RENCANA/ RELISASI PENGADAAN TA 2009

*

Unit Kerja

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

RIM B (Category 6)

Sub Prject A1 (Category 7)

Sub Prject A2 (Category 8) Consulting Services (Category 3)

Training, Workshop (Category 4)

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Civil Works (Category 1)

Goods (Category 2)

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) -

-TOTAL KEGIATAN I (Loan + Pend) -

-TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya). Categary yang tidak ada tidak perlu ditulis

1. Pekerjaan Konstruksi (Civil Works) : Sub Prject B1/B2 (Category 9)

(3)

Status : Januari 2009 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

(4)

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(5)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Balai PSDA Cimanuk-Cisanggarung

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 134,990,000 15,881 NS

1 CW 1 Perbaikan prasarana sungai 212,000,000 24,941 SW

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Penyediaan jaringan global berbasis perangkat keras dan

lunak 6,000,000

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) 346,990,000 40,822 TOTAL KEGIATAN I (Loan + Pend) 346,990,000 40,822

TOTAL KEGIATAN II (GOI-PF/APBD) 6,000,000 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

1. Pekerjaan Konstruksi (Civil Works) : RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen A

(6)

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya). Categary yang tidak ada tidak perlu ditulis

(7)

Status : April 2010 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

(8)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(9)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Balai PSDA Citanduy

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 285,642,000 33,605 NS

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) 285,642,000 33,605 TOTAL KEGIATAN I (Loan + Pend) 285,642,000 33,605

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

1. Pekerjaan Konstruksi (Civil Works) :

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen A

(10)

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) (termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

(11)

Status : April 2010 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

(12)

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(13)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Balai PSDA Ciliwung - Cisadane

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 20,800,000 2,447 NS

1 CW 1 Perbaikan prasarana sungai 350,000,000 41,176 NCB

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Penyediaan jaringan global berbasis perangkat keras dan

lunak 10,800,000

2 Perbaikan prasarana sungai 90,000,000

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) 370,800,000 43,624 TOTAL KEGIATAN I (Loan + Pend) 370,800,000 43,624

TOTAL KEGIATAN II (GOI-PF/APBD) 100,800,000 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

1. Pekerjaan Konstruksi (Civil Works) : RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen A

(14)

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya). Categary yang tidak ada tidak perlu ditulis

(15)

Status : April 2010 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Prior Review

Kont. I

Juni 2010 Juli 2010 Juli 2010 Agst 2010

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

(16)

Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(17)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Balai PSDA Citarum

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Pengadaan peralatan laboratorium 65,000,000 7,647 NS

2 GD 2 Penyediaan jaringan global berbasis perangkat keras dan lunak 3,150,000 370.59

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Penyediaan jaringan global berbasis perangkat keras dan

lunak 10,800,000

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) 68,150,000 8,018 TOTAL KEGIATAN I (Loan + Pend) 68,150,000 8,018

TOTAL KEGIATAN II (GOI-PF/APBD) 10,800,000 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

1. Pekerjaan Konstruksi (Civil Works) :

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen A

(18)

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya). Categary yang tidak ada tidak perlu ditulis

(19)

Status : April 2010 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

(20)

Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(21)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Balai PSDA Cisadea - Cibareno

No Kode Nama Paket Estimasi

Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Penyediaan jaringan global berbasis perangkat keras dan

lunak 10,800,000 1,271 NS

2

1 Perbaikan prasarana sungai 90,000,000 10,588 SW

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Rasionalisasi jaringan hidrologi 11,500,000

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) 100,800,000 11,859 TOTAL KEGIATAN I (Loan + Pend) 100,800,000 11,859

TOTAL KEGIATAN II (GOI-PF/APBD) 11,500,000 0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) 1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,000

3. Small Works (SW) < Rp. 212,500,000

4. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp 2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

1. Pekerjaan Konstruksi (Civil Works) : RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen A

(22)

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,000

3. Quality Based Selection (QBS) < Rp. 3,400,000,000

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya). Categary yang tidak ada tidak perlu ditulis

(23)

Status : April 2010 Post/ Prior Review Pengumum an Pengadaan Pemasuka n Penawaran Eval/ Nego Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN) Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$ Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC Kolom 7

: Post Review, Prior Review Kontrak I **, Prior Review Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 9

(24)

Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn) Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. Kontrak

Kolom 12: Hari/Bulan Kalender Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD) Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket Kolom 4: Estimasi biaya, dalam Rp

Kolom 5 : diisi (0) Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003 Kolom 7 : diisi (–)

(25)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : PSDA Prov. Jawa Barat Status : April 2010

No Kode Nama Paket Biaya (Rp) Estimasi

Estimasi Biaya eqv(US$) Metode Pengadaa n Post/ Prior Review Pengumuman Pengadaan Pemasukan Penawaran Eval/ Nego

Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) -

-Sub Total Keg Selain Cat 3 (Loan) -

-TOTAL KEGIATAN I (Loan + Pend) -

-TOTAL KEGIATAN II (GOI-PF/APBD) - 0 Sub Prject A2 (Category 8)

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Referensi

Dokumen terkait

Skripsi ini disusun untuk memenuhi salah satu syarat untuk memperoleh gelar sarjana keperawatan (S.Kep) pada Program Studi Pendidikan Ners Fakultas Keperawatan Universitas

Lingkar dada jantan paling tinggi pada Kambing Muara (85.50 ± 17.68 cm) berbeda nyata (P&lt;0.05) jika dibandingkan dengan kelima sub populasi kambing lainnya, kemudian disusul

Hasil analisis uji t menunjukkan dari sepuluh variabel yang digunakan terdapat delapan variabel yang memberikan pengaruh yang signifikan terhadap keputusan pembelian

melakukan pembelajaran pada Kompetensi Dasar (KD) yang sama dengan metode ceramah dan tanya jawab, dan melakukan post tes atau penilaian. Sedangkan obyek dalam penulisan ini

Kinerja sasaran “Tertib administrasi penyelenggaraan pemerintahan umum, otonomi daerah, dan kerja sama” dengan indikator “Persentase dinamika penyelenggaraan

Kesepakatan antar negara khususnya yang telah ditandatangani (disepakati) oleh Pemerintah Indonesia perlu didukung oleh seluruh masyarakat (Pemerintah Daerah).

Apabila periedema trigeminus bergeser ke arah lateral (Gambar 6), tumor tampak dekat batang otak pada gambaran dan sebaliknya nervus trigeminus akan bergeser MRI

Kabupaten Sleman Yogyakarta, untuk mengetahui pengaruh gaya hidup (aktivitas, minat, opini, nilai budaya, kepribadian) secara parsial terhadap pembelian gadget dengan sistem