• Tidak ada hasil yang ditemukan

MANAGEMENT PRESENTATION PT Adhi Karya (Persero) Tbk. Jakarta September 2015

N/A
N/A
Protected

Academic year: 2021

Membagikan "MANAGEMENT PRESENTATION PT Adhi Karya (Persero) Tbk. Jakarta September 2015"

Copied!
13
0
0

Teks penuh

(1)

MANAGEMENT PRESENTATION

PT Adhi Karya (Persero) Tbk.

Jakarta

(2)

PN Adhi Karya

nationalized

from Dutch

Company

Associate N.V

.

PN Adhi Karya

changed to

PT Adhi Karya

(Persero)

MILESTONE

2012

2014

2013

1960

1974

PT Adhi Karya

(Persero)

July 2011

TRANSFORMATION OF ADHI:

Changing Vision & Mission

RJPP 2012-2016, 5 Lines of Business[CONSTRUCTION, EPC, PROPERTY, REALTY, INVESTMENT INFRASTRUCTURE]

Organization Restructure

Establishment of ADHI Learning CenterCorporate Value: • Work Smart • Responsible Honesty • Modest Corporate Culture

Subsidiaries Establishment

Subsidiaries Establishment

Transportasi Massal BUMN)MoU (Consortium Grandhika Blok M Hotel Precast Factory

2004

Go Public

18

March 2004

ADHI, first SOE

Construction to

be listed in IDX

2015

Acquire the approval for

Government additional equity

(3)

LINE OF BUSINESS

CONSTRUCTION

Building

Airport

Seaport

Road & Bridges

Watery Works

Railway

CONSTRUCTION

Building

Airport

Seaport

Road & Bridges

Watery Works

Railway

EPC

Power Plant

Industry

Oil & Gas

EPC

Power Plant

Industry

Oil & Gas

PROPERTY &

REALTY

Apartment

Offices

Condotel

PROPERTY &

REALTY

Apartment

Offices

Condotel

HOTEL

Grandhika Hotel

HOTEL

Grandhika Hotel

INVESTMENT

Precast Concrete

Transportation

IPP

INVESTMENT

Precast Concrete

Transportation

IPP

PT APG Construction Division 1 -7

PMU Power 1, Oil&Gas PT APP Hotel Division PT APB

LRT Division PMU Power 2, IPP

PMU RFCC

Divison Property TOD

(4)

Operational Performance

5,648  6,940  10,580  10,380  8,745  8,132  11,927  9,604  10,854  9,218  41.18% 35.49% 37.79% 46.15% 48.18% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00%  ‐  5,000  10,000  15,000  20,000  25,000 2010 2011 2012 2013 2014

Carry Over New Contract Sales per  Order Book Ratio

ORDER BOOK

TENDER RATE

46,782  47,921  45,841  32,634  33,391  8,132  11,927  9,604  10,854  9,218  17% 25% 21% 33% 28% 0% 5% 10% 15% 20% 25% 30% 35%  ‐  10,000  20,000  30,000  40,000  50,000  60,000 2010 2011 2012 2013 2014

Tender Bid (IDR) Tender Won (IDR) Competitive Rate (%)

Total Tender yang diikuti

: 38.255 M

Hit Rate

: 28.0%

Tender Sudah Kontrak

: 7.863 M

Penetapan Pemenang

: 1.524 M

Tender Terendah

: 1.290 M

Jumlah

: 10.678 M

Gedung 60% Jalan &  Jembatan 28% Dermaga 3% Infrastruktur  Lainnya 9%

JENIS PEKERJAAN

Realisasi s.d. Agustus 2015

APBN 25% APBD 19% BUMN 13% Swasta/Lainnya 43%

SUMBER DANA

(5)

Financial Summary

Revenue

Revenue

Gross Profit and Gross Profit Margin

Gross Profit and Gross Profit Margin

Net Income and Net Profit Margin

Net Income and Net Profit Margin

EBITDA and EBITDA Margin

EBITDA and EBITDA Margin

In billion IDR In billion IDR In billion IDR 5,675  6,695  7,628  9,799  8,653  3,212   ‐  2,000  4,000  6,000  8,000  10,000  12,000 2010 2011 2012 2013 2014 Jun‐15 710  734  955  1,193  998  325  12.52% 10.97% 12.53% 12.18% 11.54% 10.12% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 16.00% 18.00%  ‐  200  400  600  800  1,000  1,200  1,400  1,600  1,800 2010 2011 2012 2013 2014 Jun‐15 563 562 798 931 678 190 9.92% 8.39% 10.46% 9.50% 7.83% 5.92% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 0 200 400 600 800 1000 1200 1400 2010 2011 2012 2013 2014 Jun‐15 189 182 212 406 329 70 3.33% 2.72% 2.78% 4.14% 3.80% 2.19% 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 0 100 200 300 400 500 600 2010 2011 2012 2013 2014 Jun‐15 In billion IDR

(6)

TOTAL ASSETS, LIABILITY & EQUITY

4,060 

5,123 

6,795 

8,261 

8,818 

9,994 

868 

990 

1,077 

1,460 

1,641 

1,615 

 ‐

 2,000

 4,000

 6,000

 8,000

 10,000

 12,000

 14,000

2010

2011

2012

2013

2014

Jun‐15

Total Liability

Total Equity

Total

Assets

4,928

Total

Assets

6,113

Total

Assets

7,872

Total

Assets

9,721

Total

Assets

10,459

Total

Assets

11,609

(7)

Indicative Offering Structure – Rights Issue

Key indicative terms

Issuer

PT Adhi Karya (Persero) Tbk. (“ADHI”)

Entitlement ratio

Renounceable 100,920  rights shares for every 100,000 existing share

Rights price range

IDR1,510 – IDR2,400 per share 

Rights offer size

Up to IDR2.745 trn (c,US$225 m)

Republic of Indonesia portion 

: IDR1.400 trillion

Public portion

: IDR1.345 trillion 

Number of rights 

shares to be issued

1,143,757,141 to 1,817,892,144 shares or 38.8% ‐ 50.2% of enlarged capital

Use of proceeds

Railway based mass transportation project (LRT) including its stations and property projects

Offering Format

OJK Registered format with :

Republic of Indonesia undertaking to fully subscribe for its pro rate stake of 51.0% ownership

Joint Lead Managers to act as standby purchasers for unsubscribed rights

Undertaking 

shareholder

Republic of Indonesia (51.0% of the rights shares)

Joint Lead Managers & 

Standby Purchasers

PT Bahana Securities, PT Danareksa Sekuritas, PT Mandiri Sekuritas 

(for the remaining 49.0% rights shares)

(8)

Indicative Timetable

Rights Issue 

Pricing date

14 September 2015

ADHI’s EGMS date

22 September 2015

Recording date

05 October 2015

Listing  date

07 October 2015

Allocation date

19 October 2015

Settlement of excess 

rights (rump) shares

26 October 2015

Cum date (Regular & 

Negotiation Market)

30 September 2015

(9)

THE INNER CITY

TRANSPORTATION

L I G H T R A I L T R A N S I T I N D O N E S I A

(10)

Landasan

 

Hukum

Peraturan

 

Presiden

 

Nomor

 

98

  

tanggal

 

2

 

September

 

2015

TENTANG :

PERCEPATAN PENYELENGGARAAN KERETA API RINGAN/

LIGHT RAIL TRANSIT

TERINTEGRASI DI WILAYAH

JAKARTA, BOGOR, DEPOK, DAN BEKASI

Pemerintah menugaskan ADHI untuk membangun PRASARANA Kereta Api Ringan/ LRT terintegrasi untuk lintas

pelayanan :

Cawang – Cibubur

Cawang – Kuningan – Dukuh Atas

Cawang – Bekasi Timur

Dukuh Atas – Palmerah – Senayan

Cibubur – Bogor

Palmerah – Grogol

Lintas Pelayanan lainnya yang ditetapkan dengan Peraturan Menteri Perhubungan

Scope Pekerjaan PRASARANA meliputi :

Jalur, termasuk konstruksi layang

Stasiun

(11)

KABUPATEN BEKASI

KOTA BOGOR

KOTA DEPOK

KABUPATEN TANGERANG

KOTA TANGERANG

KOTA

TANGERANG

SELATAN

KABUPATEN BOGOR

PROVINSI DKI JAKARTA

KOTA BEKASI

Sta. Baranangsiang

Sta. Sentul City Sta. Sentul Sirkuit

Sta. Cibinong Sta. Ciracas Sta. Kp. Rambutan Sta. Taman Mini

Sta. Cibubur

Peta

 

Lintas

 

Pelayanan

 

LRT

(12)

KAPASITAS DAN WAKTU TEMPUH LIGHT RAIL TRANSIT (LRT)

Cibubur-Cawang

Cawang-Dukuh Atas

Cawang-Bekasi Timur

Dukuh

Atas-

Palmerah-Senayan

Cibubur-Bogor

Palmerah-Bogor

Panjang (km)

13.7

10.5

17.9

5.5

30.5

5.5

PPHPD (

Passenger 

per Hour per 

Direction

)

12,000 

24,000 

12,000 

24,000 

24,000 

24,000 

Waktu Tempuh 

(menit)

21

18

27

12

37

12

Jumlah Stasiun

5

7

5

3

4

5

(13)

PT Adhi Karya (Persero) Tbk.

THANK YOU

Visit us at

www.adhi.co.id

For further information please contact:

Ki Syahgolang Permata, Corporate Secretary

P. +62 21 797 5312 F. +62 21 797 5311

E

.

adhi@adhi.co.id

Disclaimer:

Important Notice

 This document was prepared solely and exclusively for the parties presently being invited for the purpose of discussion. Neither this document nor any of its content may be reproduced, disclosed or used without the prior written consent of PT Adhi Karya (Persero) Tbk.

 This document may contain statements that convey future oriented expectations which represent the Company’s present views on the probable future events and financial plans. Such views are presented on the basis of current assumptions, are exposed to various risks and are subject to considerable changes at any time. Presented assumptions are presumed correct, and based on the data available on the date, which this document is assembled. The company warrants no assurance that such outlook will, in part of as a whole, eventually be materialized. Actual results may diverge significantly from those projected. The information in this document is subject to change without notice, its accuracy is not verified or guaranteed, it may be incomplete or condensed and it may not contain all material information concerning the Company.

 None of the Company, PT Adhi Karya (Persero) Tbk. or any person connected with any of them accepts any liability whatsoever for any loss howsoever arising from any use of this document or its contents or otherwise arising in connection therewith.

Referensi

Dokumen terkait

Lepas dari khilaf dan segala kekurangan, penulis merasa sangat bersyukur telah menyelesaikan skripsi yang berjudul “Analisis Rasio Keuangan dan Trend Untuk Menilai Kinerja

• Ketika bank membiayai pengeluaran infrastruktur dan pemasaran, bank dapat menempatkan dirinya sebagai mudharib daripada shahibul maal untuk menjamin bahwa bank akan

Penelitian ini menghasilkan kesimpulan bahwa faktor-faktor yang menentukan kualitas jasa pada karyawan frontline dan back-office perbankan di Surabaya terdiri dari tujuh

+XWWXQHQ GDQ 1RXYRQHQ PHODSRUNDQ SHPEHULDQ DUDQJ DNWLI NHSDGD SHQGHULWD KLSHUNROHVWHUROHPLD VHEDQ\DN J GDQ WLJD NDOL VHKDULVHODPDPLQJJXPHQXUXQNDQWRWDOSODVPD NROHVWHURO VHEHVDU

Peningkatan konsumsi susu tidak diimbangi dengan jumlah pasokan dalam negeri yang masih mengandalkan susu sapi, membuat Indonesia terus melakukan impor, bahkan hampir

Pengembangan kurikulum 2013 menitikberatkan pada penyederhanaan, pendekatan tematik-integratif dilatarbelakangi oleh masih terdapat beberapa permasalahan pada Kurikulum 2006

Sehingga, komposit serat kaca/vinil ester tidak disarankan untuk digunakan dalam aplikasi pembuatan tabung CNG yang bertekanan tinggi.. menunjukkan bahwa komposit serat kaca/vinil

Penelitian ini secara khusus bertujuan untuk mendapatkan konsentrasi gula pada hidrolisat pati sagu yang terbaik pada produksi bioetanol secara nir- sinambung pada