PERINCIA
PERINCIAN
N HARGA
HARGA RAB
RAB TIANG
TIANG 1
1
JENIS PEKERJAAN
JENIS PEKERJAAN
::P
PE
EM
MA
AS
SA
A
VOLUME
VOLUME
::1SET
1SET
LOKASI PEKERJAAN
LOKASI PEKERJAAN
:: JJAALLAAN N GGNO
NO
NAMA MA
NAMA MATERIAL
TERIAL
VOL/SA
VOL/SAT
T
SA
SAT
T
1
1 33 44
A
A PEMASANGAN TIANG BETONPEMASANGAN TIANG BETON 1
1 TIANG TIANG BETON 13 BETON 13 METER METER 350 350 dANdAN 11 SETSET
PONDASI TIANG
PONDASI TIANG 11 SETSET
B
B KONSTRUKSI TM.1 KONSTRUKSI TM.1 U/ U/ GTTGTT.. 1
1
LINE P
LINE POST INSULAT
OST INSULATOR
OR
33 BHBH1
1 ARM ARM TIE TIE BAND BAND 8"8" 44 BHBH
2
2 CROSS ACROSS ARM NPRM NP10 ! 2000 MM10 ! 2000 MM 11 BHBH
3
3 BOLBOLT NUT M1# $ 50 MMT NUT M1# $ 50 MM 55 BHBH
4
4 ARM TIE TARM TIE T%PE &50 MM%PE &50 MM 11 BHBH
5 ALLUMINIUM
5 ALLUMINIUM BENDING BENDING 'IRE 'IRE 3(2 3(2 MMMM 55 MTMT
# ALLUMINIUM T
# ALLUMINIUM TAPE APE 4))4)) 55 MTMT
&
& GROUND STEGROUND STEEL EL 'IRE'IRE 8
8 GROUND GROUND 'IRE CLAMP'IRE CLAMP 11 BHBH
*
* LINE TLINE TAP CONNECTAP CONNECTOR 150/&0 MMOR 150/&0 MM 33 BHBH
10
10 NETRAL INSULANETRAL INSULATOR ANSITOR ANSI 11 BHBH
C
C FUSE CUT OUTFUSE CUT OUT
CROSS ARM NP 10 ! 2500 MM
CROSS ARM NP 10 ! 2500 MM 22 BHBH
1 ARM
1 ARM BAND BAND 8"8" 22 BHBH
2
2 BOLBOLT NUTT NUT ## BHBH
3
3 ARM ARM TIETIE 22 BHBH
4
4 CUT CUT OUT OUT 20KV 20KV 12(5 12(5 +A,-USE +A,-USE LINK LINK #A #A MDUMDU 33 BHBH
5
5 BC 50)) DRAAD U/ JAMPER , BC 50)) DRAAD U/ JAMPER , ARRESTER ARRESTER 2020 MTMT
#
# MOUNMOUNTING BRACKTING BRACKETET 33 BHBH
D
D LIGHTNING ARRESTER LIGHTNING ARRESTER 1
1 SINGLSINGLE ARM BANDE ARM BAND 11 BHBH
2
2 CROSS ACROSS ARM T%PE 2000 U!NP8 .RM T%PE 2000 U!NP8 .3(2 ))3(2 )) 11 BHBH
2
2 BOLBOLT NUT 1# 50T NUT 1# 50 33 BHBH
3
3 ARM TIE ARM TIE T%PE &50!PIPET%PE &50!PIPE3/4"3/4" 11 BHBH
4
4 LINGHTNING LINGHTNING ARRESTER 24 K/ 5+AARRESTER 24 K/ 5+A 33 BHBH
E
E GROUNDING TRAFOGROUNDING TRAFO 1
1 BC DRABC DRAAD 50 AD 50 MM2MM2 1212 MTMT
2
2 GROUND ROD 1# MM 2(&5 MT BOD% GROUND ROD 1# MM 2(&5 MT BOD% TRA-O DAN TRA-O DAN ARRESTERARRESTER 11 SETSET
3
-- RANGKA TEMPAT DUDUK RANGKA TEMPAT DUDUK 1
1 RANGKA TEMPRANGKA TEMPAAT DUDUK TRA-O T DUDUK TRA-O LENGKAPLENGKAP 11 SETSET
2
2 ARM TIE BARM TIE BANDAND 44 BHBH
G
G LV. PANELLV. PANEL 1
1 LLV PV PANEL 2GRP 125AANEL 2GRP 125A 11 SETSET
2
2 CROSS ARM U!NP CROSS ARM U!NP 8 8 / L/ LVVPANELPANEL 22 BHBH
3
3 N % N % % 1 CORE 150 MM2% 1 CORE 150 MM2 1515 MTMT
4
4 N N % % % % 4 $ 4 $ &0 MM2 &0 MM2 /SALURAN /SALURAN KELUAR KELUAR 2020 MTMT
5
5 MCCB 250 A MCCB 250 A / 3 PHASA/ 3 PHASA 11 BHBH
#
# NH -USE 125 ANH -USE 125 A ## BHBH
&
& COPER COPER TUBE / TUBE / KABEL KABEL SCHOEN 1SCHOEN 150 MM250 MM2 88 BHBH
8
8 L L BOU' 2" BOU' 2" /SALURAN KELUARAN /SALURAN KELUARAN BABA''AHAH 44 BHBH
*
* L L BOU' 3" BOU' 3" /SALURAN MASUK /SALURAN MASUK BABA''AHAH 11 BHBH
10
10 L L BOU' BOU' PVC 2" PVC 2" /SALURAN /SALURAN KELUARAN KELUARAN AATTASAS 44 BHBH
11
11 L BOU' PVC 3" /SALL BOU' PVC 3" /SALURAN MASUK AURAN MASUK ATTASAS 22 BHBH
12
12 COPER COPER TUBE / TUBE / KABEL KABEL SCHOEN &SCHOEN &0 MM20 MM2 33 BHBH
13
13 COPER COPER TUBE / TUBE / KABEL KABEL SCHOEN 5SCHOEN 50 MM20 MM2 33 BHBH
14
14 KLEMBEUGEL KLEMBEUGEL 2"2" 44 BHBH
15
15 KLEMBEUGEL KLEMBEUGEL 3"3" 22 BHBH
1#
1# BOLBOLT T NUT NUT M1#50 M1#50 MMMM 1212 BHBH
1&
1& BC DRAABC DRAAD 50 MM2D 50 MM2 55 MTMT
18
18 -USE -USE BASEBASE 1212 BHBH
1*
1* PELAPELAT U #0 $ 25 $ 2T U #0 $ 25 $ 2 44 MTMT
20
20 PELAPELAT COPPER 30 $ 5 UNTUK NETRAL DAN INPUTT COPPER 30 $ 5 UNTUK NETRAL DAN INPUT 44 MTMT
21
21 CT CCT CLASS 1LASS 1 33 BHBH
22
22 GROUND ROD 1# MM 2(&5 MT GROUND ROD 1# MM 2(&5 MT NETRALNETRAL 11 BHBH
23
23 N%N%A- 50 MM 2A- 50 MM 2 55 MTMT
24
24 PELAT TPELAT TANDA BAHANDA BAHAA%%AA 11 BHBH
H
H TRANSFORMER SETTINGTRANSFORMER SETTING 1
1 TRANS-ORMTRANS-ORMAATOR 3PHS TOR 3PHS 50 KV50 KVA A 20000/220!20000/220!380V380V MDUMDU BHBH
2
2 TRANS-ORMTRANS-ORMAATOR 3PHS TOR 3PHS 100 KV100 KVA 20000/220!380VA 20000/220!380V MDUMDU BHBH
3
3 TRANS-ORMTRANS-ORMAATOR 3PHS TOR 3PHS 1#0 KV1#0 KVA 20000/220!380VA 20000/220!380V MDUMDU BHBH
4
4 TRANS-ORMTRANS-ORMAATOR 3PHS TOR 3PHS 250 KV250 KVA 20000/220!380VA 20000/220!380V MDUMDU BHBH
KETERA
KETERANGAN NGAN ::
1
1 HARGA SAHARGA SATUAN TUAN TERMASUK PTERMASUK PPNPN 2
2 SEMUA MASEMUA MATERIAL DARI TERIAL DARI BESI BESI HARUS HARUS DI DI HOT DIP HOT DIP GALGALVVANISANIS 3
GAN GARDU CANTOL 2 JURUSAN
JAYANA
VOLUME TOTAL
HARGA ! SATUAN
NILAI TUNAI R
MATERIAL
PASANG
BONGKAR MATERIAL
R
R
R
5 # & 8 * 0 1 R 55(000(00000 0 R 55(000(00000 1 0 R ! 0 R ! 3 R &*(10000 R 40#00 0 R 238(51800 4 R 18(0*300 R 1(#8200 0 R &*(10000 1 R 14*(52#00 R &(*4#00 0 R 15&(4&200 5 R 3(30*00 R 12200 0 R 1&(15500 1 R 11(11000 R &0000 0 R 11(81000 5 R 2(04200 R 2*000 0 R 11(##000 5 R 2(&8&00 R 2*000 0 R 15(38500 R #(35500 0 R ! 1 R 54(43200 0 R 54(43200 3 R 23(00000 R 5(30000 0 R 84(*0000 1 0 R ! 0 R ! 2 R 20&(#&500 R 8(25000 0 R 431(85000 2 R 18(0*300 R 40#00 0 R 3#(**800 # R 3(30*00 R 12200 0 R 20(58#00 2 R 2#(84300 R &0000 0 R 55(08#003 R 5&0(00000 R *(5&000 0 R 1(&38(&1000
20 R 10(&4500 R 3#*00 0 R 222(28000 3 0 R ! 0 R ! 1 R 18(0*300 R 1(#8200 0 R 1*(&&500 1 R 14*(52#00 R &(*4#00 0 R 15&(4&200 3 R 3(30*00 R 12200 0 R 10(2*300 1 R 2#(84300 R &0000 0 R 2&(54300
3 R &50(00000 R *(5&000 0 R 2(2&8(&1000
0 R !
12 R 10(&4500 R 3#*00 0 R 133(3#800
1 R 5*(08000 R 5(51000 0 R #4(5*000
0 R ! 1 R 2(&8&(84000 R 101(50000 0 R 2(88*(34000 4 R 18(0*300 R 1(#8200 0 R &*(10000 0 R ! 1 R 5(1&4(40000 R 52(20000 0 R 5(22#(#0000 2 R 155(3#400 0 R 310(&2800 15 R 180(00000 0 R 2(&00(00000 20 R #8(2*#00 0 R 1(3#5(*2000 1 R 1(451(40000 0 R 1(451(40000 # R &0(00000 0 R 420(00000 8 R 30(00000 0 R 240(00000 4 R 50(2##00 R 3&&00 0 R 202(5&200 1 R #2(30400 R 1(04400 0 R #3(34800 4 R #(00000 R 30000 0 R 25(20000 2 R 8(00000 R *0000 0 R 1&(80000 3 R 10(24300 R 34800 0 R 31(&&300 3 R &(88500 R 23200 0 R 24(35100 4 R 5(00000 R 4*500 0 R 21(*8000 2 R #(00000 R 55000 0 R 13(10000 12 R 3(30*00 R 12200 0 R 41(1&200 5 R 10(&4500 R 3#*00 0 R 55(5&000 12 R 5&(00000 0 R #84(00000 4
R
24&(00000
0 R *88(00000 4R
18&(00000
0 R &48(00000 3R
58(#8300
0 R 1&#(04*00 1 R 5*(08000 0 R 5*(08000 5 R &5(00000 0 R 3&5(00000 1 R 8(2&400 0 R 8(2&400 0 0 0 1 R #5(500(00000 0 R #5(500(00000 JUMLAH AH PENGANGKUTAN R SUBJUMLAH R PPN 106 R JUMLAH R DIBULATKAN Rp10 Rp !!,,. Rp "7,#$2. Rp 2,!!,!1. Rp 2,#%$,7%$. Rp 22!,&2".
JUMLAH
HARGA
R
Rp 2,%"&,##. Rp 1!,2#%,%17. Rp "!,!,. 0 #5(500(00000 #5(500(00000 #(550(00000 &2(050(00000 72,!,.
PERINCIAN HARGA RAB GTT
JENIS PEKERJAAN
:PEMASA
LOKASI PEKERJAAN
:GAJA%A
SAT
VOL
NO
URAIAN PEKERJAAN
PER
SAT
1 2 3 4
A PEMASANGAN TIANG BETON
1 TIANG BETON 13 METER 350 D7 2 SET
2 PONDASI TIANG
B KONSTRUKSI TM.1 U/ GTT.
1 ARM TIE BAND 8" 2 BH
2 CROSS ARM NP10 ! 2000 MM 2 BH
3 BOLT NUT M1# $ 50 MM 4 BH
4 ARM TIE T%PE &50 MM 2 BH
5 LINE POST INSULATOR 20KV MDU BH
# ALL BINDING 'IRE 3(2 MM * MT
& ALL TAP 4)) * MT
8 GROUND 'IRE CLAMP 2 BH
* LINE TAP CONNECTOR 150/&0 MM 3 BH
10 BOLT NUT M1# $ 400 MM 8 BH
C FUSED CUT OUT
1 CROSS ARM NP 10 ! 2500 MM 2 BH
2 ARM BAND 8" 2 BH
3 CUT OUT 20KV 12(5 +A,-USE LINK #A MDU 3 BH
4 BC 50 )) DRAAD U/ JAMPER , ARRESTER 25 MT
5 MOUNTING BRACKET 3 KG
D LIGHTNING ARRESTER
1 SINGLE ARM BAND #" 2 BH
2 CROSS ARM T%PE 2000 U!NP8 .3(2 )) 1 BH
3 LINGHTNING ARRESTER 24 K/ 5+A 3 BH
E GROUNDING TRAFO
1 BC DRAAD 50 MM2 8 MT
2 GROUND ROD 1# MM2 2(&5 MT BOD% DAN ARRESTER 1 BH
3 PIPA AIR 3/4 " ( 4 METER 1 BH
- RANGKA TEMPAT DUDUK TRAFO
1 1 RANGKA TEMPAT DUDUK TRA-O LENGKAP 1 SET
2 2 ARM TIE BAND 4 BH
G LV. PANEL
1 LV PANEL 2GRP A UML/43(43A(43B/PJ/*3 1 SET
3 N % % 1 CORE 150 MM2 # MT
4 N%A 4 &0 MM2 /9:;7 +<:7; 15 MT
5 COPER TUBE / KABEL SCHOEN 150 MM2 8 BH
# MCCB 250 A 2 BH
& NH -USE 125 A 2 BH
8 L BOU' 2" /SALURAN KELUARAN DARI BA'AH 4 BH
* L BOU' 3" /SALURAN MASUK BA'AH 1 BH
10 L BOU' PVC 2" /SALURAN KELUARAN ATAS 4 BH
11 L BOU' PVC 3" /SALURAN MASUK ATAS 2 BH
12 COPER TUBE / KABEL SCHOEN &0 MM2 3 BH
13 COPER TUBE / KABEL SCHOEN 50 MM2 3 BH
14 KLEMBEUGEL 2" U/GASPIJ # BH
15 KLEMBEUGEL 3" U/GASPIJ 4 BH
1# BOLT NUT M1#50 MM 12 BH
1& BC DRAAD 50 MM2 5 MT
18 GROUND ROD 1# MM 2(&5 MT NETRAL 1 BH
1* PLAT U 80 25 20 -RAME TEMPAT -USE 4 MT
20 PLAT U #0 25 20 -RAME TEMPAT SAKLAR UTAMA 4 MT
21 CT 400A/5 A CLASS 1 1 BH
22 GROUND ROD 1 BH
23 N%A- 50 MM2 5 MT
24 PELAT TANDA BAHA%A 1 BH
H TRANSFORMER SETTING
1 TRANS-ORMATOR 3PHS 50 KVA 20000/220!380V MDU BH
2 TRANS-ORMATOR 3PHS 100 KVA 20000/400V MDU BH
3 TRANS-ORMATOR 3PHS 1#0 KVA 20000/220!380V MDU BH
4 TRANS-ORMATOR 3PHS 250 KVA 20000/220!380V MDU BH
KETERANGAN :
1 HARGA SATUAN TERMASUK PPN
2 SEMUA MATERIAL DARI BESI HARUS DI HOT DIP GALVANIS 3 MATERIAL TUNAI DIPERIKSA KE TIM K'ALITAS BARANG
GAN GARDU PORTAL 2 JURUSAN
A
HARGA ! SATUAN
NILAI TUNAI R
MATERIAL
PASANG
ONGKA
R
R
R
5 # & 8 *5=#,&,8 1 0 R ! 2 R 5(500(00000 0 R 11(000(00000 Rp 0 R ! 0 R ! 2 R 18(0*300 R 40#00 0 R 3#(**800 Rp 2 R 14*(52#00 R &(*4#00 0 R 314(*4400 4 R 3(30*00 R 12200 0 R 13(&2400 2 R 11(11000 R &0000 0 R 23(#2000 # R &*(10000 R 1(#8200 0 R 484(#*200 * R 2(04200 R 2*000 0 R 20(*8800 * R 2(&8&00 R 2*000 0 R 2&(#*300 2 R 3(88400 0 R &(̠ 3 R 23(00000 R 5(30000 0 R 84(*0000 8 R 10(28000 R *&500 0 R *0(04000 Rp 2 R 20&(#&500 R 8(25000 0 R 431(85000 2 R 18(0*300 R 40#00 0 R 3#(**8003 R 5&0(00000 R *(5&000 0 R 1(&38(&1000 25 R 10(&4500 R 3#*00 0 R 2&&(85000
3 0 R !
Rp
2 R 1#(45000 R 3&000 0 R 33(#4000
1 R 14*(52#00 R &(*4#00 0 R 15&(4&200 3 R &50(00000 R *(5&000 0 R 2(2&8(&1000
0 Rp 8 R 10(&4500 R 3#*00 0 R 88(*1200 1 R 5*(08000 R 5(51000 0 R #4(5*000 1 R 2&(52000 R 34800 0 R 2&(8#800 1 R 2(&8&(84000 R 101(50000 0 R 2(88*(34000 Rp 4 R 18(0*300 R 1(#8200 0 R &*(10000 1 R 5(1&4(40000 R 52(20000 0 R 5(22#(#0000 Rp 2 R 15#(&5000 R 1(#0000 0 R 31#(&0000
VOLUM
E TOTAL
JUMLAH
# R 3&(*&000 R 8&000 0 R 233(04000 15 R &8(*2000 R 2(4*400 0 R 1(221(21000 8 R 2#(2*400 R 34800 0 R 213(13#00 2 R 1(451(40000 0 R 2(*02(80000 2 R &0(00000 0 R 140(00000 4 R 50(2##00 R 3&&00 0 R 202(5&200 1 R #2(30400 R 1(04400 0 R #3(34800 4 R #(00000 R 30000 0 R 25(20000 2 R 8(00000 R *0000 0 R 1&(80000 3 R 10(24300 R 34800 0 R 31(&&300 3 R &(88500 R 23200 0 R 24(35100 # R 5(00000 R 4*500 0 R 32(*&000 4 R #(00000 R 55000 0 R 2#(20000 12 R 3(30*00 R 20300 0 R 42(14400 5 R 11(82000 R 40#00 0 R #1(13000 1 R 5*(08000 R 5(51000 0 R #4(5*000 4
R
28&(50000
0 R 1(150(00000 4 R 24&(00000 0 R *88(00000 1 R 58(#8300 0 R 58(#8300 1 R 5*(08000 R 5(51000 0 R #4(5*000 5 R &5(00000 0 R 3&5(00000 1 R 8(2&400 0 R 8(2&400 Rp 0 0 R ! 0 0 R ! 1 R 51(##0(00000 R 1*1(40000 0 R 51(851(40000 0 0 R ! JUMLAH AH >R PENGANGKUTAN >R R SUBJUMLAH >R R PPN 10 6 >R R JUMLAH >R R DIBULATKAN >R Rp0 11,,. 1,1!,$"7. 2,#&!,#&. 2,#"%,&22. 1&1,$7. 2,%"&,##. 1$,#%,111.
HARGA
R
!1,&!1,#. 0 85(551(*1800 85(551(*1800 8(555(1*180 *4(10&(10*80 1%,12,.
PERINCIAN HARGA R.A.B. SUTM
JENIS PEKERJAAN
:
LOKASI
:
NO JENIS MATERIAL SAT
TM B4C1
1 GROUND STEEL WIRE MTR
2 GROUND WIRE CLAMP type A PCS
-3 GROUND WIRE CLAMP type B PCS 1
4 AAAC3 x 150mm MTR
5 PIN POST INSULATOR PCS
- LINE POST INSULATOR PCS
! TIANGBETON
-" TIANGBESI PCS 1
# CROSS ARM NP$10 - 2000 mm %type t&'()* PCS -10 CROSS ARM NP$10 - 2000 mm %type t+mp+* PCS 2 11 ARM TIE T,PE L 50 x #00 mm !50 mm PCS 2
12 .UMPER WIRE !0mm MT
-13 ARM TIE BAND 3/-/ SET 1
14 GU,WIRE SET 1
15 D0UBLE ARM BAND /-"/ MT
-1 STRAINCLAMP PCS
-1! WIRECLIP PCS
-1" BOLT NUT M$1 400 mm PCS "
1# SUSPENSION INSULATOR 20 Le)&p PCS
-20 BOLT NUT M1 50 mm SET
-21 BOLT NUT M$1 x 140 mm SET
-22 ALL BINDING WIRE 20 mm2 MT 5
23 ALL TAPE 4 mm2 MT 5 B C D E F G 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
24 BAND STRAPSUSP$E,E
-25 PRE6ORMED TOP TIE !0mm PCS
-26 PRE6ORMED GRIP 1 27 ISOLATOR TELUR PCS 1 28 SPAN SRUP 7 1 29 PIPA PELINDUNG 34/ MT 2 30 U-BOLT M1 PCS 1 31 ANC8OR BLOC 500 x 500 1 KETERANGAN :
1$ 8&'& S&t+& Te'm&9+) PPN 10 :
2$ Sem+& M&te'(&; D&'( Be9( 8&'+9 D( 8DG$
3$ M&te'(&; T+&( D(pe'()9& e P&(t(& <&;(t&9 B&'&$
B C D E F G 33 34 35 36 37 38 39 40 41 42 43 44 45
HARGA SATUAN NILAI TUNAI
-2 MATERIAL PASANG BONGKAR MATERIAL
B4C2 Rp Rp Rp Rp "00 Rp =355$00 Rp 5=0"4=000$00 - 0 Rp 54=432$00 Rp -1 2 Rp 54=432$00 Rp 10"="4$00 2400 Rp 1#=500$00 Rp 1=12$00 Rp 4#=5""="00$00 - 0 Rp 10=000$00 Rp 32=4"#$00 Rp - 12 Rp !#=100$00 Rp 1="2$00 Rp ##=3"4$00 - 0 Rp 5=500=000$00 Rp -1 2 Rp 5="00=000$00 Rp #5=10$00 Rp 11=!#0=212$00 - 0 R 155(3#400 R &(*4#00 Rp -2 4 R 155(3#400 R &(*4#00 Rp 53=240$00 2 4 R 2#(84300 R &0000 Rp 110=1!2$00 - 0 R 10(&4500 R 3#*00 Rp -1 2 R 1#(45000 R 3&000 Rp 33=40$00 - 1 Rp 9,000.00 Rp #=000$00 - 0 Rp 25,345.00 Rp 475.00 Rp -- 0 Rp -- 0 Rp 2,530.00 Rp 265.00 Rp -" 1 Rp 10,280.00 Rp 975.00 Rp 1"0=0"0$00 - 0 Rp 85,000.00 Rp 1,530.00 Rp -- 0 Rp 3,010.00 Rp 185.00 Rp -- 0 Rp 10,280.00 Rp 370.00 Rp -5 10 Rp 3,200.00 Rp 265.00 Rp 34=50$00 5 10 R 2(&8&00 R 2*000 Rp 30=!!0$00 JUMLAH MATERIAL H I J K L M N O P Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
- 0 Rp 750.00 Rp 100.00 Rp -- 0 Rp 11,865.00 Rp 1,530.00 Rp -- 1 Rp 11,865.00 Rp 1,530.00 Rp 13=3#5$00 - 1 Rp 17,000.00 Rp 1!=000$00 - 1 Rp 33,396.00 Rp 33=3#$00 - 2 R 2&(52000 R 34800 Rp 55=!3$00 - 1 Rp -- 1 Total Rp 68,712,339.00 PPN 10% Rp 6,871,233.90 Jumlah Rp 75,583,572.90 H I J K L M N O P Q 33 34 35 36 37 38 39 40 41 42 43 44 45
MAT
PAS
BKR
0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? 0 >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? R S T U V ! " # $$ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32R S T U V ! " # $$ 33 34 35 36 37 38 39 40 41 42 43 44 45
>RE6? >RE6? 112000 250 3425 >RE6? >RE6? 11"000 250 3425 75.52 >RE6? >RE6? 11110 !00 2"0 >RE6? >RE6? #3!5 350 240 >RE6? >RE6? 1#"00 "50 510 >RE6? >RE6? 11150 400 >RE6? >RE6? 2350 1!5 125 >RE6? >RE6? "030 #25 215 >RE6? >RE6? 2000 2"5 1200 >RE6? >RE6? 130000 1450 00 >RE6? >RE6? >RE6? >RE6? >RE6? >RE6? 25"20 102"0 3!0 0 0 3 23000 5300 0 0 2!#5 3200 25 0 0 1#1351 2535 25 0 0 "530 1"0200 3"0 0 0 31#5 !50000 #5!0 0 0 1050 21#!10 4350 0 0 3"115 5"210 1#1400 0 0 33"5! 24!50 3025 0 0 "50 10 44 0 0 133#5 5#0"0 5510 0 0 2!#1 15500 1250 0
>RE6? "$2E@0# >RE6?
$B $C $D $E $F $G $H $I $J $K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
>RE6? >RE6? >RE6?
>RE6? >RE6? >RE6?
>RE6? >RE6? >RE6?
2$!E@0" #553400 2$!E@0" 4300 50 140
#000 15#00 "4#00 #010 12100 2150
"#44000 !40!5 #"4!5 1450 250 0
4$#E@0" 5$1E@0! 5$4E@0" 1#"0 250 0
1$E@10 5$5E@0" 1$E@10 0 0 0
2$4E@0# 3$1E@0! 2$4E@0# 0 0 0
2$3E@0# 4$E@0! 2$4E@0# !"00 1!5 100
2$2E@10 !$3E@0# 2$#E@10 155"20 "250 4025 "$4E@0" 1E@0" #$4E@0"
13000 3!400 1!3400
!$#E@0" !$4E@0! "$!E@0"
4$2E@0" 3$3E@0! 4$5E@0" 13500 1250 420
$L $M $N $O $P $Q $R $S $T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PERINCIAN HARGA RAB GTT
JENIS PEKERJAAN PEMASA
LOKASI PEKERJAAN GAJA%A
NO URAIAN PEKERJAAN
1 2
A PEMASANGAN TIANG BETON
1 TIANG BESI 11 METER 350 D7 PONDASI TIANG
B KONSTRUKSI TIANG
1 ARMTIEBAND 8"/ 1#
2 CROSS ARM NP10 ! 80$50$2000 MM 8
3 BOLT NUT M1# $ 50 MM 10
4 ARM TIE T%PE &50 MM / CROSS ARM BRACE 8
5 PIN INSULATOR 20KV MDU #
# ALL BINDING 'IRE 3(2 MM #
& ALLTAP4)) #
8 GROUND'IRECLAMP 2
* LINE TAP CONNECTOR &0/150 MM *
10
C FUSED CUT OUT
1 CUT OUT 20KV 12(5 +A,-USE LINK #A MDU 2
2 BC 50 )) U/ JAMPER , ARRESTER 25
3 MOUNTING BRACKET 2
D LIGHTNING ARRESTER
1 LINGHTNING ARRESTER 24 K/ 5+A 3
2 MOUNTING BRACKET #
E GROUNDING TRAFO
1 BC 50MM2 8
2 GROUND ROD 1# MM2 2(&5 MT BOD% DAN ARRESTER 1
3 PIPAAIR3/4" (4METER 1
G AVS SETTING
1 AVS20 KV3PHS 1
2 CROSS ARM NP 10 2500 MM 2
4 ARMTIEBEND8" 2
5 BOLT NUT M1# $ 50 MM #
# ISOLTOR T!"P! LIN#$POST INS!LTOR 20& "'! #
H TRANSFORMER SETTING
1 TRANS-ORMATOR 1PHS 20 KVA 20000/220!380V MDU
KETERANGAN :
1. (R) ST!N T#R"S! PPN.
2. S#"! "T#RIL 'RI *#SI (R!S 'I (OT 'IP )L&NIS. 3. "T#RIL T!NI 'IP#RIS # TI" +LITS *RN)
NGAN AVS 20 KV UMUM A
SAT VOLUME TOTAL
HARGA ! SATUAN
NILAI T
MATERIAL PASANG ONGKA
R R R 4 5 # & 8 SET 2 R 5(800(00000 R *5(10#00 R 11(& R R BH 1# R 18(0*300 R 40#00 R 2 BH 8 R 155(3#400 R &(*4#00 R 1(3 BH 10 R 2(&1*00 R 1(0&300 R BH 8 R 2#(84300 R &0000 R 2 BH # R 1#0(00000 R 32(48*00 R 1(1 MT # R 3(#0000 R 2(5#000 R MT # R 2(&8&00 R 2*000 R BH 2 R 3(88400 R BH 3 R 1*(18800 R 2(4*400 R R R BH 2 R 5&0(00000 R *(5&000 R 1(1 MT 25 R 10(&4500 R 3#*00 R 2 BH 2 R R BH 3 R &50(00000 R *(5&000 R 2(2 BH # R R MT 8 R 10(&4500 R 3#*00 R BH 1 R 5*(08000 R 5(51000 R BH 1 R 2&(52000 R 34800 R R BH 1 R BH 2 R 20&(#&500 R 8(25000 R 4 BH 4 R 11(11000 R &0000 R
BH 2 R 18(0*300 R 40#00 R BH # R 2(&1*00 R 1(0&300 R *( # R &*(10000 R 1(#8200 R 4 R BH 1 Rp 6,500,000.00 Rp 156,000.00 R #(# J!"L( ..(-P#N)N)!TN S!*.J!"L( P P N . 10 % J ! " L ( 'I*!LTN
NAI R 10 *0(21200 Rp 11,7%,212. ! ! Rp $,1#$,&%&. *5(*8400 0#(48000 3&(*2000 20(34400 54(*3400 3#(*#000 18(4#200 &(̠ #5(04#00 ! ! Rp 1,#$",%%. 5*(14000 &(85000 ! ! Rp 2,27&,71. 8(&1000 ! ! 88(*1200 Rp 1&1,$7. #4(5*000 2&(8#800 ! ! Rp 1,2$,!$2. 31(85000 &(24000 JUMLAH HARGA R
3#(**800 22(&5200 4(#*200 ! Rp ","!",. 5#(00000 Rp. 0 Rp. Rp 26,510,712.00 Rp. 26510712 Rp. 2651071.2 Rp. Rp 29,161,783.20 Rp. Rp 2%,1"1,&.