BQ Rumah Dinas RSU 2011 Lelang Ulang

N/A
N/A
Protected

Academic year: 2017

Membagikan "BQ Rumah Dinas RSU 2011 Lelang Ulang"

Copied!
3
0
0

Teks penuh

(1)

I PEKERJAAN PENDAHULUAN

1 PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK 72,00 M'

2 PEK. PEMBERSIHAN AWAL DAN AHIR PEKERJAAN 1,00 M2

3 PEK. DIREKSI KEET / BARAK KERJA 1,00 Ls

4 PEK. DOKUMENTASI & PELAPORAN 1,00 Ls

5 PEK. AIR KERJA 1,00 Ls

6 PEK. PAPAN NAMA PROYEK 1,00 Ls

-Rp

II PEKERJAAN BANGUNAN

1 PEK. GALIAN TANAH PONDASI BATU BATA 14,74 M3

2 PEK. URUGAN TANAH KEMBALI PONDASI BATU BATA 3,69 M3

3 PEK. PASIR URUG PONDASI BATU BATA 1,80 M3

4 PEK. PAS. LANTAI KERJA 0,90 M3

5 PEK. PAS. PONDASI BATU BATA 43,20 M2

-Rp

III PEKERJAAN STRUKTUR

1 PEK. SLOOF BETON BERTULANG 15/20 2,08 M3

2 PEK. KOLOM 10/10 BETON BERTULANG 0,93 M3

3 PEK. RING BALOK 10/15 1,04 M3

4 PEK. ATAP DAK BETON T=8 CM 0,69 M3

5 PEK. ATAP DAK BETON T=5 CM (PINTU & JENDELA) 0,13 M3

-Rp

IV PEKERJAAN DINDING DAN PLESTERAN

1 PEK. PAS. DINDING BATA 1/2 BATA ( 1 : 4 ) 145,00 M2 2 PEK. PAS. DINDING BATA 1/2 BATA ( 1 : 3 ) 39,50 M2

3 PEK. PLESTERAN (1 : 4) 290,01 M2

4 PEK. PLESTERAN (1 : 3) 79,00 M2

-Rp

V PEKERJAAN KUDA-KUDA & PENUTUP ATAP

1 PEK. PAS. KUDA-KUDA 1,54 M3

2 PEK. PAS. GORDING & RANGKA ATAP 2,03 M3

3 PEK. PAS. ATAP MULTI ROOF 137,56 M3

4 PEK. PAS. LISPLANK 2/20 9,00 M2

-Rp

VI PEKERJAAN LANTAI

1 PEK. URUGAN TANAH BAWAH LANTAI 8,11 M3

2 PEK. URUGAN PASIR BAWAH LANTAI T=5 CM 4,05 M3

3 PEK. COR LANTAI 1 : 3 : 5 4,05 M3

4 PEK. PAS. LANTAI KERAMIK 30/30 76,10 M2

5 PEK. PAS. LANTAI KERAMIK 20/20 4,78 M2

7 PEK. PAS. DINDING KERAMIK 20/20 16,59 M2

8 PEK. PAS. PLIN KERAMIK 4,10 M1

-Rp

VII PEKERJAAN RABAT KELILING BANGUNAN

1 PEK. URUGAN PASIR T = 10 CM 3,34 M3

2 PEK. COR RABAT 1 : 3 : 5 T = 5 CM 1,67 M3

-Rp HARGA SATUAN

BILL OF QUANTITY ( B . Q )

JUMLAH

JUMLAH

JUMLAH

JUMLAH

JUMLAH NO

JUMLAH

JUMLAH

JUMLAH

(2)

VIII PEKERJAAN PLAFOND

1 PEK. PAS. RANGKA PLAFOND, KAYU 122,70 M2

2 PEK. PAS. PLAFOND TRIPLEK 122,70 M2

3 PEK. PAS. LIST PLAFOND 87,43 M'

-Rp IX PEKERJAAN KUSEN, PINTU, JENDELA & KUNCI

1 PEK. PAS. KUSEN PINTU PJ1 0,08 M3

2 PEK. PAS. KUSEN PINTU P1 0,02 M3

3 PEK. PAS. KUSEN PINTU P2 0,12 M3

4 PEK. PAS. PINTU P3 (KM/WC) 2,00 Bh

5 PEK. PAS. PINTU P4 (ROLLING DOOR) 6,30 M2

6 PEK. PAS. KUSEN JENDELA J1 0,09 M3

7 PEK. PAS. KUSEN JENDELA J2 0,06 M3

8 PEK. PAS. KUSEN JENDELA J3 0,04 M3

9 PEK. PAS. KUSEN JENDELA J4 0,16 M3

10 PEK. PAS. KUSEN JENDELA J5 0,04 M3

11 PEK. PAS. KUSEN VENTILASI V1 0,03 M3

12 PEK. PAS. DAUN PINTU PJ1 1,68 M2

13 PEK. PAS. DAUN PINTU P1 2,94 M2

14 PEK. PAS. DAUN PINTU P2 1,68 M2

15 PEK. PAS. DAUN JENDELA PJ1 0,58 M2

16 PEK. PAS. DAUN JENDELA J2 0,29 M2

17 PEK. PAS. DAUN JENDELA J4 0,58 M2

18 PEK. PAS. DAUN JENDELA J5 0,87 M2

19 PEK. PAS. KACA T = 4 MM 10,32 M2

20 PEK. PAS. KUNCI TANAM DOUBLE 1,00 Bh

21 PEK. PAS. KUNCI TANAM BIASA 3,00 Bh

22 PEK. PAS. KUNCI TANAM KM/WC 2,00 Bh

23 PEK. PAS. ENGSEL PINTU 4" 18,00 Bh

24 PEK. PAS. ENGSEL JENDELA 3" 20,00 Bh

25 PEK. PAS. HAK ANGIN 20,00 Bh

-Rp

X PEKERJAAN PASANG TERALIS PINTU DAN JENDELA

1 PEK. PAS. TERALIS PINTU PJ1 3,75 M2

2 PEK. PAS. TERALIS PINTU P1 3,00 M2

3 PEK. PAS. TERALIS JENDELA J1 3,00 M2

4 PEK. PAS. TERALIS JENDELA J2 2,27 M2

5 PEK. PAS. TERALIS JENDELA J3 1,08 M2

6 PEK. PAS. TERALIS JENDELA J4 1,51 M2

7 PEK. PAS. TERALIS JENDELA J5 2,27 M2

-Rp

XI PEKERJAAN SANITASI

1 PEK. PAS. CLOSED JONGKOK 2,00 Bh

2 PEK. PAS. BAK FIBERGLASS 2,00 Bh

3 PEK. PAS. PIPA 27,00 M1

4 PEK. PAS. KRAN AIR 2,00 Bh

5 PEK. PAS. FLOOR DRAIN 2,00 Bh

6 PEK. PAS. ROOF DRAIN 2,00 Bh

7 PEK. SEPTICTANK 1,00 Bh

-Rp XII PEKERJAAN INSTALASI LISTRIK

1 PEK. PASANG INSTALASI LISTRIK 35,00 Ttk

JUMLAH HARGA SATUAN

JUMLAH

JUMLAH JUMLAH

JUMLAH

(3)

2 PEK. PEMASUKAN ARUS 1300 Ampere 1,00 Unit

3 PEK. PASANG LAMPU PIJAR 16,00 Bh

4 PEK. PASANG LAMPU 19,00 Bh

5 PEK. PASANG STOP KONTAK 4,00 Bh

6 PEK. PASANG SAKLAR TUNGGAL 1,00 Bh

7 PEK. PASANG SAKLAR GANDA 5,00 Bh

8 PEK. PASANG MCB 1,00 Bh

-Rp

XIII PEKERJAAN PENGECATAN

1 PEK. CAT KUSEN PINTU & JENDELA 20,79 M2

2 PEK. CAT DAUN KUSEN PINTU & DAUN JENDELA 12,16 M2 3 PEK. CAT TEMBOK (1 X PLAMOUR + 2 X CAT WARNA) 290,01 M2

-Rp XIV PEKERJAAN PEMBUATAN SUMUR GALI

1 PEK. GALIAN TANAH SUMUR 10,00 M'

2 PAS. CINCIN BETON (GORONG-GORONG) Dia. 80 Cm 11,00 M'

3 PEK. MESIN POMPA AIR 1,00 Ls

4 PEK. INSTALASI PIPA AIR BERSIH 1,00 Ls

-Rp JUMLAH

JUMLAH

Referensi

Dokumen terkait

Hari Sabtu , Tanggal 19, Bulan Juni , Tahun 2010, Halaman C Kolom --.

[r]

Maskara dan eyeliner terdiri dari satu atau lebih pembentuk film, pigmen, dan pembawa yang sebagian besar menguap untuk memungkinkan film untuk mengatur (Barel, dkk., 2001)..

 Tokoh yang disegani bagi aliran reformisme  Pendapatnya tentang pembaharuan Islam:. “menekankan masyarakat Islam kembali semua kepada al-Quran dan al-Hadis untuk

[r]

Berdasarkan diskusi hasil penelitian tentang persepsi guru pendidikan dasar terhadap penyelenggraan pendidikan inklusif di Kabupaten Jember Provinsi Jawa Timur, maka dapat

Ada pun permasalahan yang dibahas dalam skripsi ini adalah bagaimana bentuk pengawasan kegiatan perbankan konvensional oleh Otoritas Jasa Keuangan, bagaimana bentuk

Sebagaimana telah diubah dengan Undang-Undang Nomor 3 Tahun 2004 tentang Penetapan Peraturan Pemerintah Pengganti Undang-Undang Nomor 3 Tahun 2004 tentang Perubahan