• Tidak ada hasil yang ditemukan

DAFTAR PUSTAKA. 7. G.H. Tchobanoglous, H. Theissen, S.A. Vigil. (1993). Integrated Solid Waste Management. Mc Graw Hill.

N/A
N/A
Protected

Academic year: 2021

Membagikan "DAFTAR PUSTAKA. 7. G.H. Tchobanoglous, H. Theissen, S.A. Vigil. (1993). Integrated Solid Waste Management. Mc Graw Hill."

Copied!
22
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

1. Aarve., Vesilind, Alan.,.Rinon. (1981). Unit Operations in Resource Recovery Engineering. Prentice Hall.Inc. USA.

2. Anderson, Michael. (1979). Gravity Separation. Handout 9. Pergamon Press.England.

3. Benefield, Judkins. Joseph, Weand. Barron. (1982). Process Chemistry for Water and Wastewater Treatment. Prentice Hall, Inc. New Jersey.

4. Clift, R. Grace, J.R and Weber. M,E. (1978). Bubbles, Drops and Particles. Academic Press. New York.

5. Damanhuri. Enri, Padmi. Tri. (2000). Pengelolaan Persampahan. Diktat Mata Kuliah Persampahan. Program Studi Teknik Lingkungan. ITB. Bandung.

6. Dodbiba, Fujita.(2004). Progress in Separating Plastic Materials for Recycling. Journal of Physical Separation in Science and Engineering. Tokyo, Japan.September-Desember.

7. G.H. Tchobanoglous, H. Theissen, S.A. Vigil. (1993). Integrated Solid Waste Management. Mc Graw Hill.

8. Grant, Jonkers.(1999). The APIC and the JIGSCAN Controller take the Gueswork Out of Jigging. Bateman Titaco Process Engineering. Australia.

9. Machac, I,.Ulbrichova,I, Elson, T.P,. and Cheesman, D.J,. (1995). Fall of Spherical Particles through Non – Newtonian Suspension’s. Chemical Engineering Science. 50 (20), 3323-3327. Greece.

10. Mpandelis, Kelessidis. (2006). New Approaches For Estimation of Terminal Settling Velocity of Solid Spheres Falling In Newtonian and Non-Newtonian Fluids. Paper presented at the 7th National Congress on Mechanics, June 24-26,. Chania.Grecee

11. Muller, Anette. Wienke, Lars. (2004). Measurements and Models for The Gravity Concentration of C & D Waste Through Jigging. Bauhaus University Weimar. Faculty of Civil Engineering. Chair of Processing of Building Materials and Reuse. Germany.

12. Nakazawa, Kudo, Hasegawa.(2006) Recovering Aluminium from Shredded Aluminum Electrolytic Capacitors by means of a Dry Shaking Table. Journal of Resources Processing Vol 53 : 204-208. Iwate University. Japan.

13. Nurminah, Mimi.(2002). Penelitian Sifat Berbagai Bahan Kemasan Plastik dan Kertas Serta Pengaruhnya Terhadap Bahan Yang Dikemas Fakultas Pertanian Jurusan Teknologi Pertanian Universitas Sumatera Utara.

(2)

14. Olson, Reuben. Wright, Steven. (1990). Dasar-Dasar Mekanika Fluida Teknik. PT Gramedia Pustaka Utama. Jakarta.

15. Rahardyan, Benno. (2002). Jig Separation : An alternative method for waste separation in increasing resource recovery from waste. Department of Environmental Engineering. ITB.

16. Rcheel (2004). Sedimentology. Chapter 2. Teaching Notes.

http://spartan.ac.brocku.ca.

17. Swan, (2002). Grain Size Distributions and Soil Particle Characteristics. University of Iowa.

18. Tsunekawa, M., Naoi, B., Takubo, T, Hirajima, T., Hiroyoshi, N., Otani, M., Miyamoto, M., Ito, M., (2001). Jig Separation of Plastic Waste Used in Copy Machines, The 6th International Symposium on East Asian Resources Recycling Technology, Korea, October 23-25.

19. Wills. (1979) Mineral Processing Technology : An Introduction to the Aspects of Ore Treatment and Mineral Recovery. Pergamon Press.England.

20. Yang. David, Ho Cho, Peng Felicia, (1999). Simulation of Packed Column Jigging. Thesis Submitted to the College of Engineering and Mineral Resources at West Virginia University. Department of Mining Engineering. Virginia University.West Virginia.

(3)

Lampiran A Hasil Uji Karakteristik Fisik Sampel

A.1 Hasil Analisa Saringan Plastik PET – ABS dan PS A.1.1 Hasil Analisa Saringan Plastik PET

Analisa Saringan Jenis/Bentuk ukuran saringan bukaan (mm) berat tertahan (gr) %tertahan % tertahan kumulatif % lolos kumulatif PET Cacahan 1/2" 12.7 240 15.7 15.7 84.3 PET Cacahan 3/8" 9.5 258.8 16.9 32.5 67.5 PET Cacahan 1/4" 6.5 452.0 29.5 62.0 38.0 PET Cacahan 4 4.76 2.0 0.1 62.1 37.9 PET Cacahan 10 2 580.5 37.9 100.0 0.0 Total 1533.3

A.1.2 Hasil Analisa Saringan Plastik ABS Analisa Saringan Jenis/Bentuk ukuran saringan bukaan (mm) berat tertahan (gr) %tertahan % tertahan kumulatif % lolos kumulatif 3/8" 9.5 0.0 0.0 0.0 100.0 1/4" 6.5 145.0 100.0 100.0 0.0 ABS 4 4.76 0.0 0.0 100.0 0.0 Total 145.0

A.1.3 Hasil Analisa Saringan Plastik PS Analisa Saringan Jenis/Bentuk ukuran saringan bukaan (mm) berat tertahan (gr) %tertahan % tertahan kumulatif % lolos kumulatif 3/8" 9.5 0.0 0.0 0.0 100.0 1/4" 6.5 145.0 100.0 100.0 0.0 PS 4 4.76 0.0 0.0 100.0 0.0 Total 145.0

A.2 Ukuran Sampel Cacahan

Kelompok Ukuran p (mm) l (mm) Rasio (p:l) A (mm2) 2,80 2,05 PET > 2 mm

(4)

Kelompok Ukuran p (mm) l (mm) Rasio (p:l) A (mm2) 2,35 2,00 2,75 2,40 2,85 2,50 2,55 2,10 2,45 2,00 2,50 2,40 2,95 2,15 Jumlah 24,1 20,1 Rata-Rata 2,41 2,0 1,20 4,83 6,85 6,60 6,75 6,65 7,20 6,80 7,30 7,00 6,90 6,85 6,70 6,60 6,80 6,65 7,05 6,90 6,65 6,60 PET > 6,5 mm 7,00 6,90 Jumlah 69,20 67,55 Rata-Rata 6,92 6,76 1,02 46,74 11,85 10,70 11,70 10,50 11,30 11,00 12,05 10,50 11,05 9,85 12,10 10,60 11,45 9,85 11,25 9,90 11,40 10,00 PET > 9,5 mm 11,50 11,05 Jumlah 115,65 103,95 Rata-Rata 11,57 10,40 1,11 120,2 15,00 12,85 17,00 12,80 14,50 13,00 16,50 13,50 15,00 13,70 17,00 12,90 17,80 14,00 16,50 15,00 15,50 13,50 PET > 12,7 mm 16,50 16,00 Jumlah 161,3 137,3 Rata-Rata 16,13 13,73 1,175 221,4 6,70 6,65 7,05 6,70 6,80 6,75 6,90 6,85 PS > 6,5 mm

(5)

Kelompok Ukuran p (mm) l (mm) Rasio (p:l) A (mm2) 6,65 6,70 6,90 6,80 7,10 6,90 7,25 7,00 6,95 6,75 Jumlah 69,30 68,05 Rata-Rata 6,93 6,81 1,018 47,16 6,90 6,85 6,70 6,60 6,75 6,75 6,95 6,85 6,80 6,70 6,75 6,60 6,90 6,80 7,05 6,65 7,00 7,00 ABS > 6,5 mm 6,95 6,75 Jumlah 68,75 67,55 Rata-Rata 6,88 6,76 1,018 46,44

A.3 Waktu Proses Jig untuk Masing-masing Sampel Jenis Waktu proses (menit) berat sampel (gr) waktu/berat (menit/gram) PET hijau (>2 mm) 4,3 98,95 0,043 PET biru (>6,5 mm) 13,0 140,49 0,093 PET merah (>9,5 mm) 5,0 79,04 0,063 PET kuning (>2,7 mm) 4,05 80,03 0,051 PS (>6,5 mm) 3,05 145,0 0,021 ABS (>6,5 mm) 4,03 145,0 0,028

A.4 Perhitungan Densitas Sampel A.4.1 Pengukuran Densitas Materi Berat

awal

Jenis gr ml akhir(ml) selisih(ml)

Densitas (gr/cm3) PET > 12,7 mm 3,05 50 51,15 1,15 2,6522 PET > 9,5 mm 3,05 50 51,15 1,15 2,6522 PET > 6,5 mm 3,05 50 51,15 1,15 2,6522 PET > 2 mm 3,05 50 51,15 1,15 2,6522 PS > 6,5 mm 3,04 50 51,80 1,80 1,6889 ABS > 6,5 mm 3,06 50 51,7 1,70 1,8000

(6)

A.4.2 Pengukuran Densitas Materi Ringan awal

Jenis gr ml akhir(ml) selisih(ml)

Densitas (gr/cm3) PET > 12,7 mm 3,07 50 51,6 1,6 1,919 PET > 9,5 mm 3,06 50 51,6 1,6 1,913 PET > 6,5 mm 3,07 50 51,6 1,6 1,919 PET > 2 mm 3,07 50 51,6 1,6 1,919 PS > 6,5 mm 3,05 50 52,0 2,0 1,525 ABS > 6,5 mm 3,08 50 51,9 1,9 1,621

A.4.3 Spesific Gravity Sampel

Densitas (gr/cm3) Spesific Gravity Jenis Materi Berat Materi Ringan Materi Berat Materi Ringan Rasio Densitas PET > 12,7 mm 2,652 1,919 2,652 1,919 1,382 PET > 9,5 mm 2,652 1,913 2,652 1,913 1,387 PET > 6,5 mm 2,652 1,919 2,652 1,919 1,382 PET > 2 mm 2,652 1,919 2,652 1,919 1,382 PS > 6,5 mm 1,689 1,525 1,689 1,525 1,107 ABS > 6,5 mm 1,800 1,621 1,800 1,621 1,110

A.5 Densitas Kering A.5.1 Materi Berat

Jenis sampel (gram) kg Tinggi sampel (cm) Volume (m3) Densitas (kg/m3) PET > 12,7 mm 24.45 0.02445 1 0.00004489 544.665 PET > 9,5 mm 24.45 0.02445 1 0.00004489 544.665 PET > 6,5 mm 24.45 0.02445 1 0.00004489 544.665 PET > 2 mm 24.52 0.02452 1 0.00004489 546.224 PS > 6,5 mm 21.27 0.02127 1.1 0.00004938 430.750 ABS > 6,5 mm 19.97 0.01997 0.9 0.00004040 494.295

A.5.2 Materi Berat

Jenis sampel (gram) kg Tinggi sampel (cm) Volume (m3) Densitas (kg/m3) PET kuning 22.24 0.02224 1 0.00004489 495.433 PET merah 22.24 0.02224 1 0.00004489 495.433 PET biru 22.24 0.02224 1 0.00004489 495.433 PET hijau 22.25 0.02225 1 0.00004489 495.656 PS 19.03 0.01903 0.9 0.00004040 471.028 ABS 19.93 0.01993 1 0.00004489 443.974

(7)

A. 6 Pengukuran Densitas Campuran A.6.1 Materi Berat

Jenis diameter (mm) Rasio Densitas (kg/m3) % media Rasio Densitas x 100 % pori (100%-%media) Densitas campuran (gr/cm3) PET > 12,7 mm 16.13 0.205 20.54 79.46 1.337 PET > 9,5 mm 11.57 0.205 20.54 79.46 1.337 PET > 6,5 mm 6.93 0.205 20.54 79.46 1.337 PET > 2 mm 2.41 0.206 20.60 79.40 1.338 PS > 6,5 mm 6.93 0.255 25.50 74.50 1.173 ABS > 6,5 mm 6.88 0.275 27.46 72.54 1.218

Rasio Densitas = (Densitas kering/vol.ruang) / (Densitas Basah/vol ruang)

A.6.2 Materi Ringan

Jenis diameter (100%-%media)% pori

(mm) Rasio Densitas (kg/m3) % media Rasio Densitas x 100 Densitas campuran (gr/cm3) PET > 12,7 mm 16.13 0.258 25.82 74.18 1.235 PET > 9,5 mm 11.57 0.259 25.91 74.09 1.234 PET > 6,5 mm 6.93 0.258 25.82 74.18 1.235 PET > 2 mm 2.41 0.258 25.83 74.17 1.235 PS > 6,5 mm 6.93 0.309 30.89 69.11 1.160 ABS > 6,5 mm 6.88 0.274 27.39 72.61 1.168

(8)

Lampiran B Proses Pemisahan Materi Campuran

B.1 Proses Pemisahan 1 Campuran dengan Variasi Amplitudo 1cm, 2 cm, 4 cm, dan 6 cm pada F = 85 siklus/menit

t (menit) F (siklus/mnt) PET >2 mm PET >6,5 mm PET >9,5 mm PET >12,7 mm PS > 6,5 mm ABS > 6,5 mm 38 9,47 7,02 4 3,05 5,04 3,01 48 8,37 5,38 3,1 3,01 4,56 2,01 52 7,02 3,5 2,52 2,42 4,25 1,8 67 5,31 2,17 1,51 1,3 4,05 1,32 85 1,15 0,58 1,05 1,02 2,09 1,02

B.2 Proses Pemisahan 1 Campuran dengan Variasi Frekuensi 38, 48, 52, 67, dan 85 siklus per menit pada Amplitudo 6 cm

t (menit) A (cm) PET > 2 mm PET > 6,5 mm PET > 9,5 mm PET > 12,7 mm PS > 6,5 mm ABS > 6,5 mm 1 9,47 8,02 4 3,41 6,21 3,73 2 8,37 6,38 3,1 2,48 5,04 2,05 4 4,05 3,03 2,01 2 3,24 1,33 6 1,15 0,58 1,05 1,02 2,09 1,02

B.3 Kecepatan Pergerakan Materi dalam Fluida v (cm/menit) A (cm) F 38 F 48 F 52 F 67 F 85 1 19 24 26 33,5 42,5 2 38 48 52 67 85 4 76 96 104 134 170 6 114 144 156 201 255 Keterangan : V = L/T A / ((1/F).0,5)

(9)

Gambar B.1 Pengaruh Kecepatan Pergerakan Materi terhadap Waktu Pemisahan (3 jenis sampel)

B.4 Beban Air di atas Sampel

Dilakukan pada F = 85 siklus/menit dan Amplitudo = 6 cm Berat Sampel (PET > 9,5 mm) = 92, 95 gram

h air waktu (cm) (menit) waktu/berat (gr/menit) F (N) mgh 10 4,23 0,0455 91,09 12 4,62 0,0497 109,31 14 5 0,0538 127,53 16 5,13 0,0552 145,75 18 5,4 0,0581 163,96 20 5,75 0,0619 182,18 22 6,05 0,0651 200,40 24 6,34 0,0682 218,62 26 6,51 0,0700 236,84

B.5 Pemisahan dengan Variasi Tinggi Media B.5.1 PET

Pengaruh Rasio Tinggi Media (rasio berat – ringan) terhadap Waktu Pemisahan

tinggi (cm) Campuran Materi berat Materi ringan Rasio tinggi Berat Total (gr) t (menit) waktu/berat Rasio BJ 2 8 0,25 573 7,04 0,0123 5 5 1 573,3 8,05 0,0140 4 6 0,67 573,4 8,02 0,0140 Hijau > 2 mm 3 7 0,43 572,9 7,08 0,0124 1,382 v (m/dtk) 0 1 2 3 4 5 6 7 8 9 10 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0.040 0.045 t ( m en it ) PET PS ABS

(10)

tinggi (cm) Campuran Materi berat Materi ringan Rasio tinggi Berat Total (gr) t (menit) waktu/berat Rasio BJ 5 5 1 450,5 7,01 0,0156 4 6 0,67 450,2 6,04 0,0134 > 6,5 mm 3 7 0,43 449,8 6,08 0,0135 2 8 0,25 154,9 4 0,0258 5 5 1 155,3 6,06 0,0390 4 6 0,67 155 5,03 0,0325 Merah > 9,5 mm 3 7 0,43 154,4 5,08 0,0329 1,387 2 8 0,25 237,2 3,06 0,0129 5 5 1 237,7 5,01 0,0211 4 6 0,67 237,4 4,05 0,0171 Kuning > 12,7 mm 3 7 0,43 236,6 4,02 0,0170 1,382

B.6 Proses Jig pada F = 85 siklus/menit

Ukuran sama, berat jenis berbeda (materi ringan – materi berat)

B.6.1 PET Kuning > 12,7 mm

t (menit) t/berat

berat (gr) h(cm) A=1 A=2 A=4 A=6 A=1 A=2 A=4 A=6

47,44 2 5 4,05 4 3,05 0,105 0,085 0,084 0,064 94,88 4 5,05 4,03 3,05 3,45 0,053 0,042 0,032 0,036 142,32 6 6,01 5,32 5,07 4,23 0,042 0,037 0,036 0,030 189,76 8 7,02 6,06 5,11 4,05 0,037 0,032 0,027 0,021 237,2 10 8,03 7,02 6 5 0,034 0,030 0,025 0,021 B.6.2 PET Merah > 9,5 mm t (menit) t/berat

berat (gr) h(cm) A=1 A=2 A=4 A=6 A=1 A=2 A=4 A=6

30,98 2 5,05 5 4,05 4 0,163 0,161 0,131 0,129 61,97 4 6 5 5,05 4,02 0,097 0,081 0,081 0,065 99,42 6 7 6,15 6,03 5,04 0,070 0,062 0,061 0,051 123,92 8 8,02 8 8 6,05 0,065 0,065 0,065 0,049 154,9 10 9 8,02 7,05 7,03 0,058 0,052 0,046 0,045 B.6.3 PET Biru > 6,5 mm t (menit) t/berat

berat (gr) h(cm) A=1 A=2 A=4 A=6 A=1 A=2 A=4 A=6

90,00 2 6 5 5 4,05 0,067 0,056 0,056 0,045

180,00 4 7 6,05 5,05 5 0,039 0,034 0,028 0,028

270,00 6 7,05 7 6,07 5,03 0,026 0,026 0,022 0,019

360,00 8 8 7,05 7,03 6,05 0,022 0,020 0,020 0,017

(11)

B.6.4 PET Hijau > 2 mm

t (menit) t/berat

Berat (gr) h(cm) A=1 A=2 A=4 A=6 A=1 A=2 A=4 A=6

114,6 2 6,03 6 5,05 4,05 0,053 0,052 0,044 0,035

224,8 4 7,05 7,01 6,02 5,01 0,031 0,031 0,027 0,022

330,07 6 8,04 8 7,05 6,01 0,024 0,024 0,021 0,018

448 8 9,05 9,05 8,02 7 0,020 0,020 0,018 0,016

560 10 11 10 9 8,04 0,020 0,018 0,016 0,014

B.7 Pemisahan 2 Campuran (PS – ABS) B.7.1 Pada F = 38 siklus/menit Berat (gr) t (menit) tinggi campuran (cm) PS ABS A 1 cm A 2 cm A 4 cm A 6 cm 2 88,14 123,71 5,05 5 4,43 4,37 4 176,3 247,08 5,42 5,05 5 4,5 6 265,08 371,56 6 5,21 5,14 5 8 352,69 495,21 6,5 6 5,51 5,05 B.7.2 Pada F = 48 siklus/menit Berat (gr) t (menit) tinggi campuran (cm) PS ABS A 1 cm A 2 cm A 4 cm A 6 cm 2 88,14 123,71 4,9 4,42 4,31 4,19 4 176,3 247,08 5,05 4,57 4,59 4,27 6 265,08 371,56 5,2 4,85 4,74 4,56 8 352,69 495,21 5,63 5,05 5 4,79 B.7.3 Pada F = 52 siklus/menit Berat (gr) t (menit) tinggi campuran (cm) PS ABS A 1 cm A 2 cm A 4 cm A 6 cm 2 88,14 123,71 4,5 4,25 4,05 4 4 176,3 247,08 4,8 4,32 4,2 4,05 6 265,08 371,56 5 4,45 4,35 4,25 8 352,69 495,21 5,4 4,8 4,42 4,25 B.7.4 Pada F = 67 siklus/menit Berat (gr) t (menit) tinggi campuran (cm) PS ABS A 1 cm A 2 cm A 4 cm A 6 cm 2 88,14 123,71 4,42 4,05 4,05 4,02 4 176,3 247,08 4,5 4,12 4,1 4,03 6 265,08 371,56 4,6 4,31 4,2 4,05 8 352,69 495,21 5 4,45 4,3 4,2

(12)

B.7.5 Pada F = 85 siklus/menit Berat (gr) t (menit) tinggi campuran (cm) PS ABS A 1 cm A 2 cm A 4 cm A 6 cm 2 88,14 123,71 3,13 3,08 3,05 3,02 4 176,3 247,08 3,2 3,1 3,07 3,06 6 265,08 371,56 3,58 3,15 3,15 3,1 8 352,69 495,21 4 3,5 3,31 3,18

B.8 Pemisahan 3 Campuran (PS – ABS – PET ) B.8.1 Pada F= 38 siklus/menit berat (gr) t (menit) tinggi campuran (cm) PS ABS PET A 1 cm A 2 cm A 4 cm A 6 cm 2 50,5 59,67 75,9 4,05 4,03 3,71 3,24 4 65,05 78,01 98,68 5,02 4,5 4,05 3,78 6 110,46 120,69 153 6,05 5,6 4,78 4,53 8 164,2 188,06 225,09 7,5 6,77 5,64 5,01 B.8.2 Pada F = 48 siklus/menit berat (gr) t (menit) tinggi campuran (cm) PS ABS PET A 1 cm A 2 cm A 4 cm A 6 cm 2 50,5 59,67 75,9 4,02 3,59 3,05 3,06 4 65,05 78,01 98,68 5 4,05 4 3,5 6 110,46 120,69 153 6 5 4,56 4,2 8 164,2 188,06 225,09 6,9 6,05 5,05 4,52 B.8.3 Pada F = 52 siklus/menit berat (gr) t (menit) tinggi campuran (cm) PS ABS PET A 1 cm A 2 cm A 4 cm A 6 cm 2 50,5 59,67 75,9 4 3,6 3,23 3,04 4 65,05 78,01 98,68 4,88 4,02 3,67 3,32 6 110,46 120,69 153 5,76 4,9 4,22 4,1 8 164,2 188,06 225,09 6,64 6 5 4,6 B.8.4 Pada F = 67 siklus/menit berat (gr) t (menit) tinggi campuran (cm) PS ABS PET A 1 cm A 2 cm A 4 cm A 6 cm 2 50,5 59,67 75,9 3,75 3,4 3,1 3,05 4 65,05 78,01 98,68 4,55 4 3,75 3,5 6 110,46 120,69 153 5,28 4,67 4,32 3,92 8 164,2 188,06 225,09 6,5 5,31 5,1 4,2

(13)

B.8.5 Pada F = 85 siklus/menit berat (gr) t (menit) tinggi campuran (cm) PS ABS PET A 1 cm A 2 cm A 4 cm A 6 cm 2 50,5 59,67 75,9 3,55 3,1 3,2 3,01 4 65,05 78,01 98,68 4 3,8 3,56 3,19 6 110,46 120,69 153 4,67 4,5 4 3,3 8 164,2 188,06 225,09 5,5 5 4,05 3,5

B.9 Pemisahan Materi Ringan – Berat per Satuan Waktu B.9.1 Materi Campuran Ukuran (PET @ = 15 gram)

Berat (gr) t (detik) >12,7mm >9,5 mm >6,5 mm >2mm Total 30 4 4,2 3,88 1,6 13,68 60 2,5 2,2 2,27 0,98 7,95 90 1,8 1,55 1,57 0,5 5,42 120 1 1 0,98 0,3 3,28 150 0,75 0,8 0,7 0,09 2,34 180 0,5 0,45 0,4 0,05 1,4 210 0,18 0,24 0,2 0,04 0,66 240 0,07 0,14 0,11 0,02 0,34 270 0,03 0,06 0,09 0,01 0,19 300 0,01 0,03 0,04 0 0,08 Total 10,84 10,67 10,24 3,59 35,34

B.9.2 Total Berat Materi Terpisah Lapisan atas Lapisan bawah PET (gr) (gr) hijau (> 2mm) 3,59 11,41 biru (> 6,5 mm) 10,24 4,76 merah (> 9,5 mm) 10,67 4,33 kuning(.12,7 mm) 10,84 4,16 Jumlah 35,34 24,66

B.9.3 Persentase Pemisahan terhadap Total Berat Materi Pemisahan (%) t (detik) hijau (> 2mm) biru (>6,5 mm) merah (> 9,5 mm) kuning (>12,7 mm) 30 2.67 6.47 7.00 6.67

(14)

Pemisahan (%) t (detik) hijau (> 2mm) biru (>6,5 mm) merah (> 9,5 mm) kuning (>12,7 mm) 90 0.83 2.62 2.58 3.00 120 0.50 1.63 1.67 1.67 150 0.15 1.17 1.33 1.25 180 0.08 0.67 0.75 0.83 210 0.07 0.33 0.40 0.30 240 0.03 0.18 0.23 0.12 270 0.02 0.15 0.10 0.05 300 0.00 0.07 0.05 0.02 Total 5.98 17.07 17.78 18.07

B.9.4 Akumulasi Berat Komponen Ringan Terpisah (gram)

> 12,7 mm > 9,5 mm > 6,5 mm > 2 mm t (menit) (gram) 30 4,00 4,20 3,88 1,60 60 6,50 6,40 6,15 2,58 90 8,30 7,95 7,72 3,08 120 9,30 8,95 8,70 3,38 150 10,05 9,75 9,40 3,47 180 10,55 10,20 9,80 3,52 210 10,73 10,44 10,00 3,56 240 10,80 10,58 10,11 3,58 270 10,83 10,64 10,20 3,59 300 10,84 10,67 10,24 3,59

Gambar B.2 Akumulasi komponen ringan terpisah 0,00 2,00 4,00 6,00 8,00 10,00 12,00 14,00 0 50 100 150 200 250 300 350 t (detik)

akumulasi berat komponen ringan (gr)

PET hijau (> 2 mm) PET biru (> 6,5 mm) PET merah (> 9,5 mm) PET kuning (> 12,7 mm)

(15)

B.9.5 Materi Berat Terpisah

berat sisa (gr) % Pemisahan

t (detik) berat (gr) >12,7mm >9,5 mm >6,5 mm >2mm >12,7 mm >9,5 mm >6,5 mm >2 mm 30 15 11 10,8 11,12 13,4 44,61 43,80 45,09 54,34 60 15 8,5 8,6 8,85 12,42 34,47 34,87 35,89 50,36 90 15 6,7 7,05 7,28 11,92 27,17 28,59 29,52 48,34 120 15 5,7 6,05 6,3 11,62 23,11 24,53 25,55 47,12 150 15 4,95 5,25 5,6 11,53 20,07 21,29 22,71 46,76 180 15 4,45 4,8 5,2 11,48 18,05 19,46 21,09 46,55 210 15 4,27 4,56 5 11,44 17,32 18,49 20,28 46,39 240 15 4,2 4,42 4,89 11,42 17,03 17,92 19,83 46,31 270 15 4,17 4,36 4,8 11,41 16,91 17,68 19,46 46,27 300 15 4,16 4,33 4,76 11,41 16,87 17,56 19,30 46,27 0 2 4 6 8 10 12 14 16 0 100 200 300 400 Waktu (detik)

Akumulasi Komponen Berat

Terpisah (gr)

PET Hijau (> 2 mm) PET Biru (> 6,5 mm) PET Merah (> 9,5 mm) PET Kuning (>12,7 mm)

Gambar B.3 Akumulasi Komponen Berat Terpisah

B.10 Materi Campuran Berat Jenis (PET – PS – ABS Ukuran @ > 6,5 mm) B.10.1 Materi Ringan Terpisah per satuan Waktu

Berat (gr) t (detik)

PET ABS PS Total

30 1,58 3,35 5,25 10,18 60 1,44 3,24 3,93 8,61 90 0,54 2,36 3,01 5,91 120 0,44 1,82 2,18 4,44 150 0,32 1,75 1,8 3,87 180 0,03 0,51 1,31 1,85 210 0,02 0,11 0,34 0,47 240 0,015 0,07 0,16 0,245 Total 4,385 13,21 17,98 35,575

(16)

0 1 2 3 4 5 6 0 30 60 90 120 150 180 210 240 270 t (detik) berat (gr) PS ABS PET

Gambar B.4 Materi Ringan Terpisah per satuan Waktu

B.10.2 Berat Total Materi Ringan – Berat Terpisah Ringan Berat Jenis (gr) (gr) PET 4,385 20,615 ABS 13,21 11,79 PS 17,98 7,02 jumlah 35,575 39,425

B.10.3 Persentase Pemisahan terhadap Berat Total Materi Ringan Pemisahan (%) t (detik) PET ABS PS 30 4,44 9,42 14,76 60 4,05 9,11 11,05 90 1,52 6,63 8,46 120 1,24 5,12 6,13 150 0,90 4,92 5,06 180 0,08 1,43 3,68 210 0,06 0,31 0,96 240 0,04 0,20 0,45 t Akumulasi berat (gr) % Pemisahan akumulasi materi ringan

(menit) PET ABS PS PET ABS PS

30 1,58 3,35 5,25 4,44 9,42 14,76 60 3,02 6,59 9,18 8,49 18,52 25,80 90 3,56 8,95 12,19 10,01 25,16 34,27 120 4,00 10,77 14,37 11,24 30,27 40,39 150 4,32 12,52 16,17 12,14 35,19 45,45 180 4,35 13,03 17,48 12,23 36,63 49,14 210 4,37 13,14 17,82 12,28 36,94 50,09 240 4,39 13,21 17,98 12,33 37,13 50,54

(17)

0 5 10 15 20 25 0 50 100 150 200 250 t (detik)

akumulasi berat komponen ringan

(gr)

PET ABS PS

Gambar B.5 Akumulasi Materi Ringan Terpisah per satuan waktu

B.10.4 Persentase Pemisahan Materi Berat

Akum Keluar ringan

(gr) Berat sisa (gr) % Pemisahan berat

t (detik)

total berat

(gr) PET ABS PS PET ABS PS PET ABS PS

30 25 1,58 3,35 5,25 23,42 21,65 19,75 59,404 54,914 50,095 60 25 3,02 6,59 9,18 21,98 18,41 15,82 55,751 54,914 40,127 90 25 3,56 8,95 12,19 21,44 16,05 12,81 54,382 46,696 32,492 120 25 4 10,77 14,37 21 14,23 10,63 53,266 40,710 26,963 150 25 4,32 12,52 16,17 20,68 12,48 8,83 52,454 36,094 22,397 180 25 4,35 13,03 17,48 20,65 11,97 7,52 52,378 31,655 19,074 210 25 4,37 13,14 17,82 20,63 11,86 7,18 52,327 30,361 18,212 240 25 4,385 13,21 17,98 20,615 11,79 7,02 52,289 30,082 17,806

Berat sisa = berat awal - akumulasi keluar ringan (gr)

0 5 10 15 20 25 0 50 100 150 200 250 300 t (detik) akumulasi materi terpisah (gr) PET PS ABS

(18)

B.11Laju Pemisahan Materi Berdasarkan Ukuran (PET campuran ukuran) B.11.1 Perhitungan Laju Pemisahan untuk PET > 2 mm

t (detik) d > 2 mm dt dM dM/dt M 1/M gr 30 1.6 30 0.620 0.0207 1.29 0.78 60 0.98 30 0.480 0.0160 0.74 1.35 90 0.5 30 0.200 0.0067 0.4 2.5 120 0.3 30 0.210 0.0070 0.195 5.13 150 0.09 30 0.040 0.0013 0.07 14.29 180 0.05 30 0.010 0.0003 0.045 22.22 210 0.04 30 0.020 0.0007 0.03 33.33 240 0.02 30 0.010 0.0003 0.015 66.67 270 0.01 30 0.005 0.0002 0.0075 133.33 300 0.005 30 0.005 0.0002 0.0025 400

B.11.2 Perhitungan Laju Pemisahan PET > 6.5 mm

t (detik) d > 6,5 mm dt dM dM/dt M 1/M gr 30 3.88 30 1.61 0.054 3.075 0.33 60 2.27 30 0.70 0.023 1.92 0.52 90 1.57 30 0.59 0.020 1.275 0.78 120 0.98 30 0.28 0.009 0.84 1.19 150 0.7 30 0.30 0.010 0.55 1.82 180 0.4 30 0.20 0.007 0.3 3.33 210 0.2 30 0.09 0.003 0.155 6.45 240 0.11 30 0.11 0.004 0.055 18.18 270 0.09 30 0.05 0.002 0.065 15.38 300 0.04 30 0.04 0.001 0.02 50.00

B.11.3 Perhitungan Laju Pemisahan PET > 9.5 mm d > 9,5 mm t (detik) gr dt dM dM/dt M 1/M 30 4.2 30 2.00 0.067 3.2 0.31 60 2.2 30 0.65 0.022 1.875 0.53 90 1.55 30 0.55 0.018 1.275 0.78 120 1 30 0.20 0.007 0.9 1.11 150 0.8 30 0.35 0.012 0.625 1.60 180 0.45 30 0.21 0.007 0.345 2.90 210 0.24 30 0.10 0.003 0.19 5.26 240 0.14 30 0.08 0.003 0.1 10.00 270 0.06 30 0.03 0.001 0.045 22.22 300 0.03 30 0.03 0.001 0.015 66.67

(19)

B.11.4 Perhitungan Laju Pemisahan PET > 12.7 mm t (detik) d > 12,7 mm dt dM dM/dt M 1/M gr 30 4 30 1.50 0.050 3.25 0.31 60 2.5 30 0.70 0.023 2.15 0.47 90 1.8 30 0.80 0.027 1.4 0.71 120 1 30 0.25 0.008 0.875 1.14 150 0.75 30 0.25 0.008 0.625 1.60 180 0.5 30 0.32 0.011 0.34 2.94 210 0.18 30 0.11 0.004 0.125 8.00 240 0.07 30 0.04 0.001 0.05 20.00 270 0.03 30 0.02 0.001 0.02 50.00 300 0.01 30 0.01 0.0003 0.005 200.00 Orde 0 y = -0.0101x + 2.5157 R2= 0.7978 y = -0.0108x + 2.664 R2= 0.8136 y = -0.0099x + 2 R2= 0.7973 y = -0.0039x + 0. R2= 0.6797 0 0.5 1 1.5 2 2.5 3 3.5 0 50 100 150 200 250 300 350 t (detik) M PET > 2 mm PET > 6,5 mm PET > 9,5 mm PET > 12.7 mm

Gambar B.7 Laju Pemisahan dengan Orde 0

y = 0.0185x - 0.0019 R2= 0.9097 y = 0.0156x + 0.0003 R2= 0.9547 y = 0.017x + 0.0006 R2= 0.952 y = 0.014x + 0 R2= 0.9281 0.0000 0.0100 0.0200 0.0300 0.0400 0.0500 0.0600 0.0700 0 0.5 1 1.5 2 2.5 3 3.5 M dM/dt PET > 2 mm PET > 6,5 mm PET > 9,5 mm PET > 12.7 mm

(20)

Orde 2 y = 0.996x - 96.383 R2= 0.5342 y = 0.457x - 46.893 R2= 0.4451 y = 0.1634x - 15.822 R2= 0.5165 y = 0.1324x - 12.048 R2= 0.6011 0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450.00 0 50 100 150 200 250 300 350 t (detik) 1/M PET > 2 mm PET > 6,5 mm PET > 9,5 mm PET > 12.7 mm

Gambar B.9 Laju Pemisahan dengan Orde 2

B.12 Laju Pemisahan Materi Berdasarkan Berat Jenis B.12.1 Perhitungan Laju Pemisahan PET > 6.5 mm

t (detik) Berat (gr) dt dM dM/dt M 1/M PET 30 1.58 30 0.140 0.0047 1.51 0.66 60 1.44 30 0.900 0.0300 0.99 1.01 90 0.54 30 0.100 0.0033 0.49 2.04 120 0.44 30 0.120 0.0040 0.38 2.63 150 0.32 30 0.290 0.0097 0.175 5.71 180 0.03 30 0.010 0.0003 0.025 40.00 210 0.02 30 0.005 0.0002 0.0175 57.14 240 0.015 30 0.015 0.0005 0.0075 133.33 B.12.2 Perhitungan Laju Pemisahan ABS > 6.5 mm

t (detik) Berat (gr) dt dM dM/dt M 1/M ABS 30 3.35 30 0.080 0.0027 3.31 0.30 60 3.27 30 0.910 0.0303 2.815 0.36 90 2.36 30 0.540 0.0180 2.09 0.48 120 1.82 30 0.070 0.0023 1.785 0.56 150 1.75 30 1.240 0.0413 1.13 0.88 180 0.51 30 0.400 0.0133 0.31 3.23 210 0.11 30 0.040 0.0013 0.09 11.11 240 0.07 30 0.070 0.0023 0.035 28.57

(21)

B.12.3 Perhitungan Laju Pemisahan PS > 6.5 mm Berat (gr) t (detik) PS dt dM dM/dt M 1/M 30 5.25 30 1.320 0.0440 4.59 0.22 60 3.93 30 0.920 0.0307 3.47 0.29 90 3.01 30 0.830 0.0277 2.595 0.39 120 2.18 30 0.380 0.0127 1.99 0.50 150 1.8 30 0.490 0.0163 1.555 0.64 180 1.31 30 0.970 0.0323 0.825 1.21 210 0.34 30 0.180 0.0060 0.25 4.00 240 0.16 30 0.160 0.0053 0.08 12.50 y = -0.0169x + 3.7248 R2= 0.9708 y = -0.0067x + 1.359 R2= 0.8328 y = -0.0212x + 4.7809 R2= 0.9705 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 0 50 100 150 200 250 300 t (detik) M PET (> 6.5 mm) PS > 6.5 mm ABS > 6.5 mm

Gambar B.10 Laju Pemisahan dengan Orde 0

Orde 1 y = 0.0023x + 0.0106 R2= 0.0371 y = 0.0087x + 0.0027 R2= 0.2244 y = 0.0071x + 0.0083 R2= 0.6451 0.0000 0.0050 0.0100 0.0150 0.0200 0.0250 0.0300 0.0350 0.0400 0.0450 0.0500 0 1 2 3 4 5 M dM/dt PET (> 6.5 mm) PS > 6.5 mm ABS > 6.5 mm

(22)

Orde 2 y = 0.5263x - 40.736 R2= 0.6828 y = 0.1033x - 8.2548 R2= 0.5816 y = 0.0425x - 3.2718 R2= 0.5428 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 0 50 100 150 200 250 300 t (detik) 1/M PET (> 6.5 mm) PS > 6.5 mm ABS > 6.5 mm

Gambar B.12 Laju Pemisahan dengan Orde 2

B.13 Concentration Criterion (CC)

Dh- Df

Concentration

Criterion =

Dl- Df

Dh = Spesific Gravity (SG) komponen berat Dl = SG komponen ringan

Df = SG fluida (air)

Kriteria Cc > 2,5 Gravity Separation mudah Cc < 1,26 Tidak layak

Gambar

Gambar B.1 Pengaruh Kecepatan Pergerakan Materi terhadap Waktu Pemisahan (3 jenis sampel)
Gambar B.2 Akumulasi komponen ringan terpisah
Gambar B.3 Akumulasi Komponen Berat Terpisah
Gambar B.4 Materi Ringan Terpisah per satuan Waktu B.10.2 Berat Total Materi Ringan – Berat Terpisah
+6

Referensi

Dokumen terkait

Dari sisi pengeluaran pertumbuhan tertinggi dicapai oleh Komponen Pengeluaran Konsumsi Lembaga Non-Profit yang melayani Rumah tangga sebesar 6,62%.. Dari sisi produksi,

Tulungagung tahun ajaran 2013/2014. Materi yang diujikan dalam penelitian ini adalah garis singgung lingkaran,. yaitu garis singgung persekutuan, lingkaran dalam dan luar

Pada penelitian ini, proses pemilihan supplier dilakukan dengan menggunakan metode Fuzzy Analytical Hierarchy Process yang bertujuan untuk memberikan bobot pada kriteria yang

IDEOLOGI PENERJEMAHAN ISTILAH KEAGAMAAN TEKS QURRAT AL- ‘AIN KE DALAM BAHASA INDONESIA, Skripsi: Program Studi Sastra Arab Fakultas Ilmu Budaya Universitas Sebelas

sebagaimana diatas, diberi kesempatan untuk mengajukan sanggahan secara tertulis ditujukan kepada Pejabat yang berwenang menetapkan pemenang lelang, dalam waktu selambat-lambatnya

Diklat Membantu Lebih Terlatih Dan Terampil Dalam Bekerja...88 Tabel 4.20 Distribusi Jawaban Responden Mengenai Peningkatan Pengetahuan, Kemampuan Dan Keterampilan Dalam

Dalam rangka mencapai kompatibel data saat penggunaan jenis sensor yang berbeda , shielding and different exposure sensor yang berbeda dilakukan pada variabel

Hasil seleksi akhirnya menghasilkan sebanyak 35 nominator yang kemudian diundang untuk mempresentasikan produk inovasinya di PPPPTK Matematika dalam kegiatan