16
0
0

Teks penuh

(1)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M

Ǿ 8

D 13 D 16 D 22 D 25

11.8

1 BALOK T. WUDLU TULANGAN POKOK 85

AS 7 & 8 (A s/d E) 1 Besi D 16 0,15 12.00 10 10 189.39 -

-TULANGAN POKOK 1.05

2 Besi D 16 1.20 10 1 18.94 -

-86 0,5 TULANGAN POKOK

2 BALOK T. WUDLU 3 Besi D 16 87 0,15 3.49 35 9 170.45 1.53 8

AS 7 - 8 (B - C ) 5.02 1

3.15

20

378.78

3 BALOK T. WUDLU SENGKANG 0,19

AS 7 & 8 (A s/d E) 4 Besi Ǿ 8 88 1.20 188 19 89.96 2.40 1 Ke 89

0,34

BALOK T. WUDLU SENGKANG

AS 7 - 8 5 Besi Ǿ 8 89 1.20 115 11 52.08 - - Dari 66 & 88

( B - C) & (C - D) & ( D - E) & (E - F)

30

142.04

4 BALOK GED. UTAMA 1 BALOK 450 X 250 11.85

AS A & F (1 s/d 6) TULANGAN POKOK 90

Besi D 16 0,15 12.00 10 10 189.39 -

-2 BALOK 450 X 250

TULANGAN POKOK 5

Besi D 16 91 5.15 10 5 94.69 1.7 5

0,15

5 BALOK GED. UTAMA 3 BALOK 450 X 250 92 11.85

AS 1 & 6 ( A s/d F ) TULANGAN POKOK

Besi D 16 0,15 12.00 10 10 189.39 - -4 BALOK 450 X 250 93 5,85 TULANGAN POKOK Besi D 16 0,15 6.00 10 5 94.69 - -30 568.17

6 BALOK GED. UTAMA SENGKANG 0,19

AS A & F (1 s/d 6) 5 Besi Ǿ 8 94 1.30 236 26 123.10 0.30 26

0,39

26

123.10

7 BALOK GED. UTAMA 1 BALOK 1100 X 350 95 10.44 10.94 16 8 369.90 1.06 16

AS B & E ( 2 s/d 5 ) TULANGAN POKOK

Besi D 25 0,25

2 TULANGAN POKOK 96 idem 10.94 8 8 286.45 1.06 8

Besi D 22

D 16

No

Lokasi

Item Pek.

D 25

Jumlah

Jumlah

Panj.

Gambar Potongan

D 22

Sisa

Keterangan

Panj

Jml

jml

Ǿ 8

D 13

Kebutuhan

(2)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M

Ǿ 8

D 13 D 16 D 22 D 25

D 16

No

Lokasi

Item Pek.

D 25

Jumlah

Jumlah

Panj.

Gambar Potongan

D 22

Sisa

Keterangan

Panj

Jml

jml

Ǿ 8

D 13

Kebutuhan

8 BALOK GED. UTAMA SENGKANG 0,29

AS B & E (2 s/d 5) 5 Besi Ǿ 8 99 2.80 172 43 203.59 0.80 43

1,04

43

203.59

9 BALOK GED. UTAMA 1 BALOK 1100 X 350 100 11.75 12.00 16 16 739.80 1.06 16

AS 2 & 5 ( B s/d E ) TULANGAN POKOK

Besi D 25 0,25 2 BALOK 1100 X 350 101 1.75 2.00 16 3 138.71 4.00 1 Ke 103 Konversi TULANGAN POKOK Besi D 25 0,25 3 BALOK 1100 X 350 11.75 12.00 8 8 286.45 - -TULANGAN POKOK 102 Besi D 22 0,25

BALOK 1100 X 350 1.75 2.00 8 1 35.81 - - Dari 101 Konversi

TULANGAN POKOK 103 Besi D 22 0,25 4 BALOK 1100 X 350 104 11.75 12.00 8 8 100.02 1.06 8 TULANGAN POKOK Besi D 13 0,25 5 BALOK 1100 X 350 105 1.75 2.00 8 2 25.01 8.00 1 Ke 107 Konversi TULANGAN POKOK Besi D 13 0,25 11.75 6 BALOK 1100 X 350 106 12.00 8 8 37.88 - -TULANGAN POKOK 0,25 Besi Ǿ 8 7 BALOK 1100 X 350 1.75

TULANGAN POKOK 107 2.00 8 1 4.73 4.00 1.00 Dari 105

Besi Ǿ 8 0,25

9

10 9 19 42.61 125.03 322.26 878.51

(3)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M

Ǿ 8

D 13 D 16 D 22 D 25

D 16

No

Lokasi

Item Pek.

D 25

Jumlah

Jumlah

Panj.

Gambar Potongan

D 22

Sisa

Keterangan

Panj

Jml

jml

Ǿ 8

D 13

Kebutuhan

10 BALOK GED. UTAMA SENGKANG 0,29

AS 2 & 5 ( B s/d E ) 8 Besi Ǿ 8 108 2.80 204 51 241.47 0.80 51

1,04

51

241.47

11 BALOK GED. UTAMA 1 BALOK 400 X 250 109 3,45 3.75 32 11 393.87 0.75 10

AS B,C,D (7-8) (5-6) TULANGAN POKOK 7.50 1 Ke 113¹

AS 2 ,3,4,5 (A-B) (E-F) Besi D 22 0,15

2 BALOK 400 X 250 110 3,45 3.75 48 16 303.02 0.75 16

TULANGAN POKOK

Besi D 16 0,15

12 BALOK GED. UTAMA 3 BALOK 400 X 250 111 4,65 4.95 8 4 143.23 2.10 4 Ke 112 & 113 Konversi

AS (A-1) (B-2) TULANGAN POKOK

AS ( F-1 ) (E-2) Besi D 22 0,15 AS (8-5) (A-5)

AS (E-5) (F-5) 4 BALOK 400 X 250 112 1.95 2.10 2 - - - - Dari 111 Konversi TULANGAN POKOK

Besi D 22 0,15

5 BALOK 400 X 250 113 2,1 2.10 2 - - - - Dari 111 Konversi

TULANGAN POKOK Besi D 22

6 BALOK 400 X 250 113¹ 4,65 4.95 1 - - 2.55 1 Dari 109 Konversi

TULANGAN POKOK Besi D 22 0,15 7 BALOK 400 X 250 114 4,65 TULANGAN POKOK 4.95 9 5 94.69 7.05 1 Besi D 16 0,15 21 15 397.72 537.09

13 BALOK GED. UTAMA SENGKANG 0,19

AS B,C,D (7-8) (5-6) 8 Besi Ǿ 8 115 1.20 272 27 127.84 -

-AS 2 ,3,4,5 (A-B) (E-F) 0,34

14 BALOK GED. UTAMA 9 SENGKANG 116 1.20 60 6 28.41 -

-AS (A-1) (B-2) Besi Ǿ 8 AS ( F-1 ) (E-2) AS (8-5) (A-5) AS (E-5) (F-5) 33 156.25

(4)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M

Ǿ 8

D 13 D 16 D 22 D 25

D 16

No

Lokasi

Item Pek.

D 25

Jumlah

Jumlah

Panj.

Gambar Potongan

D 22

Sisa

Keterangan

Panj

Jml

jml

Ǿ 8

D 13

Kebutuhan

15 BALOK GED. UTAMA 1 BALOK ANAK 117 2,95 3 40 16 200.04 9 16 Ke 118

AS 1-2 (B,C,D,E) 350 X200

AS 5-6 (B,C,D,E) TULANGAN POKOK 0,05

AS A-B (2,3,4) Besi D 13

AS E-F (2,3,4)

2 BALOK ANAK 118 2,2 2.25 32 - - - Dari 117

350 X200

TULANGAN POKOK 0,05

Besi D 13

3 BALOK ANAK 119 1 1.06 8 - - - Dari 97

350 X200

TULANGAN POKOK 0,06

Besi D 13

16 BALOK GED. UTAMA 4 BALOK ANAK 120 3,45 3.55 20 7 87.52 0.95 2

AS A - B (4-5) 350 X200 4.50 1 AS E - F (2-3) TULANGAN POKOK 0,05 AS E - F (3-4) Besi D 13 AS E - F (4-5) 23 287.56

17 BALOK GED. UTAMA 5 SENGKANG 0,14

AS 1-2 (B,C,D,E) Besi Ǿ 8 121 1.00 432 36 170.45 - -AS 5-6 (B,C,D,E) 0,29 AS A-B (2,3,4) AS E-F (2,3,4) 36.00 170.45 Page 4 of 16

(5)
(6)
(7)
(8)
(9)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M 12 M

Ǿ 8

Ǿ 10 D 13 D 16 D 22 D 25

-1 Poer 50 x 50 x 50 (102 bh) 1 Besi Ǿ 8 10 0,47 1.93 1,224 204 965.88 0.42 204 0.048 0,47 - - -204 - - - - - 965.88 - - - -

-2 SLOOF 300 X 550 TULANGAN POKOK 11 11 11.47 20 20 378.78 0.53 20

As.1 (A-D) dan As.23 (A-D) Besi D 16

0.47 12 11 + (2*40d) 11.64 100 100 1,893.89 0.36 100 13 3.04 3.51 20 7 126.26 1.47 7 0.47 TULANGAN POKOK 14 11 11.47 4 4 29.59 Besi D10 0.47 11.64 20 20 147.96 15 11 + (2*40d) 16 3.04 3.51 4 2 14.80 1.47 1 0.47 8.49 1 Ke 29 26 - 127 - - - 192.35 - 2,398.92 - -3 SLOOF 300 X 550 SENGKANG 0.27

As.1 (A-D) dan As.23 (A-D) Besi Ǿ 8 17 1.63 921 132 622.95 0.59 132

0.52

0.048

132

- - - - - 622.95 - - - -

-4 SLOOF 250 X 450 TULANGAN POKOK 18 11 11.47 6 6 113.63 0.53 20

As.1 (A-D) dan As.23 (A-D) Besi D 16

0.47

Item Pek.

Gambar Potongan

D 13

D 16

Sisa

Ǿ 10

Panj

No

Lokasi

D 22

D 25

Jumlah

Jumlah

Jml

Keterangan

Kebutuhan

Panj.

jml

Ǿ 8

8-150

300

550

5

16

2

10

(10)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M 12 M

Ǿ 8

Ǿ 10 D 13 D 16 D 22 D 25

Item Pek.

Gambar Potongan

D 13

D 16

Sisa

Ǿ 10

Panj

No

Lokasi

D 22

D 25

Jumlah

Jumlah

Jml

Keterangan

Kebutuhan

Panj.

jml

Ǿ 8

- - 254 - - - - - 4,810.48 - -5 SLOOF 250 X 450 SENGKANG 0.22 As.12/A-D,1-23/A,B,C Besi Ǿ 8 24 1.38 1,611 230 1,089.66 0.59 230 0.447 0.048 1.38 1,209 173 817.42 0.59 173 403 - - - - - 1,907.08 - - - -

-4 SLOOF 200 X 400 TULANGAN POKOK 25 11 11.47 8 8 151.51 0.53 8

As.1 (A-D) dan As.23 (A-D) Besi D 16

0.47 26 11 + (2*40d) 11.64 40 40 757.56 0.36 40 27 3.04 3.51 8 3 50.50 1.47 3 0.47 - - 51 - - - - - 959.57 - -5 SLOOF 250 X 450 SENGKANG 0.17 As.12/A-D,1-23/A,B,C Besi Ǿ 8 28 1.13 461 46 218.27 0.70 46 0.37 0.048 1.13 346 35 163.82 0.70 35 81 - - - - - 382.09 - - - -

-6 Kolom 250 x 375 TULANGAN POKOK 29 1.75 396 66 488.27 - 1.50 159 Dari 16

69 bh Besi  10 2.04 1

1.75 (sudah termasuk p.penyaluran)

66 - - - - - 488.27 - - - -5 Kolom 250 x 375 SENGKANG 0.345 33 bh Besi Ǿ 8 17 1.18 194 19 91.62 0.22 0.048 1.18 145 15 68.83

200

400

2

16

8-150

375

250

4

10

2

10

2

10

4

10

8-150

Page 10 of 16

(11)

Panj.

Panj. Panj. Panj. Panj.

Kg

Kg

Kg

Kg

Kg

12 M

12 M 12 M 12 M 12 M 12 M

Ǿ 8

Ǿ 10 D 13 D 16 D 22 D 25

Item Pek.

Gambar Potongan

D 13

D 16

Sisa

Ǿ 10

Panj

No

Lokasi

D 22

D 25

Jumlah

Jumlah

Jml

Keterangan

Kebutuhan

Panj.

jml

Ǿ 8

34 - - - - 160.45 - - - - 48 - - - - 229.28 - - - -

-6 Kolom 200 x 275 TULANGAN POKOK 29 1.75 198 33 244.13 - 1.50 33

33 bh Besi  10

1.75 (sudah termasuk p.penyaluran)

275

200

4

10

2

10

2

10

4

10

(12)
(13)
(14)
(15)

Panj. Panj. Panj. Panj. Panj. Kg Kg Kg Kg Kg Kg 12 M 12 M 12 M 12 M 12 M 12 M

Ǿ 8 Ǿ 10 D 13 D 16 D 22 D 25

1 Deker Sentra Kosambi tebal selimut beton 50 mm

01 6 6.40 13 13.00 246.21 5.60 13.00 sisa dipakai 02 0.2 6.40 13 13.00 246.21 5.60 13.00 sisa dipakai 02 0.2 6 02 1.8 4.08 15 8.00 151.51 3.84 8.00 1.52 26.00 4 0.2 34 643.92 Jumlah Sisa D 22 D 25

BAR BENDING SCHEDULE

No Lokasi Item Pek. Gambar Potongan

Jumlah

Panj Jml

Keterangan Kebutuhan

(16)

Referensi

Dokumen terkait

Pada siklus perbaikan mutu yang ke-2 GKM Bahagia berhasil memperbaiki cacat mutu “kurangnya isi potongan nata dalam produk akhir” dengan indikator : (1) jumlah produk yang

PROPINSI KABUPATEN KECAMATAN DESA JENIS PRASARANA SALURAN AIR/DRAINASE LOKASI DUSUN JUDUL GAMBAR - DENAH SALURAN - POTONGAN Dibuat Oleh Diperiksa Oleh Diketahui Oleh,. FILE

Gambar hasil pemotongan slender bar ST-42 dengan menggunakan pahat potong carbide insert dimana sudut potong utama Kr = 90° ditunjukkan pada gambar 9 yang merupakan

Gabungan antara kombinasi unsur nama yang harmonis dan jumlah huruf dalam nama kita yang bermakna ideal ( di tambah dengan perhitungan peruntungan fengshui

Di dalam game ini ada pertanyaan-pertanyaan yang ada hubungannya dengan karakter tokoh Mahabharata, di dalam game ini ada beberapa potongan gambar karakter

Merancang program bantu pengerjaan bar bending schedule penulangan struktur pile cap dan kolom bawah dengan bahasa pemrograman visual basic 6.0, Melakuka uji coba

Tahapan penelitian meliputi tahap persiapan, studi literatur (analisis shop drawing, bar bending schedule, visual basic 6.0, Microsoft access, dan crystal report ),

This Bar Bending Schedule method is expected to facilitate the work of construction management in calculating the need for reinforcing iron to the maximum so that there is no excess