NO KEGI ATAN PAKET
PEKERJAAN SUMBER DANA PAGU ANGGARAN KET A. BELANJA BAHAN BAKAR
MI NYAK/ GAS DAN PELUMAS
3 PAKET DAU 160,320,000.00 PEJABAT PENGADAAN
B. BELANJA PERGANTI AN SUKU CADANG
1 PAKET DAU 18,944,000.00 PEJABAT PENGADAAN 2 PENYEDI AAN ALAT
TULI S KANTOR
A. BELANJA ALAT TULI S KANTOR
1 PAKET DAU 36,366,000.00 PEJABAT PENGADAAN 3 PENYEDI AAN BARANG
CETAKAN DAN PENGGANDAAN
A. BELANJA CETAK DAN PENGGANDAAN
3 PAKET DAU 37,355,000.00 PEJABAT PENGADAAN
4 PENYEDI AAN
KOMPONEN I NSTALASI LI STRI K/ PENERANGAN BANGUNAN KANTOR PERALATAN DAN PERLENGKAPAN KANTOR
A. BELANJA PERALATAN KEBERSI HAN DAN BAHAN PEMBERSI H
1 PAKET DAU 36,830,000.00 PEJABAT PENGADAAN
6 PENYEDI AAN MAKANAN DAN MI NUMAN
A. BELANJA MAKANAN DAN MI NUMAN RAPAT
1 PAKET DAU 18,000,000.00 PEJABAT PENGADAAN 7 PENGADAAN
PERALATAN GEDUNG KANTOR
A. BELANJA MODAL PENGADAAN KOMPUTER
2 PAKET DAU 15,200,000.00 PEJABAT PENGADAAN
8 PENGADAAN OBAT DAN PERBEKALAN
A. PENGADAAN OBAT 1 PAKET DAU 740,000,000.00 ULP PEKERJAAN
PEMERI NTAH KABUPATEN
KEPULAUAN SI AU TAGULANDANG BI ARO
RUMAH SAKI T UMUM LAPANGAN SAWANG
Alamat : Kampung Sawang, Kecamatan Siau Timur SelatanRENCANA UMUM PENGADAAN
NO KEGI ATAN PAKET
PEKERJAAN SUMBER DANA PAGU ANGGARAN KET B. PENGADAAN REAGEN
LABORATORI UM RUMAH SAKI T
1 PAKET DAU 200,000,000.00 ULP
9 PENYUSUNAN STANDAR PELAYANAN
KESEHATAN
A. BELANJA MODAL
PENGADAAN BUKU NASKAH PENGEMBANGAN TI PE RUMAH SAKI T
1 PAKET DAU 40,000,000.00 PEJABAT PENGADAAN
A. PEMBANGUNAN UNI T TRANSFUSI DARAH
1 PAKET DAK 1,100,000,000.00 ULP
B. PERENCANAAN 1 PAKET DAU 48,400,000.00 PEJABAT PENGADAAN C. PENGAWASAN 1 PAKET DAU 36,300,000.00 PEJABAT
PENGADAAN A. RUANG UNI T GAWAT
DARURAT
1 PAKET DAK 878,141,000.00 ULP
B. PERENCANAAN 1 PAKET DAU 38,638,240.00 PEJABAT PENGADAAN C. PENGAWASAN 1 PAKET DAU 28,978,680.00 PEJABAT
PENGADAAN A. PENGADAAN I NSTALASI AI R
LI MBAH RUMAH SAKI T
1 PAKET DAU 253,590,000.00 ULP
B. PERENCANAAN I NSTALASI AI R LI MBAH RUMAH SAKI T
1 PAKET DAU 7,110,000.00 PEJABAT PENGADAAN C. PENGAWASAN I NSTALASI
AI R LI MBAH RUMAH SAKI T
1 PAKET DAU 9,480,000.00 PEJABAT PENGADAAN D. PENGADAAN ALAT
PENGOLAHAN AI R LI MBAH RUMAH SAKI T
1 PAKET DAU 600,000,000.00 ULP 10 PEMBANGUNAN RUMAH
SAKI T
11 PENGEMBANGAN RUANG GAWAT DARURAT
PEMBANGUNAN I NSTALASI
PENGOLAHAN LI MBAH RUMAH SAKI T
12
NO KEGI ATAN PAKET
PEKERJAAN SUMBER DANA PAGU ANGGARAN KET A. ALAT-ALAT LABORATORI UM
UTD
1 PAKET DAK 1,079,849,000.00 ULP
B. ALAT-ALAT KEDOKTERAN
ELEKTROLI T ANALYZER 1 PAKET DAU 180,000,000.00 ULP
FOTO METER ANALYZER 1 PAKET DAU 190,000,000.00 ULP REAGEN DAN ALAT-ALAT 1 PAKET DAU 130,000,000.00 ULP
14 PENGEMBANGAN RUANG OPERASI (LANJUTAN)
A. GEDUNG OPERASI 1 PAKET PEMBI AYAAN 551,587,680.00 ULP PEKERJAAN
13 PENGADAAN ALAT-ALAT KESEHATAN RUMAH SAKI T
Sawang Siau, 2 Februari 2012 Mengetahui,
Pengguna Anggaran RSU Lapangan Sawang,