(1)

Mohammad Rizqi, 2015

Optimasi Penjadwalan Pembangkitan Unit Thermal Dengan Memperhitungkan Rugi-Rugi Saluran Transmisi Berbasis Algoritma Back Propagation

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

ii

ABSTRAK

Dalam pengoperasian sistem tenaga listrik yang terdiri dari beberapa pusat pembangkit listrik, diperlukan suatu koordinasi di dalam penjadwalan besar daya listrik yang dibangkitkan masing-masing pusat pembangkit agar didapatkan suatu pembebanan

yang optimal dan lebih ekonomis. Penelitian ini bertujuan untuk melakukan studi

penggunaan algoritma back propagation dari jaringan syaraf tiruan dalam penjadwalan

optimal pembangkit thermal dengan memperhitungkan rugi – rugi transmisi. Hasil

penjadwalan metode ini akan dibandingkan dengan hasil realisasi penjadwalan pembangkit-pembangkit termal dari Pusat Penyaluran dan Pengatur Beban (P3B) PT PLN (Persero) Jawa Bali. Perbandingan ini bertujuan untuk membuktikan apakah metode yang digunakan penulis lebih baik dari penjadwalan yang direalisasi PLN, sehingga ditemukan

pula keunggulan dan kelemahan metode back propagation. Setelah dilakukan penelitian,

metode ini menghasilkan daya pembangkitan yang lebih optimal, karena besarnya daya yang dihasilkannya sama dengan daya pembangkitan PLN dalam memenuhi permintaan beban yang sama tetapi dengan rugi – rugi transmisi yang lebih kecil dan biaya bahan bakar yang lebih murah. Hasil pembebanan yang optimal akan menghasilkan efisiensi kepada perusahaan listrik sehingga dapat menekan biaya operasional pembangkitan dan tentunya secara tidak langsung akan berdampak pada murahnya biaya produksi listrik

(2)

Mohammad Rizqi, 2015

Optimasi Penjadwalan Pembangkitan Unit Thermal Dengan Memperhitungkan Rugi-Rugi Saluran Transmisi Berbasis Algoritma Back Propagation

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

iii

ABSTRACT

In the operation of the power system consisting of several electric plant,

required a large scheduling coordination within the electric power generated each

plant in order to obtain an optimal loading and more economic. This research aims

to study the use of back propagation algorithm from artificial neural network in

optimal scheduling of thermal unit by calculating losses in transmission line. The

result of this scheduling method will be compared with actual results scheduling

of thermal power plants of Distribution and Load Control Center (P3B) PT PLN

(Persero) Java Bali. This comparison aims to prove whether the method used by

the author better than scheduling realized by PLN, so that was also found that the

advantages and disadvantages of back propagation method. After doing research,

this method produces a more optimal power generation, because the result of load

schedulling by back propagation algorithm is same with schedulling realized by

PLN to meet load demand but with less transmission losses and production cost.

The optimal loading results will generate electricity efficiency of the electric

company in order to reduce the operating costs of generation and of course will

indirectly impact on the low cost of electricity production

Referensi

Dokumen terkait

listrik, karena Kabupaten Garut merupakan salah satu sumber daerah yang. memiliki potensi sumber daya alam yang bisa digunakan untuk

Mulai Perencanaan Pembuatan Pembuatan Prototipe Pengujian Prototipe Menghasilkan listrik Pembuatan Rectifier Penyempurnaan Alat Menghasilkan Tegangan DC.. Selesai

Penelitian ini bertujuan untuk mencari rugi energi listrik yang terjadi pada jaringan distribusi primer penyulang Lebaksari PT PLN (Persero) Rayon Padalarang.. Data dalam

Tujuan dari penelitian ini adalah membuat model input pembelajaran data PLN yang berbeda, dan mengetahui hasil peramalan optimal yang didapatkan berdasarkan input

Evaluasi Koordinasi Setting Rele Proteksi OCR pada Jaringan Distribusi Daya Pemakaian Sendiri di PT Indonesia Power Unit Pembangkitan. Semarang Tambak Lorok Bok I

The museum has power installed of 197 kVA with 380 Volt 3 Fase which is supplied by the State Electricity Company (PLN) through distribution substation in the

Intisari — Permasalahan penjadwalan pembangkit berkaitan dengan pemenuhan seluruh permintaan beban dan pencarian total biaya operasi pembangkitan yang optimal tanpa melanggar semua

Agar nilai kapasitor yang diberikan optimal, maka kapasitor yang diberikan harus dipasang paralel dengan beban yang menghasilkan daya reaktif total sama dengan