• Tidak ada hasil yang ditemukan

M00261

N/A
N/A
Protected

Academic year: 2017

Membagikan " M00261"

Copied!
12
0
0

Teks penuh

Loading

Gambar

Figure 1. Flow Chart of Heuristic Procedure
Figure 2. A new heuristic implementation in Monte Carlo simulation
Table 2a. Start solution
Table 3a. Start solution
+2

Referensi

Garis besar

Dokumen terkait

At the same time, the costs to cover the increase in facility for the EOQ- holding component would be going up, the plant square footage increase would provide an oppor- tunity for

A company using the actual costs of direct materials, direct labor, and overhead to determine work in process inventory cost is employing an actual cost system..

activity driver E X H I B I T 4 – 7 Tracing Costs in an Activity- Based Costing System Setup Cost $ Overhead Dollars Consumed Machine Power Cost Warehouse Cost Number of setups