Teluk Lamong, A Case for Semi-Automatic Container Terminal

N/A
N/A
Protected

Academic year: 2017

Membagikan "Teluk Lamong, A Case for Semi-Automatic Container Terminal"

Copied!
39
0
0

Teks penuh

(1)

Créateurde Solutions globales de manutention

Creator

of global handling solutions

Manufacturer

of handling and self-propelled systems

(2)

2

SCHEDULE

Gaussin Company and Port Equipment Introduction

Gaussin Range of Products

GAUSSIN Partners

Biz cases Semi-Automatic & Full Automatic Terminals

Testing platform of AIV in Gaussin Plant

(3)

Créateurde Solutions globales de manutention

3

(4)

Brief history of the Cy

4

1961 – Henri GAUSSIN - Industrial trailers

1880 – Eugène GAUSSIN

Metal constructions

1970 – Beginning of the containerization

1994 – AIRBUS ( FULL ELEC vechicle)

(5)

Créateurde Solutions globales de manutention

… with innovative products

50 000 vehicles in operation in

the world

Transport

Energy

Raw

(6)

Product cycle from prototype to

commercial launch

6

2007/08

2009/10

2011/12

2013

Définition & 1st

drafts

Prototype

Industrialisation

ATT V1

Série ATT V3

ATT Lift

Proto full Elec & Hybrid

2014

Commercialisation

8 véhicules

5 POWERPACK

Commercialisation

(7)

Créateurde Solutions globales de manutention

(8)

A network of 21 distributors currently

being implemented

Building a distribution network

28

( Freight Quip)

Russia

(RTG of Brazil

Mexico

(UCHA Maq.ria-Mexico)

Israel

(Eliyahu Consulting

Engineers Team Ltd )

Trinidad. West Indies

(C & A Distributors Limited)

MALAYSIA

(IT Port Link )

INDONESIA

(Harbarindo

+ Portek Indonesia)

Turkey

SINGAPORE

( PORTEK )

(9)

Créateurde Solutions globales de manutention

9

(10)

PORTFOLIO :

ATT & AIV available on LIFT

10

(11)

Créateurde Solutions globales de manutention

(12)

12

(13)

Créateurde Solutions globales de manutention

13

Partnership Org Chart

FULL AUTOMATIC TERMINALS

GAUSSIN

Interface Partners

CEA & BAS

CEA /BTG

SPS

Moffatt &

Nichol

Equipment Control

Navigation / Positioning

Project Management /

Expert knowledge

Simulation / Emulation

(14)

CEA FRENCH ALTERNATIVE ENERGY

TECHNOLOGIES

CEA Liten (Grenoble/France)

14

Motor validation

(15)

Créateurde Solutions globales de manutention

CEA List (Paris/France)

15

Vehicle simulation with multi-body

kinematics validation

GPS-RTK = differential GPS for

better position accuracy

Laser for guidance and

obstacle avoidance

Robotics Algorithms

(16)

16

BA Systemes

In 2007, BA Systèmes launched its initial approaches to

RID

(Research

Innovation and Development). The aim is to share BA Systèmes skills and

expertise with other entities like the Gaussin AIV system.

(17)

Créateurde Solutions globales de manutention

17

Leading global infrastructure advisor specializing in

the planning and design of facilities that shape our

coastlines, harbors and rivers as well as an

innovator in the transportation complexities

associated with the movement of freight.

(18)

18

Busine ss c a se Se m i-Aut om a t ic

a nd

(19)
(20)

SEMI-AUTOMATIC TERMINAL

Lamong Bay layout

20

(21)

Créateurde Solutions globales de manutention

Lamong Bay facilities

21

(22)

ATT LIFT OPERATION

(23)

Créateurde Solutions globales de manutention

23

ATT LIFT OPERATION

(24)

24

(25)

Créateurde Solutions globales de manutention

25

(26)

AIV segregated area on quay

(27)
(28)
(29)

BA Systèmes © 2014

System architecture

29

TOS interface

Ethernet network 100 megabits per second: dedicated to BA Systèmes Wifi AIV Manager

server

(30)

30

(31)

Créateurde Solutions globales de manutention

(32)

HERICOURT TEST RING

(33)

Créateurde Solutions globales de manutention Intelligent & Automatic 33

(34)

34

(35)

Créateurde Solutions globales de manutention 18

First firm order for complete ATT – V4

vehicles

18

On 19 October 2012 – APM Terminals Tangier –

leading operator of the Tanger Med port,

confirmed the firm order for 48 ATT V3 vehicles

and 51 POWERPACKs.

After final tests by APM Terminals Tangier

undertaken using 9 ATT V3 vehicles from October

2011 to June 2012.

In addition to the 9 vehicles put at its disposal on

the port to carry out the tests, the order

included 39 additional ATT vehicles, with delivery

planned for the first quarter 2013.

(36)

June 2013 : New order from an operator

in Turkey

A new order from AKANSEL for

40 ATT

FULL ELEC

has been signed and the

delivery of 20 units is planned in the

second half of 2014 and 20 more units

in the first half of 2015.

After APMTT creating

reference zone

on the Mediterranean and West

Africa

, PELINDO opens the area of

South East Asia

where 63% of global

volumes are processed and finally

Akansel on the

the Middle East area

The Customer could add 60 units to

this order by taking an option.

(37)

Créateurde Solutions globales de manutention

March 2014 : New order from an

operator in Germany

The GAUSSIN Group announced the

signature on 10 March 2014 of a new

order for 20 ATT V4s with the German

company FSH.

Specialised in mobility services for port

operators, FSH is GAUSSIN

Group’s

licensed distributor in Germany.

The 20 ATT-V4s will be delivered

during second-half 2014 and first-half

2015.

They will equip the port of Hamburg,

largest commercial port in Germany

and third-largest European port.

(38)

19

New order for complete ATT – V4 vehicles

19

March 2013: New order for 50 ATTV4 and 50

Powerpacks signed by a leading port operator in

Indonesia:

PT PELABUHAN INDONESIA III (PERSERO)

PELINDO III Surabaya requested driverless

navigation tests on the testing grounds at

Héricourt before deciding to equip its 50 ATTV4s

with the LIFT and Docking Station options

http://youtu.be/oVDCzpsPsRE.

(39)

Créateurde Solutions globales de manutention

39

T H AN K YOU ! SEE YOU SOON

Ga ussin Te a m

Referensi

Dokumen terkait

KEPALA BADAN PENANGGULANGAN BENCANA

Pada hari ini Senin tanggal Tiga Puluh Satu Bulan Agustus Tahun Dua ribu lima belas, mulai pukul 12.00 sampai dengan 13.00 WIB, Pokja/ULP II Kementerian Sosial RI telah

[r]

Zainal Abidin Munawwir, fakta ini menggambarkan bahwa sikap maupun dukungan politik pesantren pada sebuah partai politik tertentu, tidak selalu paralel dengan dukungan masyarakat

Based on the students’ problem and the way to solve it, the r esearcher conducted her problem statement was formulated in following question: Can the application of minimal

[r]

Hasil Peringkat Teknis untuk Pekerjaan Penyusunan Kajian Potensi CSR di Kabupaten Cianjur

ARTÍCULO CUARTO.- La Secretaría de Medio Ambiente, Recursos Naturales y Pesca, en coordinación con la Secretaría de Marina, formulará el programa de manejo del Parque