SPECIFIC AGREEMENT BETWEEN
THE GOVERNNENT OF TilE REPUBLIC OF INDONESIA AND
THE GOVERNMENT OF THE KINGDOM OF BELGIUM CONCERNING
THE PROJECT CTA - 160 : MASTER PLAN FOR THE GAS
DISTRIBUTION SYSTEN IN THE BANDUNG AREA .
---The Government of the Kingdom of Belgium and the Government of the Republic of Indonesia .
Wi tid n the framcHorl{ of the General Agreement on Technical
Cooperation of June 16 , 1969.
Desiring to co-operate in the jmplementaLion of the master
plan for gas distribution in the Bandung area ( hereinafter
refered to as the Pt"o.ject ) . lluvc agreed as folloHs :
ARTICLE
Objectives of the Project.
1.
In recent years the demand for· public gas h as increased2.
3 .
enormously in the Dandung area, and the supply and
distribution nctHork has to be adapted accordingly .
Taking into consideration the existing data available on the
present situation, including natural gas availability in the
region, Lhc project Hill propose a masterplan for a future
transmission and distribuLion system in this area.
The project is further described a n d detailed jn the
of Reference" attached to this Specific Agreement and
an integral part of it.
Transfer of !mow-how being a basic policy issue of
GovernmenL of the Republic of Indonesia, all possible
will be made so that the Belgian experts will work
LogeLher with the Indonesian experts, this making
muxlmum Lrunsf"et• of l1now-how is rea l iRecl.
"Terms bei n g
the efforts closely
ART lCLE II .
Executing Agency.
1. The Gover n ment of the Kingdom of Belgium design ates the
Belgian Administr ation for Development Co-operation
(hereinafter referred to as B.A . D .C ) as its executing
agency. B . A.D.C. is represenLed in Indo n esia by the
Development Co-op eration Section o f the Belgian Embassy in
Jakarta. The B.A.D.C . will ent rust the implementation of
its contribution to experienced consulta n t(s).
2 .
The gッカ・セョュ・ョl@ o f the Republic or Indonesia designates LhePerusaho.un Gas Negara , hereinafter referred to as PGN as its
executing Agency responsible for t h e implementation to its
contribution and operatiunul matters of the project.
ARTICLE III
Contribution of the Government of the Republic of Indonesia .
The Govet·nnwrt L or t h e Republic o r T nd onesla , in ac<:.:ordunce
with the prevailing laws and regulations shall
a. provide the Belgian experts wiLh the exempLions and
pri vileges mentioned in article 7 of the General Agreement on Technical Co-operation of June 16, 1969 ;
b. granL exoneration from all duLles, other levies and taxes
on the technical apparatus and equipment brought in into
Indonesia by Lhe con sultant and which is required to
impl ement the Project .
c. give the required agreement for the Belgian experts .
d. appoint a L'esponsible project engineer who will act as an
interface between t h e Con sultant and all Indonesian serv i ces
and organizations;
e . make available furnish ed and equipped office, and the
faci 1 i Lies for official purposes (secretary,
draughts-rHan, local transportation, domestic telephone and
international telex) required for the implementation o f the
f , support in obtaining all necessary information from private and public entities.
g. provide all available reports, maps, documents,
technical data and other information required for the
implementation of the project. Documents which are
Indonesian language will be explained by DON staff
Belgian experts and the very essential information
for the Master Plan will be translated in English.
and proper
in the
to the
required
h. give the consultants every reasonable assistance to enable
them to perform their study.
The implementation and disbursement of the contribution of the
Republic of Indonesia will be limited by and subject to its
normal budget appropriation .
ARTICLE IV.
Contribution of the Government of Lhe Kingdom of Belgium.
In accordance with Lhe prevailing laws and regulations, the
Government of the Kingdom of Belgium shall :
1. Carry out the master plan specified in Lhe T.O.R and Lake
all required administrative and budgetary measures to this
end.
2 . Provide the services of a Belgian consultant and cover the
expenses such as the wages of Lite ex per Ls 1 their
in ternaU ona 1 travels and their in Lernational telephone
communication expenses 1 their Lodging and miscellaneous
expenses not covered by the Indonesian contribution .
The contribution of the Kingdom of Belgium will be limited by
ARTICLE V.
Communications.
Any communication or document given, made or sent by eilher
Government 011 lheir designated agenl pursuant to this Agreement
or annexes hereto shall be in writing and shall be deemed to
have been duly given made or sent to lhe party lo which i t is
addressed at the lime of ils delivery by hand, mail 1 telex , cable
or radiogn.t.m at its respective address, namely :
For Indonesia Mailing address
Perusahaan Umum Gas Negara (P.G.N.)
Jalan M.I. Ridwan Rnis No . 2 ( PO. Box. 119 )
Jakarta 10110
Cable GAS PUSAT
Telex 45764 GASMI IA
Phone (021) - 361258/374809
For Belgium
Head of Development Belgian Embassy
4, Ja]an Ciourug
Jakarta Pusal INDONESIA
Mailing address Co-operation Section
Cable address
Telex address aセidabel@
JAKARTA 44413 Belgi Jltt .
ARTICLE VI
Control and Evaluation
Doth Governments may review lhe aims, objectives
implementation of the project and if necessary discuss
main problems accuring during the implementation of
project at the convening of a joint commission for
purpose.
and the the this
2 .
The Government of Indonesia reserves the right lo request theBelgian Government to recall any of Consultant's personnel
in Indonesia whose services and/or activities are found
unsatisfact.or·y or for reasons or misconduct, misbehaviour or
. .
3. AL any Lime, both Governments may supervise and/or control
on the spot Lhe state of progress of the project.'
4. Where n ecessary and after consultation, both gッカ・イョュ・ョセ@ may
evaluate Lhe project or part of its implementation aspects.
ARTICLE VII
Settlement of dispute .
Any dispute arising ouL of the interpretation or
implementation of Lhis Specific Agreement shall be settled
amicably by consultation or ョ・セッャゥ。エゥッョ@ between the two
Governments.
ARTICLE VIII.
Entering into force and validity.
This Specifi c Agreement and the aLLached Terms of Reference
shall enter inlo force on Lhe date of signing and remain in
force ur1Lill the completion of the project. Amendments to Lhe
Specific Agreement , not resulting in any increased cost to any
of the contracting parties, may be made aL any time with the
mutual consent of Lhe Government by exchange of letters.
IN \HTNESS 'NIIEREOF I
Agreement.
the Undersigned have signed Lhis Specific
SIGNED in Jakarta on 22 August
86
Language.
FOR THE GOVERNMENT OF THE REPUBLIC OF INDONESIA.
Signed
IR. SOEDARNO AGセrtosewojoN@
DIRECTOR genセral N@
in duplicate in the English
FOR THE GOVERNI'IENT OF THE KINUD0£'1 OF BELGIU1'1.
Signed
tro_Mセs@ DAEKELA.-'lDT
I
ANNEX
SPECIFIC AGREEMENT. page 1
of
9.
THE セセster@ PLAN FOR THE GAS DISTRIBUTION SYSTEM.IN THE
BAN'DUNG AREA (CTA-160)
TERMS
OF
REFERENCE
OBJECTIVE
The task of the CONSULTANT shall be to propose to PGN a masterplan for a
future and possible gas distribution network in the Bandung area, taking
into account :
the feasibility study implemented by PGN as well as all feasibility
studies and/or all other reports made available by PGN to the
CONSULTANT,
the existing gas distribution network and its characteristics
(pressure losses and leakages),
the characteristics of the presently consumed gas, its ーイッ」ゥセ」エゥッョ@ and
the Su?ply conditions to the consumers,
all data related to the existing consumers and to their consumption
charac:eristics ,
the existing data related to the potential gas market in the Bandung
area at medium term (10 years) and at long term (20 years),
the local conditions of the gas distribution network developme!tt,
the possible prospects and systems for tbe gas セオーーャケ@ of the セョ、オョァ@
area, and among other things the possibility to feed the network セイッュ@
a high-pressure ptpeline of pertセセinaL@
the economic and financial development conditions of the existing gas
ANNEX
SPECIFTI! AGREmENT. page 2 of
9
the interest for PGN and the national economy to develop a gas
distribution netwock in the Bandung area,
the セゥャャ@ to provide for transfer of Belgian technology エッセ。」、ウ@
Indonesia, by having parts of this Masterplan studies carried out in
the offices of PGN with integrated teams composed of respective staff
of PGN and the CONSULTANT, and by setting up training sessions for
Indonesian engineers on the consultanセウ@ facilities in Belgium.
This masterplan will be furthec completed by a final report outlining the
..
ANNEX
SPmiFIC AGREEMENT. page
3
of9.
SCOPE
OF
WORKS.
1.
--- --
p。セse@1
- - - ---
BASIC DATA Fセalysis@-- --
BY THE CONSULTANT
The following basic data shall be provided by pgセ@ to the
CONSULTANT
whose task will be to proceed with the analysis of such data andtheir integration in the masterplan study.
Basic data セ@ be provided by
PGN
l.j. Feasibility studies and/or any ocher existing reports oa the
PGN
gas distribution network of Bandung.
i:2. Description of the existing distribution network and its
characteristics .
1.3.
Description of the existing production unit anc! itscharacteristics.
Q セ T N@ Description of the present consumers and their consumption
characteristics .
1,5.
Description of the problems encountered during net...-orkoperation: pressure and leakage (remedies already coote!llplated
or: being implemented).
1.6. Data about the PERTAXINA nigh-pressure gas pipeline
pressure, available flow rate, gas characteristics.
ANNEX
SPECIFIC AGREEMENT.
page ij of9.
1.7.
Description and information related to the significant potentialgas market 1n the Bandung area and alongside the gas ヲ・・、・セL@ at medium term (10 years) and at long term (20 years).
1.8 • .
Provision of the topographical and mapping documents coveringthe area concerned for the needs of the masterplan studies.
1.9 ...
Data about prices*
*
*
of the gas presently distributed by PGN,
of the substitution fuels,
of the pertFセina@ gas which might possibly be available.
1.10.
Data related to the existing gas equipment for industrialconsumers and consumers of the public distribution.
1 .. 11. The CONSULTANT will review the gathered data, judge their
validity and, adjust them, if necessary.
2 . PHASE 2 - MASTERPLAN STUDY
The elaboration of the masterplan will include the various study
phases listed hereafter and will be carried out partly in integrated
teams (PGN
+
CONSULTANT) in the offices of PGN in Indonesia.STUDY SCOPE OF WORKS
2.1. Determination of the basic units for gas characteristics of
・セゥウエゥョァ@ and future supply, pipelines and ・アセゥーュ・ョエ@ calculation units, flow rates pressure-temperature calculation units, cost
estimates-investment.
2.2. Analysis of the existing network on the basis of the PGN. data
ANNEX
SPECIFIC AGREEMENT.
page5
of9.
J. Analysis of the gas potential .market at medium term (10 years)
'
and at long term (20 years) and more particularly :
3.1 Forecasted hourly gas demand (cu.m./hr).
3."2 Forecasted peak demand (cu.m./hr).
3.3 Forecasted yearly gas demand (ton oil equivalent/year).
3.4 Programme of customers' connection to the network at medium and
long term.
3.5 Conversion problems of industrial appliances and appliances
connected to the public distribution, on a technical and
economical point of view, related to the CONSULTANT's experience,
4 . Ar.alysis of potential supply sources
by propane/air production units, and/or
by available natural gas Hpertォセina@ pipeline) particularly as to following factors :
4.1 fッイ・」。ウエセ、@ hourly gas supply (cu.m./hr).
4 .2 Forecasted peak supply (cu.m./hr).
4.3 Forecasted yearly gas supply (ton oil equivalent per year)
4.4 Quality of the supply.
5.
Gas supply/demand balance analysis at medium term (10 years) andlong エ・セ@ (20 ケ・セイウI@ and more particularly :
5.1 Gas supply/demand balQnce (cu.m./hr), average and peak.
5 . 2 Gas supply/demand balance (ton oil equivalent/year) .
6. Preliminary transmission and distribution network design
6 . 1 Pre-routing of the connection pipeline with the ・クゥセエゥョァ@
PERTAMINA pipeline, and/or locating of the propane/air
production units .
6.2 Pre-routing of future and possible gas distribution system and
. ·
.ANNEX
SPECIFIC AGREEMENT • page
6.
ッセ@9.
7. Cas transmicsion and dis t ribution network siMulactoos at medium
term (10 years) and long term (20 years).
Simulation for future gas transmission and distribution network
at normal and peak conditions, year by year, according to the
connection programme of consuMers :
in cu . m/hr,
in too oil equivalent per year .
8. Gas supply system analysis
Analysis of the various existing and future ョ・エセッイォ@ feeding
systems, and recommendations for the selection of one system
(Analysis conditions flow-rate, pressure, gas
characteristics, economic and financial) .
8.1 At Medium term.
8. 2 At long term.
9. Gas distribution system analysis
9.1 Determination of the feeding pressure level of the existing
net•Jork .
9. 2 Determination of the feeding pressure level of the future
distribution network.
9.3 Analysis of the Materials to be used for both pressure levels
here above (example : steel for high and med!.u:t pressure, high
density polyethylene for medium and low distribution pressure).
10. Sizing of the future gas feeding and distribution network for
both cases : medium term (10 years) and long term (20 years) ..
10.1 Si%iag of the main feeding network and its branchings.
ANNEX
SPECIFIC AGREEMENT.
page7
ッセ@9.
11. セ。クゥュオュ@ operating pressure map : general diagram of the oetwork with its various pressure levels (maximum operating pressure)
and location of the regulating and safety equipment.
12. rmplementation programme (medium and long terms).
Study of the implementation programme in relation with the
connection programme of the future consumers .
13. Cost estimating :
Establishment of the cost estimates for
t the propane/air production unit (if this solution is
recommended),
*
*
the high and medium pressure pipelines and associated
equipment:,
the medium and low pressure pipelines foC' distribution with
their associated equipment,
セィ・@ consumers· connections and associated equipment,
*
the gas pressure reducing stations,*
the adaptions to the existing ョ・エセッイォN@14. Investoents accoC'ding to the implementation pC'ogramme オセ、・イ@ ゥ」・セ@
12.
15. Evaluation of the ᄋセ・」セョゥ」。ャ@ gas distribution cost" (cedium and
long エ・セウI@ and comments on the supply cost.
16. Race of C'eturn and N.P.V. (medium and long term).
17 . Basic Data RepoC't ln 20 copies .
18. Final RepoC't in 20 copies.
*
Final technical report and recommendations (EJCecutive Suaunary).ANNEX
spセific@ AGREEMENT ー。セ・@
8
of9
3. TRANSFER OF KNOWLEDGE
The consultant shall plan his assignment in such a way as to be able
to operate, as far as possible, on the spot . The members of the
P.G.N. staff shall be integrated in the teams of the consultant, and
shall participate in each stage of the study, ensuring thus that a
maxinum amount of ォョッセッセMィッセッセ@ is passed on to P.G. N. , both during the
studies implemented on the spot, as during those which the consultant
セッセッオャ、@ conduct in Belgium.
In his assignment, the consultant: muse make provision for the
training of two P. G.N. Engineers during 2 months . This
training-course shall mainly focus on the knowledge required in order to
accomplish a study of this type, and on the technical solutions
proposed. The training-course セッセゥャャ@ mainly be of the practical type, and organized on Belgian distribution oetvorks.
4. iセオonZZsian@ COUNTERPART SERVICES
The consultant and his group of ・セー・イエウ@ shall have the full ウオーーッセ」@
and coo?eratioa of P.G.N. and MICAS in all its aspects, namely
。、セゥョャウエイ。」ゥカ・@ supporc
support in obcaining all the necessary information from private
and public entities;
use of office acc.omodatioa and services as : secretary, draftman,
typist, telex (international) and local celephone facilities for
Belgian gas experts during their mission in Indonesia, local
transportation, and of t he necessary Indonesian staff in view of
succesfully carrying out the assignment (namely, English
translation of the Indonesian texts and data, local inquiries by
agenc. ies, customers etc..) .
all other types of assistance chat the consultant: may require,
:•
:•
'"
>< ... ...,""
... "' n 0 セ@.
...."'
...
..
...
:
...
...
-...
...
...
-...
,..._
>-,..._,
:- ::o ,_>
-> :: ;=g : - ;,:
,...,
>-"' ,__ >-::> ,...,...._
,...,
;:g
>- •,_..,
! k :.-o LNNNセ@ >--. >--.,_....,
,...,
,...,
,__ I -I I I IセMMMMMMMMMMMMMMMᄋMMMMMM]MMMMMMMMMMMMM
;, :j...
...
::...
...
...
... ...
::...
...
::
:
::::
::セ i@
Z [MMMM MMMMMM MMMM ]MMMセセMM MMMMMMMM:i
:l
.,
:l
· i:,
::
...
...
...
...
...
::
Z セᄋMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMM
MM
:•
::::
•::>....
0 U'l :::;,..,
•o '=''"'
1 .;: I セ@I w
Mセ@ .,;