(1) (2) (4) (5) (6) (8) A PENATAAN LINGKUNGAN PERMUKIMAN

1 Penataan Bantaran Sungai 1 Talud+Normalisasi RT.02/RW.05-RT.02/RW.06 1170 Meter 325,000,000

2 Jalan Setapak (Paving Blok) RT.02/RW.05-RT.02/RW.07 585 Meter 80,000,000

3 Jembatan RT.02/RW.05-RT.02/RW.08 4 Unit 60,000,000

4 Penerangan Sungai RT.02/RW.05-RT.02/RW.09 27 Unit 54,000,000

5 Penghijauan Sempadan Sungai RT.02/RW.05-RT.02/RW.09 117 Pohon 5,850,000 6 Papan Informasi & Aturan Bersama RT.02/RW.05-RT.02/RW.10 4 Unit 8,000,000

2 Ruang Terbuka Hijau 1 Taman Bermain RT.02/RW.05 1 Unit 50,000,000

2 Taman Bermain dan Lap. Bulutangkis RT.02/RW.06 1 Unit 55,000,000

3 Taman Bermain RT.01/RW.06 1 Unit 50,000,000

4 Taman Lingkar Kaw. Sentra PertanianTerpadu RT.02/RW.05 2 Unit 100,000,000

5 Taman lingkar + Kolam Sumur Tua RT.01/RW.06 1 Unit 50,000,000

3 Fasilitas Umum 1 PAUD+Taman Bermain RT.02/RW.06 1 Unit 75,000,000

2 Posyandu RT.02/RW.06 1 Unit 25,000,000

3 Rehab Posyandu RT.02/RW.05 1 Unit 10,000,000

4 Pembangunan Jalan Kawasan 1 Jalan Setapak Samping Sungai(J1) RT.01/RW.06 250 Meter 25,000,000 2 Pembentukan Badan Jalan (J2) RT.01/RW.06-RT.01/RW.05 400 Meter 26,400,000

3 Jalan Setapak (J3) RT.01/RW.05 90 Meter 9,000,000

4 Jalan Setapak (J4) RT.01/RW.05 180 Meter 18,000,000

5 Jalan Setapak Samping Sungai (J5) RT.01/RW.06 130 Meter 13,000,000

RENCANA PEMBIAYAAN RTPLP TAHUN 2015 - 2020

KAWASAN PRIORITAS PLPBK

KELURAHAN PURANGI, KEC. SENDANA, KOTA PALOPO

(3)

Rincian Kegiatan Sektor/Program

No Lokasi Volume Satuan PEMBIAYAANRENCANA

5 Jalan Setapak Samping Sungai (J5) RT.01/RW.06 130 Meter 13,000,000

6 Jalan Setapak (J6) RT.01/RW.06 85 Meter 8,500,000

7 Jalan Setapak (J7) RT.01/RW.06 195 Meter 19,500,000

8 Pembentukan Badan Jalan (J8) RT.01/RW.06 485 Meter 32,000,000

9 Pembentukan Badan Jalan Samping Sungai(J9) RT.02/RW.06 330 Meter

21,780,000 10 Pembentukan Badan Jalan & Jalan Setapak(J10) RT.02/RW.06 152 Meter 15,200,000

11 Jalan Setapak (J11) RT.02/RW.06 60 Meter 6,000,000

12 Pembentukan Badan Jalan (J12) RT.02/RW.05 110 Meter 7,260,000

13 Pengembangan Jalan Kaw. Sentra PertanianTerpadu (J13) RT.02/RW.05 440 Meter 57,640,000

14 Jalan Setapak (J14) RT.02/RW.05 155 Meter 15,500,000

15 Jalan Setapak Samping Sungai (J15) RT.02/RW.06 635 Meter 63,500,000

16 Pengaspalan Jalan (J16) RT.02/RW.06 1578 Meter 2,367,000,000

5 Hunian 1 Rehab Rumah Semua RT 34 Unit 255,000,000

2 Pagar Seragam Semua RT 121 Unit 121,000,000

6 Penataan Pedestrian 1 Pengecatan Drainase Jl. Opu Tohalide 998 Meter 24,950,000

2 Trotoar Jl. Opu Tohalide 454 Meter 68,100,000

3 Penghijauan Sempadan Jalan Jl. Opu Tohalide 100 Pohon 5,000,000

4 Halte Jl. Opu Tohalide 2 Unit 20,000,000

5 Rambu Jalan Jl. Opu Tohalide 4 Unit 2,000,000

6 Marka Jalan Jl. Opu Tohalide 454 Meter 6810000

7 Papan Informasi & Aturan Bersama Jl. Opu Tohalide 2 Unit 2,000,000

8 Tugu Penanda Kawasan Prioritas Jl. Opu Tohalide 2 Unit 3,000,000

7 Penerangan Kawasan 1 Lampu Jalan Utama Jl. Opu Tohalide 8 Unit 40,000,000

2 Lampu Jalan Lingkungan Semua RT 19 Unit 38,000,000

3 Lampu Pekarangan Semua RT 121 Unit 60,500,000

(2)

B

1 Pengelolahan Sampah 1 Bank Sampah RT.02/RW.06 1 Unit 7,000,000

2 Tempat Sampah Semua RT 121 Unit 24,200,000

3 Bak Sampah Komunal Semua RT 4 Unit 8,000,000

4 Alat Pembuat Biopori Semua RT 16 Unit 3,200,000

5 Motor Sampah Semua RT 1 Unit 30,000,000

2 SPAL 1 Perpipaan SPAL Semua RT 69 Paket 13,800,000

2 Bak Penyaring Semua RT 121 Unit 242,000,000

3 Bidang Peresapan Semua RT 15 Unit 4,500,000

3 Pembangunan Drainase 1 Saluran Drainase (d1) RT.01/RW.06 290 Meter 58,000,000

2 Saluran Drainase (d2) RT.01/RW.06 430 Meter 86,000,000

3 Saluran Drainase (d3) RT.01/RW.06 200 Meter 40,000,000

4 Saluran Drainase (d4) RT.02/RW.06 327 Meter 65,400,000

5 Saluran Drainase (d5) RT.01/RW.06-RT.01/RW.05 426 Meter 85,200,000

6 Saluran Drainase (d6) RT.01/RW.05 185 Meter 37,000,000

7 Saluran Drainase (d7) RT.01/RW.05 101 Meter 20,200,000

8 Pembangunan dan Rehab Saluran Drainase(d8) RT.02/RW.06-RT.02/RW.05 154 Meter 30,800,000

9 Saluran Drainase (d9) RT.02/RW.05 160 Meter 32,000,000

10 Saluran Drainase (d10) RT.02/RW.05 51 Meter 10,200,000

11 Saluran Drainase Kaw. Sentra PertanianTerpadu (d11) RT.02/RW.05 299 Meter 59,800,000

12 Saluran Drainase (d12) RT.02/RW.05 162 Meter 32,400,000

13 Saluran Drainase (d13) RT.02/RW.05 82 Meter 16,400,000

14 Saluran Drainase (d14) RT.02/RW.05 1116 Meter 223,200,000

15 Saluran Drainase (d15) RT.02/RW.05-RT.02/RW.06 1205 Meter 241,000,000

16 Riol (r1) RT.01/RW.06 92 Meter 6,900,000

17 Riol (r2) RT.01/RW.06 68 Meter 5,100,000

18 Riol (r3) RT.02/RW.06 135 Meter 10,125,000

19 Riol (r4) RT.02/RW.06 153 Meter 11,475,000

PENYEHATAN LINGKUNGAN PERMUKIMAN

19 Riol (r4) RT.02/RW.06 153 Meter 11,475,000

20 Riol (r5) RT.01/RW.05 157 Meter 11,775,000

4 Jamban 1 Jamban Keluarga Semua RT 12 Unit 48,000,000

2 Rehab MCK Umum RT.02/RW.06 1 Unit 3,000,000

3 MCK Umum RT.01/RW.06 1 Unit 10,000,000

1,476,675,000

C PENGEMBANGAN AIR MINUM

1 Sarana Air Minum 1 Sumur Bor Semua RT 7 Unit 70,000,000

2 Wadah Penyaring Semua RT 108 Unit 54,000,000

3 Sambungan PDAM Semua RT 108 Rumah 162,000,000

286,000,000

D PENANGULANGAN BENCANA

1 Longsor Batas Kelurahan 1 Talud+Bronjong Batas Purangi Sendana 250 Meter 1,675,000,000

2 Normalisasi Sungai Batas Purangi Sendana 250 Meter 16,500,000

3 Jembatan Batas Purangi Sendana 1 Unit

-4 Reling Pengaman Batas Purangi Sendana 100 Meter 100,000,000

2 Longsor Sungai Salangka 1 Talud RT.02/RW.06 1270 Meter 3,429,000,000

3 Sosialisasi 1 Sosialisasi Bencana Semua RT 1 Paket 5,000,000

2 Media Sosialisasi Bencana Semua RT 1 Paket 3,000,000

5,228,500,000 SUB TOTAL B

SUB TOTAL C

(3)

E PENGEMBANGAN SOSIAL

1 Pendidikan Formal 1 Program Paket B Semua RT 1 Paket 10,000,000

2 Program Paket C Semua RT 1 Paket 10,000,000

2 Pendidikan Nonformal 1 Pelatihan Menjahit Semua RT 3 Kelompok 15,000,000

2 Bantuan Mesin Jahit Semua RT 3 Kelompok 36,000,000

3 Pelatihan Meubel Semua RT 1 Kelompok 10,000,000

3 Kesehatan 1 Penyuluhan Kesehatan Lingkungan 1 Paket 5,000,000

2 Penyuluhan KB, Kesehatan ibu hamil danbalita. 1 Paket 5,000,000

4 Kelembagaan 1 Peningkatan Kapasitas Kelembagaan Kawasan 1 Paket 5,000,000

96,000,000

F PENGEMBANGAN EKONOMI

1 Ekonomi Kawasan 1 Modal Usaha Pengembangan Pertanian Semua RT 3 Kelompok 75,000,000

2 Ekonomi Rumah Tangga 1 Pelatihan Pembuatan Makanan Ringan Semua RT 1 Paket 10,000,000

2 Modal Usaha Rumah Tangga Semua RT 4 Kelompok 100,000,000

185,000,000

G PENGEMBANGAN PERTANIAN

1 Kebun Percontohan 1 Balai Pertanian RT.02/RW.05 1 Unit 20,000,000

2 Pemagaran RT.02/RW.05 120 Meter 6,000,000

3 Rumah Bibit RT.02/RW.05 & RT.01/RW.05 2 Unit 10,000,000

4 Rumah Kompos RT.02/RW.05 1 Unit 50,000,000

5 Kumbung Jamur RT.02/RW.06 1 Unit 10,000,000

2 Bantuan Pertanian 1 Pemanfaatan Lahan Pekarangan Semua RT 121 Paket 121,000,000

2 Bantuan Bibit Semua RT 1 Paket 10,000,000

SUB TOTAL F SUB TOTAL E

2 Bantuan Bibit Semua RT 1 Paket 10,000,000

3 Pupuk Semua RT 1 Paket 5,000,000

4 Traktor Kebun RT.02/RW.05 2 Unit 60,000,000

5 Alat Pertanian Semua RT 1 Paket 20,000,000

6 Media Pembibitan Jamur RT.02/RW.05 1 Unit 10,000,000

3 Pendidikan Pertanian 1 Penyuluhan Pertanian Semua RT 1 Paket 20,000,000

2 Pelatihan Pembuatan Pupuk dan ObatHama Semua RT 1 Paket 10,000,000

352,000,000

11,923,665,000

Referensi

Dokumen terkait

Dalam rangka mendukung pelaksanaan Prioritas Nasional Tahun 2019- 2024, ditetapkan 6 (enam) Sasaran Strategik Kementerian Dalam Negeri. Adapun tujuan dan Sasaran

Belanja bahan Kegiatan Peningkatan Kualitas Panitera Peradilan Pengadaan Langsung 2.680.000 38 Peningkatan Manajemen Peradilan Umum, KODE RUP: 27060693 KODE RUP SWAKELOLA:

Dengan perhatian-penuh (mindfulness) kita akan sanggup menanggung keseluruhan hidup ini — beserta kegairahan dan kebosanannya, harapan dan keputus- asaannya, kenikmatan

SILABUS MANAJEMEN SUMBER DAYA MANUSIA (SDM) DAN PRODUKTIVITAS BIDANG KESEHATAN1. PERTEMUAN KBK

This file tabulates all energy-dependent input data, including densities of states, specific rate constants for every reaction, collision up-transition probabilities and

Judul : Peningkatan profesionalisme guru melalui pelatihan english pronunciation dalam lagu

Riris Sarumpaet (via Trimansyah, 1999:21) membuat empat rumusan tentang sastra anak yang diistilahkannya sebagai bacaan anak-anak, yaitu: a) WUDGLVLRQDO , bacaan

Baja merupakan alternative bahan bangunan tahan gempa yang sangat baik, karena jika dibandingkan dengan struktur beton, baja dinilai memiliki sifat daktilitas