PUI.IU SUTAIERA
TECHNICALASSISTANCE
FOR SUPPORT OF
THE
PROJECT
MANAGEMENT
UNIT
coRE
TEAM CONSULTANTS
(CTC)
QUARTERLY
REPORT
For the
Second Quarter
of the Year 2014
MINISTRY OF PUBLIC
WORKS
DIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE
OF
PLANNING
Core Tearn
Consultant
for
Western Indonesia National Roads Improvement Project (WINRIP)
IBRD Loan No,8043-ID
No
:
03'10/CTIVOIQ-2.2014
Directorate
General
of Highways, MPW
Jl. Patimura
20
Kebayoran
BaruJakarta Selatan
Indonesia
Jakarta,
July
10,2014
Attention
Subject
:
lr.
Agusta
E.Sinulingga,
M.T
Officer
in Gharge
PMU
WINRIP
: Quarterlv Proqress Report
for
the
2noQuarter of the Year 2014
In
compliance with ltem
No.3
(List of Documents
To
Be
Delivered)
of our Consultancy
Contract,
we submit
herewith
the Quarterly
Progress Report
covering the
2nd Quarter
of theYear 2014
(April, May and June).
This report
is
reproduced and submitted
in twenty
(20) copies for distribution to all concerned authorities.
Should you have any
cornment
or additional information that
need
to be incorporated
in
the Report,
please
feel free
toget
in touch with
us.1.
DirekturJenderal Bina Marga2.
Inspektorat Jenderal, Kementrian PU3.
Direktur Transportasi - Bappenas4.
Direktur Pengelolaan Kas Negara (PKN), Kementrian Keuangan5.
Direktur Bina Program, Dit.Jen Bina Marga6,
Direktur Bina Teknik, Dit.Jen Bina Marga7,
Direktur Bina Pelaksanaan Wilayah l, DJBM8.
Biro Perencanadn & KLN, Kementrian PU9.
Kasubdit Kawasan Strategis dan Andalan, Kementrian Dalam Negeri10.
Kasubdit Pembiayaan dan Kerjasama Luar Negeri, Dit, Bipran, DJBM11
.
Kasubdit Wilayah I B, Direktorat Bina Pelaksana Wilayah l, DJBM12.
Kasubdit Wilayah I C, Direktorat Bina Pelaksana Wilayah I, DJBM13.
Kasubdit Wilayah I D, Direktorat Bina Pelaksana Wilayahl,
DJBM14.
KepalaSNVI
Pembinaan Administrasi dan Pelaksanaan Pengendalian PHLN15.
TheWorld
Bank Task Team Leader16.
PT. Perentjana Djaja17.
Yongma Engineering Co, Ltd18.
PT. Epadascon Permata Engineering Consultant19.
FilePT. PERENTJANA DJAJAin subcbnsultancy
with 6
Yongma Engineering Co. Ltd and EfPT, Epadascon Permata Engineering Consultant CTC Office: Jl. Ciniru Vll No. 25, Kebayoran Baru, Jakarta Selatan, 12180.i
I I
iii
ii
ji'
#j
ijr
iE
h
.f
3 ,.'
$
s?!
E3
i
E'5
I
s
#
F
C'
lll
?
o
E
E
fi
F
s
E RlI r" +t
{
I
Table Of Contents
Executive
Summary
...,....1
1.1
Current lmplementation
Situation
...
....,...,.1
1.1.1
CivilWorks
...1
.
1.1.2
Consultancy
Services
..._..
...,.,,.3
1.1.3
Goods
...2
1.2
Current Status of
Loan
...4
1.3
Current
Problems
and Action
Required...
...4
General
...5
2.1
Reporting Requirements
...
...,.5
2.2
Loan
Status...,...
...,....5
2.3
Financial
Management...,"
...6
2.4
Project
Cost
Monitoring...
...6
2.5
Bank
Mission...
...6
2.6
Project
Steering Committee
Meeting
...8
Project Management
and
lmplementation...
...,...,.9
3.1
Procurement
Status
...9
3.2
lmplementation Status
-
CivilWorks
...9
3.3
Variation Order
Details
...13
3.4
Consultancy
Services
...13
3.5
lmplementation of the Anti-Corruption
Actio
n
P|an...
...15
3.6
lmplementation of
the Environmental Management
P|an...
...16
Workshops
&
Training
...17
APPENDICES
Appendix
1Appendix
2Appendix
3Appendix
4
Appendix
5Appendix
6Appendix
7f
Appendix
I
Appendix
9Appendix
10
Appendix
11Appendix
12
Appendix
13
Appendix
14
Appendix
15
Appendix
16
Disbursement
and
Expenditures Status
Report
At
The End of
The
Quarter
(June
30,2014)
Detailed Summary of
the
Project
Cost
Monitoring
Procurement Management of Civil
Works
Procurement Plan
for Consulting
Services
List
of
Names
of Community
Representative Observers (CRO)
Anti
Corruption
Action
Plan (ACAP)
Activity
Progress
of Community Representative
Observers (CRO)
List of Appointed
Third Party
Monitors (TPM)
Progress of Third
Party
Monitoring (TPM) Activities
Complaints Handling Mechanism
System (CHS)
Work
Activities On
Publication/Disclosure
Environmental Safeguards
Environmental Management Plan
(EMP)
Compliance
Status
of
Monitoring
of Environmental
Mitigation
Overall Land
Acquisition
Status as of
June
30,2014
2014
Quaterly
ProgressReport
2noQuafter
: April-May-June
Executive Summary
1.1
CurentlmplementationSituation
1.1.1
Civil Works
lmplementation
of
the WINRIP
Project
is
scheduled
to be
implemented
into
three
(3)
AnnualWork
Programs (AWP's).
AWP-1
original
(procurement)
in
2012.
implementation
begun
with
the
pre-construction
activities
mid 2011 and
the
actual work implementation started
in
mid
I
AWP-2
consist
of
three (3)
implementation
stages. The
1''
stage
is
the
preparation
of
Tender
Documents (construction drawings,
bid
documents,
special
specs and other
related
documents) by Design
Supervision Consultant
(DSC)
and
Project Preparation
Consultant
(PPC),
2nostage
is
the
procurernent
of
Works
(Prequalifications,
Post
Qualifications
and
Tendering)
either
thru
International Competitive Bidding
or
National Competitive Bidding and
the
3'ostage
is
the actual
implementation
of
the Works. AWP-2
was
originally
scheduled
to start
in mid 2013 and
to be
implemented
at the
beginning of
Year
2014.
AWP-3
implementation
stages are
of the
same sequence with that of
AWP-2.
The
only difference
is
that AWP-3 is originally scheduled to take-off
beginning
the
1"
month of the Year 2013 and
to
be
implemented in
the
1't
month of
the
Year 2015.
But
to
due some
unavoidable circumstances,
the
original schedules
incurred
delays.
Actual
implementation status are shown in
Table
1.Table
1)
Under construction
2 Nos..AER
NOL issued
byWorld
Bank
1
No.
Revised AER
for resubmission
toWorld Bank
1
No.
BID
preparation (Post
Qualification)
4
Nos. DED Road
Safety
revision
1
No.
DED
1
No.
AER
NOL issued by
World
Bank
2
Nos. BID
preparation
(Post Qualification)
5
Nos.
DED
(2 Nos. Proposed
to
be2014
Quarterly
ProgressRepoft
2noQuafter
:April-May-June
For
contract packages
under AWP-2 and AWP-3
which
have
a
combined total
of
17 sub-projects (Packages),
a
consolidated updated
status
ending
on
the
2ndQuarter
of the Year
2014
are
presented
in
Table
2.
1.1.2
Consultancy
Services
1.1.3
Goods
At the
end
of
this
reporting
quarter, no
goods
were
procured.
12Nov
201211 Jun 2013 19 Jun 2013
Capacity Building
for
Disaster Risks Reduction
Capacity Building for Environmental Managem ent
2014
Quarterly
ProgressRepoft
2ndQuafter
: April-May-June
Table
2
A oigwcoGuEb^ , 3P-t{6h1s!4ilU1 IFE{ShabEFdre)
I 84kdlFtstuEyaehR+d(AERJbsdm6sbbva
C &bHEryheiq&sansEbbFpad = 2P-k€6h1sE/SDAL{eRk!uPDri@)
D PecuemdlPrPab Utury - Sffi, 8dry D.heA NBo) sd orFF E56naE (OE) ee derf Eidabn
E ErySAudrRd by DiEchEdTrMbl& F Techbalbsbntuvbw isoFsci4
G tuvised APlb.bn &ahbn tuFd (AR) Mot*rbn Lelbr (rc1) hsd t W Brief Su mm ary Status as of lhe 2n d Quarter of Year 20 14
GEUP hck
No Loan Package flem
L.igh cost PIP Mar
2012 {Ercl,
DED
Tehnid htign lod Sald
tudi EnviFnmnlal Soc a lind lcqulslllon
bnhd
lmphHhton PLn Remds Sletus
Km) m (l0R Milion) Slalus &! Bdgd Edd
shd Du6fon (tonrkl
itur' Bh 25 7 1€ 0s@ SRE AMAL
No1Al?)
2O1O E AMAL
suHitK oK 2012
1 mLWB4 U'
13 2 pLWB
S.hrPJN
w1, 21@
{q9
D73$b )R8WG
PLWB13ft 12 2 ftdnn
m% 21 00
Bftse
Uh
lawh' P&E Wd J2 lQ43 4 CK PJN2OlO FLWB13fu g% 2400
6 2i4 10 sRa
K&UR
D1O &KT?UR rcLWB 10b
12 2 OryhH 00r 24 00
55 t6m u@R oK &hi1
n11
l btw 10k
0./, 1600 B
6 25 72018& U@R oK MJ 2011
1 rcLWB20No rc13 ?
BddiE t6 00 D
5 7 96921 @ oKnru 2014 T.rgeiJut 2014 tiE O b5 2t 0c E
I E Koh PdEmM- &Eryh 468 lB 26m AMAL oKnru 2013
JUV 2014 &r2014 21 00
7 1983 fi U@R oK ffJ 2011 2010 id5 200
3
10 41617 & oKnK 2013 IersetJut 2014
Oc(2014 24 00
51i I'6TN ATOAL 10% tir.11 2t:l G
12 5s2 6 1?194m AMAL oKnK 2014 TaeelJut 2014 b5 21 00
t3 $3 7 %1519 Uffi OK PJN2011 !r3
zTdgel h m14
edq 21@ G
1i8,9S@ 0i e*E J415 zw G
2\
I5 b t42n@ UKruR oK &Bi1
rc11
1rcLm:ftb
n14
ZT'FI b 2@
6
il5
t10F_o AI€AL w 2014
zTarcet k n14
Jd5 a.m c
rE8[G6!!Bd!.
17 SpGnEKehah PqTanp* lq2$@ A@AL(b 1
&17) oK uJm11
1uffii18
Sq 2014
zTagel b
n14
Sah.PJN
0n qits 200 G
8 F8 6q2$@ ururuR oK uJ201 SabrPJN ibhm OU Ocf15 t8 0c c
t9 6 325$ q UKIJR oK trJ2011 413
m14
Bddig 0c115 t800 0
n 515t m u[ruf, oK uJ20t1 Sl.breO( ocf15 8@
2l t6 I 65tS m U&ruR oK ilJ 2011 it.EE Ou ocr 5 800
2\
[image:8.596.43.555.40.769.2]2014
Quarterly
ProgressReport
2noQuafter
: April-May-June
1.2
Gurrent Status
of
Loan
At the
end of this quarter
(June
2014) some
USD
6.26
million
of
the
USD
101.50 million forcasted expenditures
representing 2.51
% of the
available
loan had
been disbursed. Disbursement
is
considerably behind schedule
by
38.09%
of
the forecast expenditures,
while
40.60%
of
the
time
has
already
elapsed with
the
main reason
for the delay
being
the long
period waiting
for
the
implementation of
the
remaining civil works contracts and
slow
progress
of
the
four
(4) on
going construction
packages.
:
Total
disbursements
during this
Quarter amounted
to
USD
1.297
million
representing
the
payments
for
"Statement of Work Accomplished' (MC)
and
advance
payment
to civil works
Contractor.
Details
of the
Disbursements
and Expenditures Status
are
presented
in
Appendix
1.A
more
detailed
and
updated
status
of
the loan are fully
described
and
presented
in
the
Fifth
(sth)
Quarterly
Financial Report covering the
2ndQuarter
(April,
May, June) of the
Year
2014
which will
be submitted separately.
1.3
Current Problems and
Action
Required
4 no. packages Construction Stage:
Relocation of existing utilities, routine maintenance works, roadway excavations (side cuts), em bankment formation for roadway widening,
construction of stone masonry side ditches and restoration of deteriorated
Contractor
DSCCivil
Works
Project ManagerAWP-2 & AWP-3
4 no. packages procurement stage
3 no. packages procurement
preparation
4 no. packages DED/RSA review
2 no. packages under evaluation
and proposed to be replaced
4 no. packages DED
Procurement committee Civil Works Project Manager
Sub Directorate of Environment & Road Safety, DTA
-
DGH DSCTerms of Reference
On-going preparation
Sub-Directorate of Environm ent
& Road Safety - DTA - DGH
Capacity Building for Environmental Management
Terms of Reference
On-going preparation
Sub-Directorate of Environment & Road Safety, DTA
-
DGHTerms of Reference
On-going preparation
Sub-Directorate of Environm ent
& Road Safety, DTA
-
DGHWestern Indonesia National Roads Improvement Project
2014
Quarterly
Progress Report
2noQuarter
: April-May-June
General
2.1
Reporting
Requirements
Quarterly Prooress Reoorts: This
is
the Second
(2^d)
euarterly
progress
Report
as
required
and
stipulated
in
CTC's
consultancy contract
and
the
Loan
Agreement. Prior to the production of
this
report,
Monthly Progress Reports have
been
prepared
and
have
dealt with
all
aspects of the works.
This
report attempts
to
bring
the
situation up
to
date
by
covering
overall
progress up to the
end
of
Second
(2nd)Quarter of the Year 2014.
Financial Monitorino Renorts: These
have
been
prepared
for
each
quarter
since
the
beginning
of
2013
with
the first
Report,
issued
in
May
2013,
covered
the
period
January
-
March
2013.
Since
that date
quarterly
repofts
have been prepared and submitted regularly,
Financial Monitoring Report No. 1 January 2013
-
March 20'13 15 May 2013Financial Monitoring Report No. 2 April 2013
-
June 2013 15 August 2013Financial Monitoring Report No. 3 July 201 3
-
Septem ber 2013 15 November2013Financial Monitoring Report No. 4 October 2013
-
December 2013 15 February 2014Financial Monitoring Report No. 5 January
2014-March2014
15 May 2014Financial Monitoring Report No. 6 April2014
-
June 2014 Under PreparationCTC
Monthlv Proqress Reports:
These report have
been
prepared
covenng
each
full
month since January 2013.
Subsequent
reports have been
submitted
on
a
regular monthly basis.
Loan
Status
The agreed allocation
of
loan
funds from
the original loan agreement
together
with
the
%
disbursed
to the
end
of the
quarter
date
(June
30,
2014)
ispresented
in
Table
32.2
Table 3
Category
1 Patl1
Bettement and Capacily Epansion of National Roads.
220100,000 00 1,297,074,70 2,732,200,92 4,029.275.62 '1 83
2 P art2
lmplmentation Support
1 6,000.000 00 000 1,574,976.48 1,574,976 48 984
3 Part 3
Road Sector Institutional Development
1,000,000 00 0,00 0 0 0
4 Part 4
Contingency for Disaster Risk Response
0 0 0 0
Unallocated 1 2,600,000.00 0,00 0 0 0
LN 8043 DA-A 0 659,358.52 0
Original Loan
Amount 250,000,000.00 1,297,074,70 4,307 ,177,40 6,263,6'l0.62 2 5',1
2014
Quaterly
ProgressReport
2ndQuarter
: April-May-June
2.3
Financial
Management
S-Curve
for
Financial
Progress
A
report at
the
end
of
the
quarter
(June
30,2014)
is presented in
Appendix
2
Project Cost Monitoring
A
detailed summary of the
project
cost monitoring
in
tabular format
is presented
as
Appendix
3
at the end
of
this report
Bank Mission
A
World Bank
mission
took
place between
April
28
and
May
13,2014
to
review the
implementation
status
of
the Western
Indonesia National
Roads
lmprovement
Project
WINRIP). The
mission
was
comprised
of
Elisabeth Goller (Task
Team
Leader/Sr.
Transport
Specialist), Amilia
Aldian
(Transport Engineer), Budi Permana
(Procurement
Specialist),
Agus
Sjamsudin (Road Engineer),
Maria Jos6
Sala
Pelufo
(Transport
Specialist),
Novira Kusdarti
Asra (Sr.
Financial
Management
Specia list),
Ach
mad Affand i Nasution (Gove
rnance
and Anti:Co rruption Specia
list),
Dennie Stenly
Mamonto (Environmental Specialist), Francisca
Melia
Setiawati
(Social, Land
AcquisitioniResettlement Specialist),
and
Yulita
Sari
Soepardjo
(Team Assistant).
The activities
of the
mission during
April-
May
2014
are
summarized in
Table
4.
)
2.4
2.5
WINRIPACTUAPROGRESS UPTO JUNE2014 AND FORECAST UP TO DECEJIIBER2t)lT
100.o0 90 00 80.o0 70.00 60.o0 o o fr so.oo
I
:R
- 40.o0
30 00 20.00 10.00 0,00
uevraflon = s.o9? ACTUALJUne 2014
E frpefilittrsi
5.26mil|'2.s7%l
{9C*Jn"Cor}"0"'9
J,"J./
2014
Quafterly
ProgressRepoft
2noQuafter
: April-May-June
l
Table 4
Included
in
the Agenda
as
part of
Aide
Memoire
taken
up during
the Bank
lmplementation
Review
Mission
is
the "Agreed
Key Action
and
Plan"
which
is
to
reviewed and updated
every
month.
Table
5 shown
the
recent updated status of the Action Plan
Table
5".J
Kick-off meeting in DGH office
29 April-4 May 2Q14
A
number
of
meetings
were held
during
this
week6 May 2014 Travel to Padang
7 May 2014 Site visit
to
Package#
21,
8,3,
2
Meeting
with
Contractor
todiscuss
Package#
2
&#
3 status
8 May'2014 Site visit
to
Package# 20
andreturn
to
Padang,
Meetingwith
Project lmplementation Unit
to
discuss DSC Status
9
May
2014Return
to Jakarta19 May 2014 Wrap-Up meeting was held
on
19 May where the content of theAide
Memoire
was
discussed,
A
copy
of the
final
AideMemoire, edited
to
include
only
it's
relevancyto
WlNRlP,
is presented as Annex No. 1 to this report.Status
as
ofJune
2014
No. Action ByWhom Target Dates Status
1 Prcject reviews DGH and Bank Monthly Done
2 Request replacement of the CTC's team leader and send
CV to the Bank PMU May 9, 2014 Done
Review ToR for Capacity Enhancement on Disaster Risk Mitigation and translate into English
PMU and CTC / The Bank will review the TOR in oarallel
May 30,2014
Draft English version
is
reouestedto
send tothe WB informaly4
Send written confirmation to Bank where the DGH's environmental department states that package 1 (Krui-Biha) is covered by the AMDAL for packaqe 17
PMU May 14,2014 Done
Complete and send to the Bank: - AMDAL for packages 7 , 12 and 14 - AMDAL for packages 1 1 and 16 - UKL & UPL for oackaoe '13
cTc
End 2014of June,
7,12,13,14 Done
11,16 TLKJ
8 Hire consultant for the upgrading of the SPPL to UKL &
UPL for oackaoe 4 PMU May 30,2014 Done
o Complete and send to the Bank UKL & UPL for package
4
cTc
September
2014 Under process
10 Submit LARAP documents for packages 7,8, 1O and 12
for Bank review DGH July 2014 Under orocess
11 Submit to the Bank the LARAP monitoring report for
Packaoe 2 (social asoects) PMU June 2014 Under process
12 Submit to the Bank the remaining LARAP monitoring
reoort for Packaoe 3 PMU May 30,2014
Submit to
WB June 1113 Submit to the Bank the monitoring reports for packages 6,
11 and 19 (social asoects) PMU August 2014 Under process
[image:12.596.80.542.37.352.2]2014
Quarterly
ProgressRepoft
2noQuafter
: April-May-June
No Action ByWhom Target Dates Status
14 Submit to the Bank the monitoring report for packages 13
and 15 (social asoects) PMU
December
2014 Under process
15 Submit to 21 the Bank the LARAP for packages 14,20 and PMU October 201 4 Under orocess
to Action Submit to Plan the for Bank the Packaoe approved LARAP and signed
16 PMU May 30,2014 Done
1a Submit to the Bank the monitoring report for package 17
(social asoects) PMU
September
2014 Under process
18 Complete NCB bidding documents: Discuss and reach
agreement
MPW (Bintek and
Pusdata) and Bank
May 2014 1 1 June
19 Submit to the Bank the revised AER for package 17 and
AER for packaqes 5. 1 1 and 1 3 MPW
End
of
May2014
17, 5, done 11.13. June 16
20 Update procurement plan and submit to the Bank for its
orior review CPMU and MPW May 19,2014 June 1 1
21 Submit to the Bank the auditing report of the 2012 and
201 3 financial statements PMU June 30,2014 Under process
22
Submit to the Bank the revised PMM, including the web application and the revised Complaint Handling Mechanism
PMU
End
of
June2014 Under orocess
ZJ Organize training on anti-corruption for the TPM team and
cRo
cTc
Before June 2014end ofLampung
5-6
June,Padanq 18-19 June
24 Submit to the Bank quarterly progress reports PMU
Quarterly; first
progress report for
2014 to be submitted by
Mav 3O. 2O14
Done
zc Finalize ToR for technical and proposal financial audit and submit to DFET for funding
DGH (team leader for EINRIP) and Bank
May 2014 June 30
zo
Make sure that adequate budgets for LARAP
implementation are allocated in 2015 for packages 14, 1 6,
20 and 21
DGH
Through 2015 budget oroDosal
Will be
checked toLocal Government &
Balai lll
27
Submit additional LARAPS for packages #2 Padang Sawah -Simpang Empat and #3 Manggopoh -Padang Sawah (see Annex 5)
U(,I-1 End of May
2014
#2, June 30
#3, June 1 1
28
DSC to inform the PMU and the Bank about the deadlines
for engineering design and review/approval of slope protection design completion and the nomination of the
chief inspector for packaqe 4
DSC End of May,
2014
Will be checked to DSC
29 Carry out environment and social management training
for DSC field engineers/staff of contractors
cTc
Before end of May and regularly
aftemards
Lampung 5-6 June, Padang 18-19 June
)
2.6
Project Steering Gommittee
Meeting
Meeting was held in
June 26,
2014
for
the
Monitoring
Team
of WINRIP Steering
Committee.
2014
Quafterly
ProgressRepot
2noQuater
: April-May-June
]
Project
Management
and
lmplementation
3.1
Procurement
Status
(A)
Civil
Works
Civil Works
are
now being
implemented
in
Annual
Work
Programs
(AWP)
which have
been
numbered
AWP-1, AWP-2,and
AWP-3.
All
four
(4)
AWP-1
contract
packages were signed
by the
end of 2013
with
actual
work commencement
on
January
2014.
During the Second Quafier of
Year
2014, three
(3)
contract packages
for AWP-2
and
one
(1) contract
package
under
AWP-3
are
under
final
procurement
proceedings
with the
finalization
of the
Application
Evaluation Report
(AER) of
prequalification documents submitted
by Applicant
Bidders
for
submission
to
World Bank
to
request
for
concurrence
and
issuance
of
No
Objection
Letter
(NoL).
Presented in
Appendix 4
is
the current status
of
procurement
management,
(B)
Services
The
Core
Team
(CTC), Design
&
Supervision Consultant (DSC),
and the
others
Capacity
Building Consultancy
status
are
discussed
in
Section
3.4.
The
others
consultancy
packages are as
follows
:1)
Capacity
Building
for
Disaster
Risks
Reduction
2l
Capacity
Building for Environmental
Management
3)
Capacity
Building for
Road Safety
Finalization
of
the
TOR draft
for the
above 3
consultancy Packages
are
being
prepared
by
Sub
Directorate
of
Environment
&
Road
Safety
-
Directorat of
TechnicalAffair
- DGH
3.2
lmplementation
Status
-
Civil Works
AWP-1
Packages
All four
(4)
contract
packages
scheduled under AWP-1
are
currently
under
construction
by different
Contractors. Commencement of
Works
for
all
the
four
(4)
packages
commenced on the
2noweek January 2014.
As
of the end of this
reporting
quarter,
mobilization stage
for all of
the
four
(4)
contract
packages are about
to
be
fully
completed.
Other activities
done during
this
quarter were
the
completion
of
base camp construction
in
all
packages,
relocation
of
existing
utilities, routine maintenance
works,
roadway excavations
(side
cuts),
embankment formation for travelled
way
widenings, construction
of
stone
masonry
side ditches and repair and restoration
of
deteriorated existing pavement.
Table
6
presents
the
current work progress of the
four
(4)
contract
packages.
2014
Quarterly
Progress Repoft
2ndQuafter
: April-May-June
Table
6
AWP.1
1
Jaya Konstruksi Manggala Pratama Tbk
Biha - Krui 18.055% 2.t07% -L4.348% 640 lan,8,2OL4 Oct,9,2015 L74 27.19%
z
Jaya Konstruksi Manggala Pratama Tbk
Padang Sawah
-Sp. Em pat
incl.Air
Gadang Brd
7L.976y. 7.6tO% -4.8L5% 730 lan,6,2OL4 lan,5,20t6 L76 24.Lt%
5
Jaya Konstruksi
Manggala
Pratama Tbk
Manggop
on-Padang Sawah
7.45O% 5.450% -2.000% 730 lan,6,2O14 Jan,5, 2016 L76 24.L7%
4
PT. Waskita
Karya and PT. Mulya Turangga
(ro)
lpuh
-Bantal 9 840% 0.770% -9.Or0% 730 lan,lO,2Ot4 lan,9,20L6 L72 23.56%
The
current progress
of
works
of
the
on-going
four
(4)
construction
packages
were
all
lagging behind schedule.
Based
on
previous month progress, the
trend
shows that all
contract packages
are
leading to
a
downward trend with
respect
to
slippages
instead
of attaining
a
good
progress to
offset the
previous negative slippages.
In
particular, Contract Package No.1 (Biha-Krui)
and
Package No.4 (lpuh-Bantal)
are
at
currently
on the
critical level
due
to
excessive negative slippages
of
-14,348%
and
-9,070ol0,
fesp€ctively.
lf
no
realistic
action plan is implemented,
the
slippages
will
keep
on accumulating and there
will come
a
time that
the
project
will
be out of control,
CTC have called
the
attention
of
DSC
thru
official letters
way back
in
May
2O14
and
earfy part
of
June 2014
regarding
the
negative slippages,
but CTC
never
received response, to
those
letters issued
to
DSC.
n
Sfrow
Cause Meeting
to
address
the slow
progress
of
Package
No.4
(lpuh-Bantal)
was
held during
the
1't
week of June
2014. lnstead of
catching up with
the
schedule, the
more
the
negative
slippage slipped
down
from -5,465%
the
previous
month
to
-9,O7OTo
this
month.
lt
implies
that
the
agreements
and
commitments
from
the Contractor's action plan
were
not
effective to
address
the
issue.
CTC
suggested
that
DSC
shall
initiate
to
schedule
a
high level meeting
to
be
attended
by no other than the
Contractor's principal together
with
the
higher
authorities
of
Project
lmplementation
Unit
(Balai)
in
order
to address
this
issue.
[image:15.596.52.574.35.728.2]2014
Quafterly
Progress Repoft
2noQuafter
: April-May-June
Further suggested
that the
Contractor
shall
present
a
workable
action
plan
and
catch
up
schedule
with
commitments
to
infuse additional resources
such
as
financial
resources, mobilize additional manpower and equipment
and if possible
the
action plan shall
be
implemented on a two (2)
shifts
per
day
basis.
With
respect
to
the other two (2)
contract packages, Contract Package No.2
(Padang
Sawah-Simpang Empat),
and
Contract Package
No.3
(Manggopoh-Padang Sawah),
it is
noted
that the
slippages
were still in
a
manageable
levels,
-
CTC
suggested
that
the
DSC shall
closely monitor
the work
activities
of
the
'
Contractors in order that the slippages can
be reducdd
or
even
attain
an
ahead of
schedule
progress in
the coming
month.
Most
of
the delays
incurred
were
attributed
to
difficulty
in
locating suitable
base
camps and quarry
sites
of
unlimited
quantities,
frequent
out
of
project site
of
the
-;
Contractor's Superintendent
and Site
Manager,
delayed
production
of
crushed
aggregates and limited monthly operating expenses.
Another factor
which
may have contributed to the
slow
progress
of
work was lack of
close supervision
from the
DSC
due to
inadequate staff.
During
this
period, in particular during
the month
of June
2014, there
was
no Team
Leader due
to the
resignation
of the
originally nominated
Team Leader.
lt was only
on
the
last
day
of June
2014 that
the replacement
Team
Leader
rnobilized
to
the
project.
In addition,
both Chief
Inspector/Quantity Engineer
of Packages
No.3
and
Package
No.4
resigned
from
their
respective assignment
and
replacements
are
still
to
be
appointed at site.
-)
For contract
packages
under
AWP-2
and AWP-3
which
have a combined
totalof
17 packages, a brief
summary
of the actual activities and status as
of this
reporting
period are
presented
in Table 2, page 3 of this Report.
AWP-2
& AWP-3
Packages
Application
Evaluation
Report (AER)
for two
(2)
AWP-2
packages.and
one
(1)
AWP-3
package
were accepted by the World Bank with
the
issuance
of
No
Objection Letter
(NOL).
While the
other package under AWP-2, issuance
of NOL
was withheld
due
to comments which
have
to
be
addressed
prior
to concurrence.
As of
end
of
this report period,
the
procurement
status
of the four (4)
contract
packages are shown
in Table
7.2014
Quarterly
Progress Repoft
2noQuafter
: April-May-June
Table
7
The
status of
the
remaining packages
are
shown
in
Table
I
Table
84
I
Psr.
Pedati-
Kerkap
6c
c
2
Indrapura
-
Tapan
7c
e
Bts. Pariaman
-Manggopoh
8c
4
Rantau Kijang
-
Kota
Aouno
5
Sp. Empat - Sp.
Air
Balam
10c
6
Kembang
-
Indrapura
12c
a
T
Painan
-
Kambang
14d
Sibolga
-
BtsTapsel
15c
I
Seblat
-
lpuh
'1610
Mukomuko
-
Bts.
Sumbar
1B11
Lais
-
Bintunan
19c
c
12
Lubuk Alung - Sicincin
2013
Lubuk Alung
-
Kuraitaji
213
4
4
94
Notes
:Packages
No.
9
and 18
areproposed
to
be
deleted
and
tobe
replaced
by
two
(2)
roadlinks
located
in
Sibolga
City,Sumatera
Utara.
Legend:C-Completed
.,/
-
On Going
*
-
Procurement Type
[image:17.595.36.545.53.791.2]2014
Quafterly
ProgressRepoft
2noQuafter
: April-May-June
3.3
Variation Order
Details
There are
still
no Variation Order initiated
by
either
the
DSC Consultant
or
the
Contractors
of the four
(4) civil works contract
of the
on-going contract
packages
as
it
is too early and the
current activities
are
mainly stockpiling
of
roadway
material, production of crushed aggregates
and
minor roadwork
items.
However,
in
anticipation
of
future
claims
for
varied works by
the
Contractors,
arevised costs
of
additional
10o/oto the
Estimated
Cost
for
each contract package
was prepared and submitted
to
PMU
to cover any Variation
Orders
that may arise
during
the implementation of the Works.
Consultancy
Services
TechnicalAssistance for
Core Team
Consultant
(CTC)
to
Support the Project
Management Unit.
Lead
Gonsultant:
PT.
Perentjana
Djaja
CTC
Contract
No.
06-20/CTC/TA/LN/8043/1112
was
signed
on
5
Nov
2012
between
the
Ministry
of
Public
Works
,
Directorate
of
Planning,
DGH
and
PT.
Perentjana
Djaja, Yongma Engineering
Co.
Ltd,
PT.
Epadascon
Permata
Engineering Consultant,
JVand the
work
commenced
on
12 November 2012.
Amendment
No.1
to
this
contract dated
25
October
2013
was
signed
to
accommodate
the
increase
in staffing requirements with the
following increase
incost.
Amendment
No.
2
is
still
to
be
officially
approved.
Proposed amendment
to
the
Original Contract
and
Amendment
No.
1
are
additional man-months
for
professional and technical staff
for
international
and
local, replacement of foreign
and
localconsultants
and modification to
various
reimbursables
to
match
with
the
actual requirements. Presented in Table
9
is
the
current status of CTC contract.
Table
9
3.4
_)
'l
2,141,540,0O0
1O%
VAT
131,592
2,242,617,5O0
Total
Amendment
No.
1Variance
Against
Original Contract
* 1,371,925
[image:18.598.27.555.56.805.2]2014
Quafterly
ProgressRepoft
2noQuafter
: April-May-June
*137,192
TotalAmendment
No.
2"24,704,54,150
Variance Against
Original Contract
)
*
Tentativeuntil
Amendment No, 2 is officially approvedCorrections
:lnthe
subrnitted 1't Quarterly
Reportof the
Year 20L4 coveringthe
period January:
20t4
to
March20L4,the two
(2) variances indicated were erroneously calculated dueto
non-inclusion
of
the
I0%
value Added
Tax on
the
original
contract
amount. Hence, those variances shown inthat
Reportare
now superseded by the new figures shown above. CTC apologizedfor the
erroneous figuresthat
were reported,Technical Assistance
for
Design
& Supervision
Gonsultant
(DSG)
Lead
Consultant:
Renardet S.A
DSC
Contract No.
KU.03.01/PPK-PRMINRIP/Bx/01A/\|2O13
was
signed
on
11Jun 2013
between
the
Ministry
of
Public
Works,
Head
of
Regional Office for
National
Roads
lmplementation, DGH
and
Renardet
S.A.
PT
Cipta
Strada,
PT.
Daya Creasi
Mitrayasa,
PT.
Seecons
and
PT. Yodya Karya
(Persero) Joint
Venture
and
mobilized
on
19
June
2013.
Table 10
shows
the
current status of
DSC contract.
Table
10
TechnicalAssistance for
Capacity
Building for
Disaster Risks Reduction
Lead
Consultant
: Still
to
be Procured
Draft
Terms of
Reference in Bahasa
and
English
translation are
under final
preparation.
Technical Assistance
for
Capacity
Building for Environmental
Management
Lead Gonsultant
: Still
to
be Procured
Draft
Terms of
Reference
stillto
be prepared.
Technical Assistance
for
Gapacity
Building for
Road Safety
Lead
Consultant
: Still to be Procured
ll
Original Contract
(exc. VAT)
51,818,705,000
VAT
10%
(GOl Portion)
82.060.00
5,181,870,500
57,000,575,500
[image:19.595.128.561.62.186.2]2014
Quafterly
Progress Repoft
2noQuafter
: April-May-June
3.5
Draft Terms
of
Reference still
to
be prepared.
Procurement Plan
for
consulting services is presented
in
Appendix
5
lmplementation of
the Anti-Corruption
Action
Plan
Community
Representative
Officers
(CRO)
CROs have been
appointed
for
AWP-1
packages
and
those
appointed
for
the
AWP-1
packages
attended
the
bid opening
meetings in,Packages 1 and
4
and
Packages
2
and
3
in
Palembang
and
Padang,
respebtively.
All
cRos
are
university
staff
members
as
prioritized
in
the
PMM and
have
had
extensive
training
sessions.
To
date or
as
of end of this
2noQuarter of the Year
2014,
a
total
of
eight
(8)
have
been
appointed
to
discharge
their
duties
as
independent
observers
during
the
procurement activities.
A
complete
list
of
CROs
appointed
with
corresponding credentials
as
of
end
of
June 2014
can
be
found
in
Appendix
6.
Appendix
7 shows
their
activities since
the
inception
of the
project.
Third
Party
Monitors
(TPM)
During
this
Quarter there
was
no appointment of
Third
Party Monitors, however,
in the
1"
Quarter
at this Year, Third
Party Monitors have been appointed
to
monitor
the progress of the
works for
Packages
1,
2, 3
and
4.
To
date
a
total
twelve (12) appointments have been approved.
List
of
appointed TPM
with their
respective occupations
and
professional
affiliations
are shown
in Appendix 8,
while
Appendix
9
shows
the
past
to
present activities/progress of the
TPM.
Complaint Handling
System
(CHS)
The WINRIP website, which
will
be available
for
reporting
all
aspects of
the
Anti-Corruption
A c t
io
n
Plan
including
the
registering
of
complaints
by the
general
public,
is
still
under
development
although already
running
on
http:/iwinrip-ibrd.com.
Appendix
10 and
Appendix
11 show the
work
plan on
cHS
system
and
Work Activities on Publication/Disclosures.
_)
'l
l
2014
Quafterly
Progress Report
2noQuafter
: April-May-June
3.6
lmplementation of
the
Environmental Management Plan and LARAP
A
project category
is
assigned
depending
on
the
likely
degree
explanation
as follows:
to each
package
as either
Category
A, B or
C
of
influence
on
environmental issues
with
a
brief
)
Category
A
project
is
one which
will
have
a
significant negative
impact
on
the
environment and
may have
an
influence
on
areas outside
the
actual project area. A
project
classified as
such
requires an
AMDAL
(ANDAL, RKL/RPL) study.
Category
B
project
is one which affects
the
people
or the
environment
to
some
extent but with
a
smaller impact
than
a
Category
A. The
required
environmental
analysis
is
a
UKL/UPL study only.
Category
C
project
has
minimal
effect
on
the
people
or
environment
and
an
environmental
analysis
is
not
required.
SPPL issued
handle
any
minor
problem
which
may arise.
All
the
twenty
one (21)
packages require environmental impact
investigations.
There are
a
total of fourty one
(41)
studies
required,
twenty
(20)
for
environmental
impact
investigations and twenty one
(21)for
social studies.
The
twenty (20)
environmental
studies need
the
approval
of the
Environmental
Agency
(BLH) with
five
(5)
of the
studies (AMDAL/ElA)
to
be
approved by
World
Bank (WB).
While
the
twenty one (21) social studies
(SLARAP
and
LARAP) require
the
approval
of
World
Bank prior
to
implementation.
As
of ehd of
this
reporting
period
for the
Second
Quarter
of
thd Year 2014
ending
June 2014, nineteen (19)
environmental impact
studies
has
been approved
by
BLH,
while three
(3) of the
five
(5)
studies that
requires
World
Bank
approval,
Bank
already issued No
Objection
Letter (NOL). The
remaining
one (1)
environmental
impact studies
(UKL-UPL)
for
Packages
No.
4
(lpuh-Bantal)
is
currently
under
preparation.
For
the
social studies
,
twelve
(12)
of the
twenty
one
(21)
studies
were
already
given
No Objection Letter from the
World
Bank (WB).
Appendix
12
details
the
list
of
Environmental Safeguard
and
Appendix
13
describes
the
Environmental Management Plan (EMP) Compliance up
to the
end
of this Quarter
(June 2014).
i
2014
Quafterly
Progress
Report 2noQuarter
: April-May-June
I
Presented below
Table
11
in a
tabulated
format
is
the
current status
of
the
environmental and social studies.
Table
11Note: UKL & UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB.
Status
of
monitoring
of
environmental mitigation
are shown in
Appendix
14
and
Appendix
15 covers the
status of overall
land acquisition.
4
Workshops
& Training
During
this
quarter
(April,
May
and June
2014)
two (2)
trainings
were
conducted
in
Fadang
and
Lampung.
The
two
(2) training
are:(1)
Training
on Work
Plan
for
Environmental
Management
and Monitoring
or
Rencana
Kerja
Pengelolaan
dan
Pemantauan
Lingkungan (RKPPL)
and
(2)
Training
on
Third Party Monitoring
(TPM).
Another training
of
the
same
nature
is
tentatively scheduled on July
2014 in Bengkulu.
-.\
Works
Program
No
of
Packages
No
of lnvestigations
Approval by
RemarksBLH
World
BankAWP-1 4 11
AMDAL
x
1UKL&UPL x 2
SPPL
x
4Full
LAMP
x 41 (AMDAL)
1
UKL&UPL 4 (SPPL)
4
Full LARAP
Approved
-
NOL issued byryB
(LARAP arid AMDAL paket 1&17), except for SPPLAWP.2
I
17AMDAL
Study
x 4UKL&UPL x 4
Simple
LAMP
x
1Full LARAP x 8
4 UKL&UPL
4 AMDAL
1
Simple LARAP;3 Full LARAP
1 (one) Study AMDAL for three packages. Packages No.7, 12 and 14 /packages on AWP2 &AWP3.
1 (one) Study AMDAL for two packages. Packages No.1 1 & 16. /packages on AWP2 &AWP3.
AWP-3 8 13
Full I-ARAP x 4
Simple
LAMP
x 4AMDAL Study x 1= Paket No.1 AWP 1
UKL/UPL x 5
AMDAL OK = paket No.1& 17
AWPl
5 UKL&UPL
1 Simple LARAP;
3 Full I.ARAP
Approved
-
NOL issued by WB include AMDALexcept
for UKUUPLTotal
21 41 Env=20,Soc=21 19 12 [image:22.598.22.553.103.692.2]2014
Quafterly
ProgressRepoft
2noQuafter
: April-May-June
A side from the two (2)
separate trainings
that were
delivered
,
the lWorkshop
for
Finalization of
the
Project Management Manual (PMM) Updating"
was
carried
out
in
an out
of town
venue
in Bogor.
Presented in
Appendix
16
is
the
Summary of Workshop
and
Trainings since
the
project
started up
to
end of this quarter.
c
APPENDIX
1
Disbursement and Expenditures
Status
gE
= EEEJ!
Ea
F F tlt
o9a NOO ooo hoo NOO <-o@ <THN I @ aFN(tlnl n\nc'l
t r\N@r)
N @N€i
N \oNio
o @oi+
F. @6@O
o \DNc)\O
@ Ni@O
idi N I ( l { ! c 3 Og FU
<t
!4t _EO '-9xo
E o4
o r) tl ! N ql N o b Ns
s
m ino@
Fl nnen
o o@hm
N miNol
N Omhh
N mhv@
or @i$$
N Oihi
m o\oih
h iiii
t
,
I I u o E E c c )( t! o o EIa ,12
OE
ii
=o
=L o EL x IJ oEr
.9( -lEr
|J o \o Ns
r
N MN+@
q I'1
..{u)h
@hNst-r o€@v
N tcooror
O m + F...1
N NMN*
q r-1on
vid ( I It EC
s,t
EGJC
To ooN@
\ eenvl
N mq
o io
N $N
o h+
N ii
! t 0, (, g = Ito
o
n sfooo N o s N h N U; N N N {-tr oeE
|Er! o|J JO ooo ooo @iN idq \n-1\
O NMMN
o cn@orcf)
o oi$h
O NONi
o hhNo
q \ryq.t
O iNN@ N iiiH N
EE
s8
F
,€Ft=e
E
E ;3
H$
;g
t g
e
5s
.H$
5s
g
e*E*e
es
c
ibgg $$
gi
'
rF *E:E'=*EcriqisiE*
E#e
$$s
Ere
Ei
*Eaf;qg+['
;
:f,;ggE:3E:Es55ifg:i;E
gg[
$$[
F#E
i
EE
a{ fr! t rno
v,=
g |Jo
--F ) ! -LEgo
EHH
tpse
E.E
g;
fEiH
o gtr
=frE
EP
6
2
c
.Ebb8
EEE;
frfisf;
E
=€
-9
ll
r-E.8
I
I
APPENDIX2
Report
At
The End
of
The Quarter
(June 30,2014)
Appendix
2
Western
Indonesia
National
Roads
lmprovement
Project
Project Report
Format
-
2
Report
for the quarter
ended
on
30-05-14
-)
Particulars
(
Amount
in
US SI
Bank Fund disbursed
till
date
Total
Project
Uses
till
date
Worfd
Bank Share
@
70%
for
CW
World
Bank Share @
LOO%for TA
Worfd
Bank Share @
LOO%for
IOCFunds Undisbursed
to
date
Forecast
for
Project payments
for the
next
6 months
World
Bank Share
@
70%
for
CW
World
Bank Share @
IOO%
for
TA
World
Bank Share @
LOO%for
IOCFund Undisbursed
for
next
6
month
Net
Funds
required from the
Bank
Forecast
for
DIPA
from GOlfor the
6
months
I tl
ill
IV
V
VI
vtl
vill
IX
X
xl
6,263,6L0.62
7,89r,952.55
5,604,252.10
L,501,920.44
73,056.O4
243,736,389.39
8,589,986.t2
6,0L2,637.64
362.25
150.10
228,t52,rL7.47
6,013,143.99
2,576,842.t3
APPENDIX
3
.c P I ! 5 I :c> Ffr Eg dE E€!g d= IEa 5E=
=tE-
o d! E9Ee-!e
;HEg*
€UgTS
cE
i
5-E g-e3E'EE5F€
!e'cEEE:
gEE=EE5
5I'
R d N F N j a @ @ o o t.I
l'
dl sl o E] t-l ? tE
lc IN t@ IN ls_ to t@ EI
U' Y Eo
=
o-J Fo
F sI
6:E
9{ *> kE:
F f 6 E Y= :-<*>
E=t=1
FP3 9g B= F 3 E P I E t{
E e g E t I E'0^
4q v1tr-E;:
oEc :ENF{ $e
FoE'€3is
x:!o
;Egco
-u=E
Ed
6 F6 E h
j
APPENDIX
4
Procurement
Management
of
Givil
Works
u
t
zo
Ei
f5
E-Ets <z EE =E
kE zl,
3fi !45 29 o5
oo
z9
2i
U
F U
APPENDIX
5
Procurement
Plan
for
Gonsulting
Services
z
b
;
E
I
:
t
E a
I
E
o
,5
o e e
E
o
t
e
I
E
5
E
.6
a
I
q I
g
3
n
F s
t 6i
2 o
c
o o
o
@
o o o
o
o
!
FE :.9
::
EE
tr9
OE
xs i8
0-}
)
APPENDIX
6
List of
Names
of community
Representative
observers
(cRo)
Pi-.b
d.YYE
&tjui
reuurM p!€ Jo luaualunouuv
>o
@-N ijj>o
N=>o
z.RP
flo dNfis
o F.! -^F!
XJH
vo->q
Iue€ plroM
uoJJ Jaua'l uorpetqo oN
oq*
$K
@-- -to dN5"r
BK
09-BX
SuruadO p!g Jo ale6 > -dl
;dx
i-li
=HX =@o<dN o > -do =@o =dN p!8 ol uollelr^ul Jo aleo > -o>dR
9=i=
9rin
i5R
=
-P
uorlednslo s,ouJ
o P> E! 9? 6@
='=
>f
F@ LO o! fio,qF
@u
oz
.E o = 6E:
t'i
3o
::>.- c.= F.q3
.:v
nc.>
oEE5
<i6 oEE 6 o l EG E o o r o J .=g !, .:Ai >> t ;ti 'E 6f
=
Eg
c:c
o ;iJ
!tro
E
i+
v!*
i<
g
ox
g
fls
:=
E.;
oo>s
Ez
9! :q o>oEq
EE
3;
H-3'i
!t.-ir :6o U t U
eul
a !o ! .! B o o o c cAl --l.= >l
RAi auoq0alsI € o o € r N 4 € 0 n rN € 4 $N rm r@ @@ N'N @6 N N @ o N N N @ N 6 € + N o rr o € o N n @ ts o N
ssoJppv s,ouf
d-;E E- gi
8!€i
o=9i
rFei
=o-'r
dFE!
cs
O:=E}
L4 h;XZ
ct z -u ;E iid +! -o =o CE 6l 6Y3{
o+ Eau
FJ:I!
960
p
>e
U6 (9d c F.'
e{
=z
39
J@ Pc -6@q*q
E<
UOci
o-co
z
6U >c Q6 L:<'
.NoiU
M; C
E ^--g Ed*
9d*
.-2.= H.!_5E5
4YX=A=
bo 'E @ G .9g
o &, L) Erc.r r. =zqooFo:= c=
x^- = v=+
=.=:s -EE
z ^r,
dO
@z
o
o
ai!
.q ,{o
Xovo =o LZ o @ .:o
=E
ni! Xo vo Zo tZ 6 6ip
-:
=i9o
H! X=^-:
-cG -Erzx
a6
6za1e6 3u1u1et1
>RR
> -dlN N ar-l
>E
:N
z
i! d)
gN
R"r
sx
aleo uorpalas
di >=
sx
N- .r >:
gx
ra i\d-l;-R.r
>Esx
ouf
papalasJo ar!eN5 o!
_:3
its c-YQ >6;s
>=
:d ;^i q -c dE.i>
g o N:
d o n c =z
E = :F5>
o!! NE d96,i >
=>
i:h
GX aBelce6 o;=
;,H
4ci
AE
uo
o
o
@
a8elred 'oN N a3u r^ord
@ f c 6 e
E9
o6}E
=B9
oo
3E
5 ao@
z
N mc .9 G o.
:
o
.= g OJ (o EE
(o E tr (os
o L CJ P I q) J:=
3 L VI L o oo OJ z.=
c J o .= o CL c) L (J o J .=g cj.:
fE
E (U .E E E oU
oU
(U E o o CL o c .9 .2 E (E (u -.=n f, g (o s o L CJ P IJ o .=q of
!
o $ L c) 0) J .=q o.:
=
=tc o=
o (J '5 o V' qJ E o f() oo
o E(! (u -L l r!--clo o o (o (E 3 tt, qJ oo oz
:g g OJ .=o-ts
o L OJ (J (u Jo
c, IJ !, o Ig
o lh o o E oz
'ii
N (o J 5 J .j E=
L c\i (J ttl J vl (o rj .jc
IJ:
t
a
t F E o, o (go
r! N f-f!o
c..i b0 l!t
o
t F uo F s:
d (tl LE
(! N tjo
+
o CL^i
F F vlc
.9z
|! J ! |! v1 ..i F (! I (Jc
! =t5 '6 N i c\i o q0 o J(J o4
(E co I L \Z ci tr th '(! -CO-EE
a tLlttl <; o-Ti
€€
o->
o;
$,;
ct (o (o co CL o blctg
zi
t! 4 Flo
(\|o
(no
o
slo .g o 4 o-E J (E (u tr tt, Pq CJ
=
(E c, (! E = ttl 0)=
J (u co oz
(\
(n sf^-)
J G E 0r c
'-ogr
e= UO - b! >q+
4
.S.s$**E
=aiH
6€?i
v C Ya -:i=Ees
E€$fg
usi$lt
-:i6bf
geEgg
*:J C fi
E F
9)
FT;
E
P€
e;E€E
€ hS q o
E
5F
i
F+EE€'F
q c.= EF
€FEEI
.3E!:*
eE;€;
E€g$"$
z=59t;
..9
-_g 6O >h =s EOEi
oE
N=#s
?g
gr- u
H.S i;c l!.f
,9Y
>Y
,=> e.E o(=.s
l-s*-6
EO1€
c-oc.t9
Oig{E
E.E
co{E
=u
€h;
EEfr
!uHxEg
5.o 6.:
oE
EJ 6O >h q€ EO '=> L:F od m= gq rjr co:9
-@- @:f .g i;tr =6 ,PV.U .=>9f.
de
.=g
rs
E-e
!@:5
ET
gfi .=H EI EO G9 .+Ei =Q?E
n!
Fb
EU&3
e$
-oz
E
H
FE
*f
Es
!
@-^-EfsE
u: o, H 6: g
..>
E
F,g€aL
.;9*Eg
B:
$ E
FE€;98
gel'OdEE,i.s+ !
^v;--:e
EIFgI
3bq.lt
=';s: tj
E!3;€
E55EE
^
Pt
E
*
3i-8
E
P
;
HE=6-@
E#EE:F
;aE;E
tEsis
E>59;
q o os
u @ E -g6 @r
;
z
!€
oz
T J o u =z
o U o E L o ctz
o J =z
@ @ o O F\z
6 4 qz
= -@z
o 6 u E"=i
gc
R"r
:'
>E
F-'
i\m
>E
g-
{i
g;i
€a
!I
oR'.
>E
5-F.'i\9
-o
5^
R,n
>E
5^
o H Jg G c o 6 YEH
.q: -,o EE E. x@ ii3s3
:ri
ta
@ @ 6 ! i(ii
( No m $o u o o U 6 iig
<E
g69
o635
uo@
o
z
.:
Bo
c
(J o q o CL oc
os
.Eo
Eft
95
ii
o. ^-= eoo>=t
EP
(,|!Oo
E
(r'
EOEEEI
EOE
E€=
Ea
mo
N m E. o at, m Ho
N @ ct AJ vl d')o
N oo Ha
AJ u', rn do
(\
oo r{ CL c, tt,rg
oF!'E
E'E
3R
Sp
oo.'
-Fd
>o
=N Fd>o
5N
09m>o
ENb.Eo
fiEE
Fi ao!>6
j-
gH
R-F.'
;{
o?>E
5^
o h0 o J 9{
(o in Yi8_
g,F
t, cL
<iE
$H
EE
(o |D @ = CL o !0ctg
2E
oa-o
No
ano sfo
o I
c
o o. b0 ct o J g OJ |E E V, o=
g OJ (o E t ttl 6 o)=
5 J bI) o) co oz
N (Y) $)
APPENDIX
7
Anti
Corruption
Action
Plan (ACAP)
Appendix
7
ACAP Activity
Progress
Activities
Progress
of Community Representative
Observers
(CROs)
from
January
2OL3-
June
2014 and
the Works
Plan
I
No Su bject of Activities Date of Finish/
completed
'J_.
Orientation
and studied of WINRIP documents and Development of Works plan January 20132 Prepared of Workshop of Procurement Document Evaluation. February 2013
3 Conducted Workshop
of
Procurement Document Evaluationfor
pOKJA, Satker/ppK,Balai BBPJN and PMU.
Febr.28,20t3
-March 01,
2Ot3
.4 Provided of Term of Reference (ToR) of
the
cRo's selection and Guidelinesfor
cRo's SelectionMarch 1, 2013
5. Provided
the
Materials (slide Presentation/Power-point) of General Explanations about WINRIP and the CRO's selection andMarch 8, 2013
6. Provided Training Materials
for
CROs. March 8, 20137. Sending an official
letter
No.Hm.0603/Bp-!t/0L75/2013,
fromthe
Directorof
Planning as Chairmanof
PMUto
Headof
BBPJN ll&
1il, about the Selectionof
CROs/WPM, + TOR and Guidelines Document
March 11, 2013
8 Preparation of Socialization on CROs selection in BBPJN
ll
Padangfor
package 02Padang Sawah
-
Simpang Empat and package 03 Manggopoh - padang Sawah, andsocialization on cRos selection
in
BBPJNlll
Palembangfor
package 01 Krui-
Biha and package 04 lpuh-
Bantal.March 31, 2013
v. Socialization on CROs selection in BBPJN
ll
Padangfor
package 02 padang Sawah-Simpang Empat and package 03 Manggopoh - Padang Sawah
April9,2013
10 socialization on cRos selection in BBPJN
lll
Palembangfor
package 01 Krui-
Biha and package 04 lpuh-
Bantal.April
11,2013tL.
Sentthe Invitation letter
from
Head of BBPJN lllto
Rectorof
Universities /Headof
colleges in Palembang, about selection of the cRosfor
package 01. Krui-
Biha (prov. Lampung) and package 04. lpuh-
Bantal (Prov. Bengkulu).May
t7,20t3
12 Sen