• Tidak ada hasil yang ditemukan

JADWAL PELAKSANAAN KEGIATAN APBD DINAS PSDA PROVINSI JAWA TENGAH TAHUN 2016

N/A
N/A
Protected

Academic year: 2021

Membagikan "JADWAL PELAKSANAAN KEGIATAN APBD DINAS PSDA PROVINSI JAWA TENGAH TAHUN 2016"

Copied!
28
0
0

Teks penuh

(1)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des

1 4.752.000

a. Penyediaaan Jasa Surat Menyurat Dinas 4.752.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

2 450.000.000

a. Penyediaan jasa komunikasi, sumber daya air dan listrik 439.278.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Penyediaan jasa komunikasi 10.722.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

3 62.325.000

a. Penyediaan jasa jaminan barang milik daerah 62.325.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

4 158.256.000

a. Belanja Pengelolaan Sampah 5.400.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Cleanning Service 152.856.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

5 75.000.000

a. Penyediaan alat tulis kantor 75.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

6 75.000.000

a. Penyediaan barang cetakan dan penggandaan 75.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

7 52.000.000

a. Penyediaan komponen instalasi listrik/penerangan bangunan kantor

30.210.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Perbaikan instalasi listrik 21.790.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

8 4.620.849.000

a. Pengadaan Excavator 2.000.000.000 ==== ==== ==== ++++ ==== b. Honorarium Tim Pengadaan Barang dan Jasa

(Excavator)

3.750.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== c. Honorarium Penerima Hasil Pekerjaan (Pengadaan

Excavator)

2.250.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== d. Pengadaan Alat Kantor Lainnya 155.000.000 ==== ==== ++++ ====

e. Honorarium Tim Pengadaan Barang dan Jasa (Pengadaan Alat Kantor)

1.350.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== f. Honorarium Penerima Hasil Pekerjaan Pelaksanaan

Pengadaan Alat Kantor

1.050.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== g. Pengadaan Alat Kantor Sekretariat Dewan SDA

(WISMP Hibah - Dinas)

90.991.000 ==== ==== ++++ ==== h. Pengadaan Peralatan Kantor Sekertariat TKPSDA

(WISMP Hibah - JT)

151.800.000 ==== ==== ++++ ==== i. Pengadan Alat Kantor untuk dukung operasional

(WISMP Hibah - PC)

116.000.000 ==== ==== ++++ ====

j. Pengadaan Peralatan Bantu ( Pengadaan Komputer) Kegiatan Pengelolaan Kualitas Air (WISMP Hibah - BPSDA PC)

78.000.000 ==== ==== ++++ ====

k. Pengadan Peralatan Untuk Komunikasi Masa (WISMP Hibah - BPSDA PC)

84.500.000 ==== ==== ++++ ====

l. Pengadaan Komputer Sekretariat Dewan SDA (WISMP Hibah - KMM)

109.009.000 ==== ==== ++++ ==== m. Pengadaan Perangkat Keras Komputer Hidrologi

(WISMP HIbah - BPSDA PC)

116.000.000 ==== ==== ++++ ====

n. Pengadaan Peralatan Pengolah Data:Perangkat Keras,Perangkat Lunak dan Pheriperalnya (WISMP Hibah - JT)

354.500.000 ==== ==== ++++ ====

o. Pengadaan Komputer Sistim Informasi SDA Provinsi (WISMP Pendampingan - SISDA)

85.800.000 ==== ==== ++++ ==== p. Penyediaan Perangkat Pengelolah Data Alokasi Air

(WISMP Pendampingan - BPSDA PC)

69.500.000 ==== ==== ++++ ====

q. Pengadaan Peralatan Pengolah Data Sistim Informasi SDA - PAKET 1 (WISMP Pendampingan - BPSDA PC)

85.000.000 ==== ==== ++++ ====

r. Pengadaan Peralatan Pengolah Data Sistim Informasi SDA - PAKET 2 (WISMP Pendampingan - BPSDA PC)

189.000.000 ==== ==== ++++ ====

s. Pengadaan Komputer Pengelolaan Hidrologi Wilayah Sungai (WISMP Pendampingan - BPSDA Jratun)

108.000.000 ==== ==== ++++ ====

t. Pengadaan Komputer dan Alat-alat Pemantauan Kualitas Air (WISMP Pendampingan - BPSDA Jratun)

48.000.000 ==== ==== ++++ ====

u. Pengadaan dan Pemasangan Peralatan Komputer Pengelolaan Banjir (WISMP Pendampingan - BPSDA Jratun)

70.000.000 ==== ==== ++++ ====

v. Pengembangan Unit MIS Database dan WEB (WISMP Pendampingan - BPSDA Jratun)

100.000.000 ==== ==== ++++ ==== w. Perlengkapan Komputer Sisda 196.356.000 ==== ==== ==== ++++ ==== x. Honorarium Tim Pengadaan Barang dan Jasa (Komputer

Sisda)

1.350.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== y. Honorarium Penerima Hasil Pekerjaan (Pengadaan

Komputer Sisda)

1.050.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== z. Perlengkapan Komputer Gaji On Line 100.393.000 ==== ==== ++++ ====

aa. Honorarium Tim Pengadaan Barang dan Jasa (Pengadaan Komputer Gaji On Line)

1.350.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ab. Honorarium Penerima Hasil Pekerjaan (Pengadaan

Komputer Gaji On Line)

1.050.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ac. Pengadaan Peralatan Studio Video dan Film (Dinas dan

Balai)

197.000.000 ==== ==== ++++ ==== ad. Honorarium Tim Pengadaan Barang dan Jasa

(Pengadaan Alat Studio)

1.350.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ae. Honorarium Penerima Hasil Pekerjaan (Pengadaan Alat

Studio)

1.050.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== Penyediaan komponen instalasi listrik/penerangan bangunan

kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan peralatan dan perlengkapan kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

JADWAL PELAKSANAAN KEGIATAN APBD

DINAS PSDA PROVINSI JAWA TENGAH

TAHUN 2016

Penyediaan jasa surat menyurat - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan jasa komunikasi, sumber daya air dan listrik - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan jasa jaminan barang milik daerah - DINAS PENGELOLAAN SUMBER DAYA AIR

Kegiatan Penyediaan Jasa Kebersihan Kantor/Rumah Dinas - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan alat tulis kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan barang cetakan dan penggandaan - DINAS PENGELOLAAN SUMBER DAYA AIR

(2)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

af. Pengadaan Alat Komunikasi Telephone 98.000.000 ==== ==== ==== ++++ ====

ag. Honorarium Tim Pengadaan Barang dan Jasa (Pengadaan Alat Komunikasi)

1.350.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ==== ==== ah. Honorarium Penerima Hasil Pekerjaan (Pengadaan Alat

Komunikasi)

1.050.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ==== ====

9 25.000.000

a. Penyediaan peralatan rumah tangga 25.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

10 7.590.000

a. Penyediaan bahan bacaan dan peraturan perundang-undangan

7.590.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

11 30.000.000

a. Penyediaan makanan dan minuman 30.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

12 225.000.000

a. Rapat-rapat koordinasi dan konsultasi ke dalam dan luar daerah

225.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

13 2.195.945.000

a. Pendukung Penyediaan Jasa Pelayanan Perkantoran 1.229.945.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Outsourching Keamanan Dinas 244.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Outsorching Keamanan BPSDA Pemali Comal 81.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Outsorching Keamanan BPSDA Jragung 61.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Outsourching Keamanan Balai PSDA Seluna 81.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Outsourching keamanan Balai PSDA Bengawan Solo 81.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Outsourching keamanan Balai PSDA Probolo 81.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Outsourching keamanan BPSDA Serayu Citanduy 81.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ i. Outsourching Pengemudi Dinas PSDA (Pusat) 151.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ j. Outsourching Pengemudi Balai PSDA Pemali Comal 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ k. Outsourching pengemudi Balai PSDA Jragung Tuntang 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ l. Outsourching Pengemudi Balai PSDA Bengawan Solo 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ m. Outsourching Pengemudi BPSDA Probolo 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ n. Outsourching Pengemudi BPSDA Serayu Citanduy 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ o. Outsourching pengemudi BPSDA Seluna 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

14 2.242.500.000

a. Pembangunan gedung kantor BPSDA Bengawan Solo 2.237.225.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== b. Honorarium Pelaksanaan Pengadaan Barang dan Jasa

pendukung kegiatan pembangunan gedung kantor

5.275.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ====

15 30.000.000

a. Pemeliharaan rutin / berkala rumah dinas 30.000.000 ==== ++++ ==== ====

16 150.000.000

a. Pemeliharaan Gudang, Jalan Kolonel Soegiono Nomor 2 Semarang

80.200.000 ==== ++++ ++++ ====

b. Pemeliharaan kantor Dinas PSDA Jateng 65.000.000 ==== ++++ ++++ ====

c. Honorarium pemeliharaan gudang kol. Sugiono 2.400.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== d. Honorarium pemeliharaan kantor Dinas 2.400.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ====

17 742.500.000

a. Pemeliharaan rutin/berkala kendaraan dinas/operasional 742.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

18 27.225.000

a. Pemeliharaan rutin/berkala perlengkapan gedung kantor 27.225.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

19 7.334.000

a. Pemeliharaan rutin/berkala mebeleur 7.334.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

20 157.485.000

a. Rehabilitasi sedang/berat gedung koperbal BPSDA Bengawan Solo

155.085.000 ==== ++++ ++++ ++++ ==== b. Honorarium Tim pengadaan dan penerima hasil

pekerjaan

2.400.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ====

21 57.750.000

a. Kegiatan Pemeliharaan Rutin/Berkala Peralatan Kantor dan Rumah Tangga

57.750.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

22 2.458.000

a. Pemeliharaan Rutin/Berkala Arsip 2.458.000 ==== ++++

23 139.500.000

a. Pengadaan pakaian dinas beserta perlengkapannya 139.500.000 ==== ++++ ++++ ++++

24 24.750.000

a. Pendidikan dan pelatihan formal 24.750.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

25 55.050.000

a. Sosialisasi peraturan perundang-undangan 55.050.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

26 130.470.000

Sosialisasi peraturan perundang-undangan - DINAS PENGELOLAAN SUMBER DAYA AIR Bimbingan teknis implementasi peraturan perundang-undangan - DINAS PENGELOLAAN SUMBER DAYA AIR Pemeliharaan rutin/berkala mebeleur - DINAS PENGELOLAAN SUMBER DAYA AIR Rehabilitasi sedang/berat gedung kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

Kegiatan Pemeliharaan Rutin/Berkala Peralatan Kantor dan Rumah Tangga - DINAS PENGELOLAAN SUMBER DAYA AIR

Kegiatan Pemeliharaan Rutin/Berkala Arsip - DINAS PENGELOLAAN SUMBER DAYA AIR

Pengadaan pakaian dinas beserta perlengkapannya - DINAS PENGELOLAAN SUMBER DAYA AIR

Pendidikan dan pelatihan formal - DINAS PENGELOLAAN SUMBER DAYA AIR

Kegiatan Penyediaan Jasa Pelayanan Perkantoran - DINAS PENGELOLAAN SUMBER DAYA AIR

Pembangunan gedung kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

Pemeliharaan rutin/berkala rumah dinas - DINAS PENGELOLAAN SUMBER DAYA AIR Pemeliharaan rutin/berkala gedung kantor - DINAS PENGELOLAAN SUMBER DAYA AIR

Pemeliharaan rutin/berkala kendaraan dinas/operasional - DINAS PENGELOLAAN SUMBER DAYA AIR

Pemeliharaan rutin/berkala perlengkapan gedung kantor - DINAS PENGELOLAAN SUMBER DAYA AIR Penyediaan peralatan rumah tangga - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan bahan bacaan dan peraturan perundang-undangan - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan makanan dan minuman - DINAS PENGELOLAAN SUMBER DAYA AIR Rapat-rapat koordinasi dan konsultasi ke dalam dan luar daerah - DINAS PENGELOLAAN SUMBER DAYA AIR

(3)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

a. Bimbingan teknis implementasi peraturan perundang-undangan

130.470.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

27 350.000.000

a. Penyusunan Program dan Anggaran Pengelolaan SDA 350.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

28 400.000.000

a. Pemantauan, Evaluasi dan Pelaporan Kinerja Pengelolaan SDA

400.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

29 858.000

a. Penyediaan jasa surat menyurat 858.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

30 108.900.000

a. Penyediaan jasa komunikasi, sumber daya air dan listrik 108.900.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

31 24.948.000

a. Kegiatan Penyediaan Jasa Kebersihan Kantor/Rumah Dinas

24.948.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

32 13.200.000

a. Penyediaan alat tulis kantor 13.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

33 16.500.000

a. Penyediaan barang cetakan dan penggandaan 16.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

34 6.732.000

a. Penyediaan komponen instalasi listrik/penerangan bangunan kantor

6.732.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ====

35 5.418.000

a. Penyediaan peralatan rumah tangga 5.418.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ====

36 1.485.000

a. Penyediaan bahan bacaan dan peraturan perundang-undangan

1.485.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

37 6.311.000

a. Penyediaan makanan dan minuman 6.311.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

38 27.030.000

a. Rapat-rapat koordinasi dan konsultasi ke dalam dan luar daerah

27.030.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

39 16.500.000

a. Pemeliharaan rutin/berkala rumah dinas 16.500.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ====

40 50.000.000

a. Pemeliharaan rutin/berkala gedung kantor 50.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ====

41 118.674.000

a. Pemeliharaan rutin/berkala kendaraan dinas/operasional 118.674.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

42 1.803.000

a. Pemeliharaan rutin/berkala mebeleur 1.803.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ====

43 17.274.000

a. Kegiatan Pemeliharaan Rutin/Berkala Peralatan Kantor dan Rumah Tangga

17.274.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ====

44 965.000

a. Kegiatan Pemeliharaan Rutin/Berkala Arsip 965.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ====

45 5.225.600.000

a. Alat Tulis Kantor I 24.364.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Honorarium Panitia Pelaksana Kegiatan 12.250.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Honorarium Tim Pengadaan Barang dan Jasa 3.150.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Honorarium Pelaksana Kegiatan 55.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Upah Tenaga Pendukung Survey dan Pengukuran 11.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Upah Tenaga Pendukung OP Lapangan 1.062.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Upah Tenaga Pendukung Pemeliharaan 77.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Upah Tenaga Pendukung Operasional 44.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ i. Upah Tenaga Penanganan Darurat Irigasi 30.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ j. Alat Tulis Kantor II 35.909.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ k. Bahan Bakar Minyak/Pelumas Alat Kerja I 92.880.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ l. Bahan Bakar Minyak/ Pelumas Alat Kerja II 105.300.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ m. Bahan Baku Bangunan 2.576.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ Kegiatan Pemeliharaan Rutin/Berkala Peralatan Kantor dan

Rumah Tangga - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pemeliharaan Rutin/Berkala Arsip - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pemeliharaan Prasarana dan Sarana Irigasi Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan makanan dan minuman - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Rapat-rapat koordinasi dan konsultasi ke dalam dan luar daerah - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Pemeliharaan rutin/berkala rumah dinas - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Pemeliharaan rutin/berkala gedung kantor - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Pemeliharaan rutin/berkala kendaraan dinas/operasional - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Pemeliharaan rutin/berkala mebeleur - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Penyediaan Jasa Kebersihan Kantor/Rumah Dinas - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan alat tulis kantor - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA Penyediaan barang cetakan dan penggandaan - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan komponen instalasi listrik/penerangan bangunan kantor - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan peralatan rumah tangga - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan bahan bacaan dan peraturan perundang-undangan - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Penyusunan Program dan Anggaran Pengelolaan SDA - DINAS PENGELOLAAN SUMBER DAYA AIR

Kegiatan Pemantauan, Evaluasi dan Pelaporan Kinerja Pengelolaan SDA - DINAS PENGELOLAAN SUMBER DAYA AIR

Penyediaan jasa surat menyurat - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan jasa komunikasi, sumber daya air dan listrik - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

(4)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

n. Bahan Perawatan Rutin 154.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ o. Bahan Penanganan Darurat Irigasi I 72.100.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ p. Bahan Penanganan Darurat Irigasi II 75.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ q. Bahan Peralatan Kerja I 11.981.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ r. Bahan Peralatan Kerja II 30.312.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ s. Jasa Pengajar/Instruktur/Narasumber 24.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

t. Cetak 13.430.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

u. Penggandaan 36.878.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

v. Makanan dan Minuman Rapat I 32.175.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ w. Makanan dan Minuman Rapat II 5.400.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ x. Makanan dan Minuman Rapat III 8.100.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ y. Perjalanan Dinas Dalam Daerah I 82.215.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ z. Perjalanan Dinas Dalam Daerah II 91.350.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ aa. Perjalanan Dinas Dalam Daerah III 146.160.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ab. Perjalanan Dinas Dalam Daerah IV 31.320.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ac. Pemeliharaan Jaringan DI Kedungwaru 680.000.000 ==== ==== ++++

ad. Pekerjaan Pemeliharaan DI Medani I 65.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ae. Pekerjaan Pemeliharaan DI Medani II 95.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== af. Pekerjaan Pemeliharaan DI Medani III 95.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ag. Pekerjaan Pemeliharaan DI Medani IV 95.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ah. Pekerjaan pemeliharaan DI Siwayut I 80.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ai. Pekerjaan Pemeliharaan DI Siwayut II 80.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== aj. Pekerjaan Pemeliharaan DI Sentul I 65.000.000 ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ak. Pekerjaan Pemeliharaan DI Sentul II 60.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== al. Pekerjaan Pemeliharaan DI Sentul III 80.000.000 ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== am. Pekerjaan Pemeliharaan DI Sentul IV 80.000.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== an. Pekerjaan Pemeliharaan DI Widodaren I 60.000.000 ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ao. Pekerjaan Pemeliharaan DI Widodaren II 60.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ap. Pekerjaan Pemeliharaan DI Widodaren III 90.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== aq. Pekerjaan Pemeliharaan DI Bakalan I 80.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ar. Pekerjaan Pemeliharaan DI Bakalan II 80.000.000 ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== as. Pekerjaan Pemeliharaan DI Bakalan III 75.000.000 ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== at. Pekerjaan Pemeliharaan DI Kedungwaru I 80.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== au. Pekerjaan Pemeliharaan DI Kedungwaru II 80.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== av. Pekerjaan Pemeliharaan DI Kedungwaru III 80.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== aw. Pekerjaan Pemeliharaan DI Kramat I 75.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ax. Pekerjaan Pemeliharaan DI Kedungsapen I 60.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ay. Pekerjaan Pemeliharaan DI Kedungsapen II 90.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== az. Pekerjaan Pemeliharaan DI Kedungsapen III 80.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ba. Pekerjaan Pemeliharaan DI Kedungsapen IV 80.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bb. Pekerjaan Pemeliharaan DI Kedungsapen V 80.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bc. Pekerjaan Pemeliharaan DI Logung I 80.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== bd. Pekerjaan Pemeliharaan DI Logung II 80.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== be. Pekerjaan Pemeliharaan DI Logung III 60.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ==== ==== bf. Hadiah Barang dan Uang Atas Penghargaan 9.450.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

46 220.320.000

a. Tenaga Kerja 4.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

b. Alat Tulis Kantor 10.735.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Jasa Pengajar/Instruktur/Narasumber 2.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Cetak dan Penggandaan 2.480.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Makanan dan Minuman Rapat 2.475.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Perjalanan Dinas Dalam Daerah 7.830.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Perkuatan Tebing Embung Dukuhmulyo 95.000.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== h. Perkuatan Tebing Embung Jatisari 95.000.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ====

47 200.000.000

a. Upah Tenaga Kerja 14.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Alat Tulis Kantor 13.916.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Bahan Baku Bangunan 1.468.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Jasa Pengajar/Instruktur/Narasumber 2.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Cetak dan Penggandaan 4.236.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Makanan dan Minuman Rapat 4.545.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Perjalanan Dinas Dalam Daerah 17.835.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Pemeliharaan Sedrain Pond DAS Logung 10.000.000 ==== ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== i. DAM Parit Anak Sungai Piji 72.000.000 ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== j. Sumur Resapan Konservasi dengan Biopori DAS

Logung

10.000.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== k. Wd. Gembong, Gunungrowo, Tempuran, Greneng,

Simo, Butak, Nglangon, Sanggeh

50.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ====

48 200.000.000

a. Pengadaan ATK 6.617.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ====

b. Penyuluhan dan Sosialisasi Aset 37.160.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== c. Pengadaan Patok Batas dan Papan Larangan 48.350.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== d. Analisis Laboratorium Kualitas Air 62.500.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== e. Penyuluhan dan Sosialisasi Kualitas Air 3.300.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ====

f. Belanja Cetak 1.550.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ====

g. Belanja Penggandaan 3.022.000 ==== ==== ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== h. Perjalanan Dinas 37.501.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ 49 Kegiatan Pengelolaan data base SDA Balai PSDA Seluna - 300.000.000

BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pemeliharaan Prasarana dan Sarana Air Baku Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pemeliharaan Prasarana dan Sarana Konservasi Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pengendalian dan Pendayagunaan SDA Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

(5)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

a. Honorarium Penjaga Pos Hidrologi 124.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Upah Tenaga Kerja 35.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Pengadaan ATK 22.250.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== d. Pengadaan Bahan Peralatan Kerja 5.523.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ====

e. Belanja Cetak 2.180.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ====

f. Belanja Penggandaan 2.816.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== g. Perjalanan Dinas 76.654.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Pemeliharaan Pos dan Peralatan Hidrologi 30.777.000 ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ==== ==== ====

50 325.000.000

a. Upah Tenaga Kerja 16.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Alat Tulis Kantor 15.187.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ c. Bahan Baku Bangunan 1 34.298.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Bahan Baku Bangunan 2 20.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Jasa Pengajar/Instruktur/Narasumber 4.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Cetak & Penggadaan 3.240.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Makanan & Minuman 2.700.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Perjalanan Dinas Dalam Daerah 19.575.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ i. Pekerjaan Pemeliharaan S. Logung 90.000.000 ==== ==== ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== j. Pekerjaan Pemeliharaan S. Dawe 90.000.000 ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== k. Pekerjaan Pemeliharaan S. Wulan; S. Gelis & S. Juana 30.000.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ====

51 350.000.000

a. Upah Piket 148.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

b. Pengadaan ATK 5.888.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ====

c. Operasional Alat Berat Pengelolaan Banjir 98.210.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== d. Penanganan Darurat 50.000.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== e. Rakor Pengelolaan Banjir 8.420.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== f. Pengadaan Cetak Blangko 310.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== g. Penggandaan Kegiatan Banjir 1.256.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== h. Perjalanan Dinas 37.416.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

52 858.000

a. Belanja Bahan habis pakai 858.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

53 136.298.000

a. Pelayanan Administrasi Perkantoran 136.298.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

54 24.948.000

a. Pelayanan Administrasi Perkantoran 24.948.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

55 16.500.000

a. Pelayanan Administrasi Perkantoran 16.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

56 16.500.000

a. Pelayanan Administrasi Perkantoran 16.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

57 6.837.000

a. Pelayanan Administrasi Perkantoran 6.837.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

58 6.596.000

a. Pelayanan Administrasi Perkantoran 6.596.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

59 1.485.000

a. Pelayanan Administrasi Perkantoran 1.485.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

60 6.311.000

a. Pelayanan Administrasi Perkantoran 6.311.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

61 40.809.000

a. Pelayanan Administrasi Perkantoran 40.809.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

62 16.500.000

a. Peningkatan Sarana dan Prasarana Aparatur 16.500.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ====

63 50.000.000

a. Peningkatan Sarana dan Prasarana Aparatur 50.000.000 ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ====

64 148.664.000

a. Peningkatan Sarana dan Prasarana Aparatur 148.464.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

65 1.803.000

a. Peningkatan Sarana dan Prasarana Aparatur 1.803.000 ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ====

66 14.344.000

Rapat-rapat koordinasi dan konsultasi ke dalam dan luar daerah - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Pemeliharaan rutin/berkala rumah dinas - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Pemeliharaan rutin/berkala gedung kantor - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Pemeliharaan rutin/berkala kendaraan dinas/operasional - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Pemeliharaan rutin/berkala mebeleur - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pemeliharaan Rutin/Berkala Peralatan Kantor dan Rumah Tangga - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan alat tulis kantor - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO Penyediaan barang cetakan dan penggandaan - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan komponen instalasi listrik/penerangan bangunan kantor - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan peralatan rumah tangga - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan bahan bacaan dan peraturan perundang-undangan - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan makanan dan minuman - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pemeliharaan Prasarana dan Sarana Pengendalian Banjir dan Pengamanan Pantai Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Kegiatan Pengelolaan Banjir Balai PSDA Seluna - BALAI PENGELOLAAN SUMBER DAYA AIR SERANG LUSI JUANA

Penyediaan jasa surat menyurat - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Penyediaan jasa komunikasi, sumber daya air dan listrik - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Penyediaan Jasa Kebersihan Kantor/Rumah Dinas - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

(6)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

a. Peningkatan Sarana dan Prasarana Aparatur 14.344.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

67 965.000

a. Peningkatan Sarana dan Prasarana Aparatur 965.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

68 9.459.200.000

a. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Kedungboyo

199.000.000 ==== ++++ b. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Sudangan

198.000.000 ==== ++++ c. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Cengklik 198.500.000 ==== ++++ d. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Braholo 198.500.000 ==== ++++ e. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Walikan 199.500.000 ==== ++++ f. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Kwangsan

199.000.000 ==== ++++ g. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Gisik 199.000.000 ==== ++++

h. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Trani 525.000.000 ==== ==== i. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Lemahbang II

410.000.000 ==== ====

j. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Plosowareng

556.000.000 ==== ====

k. Pengadaan Karung Plastik 78.000.000 ++++

l. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Cengklik (Saluran Sekunder Kiri)

99.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== m. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Jumeneng

100.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== n. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Pundung 46.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== o. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Tritis 97.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== p. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Nyaen 100.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== q. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Gisik 143.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== r. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Ngasem 45.500.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== s. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Baran 85.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== t. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Gunung

Maling

44.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== u. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Glodog 80.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== v. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Pakelan 45.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== w. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Brajan 47.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== x. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Mantren 45.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== y. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Wonotoro

94.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== z. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Parean 115.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== aa. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Kedungboyo

95.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ab. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Garat 44.700.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ac. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Pager-Tlatar

44.600.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== ad. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Klego 95.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== ae. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Bapang

(Saluran Sekunder Menjing Kiri)

96.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== af. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Bapang

(Saluran Sekunder Menjing Kanan)

90.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ag. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Bonggo 93.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== ah. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Jetis 90.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== ai. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Sudangan

45.200.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== aj. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Kepoh 97.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ak. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Seloromo

44.900.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== al. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Sedayu 44.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== am. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Kwangsan

46.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== an. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Temantenan

44.700.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ao. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Kasihan

II

45.750.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ap. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Serambang

45.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== aq. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Bakdalem II

44.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ar. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Munggur 50.391.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== as. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Trani 100.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== at. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Jatu 44.900.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== au. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Blingi 80.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== av. Pemeliharaan Prasarana dan Sarana Irigasi D.I Plampean 68.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== Kegiatan Pemeliharaan Rutin/Berkala Arsip - BALAI

PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pemeliharaan Prasarana dan Sarana Irigasi Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

(7)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

aw. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Cangkring

44.500.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ax. Pemeliharaan Prasarana dan Sarana Irigasi D.I Majegan 40.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== ay. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Lemahbang II

145.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== az. Pemeliharaan Prasarana dan Sarana Irigasi D.I Klego

Sal. Sekunder Grogak

78.266.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== ba. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Braholo 44.500.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bb. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Nglasem 45.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bc. Pemeliharaan Prasarana dan Sarana Irigasi D.I Cengklik

Kanan

94.355.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bd. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Sidomakmur

87.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== be. Pemeliharaan Prasarana dan Sarana Irigasi D.I Pulo 43.500.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== bf. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Menggok

40.281.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== bg. Pemeliharaan Prasarana dan Sarana Irigasi D.I Mindi 42.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bh. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Walikan 136.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bi. Pemeliharaan Prasarana dan Sarana Irigasi D.I

Plosowareng Sal. Sekender Banaran

80.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bj. Pemeliharaan Prasarana dan Sarana Irigasi D.I.

Semanding

44.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bk. Pemeliharaan Prasarana dan Sarana Irigasi D.I

Plosowareng Sal. Sekunder Candi

43.500.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== bl. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Latung 46.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== bm. Pemeliharaan Prasarana dan Sarana Irigasi D.I

Plosowareng Sal. Sekunder Dukuh

44.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bn. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Jabang

(Saluran Sekunder Sende)

98.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bo. Pemeliharaan Prasarana dan Sarana Irigasi D.I. Jabang

(Saluran Sekunder Karang)

47.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== bp. Pemeliharaan Prasarana dan Sarana Irigasi D.I Jaban

Sek. Lumbungkerep

85.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== bq. Belanja Alat Tulis Kantor 100.073.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ br. Belanja Bahan Bakar Minyak/Gas 137.004.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bs. Belanja Bahan Baku Bangunan I 10.546.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bt. Belanja Bahan Baku Bangunan II 18.186.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bu. Belanja Bahan Baku Bangunan III 70.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bv. Belanja Bahan Peralatan Kerja I 11.644.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bw. Belanja Bahan Peralatan Kerja II 106.772.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bx. Belanja Cetak I 4.340.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ by. Belanja Cetak II 37.200.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ bz. Belanja Cetak III 4.340.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ca. Belanja Penggandaan 20.200.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cb. Belanja Makanan dan Minuman I 2.700.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cc. Belanja Makanan dan Minuman II 70.875.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cd. Belanja Makanan dan Minuman III 6.750.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ce. Belanja Makanan dan Minuman IV 16.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cf. Belanja Makanan dan Minuman V 18.900.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cg. Belanja Makan dan Minum Rapat VI 900.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ch. Belanja Makan dan Minum Rapat VII 900.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ci. Belanja Makan dan Minum Rapat VIII 1.625.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cj. Belanja Makan dan Minum Rapat IX 4.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ck. Belanja Makan dan Minum Rapat X 4.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cl. Belanja Makan dan Minum Rapat XI 2.250.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cm. Honorarium PNS I 64.800.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cn. Honorarium PNS II 13.500.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ co. Honorarium PNS III 13.500.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cp. Honorarium Non PNS I 84.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cq. Honorarium Non PNS II 548.250.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cr. Honorarium Non PNS III 720.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cs. Uang Harian Peserta Kegiatan I 15.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ct. Uang Harian Peserta Kegiatan II 10.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cu. Uang Harian Peserta Kegiatan III 5.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cv. Uang untuk diberikan Kepada Pihak Ketiga /

Masayarakat

18.000.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== cw. Belanja Jasa Pengajar/Instruktur/Narasumber/ Pembahas

/ Tenaga Ahli I

7.200.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cx. Belanja Jasa Pengajar/Instruktur/Narasumber/ Pembahas

/ Tenaga Ahli II

3.600.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cy. Belanja Jasa Pengajar/Instruktur/Narasumber/ Pembahas

/ Tenaga Ahli III

10.800.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ cz. Belanja Jasa Pengajar/Instruktur/Narasumber/ Pembahas

/ Tenaga Ahli IV

5.400.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ da. Belanja Perjalanan Dinas I 86.400.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ db. Belanja Perjalanan Dinas II 40.608.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ dc. Belanja Perjalanan Dinas III 86.400.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ dd. Belanja Perjalanan Dinas IV 30.068.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ de. Belanja Perjalanan Dinas V 43.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ df. Belanja Perjalanan Dinas VI 51.840.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ dg. Belanja Perjalanan Dinas VII 27.072.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ dh. Belanja Hadiah Barang 900.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ====

69 239.760.000

a. Pekerjaan Swakelola Pemeliharaan Air Baku 32.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== b. Pekerjaan Swakelola Pemeliharaan Air Baku 33.240.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== Kegiatan Pemeliharaan Prasarana dan Sarana Air Baku Balai

PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

(8)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

c. Pekerjaan Swakelola Pemeliharaan Air Baku 34.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== d. Pekerjaan Swakelola Pemeliharaan Air Baku 35.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== e. Pekerjaan Pemeliharaan Prasarana dan Sarana Air Baku 32.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== f. Belanja Perjalanan Dinas I 9.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Belanja Alat Tulis Kantor 12.151.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== h. Belanja Bahan Baku Bangunan 2.748.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ====

i. Belanja Cetak 2.552.000 ==== ==== ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ====

j. Belanja Penggandaan 5.440.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== k. Belanja Makanan dan Minuman Rapat 900.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== l. Belanja Makanan dan Minuman Rapat 3.375.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ m. Belanja Makanan dan Minuman Rapat 2.250.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ==== ==== n. Belanjan Perjalanan Dinas II 8.366.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ o. Belanja Perjalanan Dinas III 4.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ p. Belanja Perjalanan Dinas IV 9.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ q. Belanja Perjalanan Dinas V 3.196.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ r. Upah Tenaga Kerja 2.700.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ s. Uang Harian Peserta Kegiatan 4.000.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ==== ==== t. Belanja Jasa Pengajar/Instruktur/Narasumber/Pembahas

/Tenaga Ahli

1.800.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ==== ====

70 380.000.000

a. Pekerjaan Swakelola Pemeliharaan Konservasi Pembuatan Sumur Resapan

30.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== b. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Sedran Pond

31.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== c. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Dam Parit

34.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== d. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Dam Parit

73.177.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== e. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Dam Parit

35.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== f. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Dam Parit

32.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== g. Pekerjaan Swakelola Pemeliharaan Konservasi

Pembuatan Dam Parit

35.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== h. Belanja alat tulis kantor 16.868.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== i. Belanja Bahan / Material 1.946.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== j. Belanja Cetak dan Pengadaan 6.661.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== k. Belanja Makanan dan Minuman 3.375.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== l. Belanja Makanan dan Minuman Rapat 1.620.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== m. Belanja Makanan dan Minuman Rapat 3.375.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== n. Upah Tenaga Kerja 3.600.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ++++ o. Uang Harian Peserta Kegiatan 6.000.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== p. Belanja Jasa Pengajar/Instruktur/Narasumber/Pembahas

/Tenaga Ahli

5.400.000 ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ====

q. Belanja Perjalanan Dinas I 31.680.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ r. Belanja Perjalanan Dinas II 3.384.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ s. Biaya Perjalanan Dinas III 10.560.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ t. Belanja Perjalanan Dinas IV 10.560.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ u. Biaya Perjalanan Dinas V 4.794.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

71 200.000.000

a. Program Pengembangan, Pengelolaan dan Konservasi Sungai, Danau dan Sumber Daya Air Lainnya

200.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

72 300.000.000

a. Program Pengembangan, Pengelolaan, dan Konservasi Sungai, Danau dan Sumber Daya Air LAinnya

300.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

73 300.000.000

a. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir dan Pengamanan Pantai

26.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== b. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

20.000.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== c. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

27.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== d. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

27.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== e. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

26.000.000 ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== f. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

25.046.000 ==== ==== ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== g. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

28.000.000 ==== ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== h. Pekerjaan Swakelola Pemeliharaan Pengendalian Banjir

dan Pengamanan Pantai

27.000.000 ==== ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ==== ==== i. Belanja Alat Tulis Kantor 15.910.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== j. Belanja Bahan Baku Bangunan 1.338.000 ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== k. Belanja Cetak dan Pengadaan 8.352.000 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== l. Uang Harian Peserta Kegiatan 3.000.000 ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== m. Upah Tenaga Kerja 2.700.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ n. Belanja Jasa Kantor 1.800.000 ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== o. Belanja Makanan dan Minuman Rapat 1.125.000 ==== ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ p. Belanja Makanan dan Minuman Rapat 3.375.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== Kegiatan Pemeliharaan Prasarana dan Sarana Pengendalian

Banjir dan Pengamanan Pantai Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pemeliharaan Prasarana dan Sarana Konservasi Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pengendalian dan Pendayagunaan SDA Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Pengelolaan data base SDA Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

(9)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

q. Belanja Makanan dan Minuman Rapat 1.125.000 ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== r. Belanja Makanan dan Minuman Rapat 1.125.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ==== s. Perjalanan Dinas I 12.950.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ t. Perjalanan Dinas II 4.512.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ u. Perjalanan Dinas III 21.610.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ v. Perjalanan Dinas IV 6.392.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ w. Perjalanan Dinas V 8.640.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

74 200.000.000

a. Program Pengendalian Banjir dan Pengamanan Pantai 200.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

75 5.366.638.000

a. DD DI. Tingal 520.000.000 ==== ====

b. DD Jaringan Irigasi Menyawak 300.000.000 ==== ==== c. DD Bendung Watujagir & Penanganan Longsoran Pada

Saluran J.I. Tangsi

350.000.000 ==== ==== d. DD Bendung Blingi, Bendung Pulo, Bendung Plampean

dan Bendung Pundung

400.000.000 ==== ==== e. DD. DI. Loning Kragilan, K. Butek (Lokus DI. Kragilan) 500.000.000 ==== ==== f. DD. DI. Sedayu, DI. Srambang, DI. Kepoh 375.000.000 ==== ==== g. DD DI. Sinongko, DI. Sucen, DI. Isep-Isep 300.000.000 ==== ====

h. DD. DI. Gondang 350.000.000 ==== ====

i. DD. DI. Gangsa Lumingser 350.000.000 ==== ====

j. DD. DI. Jetis 400.000.000 ==== ====

k. DD. DI. Nglasem Dan DI. Walikan 300.000.000 ==== ++++

l. DD DI. Kedungboyo 400.000.000 ==== ====

m. DD DI Menggok Dan DI Braholo 250.000.000 ==== ++++

n. Honorarium Pokja Pengadaan Barang Dan Jasa > 500 jt 3.150.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== o. Honorarium Pokja Pengadaan Barang dan Jasa >200 Jt -

500 Jt

31.800.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== p. Honorarium Panitia Penerima Hasil Pekerjaan 42.250.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ ==== q. Belanja alat tulis kantor Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Irigasi

13.604.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ r. Belanja Penggandaan Belanja Penggandaan 10.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ s. Belanja makanan dan minuman rapat Kegiatan

Pendukung Pengadaan Konsultansi

10.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ t. Belanja makanan dan minuman rapat Kegiatan

Pendukung Pengadaan Konsultansi

5.850.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ u. Belanja perjalanan dinas dalam daerah 444.419.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ v. Belanja perjalanan dinas luar daerah Koordinasi Terkait

Permasalahan Prasarana Dan Sarana Irigasi

9.165.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

76 12.753.043.000

a. Perencanaan Embung Cikeusal 280.000.000 ==== ==== ==== ==== ++++

b. Perencanaan Embung Purwojati 280.000.000 ==== ++++

c. Perencanaan Embung Sidorejo 270.000.000 ==== ++++

d. Perencanaan Embung Pantai Ayah 270.000.000 ==== ++++

e. Perencanaan Embung Karanganyar 270.000.000 ==== ++++

f. Perencanaan Embung Meteseh 250.000.000 ==== ++++

g. Perencanaan Embung Randublatung 270.000.000 ==== ++++

h. Perencanaan Embung Kedung Asri, Embung Ringinarum

280.000.000 ==== ++++

i. Perencanaan Revitalisasi Situ Elok, Situ Bamban, Embung Tapak Bima Karanggintung, Embung Tapakbima Kemawi

560.000.000

j. Perencanaan Revitalisasi Emb. Bunter, Emb. Cipondoh, Emb. Cikalong Dan Emb. Liyunggunung (Kab. Cilacap)

570.000.000

k. Perencanaan Revitalisasi Emb. Dukuhmulyo, Emb. Sembaturagung, Emb. Gebang Dan Emb. Gemeces (Kab. Pati)

540.000.000

l. Perencanaan Revitalisasi Emb. Mranggen, Emb. Tibayan, Emb. Krikilan Dan Emb. Tarubayan (Kab. Klaten)

540.000.000

m. Perencanaan Revitalisasi Emb. Pete, Emb. Kedungwaduk, Emb. Tewel, Emb. Bumiaji (Kab. Sragen)

540.000.000

n. Perencanaan Revitalisasi Emb. Karangsari, Emb. Rancawuluh Dan Emb. Kedawung (Kab. Brebes)

420.000.000 o. Perencanaan Revitalisasi Emb. Margapadang, Emb.

Bulakpacing Dan Emb. Dukuhdamu (Kab. Tegal)

405.000.000

p. Perencanaan Revitalisasi Emb. Sekarsari, Emb. Warugunung, Emb. Ronggomulyo, Emb. Maguwan (Kab. Rembang)

550.000.000

q. Perencanaan Revitalisasi Emb. Klampis, Emb. Bulakelor, Emb. Rengaspendawa (Kab. Brebes)

420.000.000 r. Perencanaan Revitalisasi Emb. Danayasa, Emb.

Kaligelang, Emb. Sibiuk, Emb. Tegalsari (Kab. Pemalang)

325.000.000

s. Perencanaan Revitalisasi Emb. Pego, Emb. Ngunduk, Embung Boto (Kab. Wonogiri)

460.000.000 t. Perencanaan Revitalisasi Emb. Song Ireng, Emb. Doya,

Emb. Mesu (Kab. Wonogiri)

460.000.000 u. Perencanaan Revitalisasi Emb. Sojomerto, Emb. Ngerjo,

Emb. Tejorejo Dan Emb. Rowobranten

540.000.000 v. Perencanaan Emb. Tlogobulu, Emb. Clapar (Kab.

Purworejo)

460.000.000 ==== ++++

w. Perencanaan Emb. Bukur, Emb. Jolotigo (Kab. Pekalongan)

450.000.000 ==== ++++

Kegiatan Pengelolaan Banjir Balai PSDA Bengawan Solo - BALAI PENGELOLAAN SUMBER DAYA AIR BENGAWAN SOLO

Kegiatan Perencanaan teknis Prasarana dan Sarana Irigasi - BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS

Kegiatan Perencanaan Teknis Prasarana dan Sarana Air Baku - BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS

(10)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

x. Perencanaan Emb. Plompong, Emb. Kamal (Kab. Brebes)

460.000.000 ==== ++++

y. Perencanaan Emb. Karangpasar, Emb. Asemrudung (Kab. Grobogan)

450.000.000 ==== ++++

z. Perencanaan Em. Kedungbanteng dan Musuk (Kab. Boyolali)

450.000.000 ==== ++++

aa. Perencanaan Emb. Logandu, Emb. Kebagoran (Kab. Kebumen)

460.000.000 ==== ++++

ab. Honorarium Pokja Pengadaan Barang/ Jasa > 500 Jt 22.050.000 ++++ ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ac. Honorarium Pokja Pengadaan Barang/ Jasa >200 Jt -

500 Jt

55.650.000 ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ad. Honorarium Panitia Penerima Hasil Pekerjaan Untuk

Pekerjaan >200 Jt

91.000.000 ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ==== ae. Belanja alat tulis kantor Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Air Baku

14.013.000 ++++ af. Belanja Penggandaan Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Air Baku

8.814.000 ++++ ag. Belanja Makanan dan Minuman Kegiatan Perencanaan

Teknis Prasarana Dan Sarana Air Baku

11.250.000 ++++

ah. Belanja Kegiatan Pendukung Pengadaan Konsultansi 6.750.000 ai. Belanja Perjalanan dinas dalam daerah Kegiatan

Perencanaan Teknis Prasarana Dan Sarana Air Baku Survai Penyusunan KAK

21.865.000 ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ====

aj. Belanja Perjalanan dinas dalam daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Air Baku Survai Supervisi Pekerjaan

764.781.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

ak. Belanja Perjalanan dinas dalam daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Air Baku Survai Koordinasi Terkait Permasalahan Prasarana Dan Sarana Air Baku

47.320.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

al. Belanja perjalanan dinas luar daerah Koordinasi Terkait Permasalahan Prasarana Dan Sarana Air Baku

19.550.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

am. Perencanaan Embung Mojorembun Dan Embung Sitirejo (Kab. Blora)

460.000.000 ==== ++++

77 1.346.004.000

a. Perenc. Konservasi S. Putih DAS Bodri Kab Temanggung-Kendal

400.000.000 ==== ++++

b. Perenc. Konservasi S. Comal Hulu Kab. Pekalongan-Pemalang

400.000.000 ==== ++++

c. Perenc. Konservasi S. Damar Kab. Kendal 325.000.000 ==== ++++ d. Belanja alat tulis kantor Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Konservasi SDA

6.690.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Belanja alat tulis kantor Pembinaan desain di 6 Balai : 2.388.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== f. Belanja Penggandaan Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Konservasi SDA

4.739.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Belanja Penggandaan Pembinaan desain di 6 Balai : 14.490.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== h. Belanja makanan dan minuman rapat Kegiatan

Perencanaan Teknis Prasarana Dan Sarana Konservasi SDA

4.500.000 ++++

i. Belanja makanan dan minuman rapat Kegiatan Perencanaan Teknis Pembinaan desain di 6 Balai :

9.450.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== j. Belanja makanan dan minuman rapat Kegiatan

Perencanaan Teknis Kegiatan Pendukung Pengadaan Konsultansi

675.000 ++++ ++++

k. Belanja Perjalanan dinas dalam daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Konservasi SDA (Survai Penyusunan KAK)

9.136.700 ++++ ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ====

l. Belanja Perjalanan dinas dalam daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Konservasi SDA (Supervisi Pekerjaan)

93.312.500 ==== ==== ==== ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ====

m. Belanja Perjalanan dinas dalam daerah (Koordinasi Terkait Perencanaan Teknis Prasarana Dan Sarana Konservasi SDA)

30.770.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

n. Belanja Perjalanan dinas dalam daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Konservasi SDA (Pembinaan desain di 6 Balai :)

19.166.800 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ====

o. Belanja perjalanan dinas luar daerah Koordinasi Terkait Permasalahan Prasarana Dan Sarana Konservasi SDA

7.986.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

p. Honorarium Pokja Pengadaan Barang dan Jasa Pengadaan Barang/ Jasa >200 Jt - 500 Jt

7.950.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== q. Honorarium Panitia Penerima Hasil Pekerjaan Untuk

Pekerjaan >200 Jt

9.750.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++

78 750.000.000

a. Pengadaan Peralatan Hidrologi. 197.426.000 ==== ++++

b. Pengadaan Peralatan Klimatologi. 197.586.000 ==== ++++

c. Swakelola Pendukung Kegiatan Pengelolaan Alat dan Data Hidrologi.

354.988.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

79 1.500.000.000

a. Studi Zonasi Sungai Pemali WS Pemali Comal 300.000.000 ==== ++++ b. Studi Kelayakan Suplesi Irigasi Tangsi dari Mata Air

Gending

300.000.000 ==== ++++

c. Studi LARAP Kanal Banjir Timur 600.000.000 ==== ++++

d. Honor Panitia Pengadaan Jasa Konsultansi >200 - 500 Jt

7.950.000 ==== ==== ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ==== e. Honor Panitia Penerima Hasil Pekerjaan Barang/Jasa

>200 Jt

9.750.000 ==== ==== ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== f. Belanja Alat Tulis Kantor 20.526.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Belanja Penggandaan 7.081.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Belanja Makan dan Minum Rapat 8.100.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ Kegiatan Penyusunan Rencana Pengembangan SDA -

BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS Kegiatan Perencanaan Teknis Prasarana dan Sarana Konservasi - BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS

Kegiatan Pengelolaan Alat dan Data Hidrologi - BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS

(11)

Jan Feb Mar Apr Mei Jun Jul Agus Sept Okt Nov Des No NAMA KEGIATAN DAN PAKET PEKERJAAN ANGGARAN (Rp.)

i. Belanja Perjalanan Dinas Dalam Daerah 123.537.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ j. Belanja Perjalanan Dinas Luar Daerah 123.056.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

80 500.000.000

a. Belanja Alat Tulis Kantor 27.217.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ b. Belanja Dekorasi/Dokumentasi 300.000 ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== c. Belanja Jasa Publikasi 51.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ d. Belanja Penggandaan 47.924.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ e. Belanja Makan dan Minum Rapat 19.350.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Belanja Perjalanan Dinas Dalam Daerah 174.977.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Belanja Perjalanan Dinas Luar Daerah 145.632.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Belanja Pemeliharaan Peralatan dan Mesin 33.600.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

81 1.951.035.000

a. Desain Penanganan Longsoran dan Groundsill di Sungai Blorong dan Blukar serta Normalisasi Kali Tinab (Kab. Kendal dan Kab. Batang)

450.000.000 ==== ++++

b. DD. Normalisasi Kali Sambong (Kab. Batang) 280.000.000 ==== ++++ c. DD. Penanganan Kerusakan Pantai Timur Semarang/

Demak

1.000.000.000 ==== ==== d. Honorarium Pokja Pengadaan Barang dan Jasa

Pengadaan Barang/ Jasa >200 Jt - 500 Jt

5.300.000 ==== ==== ==== ==== ==== ==== ++++ ==== ==== ==== ==== ==== e. Honorarium Pokja Pengadaan Barang/ Jasa >500 Jt - 1

M

3.150.000 ==== ==== ++++ ==== ==== ==== ==== ==== ==== ==== ==== ==== f. Honorarium Panitia Penerima Hasil Pekerjaan Untuk

Pekerjaan >200 Jt

9.750.000 ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ++++ g. Belanja alat tulis kantor Kegiatan Perencanaan Teknis

Prasarana Dan Sarana Pengend. Banjir & Pengm.Pantai

8.463.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

h. Belanja Penggandaan Kegiatan Perencanaan Teknis Prasarana Dan Sarana Pengend. Banjir & Pengm. Pantai

4.967.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

i. Belanja makanan dan minuman rapat Kegiatan Perencanaan Teknis Prasarana Dan Sarana Pengend.Banjir & Pengm. Pantai

4.500.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

j. Belanja Makanan Dan Minuman Rapat Kegiatan Perencanaan Teknis Prasarana Dan Sarana Pengend. Banjir & Pengm. Pantai Kegiatan Pendukung Pengadaan Konsultansi

900.000 ++++ ++++ ++++

k. Belanja Perjalanan Dinas Dalam Daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Pengend. Banjir & Pengm. Pantai (Survai Penyusunan KAK)

6.260.300 ++++ ++++ ++++ ++++ ==== ==== ==== ==== ==== ==== ==== ====

l. Belanja Perjalanan Dinas Dalam Daerah Kegiatan Perencanaan Teknis Prasarana Dan Sarana Pengend. Banjir & Pengm. Pantai (Supervisi Pekerjaan)

123.223.700 ==== ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ====

m. Belanja Perjalanan Dinas Dalam Daerah Untuk Koordinasi Terkait Perencanaan Teknis Prasarana Dan Sarana Pengend.Banjir & Pengm. Pantai

43.895.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

n. Belanja Perjalanan Dinas Luar Daerah Koordinasi Terkait Permasalahan Prasarana Dan Sarana Pengend.Banjir & Pengm. Pantai

10.626.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

82 67.355.091.000

a. upah Tenaga Pendukung Administrasi Teknik Pembangunan irigasi

44.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== b. Upah Tenaga Pekerja Operator Pompa (Pompa

Banjaran)

30.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== c. Tenaga Mekanik (Pompa Banjaran) 750.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ====

d. Stabillo 1.820.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

e. Binder clips ; 25 mm 3.240.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ f. Paper clips ; logam 800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ g. Stofmap kertas 2.395.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ h. Stofmap/snelechter ; bahan plastik 4.200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ i. Odner ; karton logam 8.976.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ j. Lakban ; 2" hitam 200.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ k. Kertas HVS A4 ; 70 gr ; 210 x 297 mm 10.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ l. File box ; Fc 10 cm 1.612.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ m. CD/DVD Blank Disc ; CD-R-Media ; 700 MB 280.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ n. Ink Jet Catridge Black 3.582.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ o. Ink Jet Catridge Colour 3.702.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ p. Toner printer Laser ; black toner catridge 1000-2500

lembar

42.420.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ q. Kertas HVS F4 ; 70 gr ; 216 x 330 mm 12.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ r. Belanja Pelumas (Pompa Banjaran) 2.350.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ====

s. Foto Copy A4 6.000.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

t. Foto Copy A3 3.109.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++

u. Belanja BBM (Pompa Banjaran) 187.200.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ==== v. Penjilidan < 5 cm 2.400.000 ==== ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ w. Minum dan Makan Kecil (30 org x 8 kali) 4.800.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ x. Makan (30 org x 8 kali) 6.000.000 ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ y. DI. Soropadan Kab. Temanggung 2.130.000.000 ==== ====

z. DI pundung Kab. Boyalali - Klaten 3.000.000.000 ==== ==== aa. DI. Banjaran (Sek. Menyawak&Jaringan Suplesi) Kab.

Banyumas

4.100.000.000 ==== ==== ab. DI. Asem Siketek Kab. Pekalongan 1.850.000.000 ==== ==== ac. DI. Krenceng Kab. Purbalingga 3.100.000.000 ==== ==== ad. DI. Widodaren Kab. Pati 2.500.000.000 ==== ==== ae. DI. Wonotoro Kab. Boyolali-Semarang 2.000.000.000 ==== ==== af. DI. Padurekso Kab. Pekalongan 1.500.000.000 ==== ==== ag. DI. Tangsi Kab. Magelang 2.000.000.000 ==== ==== Kegiatan Pengelolaan Sistem Informasi SDA - BIDANG

PENGEMBANGAN & PEMBINAAN TEKNIS

Kegiatan Perencanaan Teknis Prasarana dan Sarana Pengendalian Banjir dan Pengamanan Pantai - BIDANG PENGEMBANGAN & PEMBINAAN TEKNIS

Kegiatan Perbaikan dan Pembangunan Prasarana dan Sarana Irigasi - BIDANG IRIGASI & AIR BAKU

Referensi

Dokumen terkait

BALAI PSDA PEMALI COMAL, BALAI PSDA BODRI KUTO DAN BALAI PSDA SERANG LUSI JUANA.. BENDUNG. Q

Kesimpulan terkait faktor intelijensi pemasaran yang dilakukan perusahaan berskala besar yaitu: (1) Beberapa perusahaan seperti yang dijelaskan di pem- bahasan data menggunakan

115 SD NEGERI JATIMELATI 1 Pondok Melati 116 SD NEGERI BANTARGEBANG 1 Bantargebang 117 SDK PENABUR HARAPAN INDAH Medan Satria 118 SD ISLAM LABSCHOOL STAI BANI SALEH Bekasi Timur 119

Asumsi tidak terpenuhi, maka analisis yang berkaitan dengan sebaran peluang (pembentukan selang. dengan sebaran peluang

Undang-Undang Nomor 12 Tahun 1956 tentang Pembentukan Daerah Otonom Kabupaten dalam Lingkungan Daerah Provinsi Sumatera Tengah (Lembaran Negara Republik

Seperti tahun sebelumnya di dalam publikasi ini, penyajian Produk Domestik Regional Bruto (PDRB) atas dasar harga konstan mulai menggunakan tahun dasar 2000, artinya seluruh

BALAI PSDA PROGO BOGOWONTO LUK ULO DAN BALAI PSDA SERAYU CITANDUY. KAB /

(1) Besarnya retribusi yang dipungut untuk memperoleh perijinan dan pemakaian fasilitas pada Taman Rekreasi Kota sebagaimana dimaksud dalam Pasal 3 Peraturan Daerah ini