Overall Equipment Effectiveness

(OEE)

(2)

What is OEE ?

OEE

Overall Equipment

Effectiveness

Why is a high OEE

important for the

department ?

OEE

Calculation

How can i

influence

the OEE ?

Making OEE

part of Visual

Management

(3)

Overall Equipment Effectiveness

Total time

e.g. 480 min. (1 shift)

Available time

Running time

Productive time

Effective time

OEE is the way to measure how effectively machine / equipment hours are used

(Value Adding)

Planned

Downtime

Downtime

Performance

Losses

Quality Losses

OEE is loss due to:

Depending on definition TPM®

knows 6-16 different losses

- breakdowns, repairs - changeover

- adjustment - start up

- machine speed - short stoppages - lower yield - scrap - reject - rework

(4)

Calculation of LOSSES

Total time

e.g. 480 min. (1 shift)

Running time

340 min.

Productive time

270 min.

Effective time

250 min.

- breakdowns, repairs - changeover

- adjustment - start up

- long cycle time - minor stoppages - reduced yield - scrap

- rework - rejects

- breaks, planned maintenance, training

Total losses = 170 min / shift

Available time

(5)

Calculation of OEE

Productive Performance= Running time - Performance loss Running time

= 340 min – 70 min 340 min

Quality = Productive time - Quality loss time Productive time

= 270 min - 20 min 270 min Availability

(Running Efficiency) =

Available time - Downtime Available time

= 420 min - 80 min

420 min

factor 81%

factor 79.4%

factor 92.6%

X

X

= 59.6%

OEE

(in %)

=

(6)
(7)
(8)

How to increase OEE ?

Data collection is the very important basis to increase OEE

Collect data for all downtime and losses on the machine

Data analysis and visible measure

Make improvements visible and implement

J F M A M J J A S O N D

OEE Trend

Target 2003

Analysis

Repair Changeover Tool change Scrap Minor Stopp.

33 26 16 7 3

Repairs

Change over, Adjustm.

Tool change

Minor stoppages

Scrap, rework

Autonomous Mainten.

Preventive Maintenance

Changeover reduction

Standardize tooling

Improved machine reliability

Standardisation

(9)

Making OEE visible

Repairs Chgeover Tool chg. Scrap Min.Stop.

33 26 16 7 3

J F M A M J J A S O N D

OEE trend machine 01

Target 2003

J F M A M J J A S O N D

OEE trend Machine 01

Target 2003

J F M A M J J A S O N D

OEE trend Machine 02

Target 2003

J F M A M J J A S O N D

OEE trend Machine 03

Target 2003

J F M A M J J A S O N D

Machine Information

Departement Information Company Information

shows the current situation of the machine or plant

shows the machine in the area

(10)

2003 2004

Measures

t Date

.

Department

company

Structured matrix sheet

Effects of OEE improvement activities

effect of improvement project

OEE in %

target

(11)

Fundamental concept of plant effectiveness

5 productivity losses

3 production/ cost losses

– not part of OEE -

Machine failure

Set up & adjustments

Tool changes

Start-up losses

Minor stoppages

Speed Losses

Defects and Rework

Shutdown

Management losses

Motion

Line organization

Logistics

Adjustments

8 availability losses

Loss of energy

Die, Jig and tool losses

Referensi

Dokumen terkait

2015 Pengaruh latihan plyometric terhadap power tungkai atlet remaja bola voli Jurnal/PJKR FKIP UNISMA Bekasi. File Bidang

KESATU : Membentuk Tim Penyusun Penetapan Kinerja (TAPKIN) Kabupaten Bantul Tahun 2010 dengan susunan dan personalia sebagaimana tersebut dalam

Oleh kerana itu organisasi masa depan yang akan mampu bersaing harus memiliki visi yang jelas dan terarah, pimpinan harus memiliki kompetensi yang menonjol sesuai

bahwa penilaian dan verifikasi sebagaimana tersebut dalam ditto* (b) di atas adalah dalam rangka untuk menentukan akurasi data dan informasi isian borang akreditasi dan

Beberapa ketentuan dalam Peraturan Gubernur Nomor 15 Tahun 2010 tentang Pedoman Pengelolaan Belanja Tidak Terduga di Provinsi Nusa Tenggara Barat (Berita Daerah

Mahasiswa mampu menganalisa gaya hidup yang terjadi pada masa dewasa awal (gay, lesbian, hidup bersama tanpa pernikahan, remarried, single adult yang belum

Penelitian ini bertujuan untuk menguji pengaruh karakter eksekutif, karateristik perusahaan, dan tata kelola perusahaanyang baik terhadap tax avoidance.Penelitian ini

™ Perencanaan pembangunan Mixed-use Building dengan dua massa bangunan atau lebih dengan fasilitas dua fungsi hunian (rumah susun) dan dagang (pasar modern) yang berbeda namun