11
0
0

Teks penuh

(1)

No

Lokasi

Pekerjaan

Vol

Sat

Harga (Rp)

Jumlah (Rp)

SUTM

1215

ms

-SUTR

200

mtr

-GTT 100kVA

1

set

-SLO SUTM

1.215

km

-SLO SUTR

0.2

km

-SLO GTT

100

kVA

-Dsn. Palongan, Ds. Wringin, Kec. Wringin

1

Sub Jumlah

REKAPITULASI BILL OF QUANTITY (BQ)

PEKERJAAN PENGADAAN/PEMASANGAN SUTM, SUTR DAN GTT

KABUPATEN BONDOWOSO

TAHUN ANGGARAN 2013

Sub Jumlah

Jumlah

Dibulatkan

Terbilang :

.

PPN (10%)

Jumlah Total

.,

... 2013

Dibuat oleh,

PT/CV

(

..)

(2)
(3)

PEKERJAAN : Pengadaan Material dan Pemasangan SUTM 20 kV

VOLUME : 1,215 Ms

LOKASI : Dsn. Palongan, Ds. Wringin, Kec. Wringin

PERINCIAN MATERIAL

TM-1 TM-2 TM-4 TM4X TM-10 TM-5 TM-5C GW SP

3 15 1 1 3 1 18 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 A 3 C - S 150 mm2 Mtr 3,842 - - - -

-2 All Bending Wire 3,2 mm2 Mtr 16.2 162 6.6 0 5 190 - - - -

-3 All Tape 0,4 x 10 mm Mtr 9.9 99 10.8 0 3 123 - - - -

-4 Anchor block u/ trekschoor Bh 18 18 - - - -

-5 Anchor Rod TM Bh 18 18 - - - -

-6 Arm Tie Band + Boll & Nut 16 x 50 mm Bh 3 3 - - - -

-7 Arm tie type 750 mm Bh 3 30 2 2 12 0 5 54 - - - -

-8 Arm tie type 900 mm Bh - - -

-9 Ball Clevis Bh 3 3 18 0 6 30 - - - -

-10 Ball Isolator TM Bh 18 18 - - - -

-11 Bolt & Nut M.16 x 400 + washer Bh 6 60 4 4 74 - - - -

-12 Bolt & Nut M.16 x 500 + washer Bh 6 6 - - - -

-13 Bolt & Nut M.16 x 120 + washer Bh 3 0 6 9 - - - -

-14 Bolt & Nut M.16 x 140 + washer Bh 3 3 18 24 - - - -

-15 Cross Arm 2000 mm tipe tarik Bh 2 2 12 0 3 19 - - - -

-16 Cross Arm 2000 mm tipe tumpu Bh 3 30 33 - - - -

-17 Cross Arm 3000 mm tipe tarik Bh - - -

-18 Cut.Out 24 kV + Fuse link 100 A polimer Set 3 3 - -

-19 Clamp Beugles 6" - 4" u/ Ver. Stik Bh - - -

-20 Dead end Clamp Bh 3 3 18 0 6 30 - - - -

-21 Double Arm Band 8" Bh 3 3 - - - -

-22 Double Arm Bolt & Nut M.16 x 400 Bh 3 3 - - - -

-23 Galvanis Gaspipe 0,75 x 2 Mtr Bh 18 18 - - - -

-24 Galvanis Pipa 2" - 2 mtr u/ strut tie Bh - - -

-25 HV Band Strap Bh 3 3 18 0 6 30 - - - -

-26 Isolator Tarik 20 kV Bh 3 3 18 0 6 30 - - - -

-27 Joint Sleve 70 mm2 Bh 0 3 3 - - - -

-28 Line Tape Connector Bh 9 0 3 12 - - - -

-29 Tanda Bahaya kecil Bh 3 15 1 1 3 0 1 24 - - - -

-30 Tiang Beton 13/350 daN GW Btg 3 15 18 - - - -

-31 Tiang Beton 11/200 daN Btg 4 4 - - - -

-32 Tiang Beton 13/350 E daN GW Btg 1 3 0 1 5 - - - -

-33 Tiang Beton 9/200 daN Btg - - - -

-34 Steel wire 22 mm2 u/ Gnd Wire Mtr 1,276 - - - -

-PERINCIAN BILL OF QUANTITY (BQ)

JUMLAH HARGA (Rp.)

JUMLAH (Rp) MATERIAL PASANG MATERIAL PASANG

No. JENIS MATERIAL SAT JUMLAH

MATRIAL

HARGA SATUAN (Rp.)

34 Steel wire 22 mm2 u/ Gnd Wire Mtr 1,276 - - - -

-35 Isolator Tumpu 20 kV Bh 9 90 6 0 1 106 - - - -

-36 Penghalang Panjat 10" Bh 3 15 1 1 3 0 1 24 - - - -

-37 Pipa Galv. 4" - 3 Mtr u/ Verling Stick. Bh - - -

-38 Preformed grip 22 mm2 + accesories Bh 3 15 1 1 3 0 1 24 - - - -

-39 Preformed Grip 70 mm DIA Bh 72 72 - - - -

-40 Single Arm Band & Bolt Nuts M 16 + washer Bh 4 4 - - - - -41 Single GW band + Bolt&Nut M16x50 Bh 18 16 34 - - - -

-42 Socket Eye Bh 3 3 18 0 6 30 - - - -

-43 Steel Wire 70 mm2 Mtr 234 234 - - - -

-44 Strut Arm NP. 10 - 300 mm Bh 4 4 - - - -

-45 Strut Tie 2" 2000mm Bh 4 4 - - - -

-46 Terminal Lug 70 mm CU/AL. Bh - - -

-47 Timble ( Kousen ) u/ GW Bh 36 36 - - - -

-48 Turn Bukle / Spanscroef 3/4 " Bh 18 18 - - - -

-49 U Bolt & Nut M 16 + Steel Plate Bh 18 18 - - - -

-50 U strap Bh 3 0 2 5 - - - -

-51 Wire Clips Bh 18 18 - - - -

-52 Transportasi Rit 5 - - - -

-- -

(4)
(5)

PEKERJAAN : Pengadaan Material dan Pemasangan SUTR

VOLUME : 200 mtr

LOKASI : Dsn. Palongan, Ds. Wringin, Kec. Wringin

TR-2 TR-3 TR- 3A TR 5X TR 6 ARDE GW SP

3 1 1 1 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Anchor block u/ trekschoor Bh 4 4 - - - -

-2 Anchor rod TR Bh 4 4 - - - -

-3 Arm Tie Band + Boll & Nut 16 x 50 mm Bh - - -

-4 Arm tie type 900 mm Bh - - -

-5 Ball Isolator TM Bh 4 4 - - - -

-6 Bc 50 mm2 u/ Arde mtr 8 8 - - - -

-7 Bimetal Connector 50 mm AL/CU Set 1 1 - - - -

-8 Bolt & Nut M.16 x 140 + washer Bh - - -

-9 Bolt & Nut M.16 x 400 + washer Bh - - -

-10 Bolt & Nut M.16 x 50 Bh 2 0 2 - - - -

-11 Bundled Conductor 3 x 70 + 1x 50 mm2 mtr 210.00 - - - -

-12 Cross Arm 3000 mm tipe tarik Bh - - -

-13 Dead end tube Bh 4 4 8 - - - -

-14 Double Guy Wire band Bh - - -

-15 Ground rod TR Bh 1 1 - - - -

-16 Roll Isolator Bh - - -

-17 Instulated tension join 50/50 AL Bh - - -

-18 Kousen u/ 35 mm Bh 8 8 - - - -

-19 All Bending Wire 3,2 mm2 mtr - - -

-20 Link Bh 2 2 4 - - - -

-21 Pierching connector 70/70 , 50/50 Bh 4 0 0 4 - -

-22 Pipa galv. 3/4" 2 mtr Bh 4 4 - - - -

-23 Pipa PVC 2" 0.5 Mtr Bh 1 1 2 - - - -

-24 Plastic strap Bh 9 2 2 0 0 13 - - - -

-25 Pondasi HT Pole type D ls - - - -

-26 Preformed grip 35 mm2 Bh 8 8 - - - -

-27 Single Arm Band & Bolt Nuts M 16 + washer Bh 0 - - -

-28 Single Guy Wire band 8" Bh 4 0 4 - - - -

-29 Stainless steel strip mtr 4.5 1.5 1.5 0 0 8 - - - -

-30 Steel wire 35 mm2 mtr 44 44 - - - -

-31 Stoping Buckle Bh 6 2 2 0 0 10 - - - -

-32 Strain Clamp Bh 6 1 1 0 0 8 - - - -

-33 Strut Arm Np. 10-250 mm Bh 0 - - -

-34 Strut Tie 2" 2000mm Bh 0 - - -

-35 Suspension Clamp Bh 0 - - -

-36 Suspension Braket Bh 0 - - -

-37 Tension Braket Bh 3 1 1 0 0 5 - - - -

-38 Terminal lug 50 Bh 2 2 - - - -

-No. JENIS MATERIAL SAT JUMLAH

MATRIAL

HARGA SATUAN (Rp.) KONSTRUKSI

PERINCIAN BILL OF QUANTITY (BQ)

JUMLAH HARGA (Rp.)

JUMLAH (Rp) MATERIAL PASANG MATERIAL PASANG

38 Terminal lug 50 Bh 2 2 - - - -

-39 Tiang Beton 13/350 daN GW Bh - - - -

-40 Tiang Beton 9/200 daN Bh 2 0 0 2 - - - -

-41 Tiang Beton 9/200E daN Bh 1 1 - - - -

-42 Turn Bukle / Spanscroef 3/4 " Bh 4 4 - - - -

-43 U Bolt & Nut M 16 + Steel Plate Bh 4 4 - - - -

-44 Wire Clips Bh 4 4 - - - -

-45 Transportasi rit 2 - - - -

-- -

(6)

Pekerjaan : Pengadaan Material dan Pemasangan GTT 20 kV-1 Tiang

Volume :

1 Set

Lokasi : Dsn. Palongan, Ds. Wringin, Kec. Wringin

MATERIAL

O. PSG

O. BKR

MATERIAL

O. PSG

O. BKR

POLE TOP ARRANGEMENT

1 Tiang Beton 13/350 E daN GW

Bh

1

-

-

-

-

-2 Cross Arm -2000 mm tipe tumpu

Bh

3

-

-

-

-

-3 Arm tie type 750 mm

Bh

1

-

-

-

-

-4 Bolt & Nut M.16 x -400 + washer

Bh

4

-

-

-

-

-5 Bolt & Nut M.16 x -50

Bh

6

-

-

-

-

-6 Isolator Tumpu 20 kV

Bh

3

-

-

-

-

-CONDUCTOR + PROTECTION

7 Cut.Out 24 kV + Fuse link 100 A polimer

Bh

3

-

-

-

-

-8 Lighting Arrester 24 kV 10 kA

Bh

3

-

-

-

-

-9 Line Tape Connector

Bh

3

-

-

-

-

-10 Penghalang Panjat -10"

Bh

1

-

-

-

-

-11 Tanda Bahaya besar

Bh

1

-

-

-

-

-12 NYAF 25 mm2

Mtr

3

-

-

-

-

-13 NYAF 50 mm2

Mtr

12

-

-

-

-

-14 SKT 150 mm CU

Bh

4

-

-

-

-

-15 SKT 25 mm CU

Bh

6

-

-

-

-

-16 SKT 50 mm CU

Bh

5

-

-

-

-

-17 SKT 70 mm CU

Bh

3

-

-

-

-

-GROUNDING TRAFO

18 Ground Rod TM

Bh

5

-

-

-

-

-19 Bimetal Connector 50 mm AL/CU

Bh

5

-

-

-

-

-20 Bc 50 mm2 u/ Arde

Mtr

15

-

-

-

-

-21 Copper tube 50 mm2

Bh

5

-

-

-

-

-22 Bolt Nut 12 x 50mm

Bh

5

-

-

-

-

-23 Pipa Galvanis 3/4"

Bh

1

-

-

-

-

-JUMLAH HARGA (Rp.)

JUMLAH (Rp.)

PERINCIAN BILL OF QUANTITY (BQ)

No.

JENIS MATERIAL

SAT

VOL

HARGA SATUAN (Rp.)

DUDUKAN TRAFO

24 Dudukan Trafo lengkap u/ 1 tiang Lengkap

Set

1

-

-

-

-

-LV PANEL

25 LV Panel 2 Group - 630Amp Lengkap

Set

1

-

-

-

-

-26 NYY 150 mm2

Mtr

40

-

-

-

-

-27 NYY 4 x 70 mm2

Mtr

20

-

-

-

-

-28 Copper Tube 150 mm2

Bh

8

-

-

-

-

-29 Copper Tube 70 mm2

Bh

8

-

-

-

-

-30 Copper Tube 25 mm2

Bh

3

-

-

-

-

-31 Pipa Galvanis 3" - 6 Mtr

Bh

1

-

-

-

-

-32 Pipa Galvanis 2" - 6 Mtr

Bh

2

-

-

-

-

-33 Elbow Besi 3"

Bh

1

-

-

-

-

-34 Elbow Besi 2-34;

Bh

2

-

-

-

-

-35 Elbow PVC 3"

Bh

2

-

-

-

-

-36 Elbow PVC 2"

Bh

4

-

-

-

-

-37 Pondasi tiang type C

Set

1

-

-

-

-38 Distribusi Trafo 100 kVA - 20 kV ( 3 Phasa )

Bh

1

-

-

-

-

-39 Transportasi

rit

1

-

-

-

--

-

(7)

No

Nama Material

Sat Harga sat Ongkos

1

A 3 C - S 150 mm2

Mtr

-

-2

All Bending Wire 3,2 mm2

Mtr

-

-3

All Tape 0,4 x 10 mm

Mtr

-

-4

Anchor block u/ trekschoor

Bh

-

-5

Anchor Rod TM

Bh

-

-6

Arm Tie Band + Boll & Nut 16 x 50 mm

Bh

-

-7

Arm tie type 750 mm

Bh

-

-8

Arm tie type 900 mm

Bh

-

-9

Ball Clevis

Bh

-

-10

Ball Isolator TM

Bh

-

-11

Bolt & Nut M.16 x 400 + washer

Bh

-

-12

Bolt & Nut M.16 x 500 + washer

Bh

-

-13

Bolt & Nut M.16 x 120 + washer

Bh

-

-14

Bolt & Nut M.16 x 140 + washer

Bh

-

-15

Cross Arm 2000 mm tipe tarik

Bh

-

-16

Cross Arm 2000 mm tipe tumpu

Bh

-

-17

Cross Arm 3000 mm tipe tarik

Bh

-

-18

Cut.Out 24 kV + Fuse link 100 A polimer

Set

-

-19

Clamp Beugles 6" - 4" u/ Ver. Stik

Bh

-

-20

Dead end Clamp

Bh

-

-21

Double Arm Band 8"

Bh

-

-22

Double Arm Bolt & Nut M.16 x 400

Bh

-

-23

Galvanis Gaspipe 0,75 x 2 Mtr

Bh

-

-24

Galvanis Pipa 2" - 2 mtr u/ strut tie

Bh

-

-25

HV Band Strap

Bh

-

-26

Isolator Tarik 20 kV

Bh

-

-27

Joint Sleve 70 mm2

Bh

-

-28

Line Tape Connector

Bh

-

-29

Tanda Bahaya kecil

Bh

-

-30

Tiang Beton 13/350 daN GW

Btg

-

-DAFTAR HARGA SATUAN UNTUK PEMASANGAN

SALURAN UDARA TEGANGAN MENENGAH TH 2013

30

Tiang Beton 13/350 daN GW

Btg

-

-31

Tiang Beton 11/200 daN

Btg

-

-32

Tiang Beton 13/350 E daN GW

Btg

-

-33

Tiang Beton 9/200 daN

Btg

-

-34

Steel wire 22 mm2 u/ Gnd Wire

Mtr

-

-35

Isolator Tumpu 20 kV

Bh

-

-36

Penghalang Panjat 10"

Bh

-

-37

Pipa Galv. 4" - 3 Mtr u/ Verling Stick.

Bh

-

-38

Preformed grip 22 mm2 + accesories

Bh

-

-39

Preformed Grip 70 mm DIA

Bh

-

-40

Single Arm Band & Bolt Nuts M 16 + washer

Bh

-

-41

Single GW band + Bolt&Nut M16x50

Bh

-

-42

Socket Eye

Bh

-

-43

Steel Wire 70 mm2

Mtr

-

-44

Strut Arm NP. 10 - 300 mm

Bh

-

-45

Strut Tie 2" 2000mm

Bh

-

-46

Terminal Lug 70 mm CU/AL.

Bh

-

-47

Timble ( Kousen ) u/ GW

Bh

-

-48

Turn Bukle / Spanscroef 3/4 "

Bh

-

-49

U Bolt & Nut M 16 + Steel Plate

Bh

-

-50

U strap

Bh

-

-51

Wire Clips

Bh

-

-52

Transportasi

Rit

-

-.,

... 2013

Dibuat oleh,

PT/CV

(8)
(9)

No

Nama Material

Sat Harga sat Ongkos

1

Anchor block u/ trekschoor

Bh

-

-2

Anchor rod TR

Bh

-

-3

Arm Tie Band + Boll & Nut 16 x 50 mm

Bh

-

-4

Arm tie type 900 mm

Bh

-

-5

Ball Isolator TM

Bh

-

-6

Bc 50 mm2 u/ Arde

mtr

-

-7

Bimetal Connector 50 mm AL/CU

Set

-

-8

Bolt & Nut M.16 x 140 + washer

Bh

-

-9

Bolt & Nut M.16 x 400 + washer

Bh

-

-10

Bolt & Nut M.16 x 50

Bh

-

-11

Bundled Conductor 3 x 70 + 1x 50 mm2

mtr

-

-12

Cross Arm 3000 mm tipe tarik

Bh

-

-13

Dead end tube

Bh

-

-14

Double Guy Wire band

Bh

-

-15

Ground rod TR

Bh

-

-16

Roll Isolator

Bh

-

-17

Instulated tension join 50/50 AL

Bh

-

-18

Kousen u/ 35 mm

Bh

-

-19

All Bending Wire 3,2 mm2

mtr

-

-20

Link

Bh

-

-21

Pierching connector 70/70 , 50/50

Bh

-

-22

Pipa galv. 3/4" 2 mtr

Bh

-

-23

Pipa PVC 2" 0.5 Mtr

Bh

-

-24

Plastic strap

Bh

-

-25

Pondasi HT Pole type D

ls

-

-26

Preformed grip 35 mm2

Bh

-

-27

Single Arm Band & Bolt Nuts M 16 + washer

Bh

-

-DAFTAR HARGA SATUAN UNTUK PEMASANGAN

SALURAN UDARA TEGANGAN RENDAH TH 2013

27

Single Arm Band & Bolt Nuts M 16 + washer

Bh

-

-28

Single Guy Wire band 8"

Bh

-

-29

Stainless steel strip

mtr

-

-30

Steel wire 35 mm2

mtr

-

-31

Stoping Buckle

Bh

-

-32

Strain Clamp

Bh

-

-33

Strut Arm Np. 10-250 mm

Bh

-

-34

Strut Tie 2" 2000mm

Bh

-

-35

Suspension Clamp

Bh

-

-36

Suspension Braket

Bh

-

-37

Tension Braket

Bh

-

-38

Terminal lug 50

Bh

-

-39

Tiang Beton 13/350 daN GW

Bh

-

-40

Tiang Beton 9/200 daN

Bh

-

-41

Tiang Beton 9/200E daN

Bh

-

-42

Turn Bukle / Spanscroef 3/4 "

Bh

-

-43

U Bolt & Nut M 16 + Steel Plate

Bh

-

-44

Wire Clips

Bh

-

-45

Transportasi

rit

-

-.,

... 2013

Dibuat oleh,

PT/CV

(

..)

(10)

POLE TOP ARRANGEMENT

1 Tiang Beton 13/350 E daN GW

Bh

-

-2

Cross Arm 2000 mm tipe tumpu

Bh

-

-3

Arm tie type 750 mm

Bh

-

-4

Bolt & Nut M.16 x 400 + washer

Bh

-

-5

Bolt & Nut M.16 x 50

Bh

-

-6

Isolator Tumpu 20 kV

Bh

-

-CONDUCTOR + PROTECTION

7 Cut.Out 24 kV + Fuse link 100 A polimer

Bh

-

-8 Lighting Arrester 24 kV 10 kA

Bh

-

-9 Line Tape Connector

Bh

-

-10 Penghalang Panjat -10"

Bh

-

-11 Tanda Bahaya besar

Bh

-

-12 NYAF 25 mm2

Mtr

-

-13 NYAF 50 mm2

Mtr

-

-14 SKT 150 mm CU

Bh

-

-15 SKT 25 mm CU

Bh

-

-16 SKT 50 mm CU

Bh

-

-17 SKT 70 mm CU

Bh

-

-GROUNDING TRAFO

18 Ground Rod TM

Bh

-

-19 Bimetal Connector 50 mm AL/CU

Bh

-

-20 Bc 50 mm2 u/ Arde

Mtr

-

-21 Copper tube 50 mm2

Bh

-

HARGA

SATUAN

ONGKOS

PASANG

DAFTAR HARGA SATUAN UNTUK PEMASANGAN

GARDU TRAFO 2 TIANG TH 2013

No

JENIS MATERIAL

SAT

21 Copper tube 50 mm2

Bh

-

-22 Bolt Nut 12 x 50mm

Bh

-

-23 Pipa Galvanis 3/4"

Bh

-

-DUDUKAN TRAFO

24 Dudukan Trafo lengkap u/ 2 tiang Lengkap

Set

-

-25 Dudukan Trafo lengkap u/ 1 tiang Lengkap

Set

-

-LV PANEL

26 LV Panel 2 Group - 630Amp Lengkap

Set

-

-27 NYY 150 mm2

Mtr

-

-28 NYY 4 x 70 mm2

Mtr

-

-29 Copper Tube 150 mm2

Bh

-

-30 Copper Tube 70 mm2

Bh

-

-31 Copper Tube 25 mm2

Bh

-

-32 Pipa Galvanis 3" - 6 Mtr

Bh

-

-33 Pipa Galvanis 2" - 6 Mtr

Bh

-

-34 Elbow Besi 3-34;

Bh

-

-35 Elbow Besi 2"

Bh

-

-36 Elbow PVC 3"

Bh

-

-37 Elbow PVC 2"

Bh

-

-38 Pondasi tiang type C

Set

-

-39 Distribusi Trafo 100 kVA - 20 kV ( 3 Phasa )

Bh

-

-40 Distribusi Trafo 50 kVA - 20 kV ( 3 Phasa )

Bh

-

-41 Transportasi

rit

-

-.,

... 2013

Dibuat oleh,

PT/CV

(

..)

(11)

No

URAIAN KEGIATAN

SAT

KETERANGAN

1 SUTM

0 s/d 0.25

kms

Rp.

-

-0.26 s/d 0.5

kms

Rp.

-

-0.51 s/d 0.75

kms

Rp.

-

-0.76 s/d 2.5

kms

Rp.

-

-2.6 s/d 5

kms

Rp.

-

-5.1 s/d 20

kms

Rp.

-

-20.1 s/d 60

kms

Rp.

-

-60.1 s/d 80

kms

Rp.

-

-80.1 s/d 100

kms

Rp.

-

-100.1 & keatas

kms

Rp.

-

-2 SKTM

-0 s/d -0.25

kms

Rp.

-

-0.26 s/d 0.5

kms

Rp.

-

-0.51 s/d 0.75

kms

Rp.

-

-0.76 s/d 1

kms

Rp.

-

-1.1 s/d 1.5

kms

Rp.

-

-1.6 s/d 2

kms

Rp.

-

-3 Gardu Trafo

s/d 50

kVA

Rp.

-

Portal/Control

100 s/d 200

kVA

Rp.

-

Portal/Control

250 s/d 400

kVA

Rp.

-

Portal/Control

500 s/d 630

kVA

Rp.

-

Portal/Control

800 s/d 2000

kVA

Rp.

-

Portal/Control

2500 s/d keatas

kVA

Rp.

-

Portal/Control

4 SUTR

-0 s/d -0.25

km

Rp.

-

-DAFTAR HARGA SATUAN

PEKERJAAN SERIFIKASI LAIK OPERASI (SLO)

BIAYA (Rp)

0 s/d 0.25

km

Rp.

-

-0.26 s/d 0.5

km

Rp.

-

-0.51 s/d 0.75

km

Rp.

-

-0.76 s/d 2.5

km

Rp.

-

-2.6 s/d 5

km

Rp.

-

-5.1 s/d 20

km

Rp.

-

-20.1 s/d 60

km

Rp.

-

-60.1 s/d 80

km

Rp.

-

-80.1 s/d 100

km

Rp.

-

-100.1 s/d keatas

km

Rp.

-

-5 Cubicle

-Cubicle Single Incoming

Set

Rp.

-

1 Incoming - 1 Outgoing - 1 Pengukuran

Cubicle Double Incoming

Set

Rp.

-

2 Incoming - 1 Outgoing - 1 Pengukuran

Gardu Konvensional

Set

Rp.

-

-Cubicle 20 KV lengkap dengan proteksi

Unit

Rp.

-

-Incoming 20 KV Trafo

Unit

Rp.

-

-Bus Coupler 20 KV

Unit

Rp.

-

-.,

... 2013

CV. BANGUN SEJAJAR PRIMA

Dibuat oleh,

PT/CV

(

..)

Referensi

Dokumen terkait

Hasil penelitian menunjukkan (1) Penempatan patung Ganesha di Desa Manistutu ditempatkan diberbagai tempat dengan fungsi yang berbeda-beda, (2) Penempatan patung

Data dari ujicoba luas ini dianalisis untuk mengetahui perbedaan kemampuan tes PI dalam mengukur penguasaan konsep mahasiswa dengan latar belakang yang sama

Dengan penerapan Augmented Reality tersebut dapat memberikan kemudahan dalam mendapatkan informasi dan menjadi solusi untuk dapat memilih Kopi Tampan sebagai

1. “Actions,” such as recruiting/transporting 2. “Purpose” being labor exploitation. It will be useful for stakeholders, especially at the grassroots to educate perpetrators so that

Suatu perilaku konsumen tak lepas dari pengaruh kelompok dan personal yang dianutnya. Reference group adalah seseorang atau sekelompok orang yang mempengaruhi perilaku

Layar scienceDirect dan menu-menu yang ditampilkan pada dokumen ini hanya ilustrasi untuk memudahkan pemakaiannya, tampilan layar sebenarnya mungkin saja berbeda ketika anda

DESKRIPSI UNIT : Unit kompetensi ini merupakan kemampuan yang didasari atas pengetahuan, keterampilan dan sikap kerja yang dibutuhkan untuk melakukan layanan

a. Penggunaan komputer yang bertujuan untuk memperingan dan mempercepat pekerjaan, di sisi lain bisa menimbulkan pengangguran, karena beban pekerjaan semakin