4.7.3 Publication / Disclosure

The second task under ACAP is publication of related ACAP documents for public disclosure with easy access to the general public and this is mainly manifest in the ACAP segment of the WINRIP website. This ACAP section has been being designed to attain the best possible transparency of the project.

(27)

monitoring of the project:

• Work Plan and Procurement Plan.

• Quarterly newsletter containing information on the list of contracts,

implementation progress, projects related activities, number, types and status of complaints in each location. The newsletter will also be made available to civil society in hard copy and through electronic mailing system.

• Mid-Term Review Report, promptly after completion of the mid-term review

implementation support is carried out in accordance with the loan agreement;

• All final audit reports (financial or otherwise, including qualified audit reports)

prepared in accordance with the loan agreement and all formal responses of the government in relation to such reports. The publication should be done within one month after the report is accepted as final.

• Contracts awarded with information on general scope of work (with location),

value, and summary information of the awarded firms/ contractors. The practice in other projects demonstrates that disclosure of contracts awarded will help in reducing fraudulent practices

Ministry of Public Works (PU) maintains a website: http://www.pu.go.id/, with a link to ’eproc.pu.go.id’ for information on semi e-procurement or e-procurement. PMU WINRIP supported by CTC will develop his own website: http://www.winrip-ibrd.com, and with it all the information and data about WINRIP be inputted or uploaded on this site.

In the application of one of the components of ACAP, the public disclosure and transparency, it is necessary to spread information and increase the capacity of all stakeholders involved in the implementation of this WINRIP project, through a variety of relevant training. The trainings have been expressed in the ToR of CTC WINRIP and described in the Project Implementation Plan (PIP).

One of the major risks to effective project implementation and management derives from the likelihood that project management staff does not have adequate training in or experience of the management of large-scale projects.

Procedures to mitigate these risks include the need to conduct comprehensive training of staff in all participating entities involved with the procurement, financial management and supervision of the project.

In response to this need, an Annual Training Program has been prepared, which identifies the major training requirements to be addressed. This program builds on previous training programs prepared and implemented by DGH to strengthen management staff and support the implementation of loan programs like WINRIP.

Activity of training will be carried out and supported in CTC contract, including the budget which use provisional sum budgets

(28)

implementation and monitoring are well understood, to explain the safeguard aspect of the project including the Anti-Corruption Action Plan (ACAP) and the Environmental and Social safeguards (ESS), and to reinforce technical guidelines as required.

Training will be provided an extension of normal DGH training program as outlined in table below:

No Training Topic Purpose Target Agencies/Units EstimatedTrainees/

Year 1 Procurement Training

(Including Provision of ACAP) Special Training in procurementfor members of Procurement Committees

Detailed provision of ACAP

Procurement Committees at Provincial Level

30

2 Training In Project

Management Required civil service training

Prospective staff for

Satker (Work Units) 20

3 Refresher Training in Project

Management Feedback to Projectmanagement staff from wider experience

Satker (Work Units) in

Provinces 60

4 Application of PMM

(including other provisions of ACAP)

Familiarization with Project Management requirements Awareness of particular

requirements of ACAP

Senior Staff of Provincial Agencies Administrative Staff Technical Staff

60

5 Financial Management Reporting Training (IFR) follows on from PMM Training

Procedures for monthly data collection, consolidation and reporting for procurement, Disbursment; Physical Progress

Staff of Satker Staff of Provincial

Financial Agencies Technical Staff

30

6 Environmental Monitoring

Workshops Review of Results ofEnvironmental Special Clauses (ESCs)to be provided by DSC

Provincial Works Agencies Supervision

Consultants Contractors

30

7 Training of Treasurers

(Bravate A Cource) Basic civil service training frofinancial officers

Project Units (Satker) in

Provinces 20

Total Trainees Estimated 250

WINRIP project implementation is planned for 3 (three) years (2013 -2015), the number of trainees is 3 x 250 = 750. It is also possible on the way of time, type or duration of training may change tailored to the needs.

The Training Program summarized and described below:

1. Procurement Training: For the Procurement Working Group Committees (POKJA Pengadadaan) of each entity.

To make sure that members of Procurements Committees in each participating entity are fully familiar with requirements of Presidential Regulation (Perpres) 54/2010 and Presidential Regulation (Perpres) 70/2012 and the World Bank Procurement Guidelines, plus provisions of Project Management Manual (PMM) regarding procurement (including the Anti-Corruption Action Plan, ACAP).

(29)

2. Training in Project Management: Annual course for prospective key staff.

Purpose of Training is to train the candidates for future appointments as key project staff in all aspects of Project Management.

Prospective key staffs (Heads of Work Units, Commitment Officers and Treasury), who were do not yet have a certificate in project management. The candidates will be selected from officials of the public works agencies (National/Provinces) in the 3 / 4 provinces with WINRIP Subprojects

3. Refresher Training in Project Management: Annual refresher course for key staff of project units.

Training purpose is to give staff currently occupying key position in Work Units a brief updating in latest developments in project management.

Training target is Key staff: Heads of Work Units, Commitment Officers and Treasurers.

4. Project Management Manual (PMM) Training: Initial training / annual refresher training in use of PMM.

To introduce provisions in the PMM to all the elements that are responsible for the implementation of WINRIP, in order to carry out their duties in accordance with the need to properly and fully observed during project implementation WINRIP.

All groups participating in project implementation should be included in the audience addressed by this component

5. Training in Reporting for FMR: Initial training / subsequent refresher training in the details of monthly financial and other reporting requirements for FMR and other financial management aspects of the project.

The purpose is to provide staff at project level with training in the preparation and submission of monthly reports on disbursements, procurement activities and project progress.

The recipients of this training will include but not limited

• Staff of the units involved in recording and reporting project performance

information of each project (2 persons per project).

• The Chief Financial Officer (Kepala Bagian Keuangan) in each Province (2

per entity).

6. Environmental Workshop: Annual workshops to disseminate environmental management and monitoring procedures to contractors, consultants and key project staff.

(30)

7. Training in Treasury (Brevet A): Annual training for financial staff of project units.

To provide staff currently occupying key financial positions in Work Units with full understanding of financial record keeping and compliance with Ministry of Finance and Treasury standards and procedures.

The training target is the key financial staffs (Treasurers, SPM Issuing Officers, and Accountants).

4.7.4 Complaints Handling Mechanism (CHS)

The ACAP as adopted by the Ministry of Public Works for WINRIP states on the subject of “Complaints handling system”. The Community Development Specialist and the Management Information Specialist will play a crucial role in the set-up of the Complaints Handling System (CHS) within PMU, in cooperation with the PMU officer(s) in charge of the Complaints Handling Unit (CHU).

CHS essentially has four main components as follows:

Data Entry.

All complaints were expected to be submitted through the WINRIP website but in fact, to date, most complaints have been received by letter, either directly or indirectly, although a few were sent by fax or email. However, to attain the best possible transparency of the project, complaints submitted

manually through letter, facsimile, telephone, e‐mail or visit to the Public

Works regional offices will be entered in the WINRIP website by the CHS team of CTC. The possibility of using the ‘short message service’ (SMS) from a cell phone for complaints was considered and it was decided that all SMS messages, although not treated as formal complaints, will be recorded as additional information.

Complaint Registration.

Every submitted complaint is registered and stored into the CHS database, categorized, and sent to the correlated expert for future consultation in order to formulate a response.

Complaint Assessment.

The CHS Team assesses the urgency and complexity of all complaints. Simple complaints are followed by the formulation of a response for PMU’s approval before uploading the formal response into the WINRIP website. Complex complaints are followed by a thorough investigation.

Field Investigation and Analysis.
(31)

to formulate a conclusion, solution, next action and any further decision.

4.7.5 Third Party Monitoring (TPM)

All WINRIP packages are designed to have external parties involved in conducting an independent assessment of the project throughout construction. Project information is accessible through the WINRIP website (under construction), project information booth which is normally maintained in the PPK/Satker/Dinas office or, project announcement (billboard) at each site. ACAP requires a third party, from outside the project, to independently monitor the progress of construction work of each link and these personnel are provided by universities nearby each package.

It was decided that the best method of recruitment for TPM was through the universities closest to each package and PMU mailed invitations asking them to express their interest in forming independent monitoring teams of Third Party Monitors. This concept is based on the fact that Universities/Technical Faculties have the engineers available for recruitment and Universities could use this opportunity to be involved in public service. It is hoped that this concept will be more effective and more efficient in getting legitimate, competent, independent Third Party Monitoring (TPM).

The duties of a TPM included:

a)

Report to the PPK for his intended package and obtain copies of all

drawings and contract documentation.

b)

Make at least three (3) separate visits to site, with each visit up to four (4)

days long, and ascertain that the works are being carried out in compliance with the drawings and documentation.

c)

Prepare and submit a report for the PMU following each visit with their last

report post PHO.

4.8 Road Safety Audit

Since the Senior Road Safety Audit Engineer has been mobilized on 1st May 2013,

technical design review which is AWP2 and AWP-3 sub-projects in aspect of road safety has been implemented. After completing of technical design review, the report of RSA which is to identify the road safety weaknesses in design during the design and actual construction and make recommendations for realistic improvements, has been made in response to recommendation of the links for betterment and their implementation under Annual Works Programs(AWP-2,3), through site visiting, review of prepared drawing & report, had an official meeting with stakeholder which is for Full design review and technical advisory. The CTC technical design team(highway & road safety audit) shall compile all the road safety recommendations in the Road Safety Audit Reports which shall be part of the technical reports. The RSA report has to be disseminating in particular to the audited packages.

(32)

5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS

5.1 Draw Downs and Future Costs

Details of the disbursements already made from the loan are listed in the following sub‐

section.

5.2 Disbursement

The total disbursement from the loan to the end of September 2013 was USD 2,207,915.00 equivalent to approximately 0.88% of the loan funds.

The total expenditure to date measured in the term of the World Bank commitment,

not including the Special Account advance, is shown in Appendix C. The following

table summarizes the individual disbursements as calculated by CTC but retaining

the total disbursement fromClient Connectionat the end of September 2013.

Category Description

Loan Restructuring

Amount US$

Totals Disbursed to End September

in US$

% Disbursed

1

Part 1Betterment and Capacity Expansion of National Roads.

220,400,000.00 0 0

2

Part 2

Implementation Support

16,000,000.00 714,755.81 4.47

3

Part 3

Road Sector Institutional Development

1,000,000.00 0 0

4

Part 4

Contingency for Disaster Risk

Response

0 0 0

Unallocated 12,600,000.00 0 0

LN 8043 DA-A 1,493,159.19 0

Original Loan

Amount 250,000,000.00 2,207,915.00 0.88

5.3 Management Information System

5.3.1 General Overview

[image:32.595.90.527.287.622.2]
(33)

6.7.1 WebGIS

1. What is WebGIS?

Website Geographic Information System (WebGIS) is a web-based information system that can collect, store, process, manage, and displaying spatial data into thematic maps that related to highways. The thematic maps and other project information then overlayed in the Google Maps. And users can accessed it on internet with URL http://gis.winrip-ibrd.com.

2. Objectives

• To trace the highways alignment to conform with Detailed Engineering Design

(DED).

• Displaying location and others project information on maps that is more easily

seen and understood by users.

• Knowing natural and geographical conditions around highways like rivers,

forests, mangroves and beaches that have an impact on highways. So that it requires the construction of bridges, retaining landslides and abrasion.

• Knowing highways have crossed over the protection forest area that needs a

feasibility study of environmental impacts.

• Knowing social conditions of communities and settlements around highways

for preliminary information in land acquisition activities.

3. GIS Concept

Data sources for GIS derived from images data, field data, field survey, socio-economic maps, and GPS (Global Positioning System). All further processed and analyzed with specific software as needed to produce output of the thematic maps.

GIS comprised of 2 types of data, namely:

1. Spatial data, ie the data that pertaining to spatial aspects such as geographical conditions on surface of earth. Generally in form of geographical maps in a digital format that has coordinates x, y and z.

2. Non-spatial data, ie attribute data that is related to characteristics and descriptions of geographical objects. For examples: street name, roads length and elevation, place name and others project information.

(34)

4. Spatial Data and Layers

Spatial and non-spatial data that use in WebGIS application is divided into several layers as follows:

Highways Alignment

Outline polygons that displaying highways alignment of the WINRIP project. Red lines for packages of AWP 1, orange lines for packages of AWP 2 and yellow lines for packages of AWP 3.

Protection Forests

Shape polygons that displaying the protected forest areas on the Sumatra island.

Floods

Shape polygons that represent areas of potential flood affected on the Sumatra island.

Landslides

Shape polygons that represent areas of landslides on the Sumatra island.

Project Information

Attribute data of project such as package number, length of roads, procurement method and cost estimates.

Physical Progress Photo

Photos that shows of physical progress of each package in the field.

Physical Progress Chart

Charts that shows of physical progress of each package in the field.

Financial Progress Chart

Charts that shows of financial progress of each package.

5. Technical Information

• Base Map, is the base map as a place to put all of maps and information.

Here we use the Google Maps as a base map of WebGIS application.

• Maps Framework, is a server machine where to process map using Google

Maps Engine.

• Integration with WINRIP Website, WebGIS applications will embedded in

(35)

6. Time Schedule

No.

Activities

Time Schedule

September

October

I

II

III

IV

I

II

III

IV

V

1 Preparation

2 Data Collection

3 Map Analysis

4 Develop WebGIS

5 Test System

6 Integration with WINRIP

Website

7. Activities Status on September

No.

Activities

Status

1 Preparation Hosting, sub-domain name and storage is

set up in online server of WINRIP website. The sub-domain names used link URL http://gis.winrip-ibrd.com.

2 Data Collection The data we have collected are as follows:

• WINRIP roads alignment are taken from

PMM and DED.

• Maps of protection forests sourced from

the Ministry of Forestry, edition 2011.

• Map of potential flooding across

Indonesia from LAPAN, edition 2013.

• Project information taken from

procurement and highway reports.

3 Map Analysis We have analyzed and processed data into

.kml files. That files will be used as metadata in WebGIS application. And we will continue to update the map with new data and from comment that we received.

The Management Information System tasks will include the followings:

1) Information System

a. Develop and manage a database system to store soft copy documents into a file storage server.

(36)

•Letter Database System, used to record all information of incoming and outgoing letter.

•Document Library System, used to record all information of hard copy

documents then store it into library shelves. c. Create and maintain a WINRIP official website.

d. Develop and update a Geographic Information System (GIS) of spatial and roads information that overlay into Google Maps.

e. Develop and manage a Financial Management Information System (FMIS), the web based application to monitoring financial progress.

f. Develop and manage a Progress Monitoring System (PMS), the web

based application to monitoring physical progress.

g. Provide a Complaint Handling System (CHS), used and support the ACAP activities to accommodate complaints from t

Gambar

Table 2.1 Proposed Physical Works by DGH Program
table summarizes the individual disbursements as calculated by CTC but retaining
Table 6.4.1

Referensi

Dokumen terkait

The Representation of Black and White Relationship in The Blind.

Tanggal 4 Januari 2015 tepatnya pada tanggal 12 Rabiul Awwal 1436 Hijriah adalah hari besar yang penting dan bersejarah bagi Ummat Islam di seluruh dunia. Hari itu merupakan hari lahirnya Nabi Besar bagi Ummat Islam, Nabi Muhammad

community itself asks for the creation of a Natural Protected Area," says Carlos Lopez Santos of Amigos de Sian Ka'an , the Cancun-based NGO that has worked with the

Christian School in Memphis, Tennessee), his adoption by Sean and Leigh Anne.. Tuohy, to his position as one of the most highly coveted prospects in

Tandakan (√) pada aktiviti fizikal yang dapat meningkatkan kapasiti aerobik dan (X) pada aktiviti yang sebaliknya..

Data yang digunakan adalah klausa kompleks dalam artikel Indonesia naval captain says may have located missing plane tail’s section surat kabar New Straits Times (Teks A)

Data yang digunakan adalah klausa kompleks dalam artikel Indonesia naval captain says may have located missing plane tail’s section surat kabar New Straits Times (Teks A)

Bahan : Kad manila, gunting, warna air, pelekat (selotape), lidi atau batang ais krim.. Soalan : Hasilkan topeng mata