Rekayasa Biaya

Konstruksi

Fakultas Program Studi Tatap Muka Kode MK Disusun Oleh

Teknik S2 SIPIL MK

14

MK20200 Budi Susetyo

Abstract

Kompetensi

(2)

Review

Pendahuluan

(3)

2013

3

Rekayasa Biaya Konstruksi Budi Susetyo

Review

The following matrix has been developed to provide a range of estimate variance (plus or minus), based on the level construction

evaluation of the level of complexity of the project:

The following matrix has been developed to provide a range of estimate variance (plus or minus), based on the level construction documents completion, in com

evaluation of the level of complexity of the project:

Project complexity recognizes the different degrees of dificulty

complexity normal, standard, typical, and repetitive project, through to medium complexity, and up to high complexity projects such as structurally or aesthetically

environmental projects, full-etc.

Project complexity recognizes the different degrees of dificulty in estimating, from a low complexity normal, standard, typical, and repetitive project, through to medium complexity, a up to high complexity projects such as structurally or aesthetically

environmental projects, full-etc.

Konstruksi Pusat Bahan Ajar dan eLearning

http://www.mercubuana.ac.id

The following matrix has been developed to provide a range of estimate variance (plus or minus), based on the level construction documents completion, in combination with an evaluation of the level of complexity of the project:

The following matrix has been developed to provide a range of estimate variance (plus or minus), based on the level construction documents completion, in combination with an evaluation of the level of complexity of the project:

Project complexity recognizes the different degrees of dificulty in estimating, from a low

complexity normal, standard, typical, and repetitive project, through to medium complexity, and up to high complexity projects such as structurally or aesthetically-variant projects, leading

-service hospital facilities, complex mechanical or electrical systems, Project complexity recognizes the different degrees of dificulty in estimating, from a low

complexity normal, standard, typical, and repetitive project, through to medium complexity, a up to high complexity projects such as structurally or aesthetically-variant projects, leading

-service hospital facilities, complex mechanical or electrical systems, The following matrix has been developed to provide a range of estimate variance (plus or

documents completion, in combination with an The following matrix has been developed to provide a range of estimate variance (plus or

bination with an

in estimating, from a low

complexity normal, standard, typical, and repetitive project, through to medium complexity, and variant projects, leading-edge ice hospital facilities, complex mechanical or electrical systems, Project complexity recognizes the different degrees of dificulty in estimating, from a low

complexity normal, standard, typical, and repetitive project, through to medium complexity, and variant projects, leading-edge service hospital facilities, complex mechanical or electrical systems,

(4)
(5)

2013

5

Rekayasa Biaya Konstruksi Budi Susetyo

Class D Estimate

A Class D estimate is generally an estimate based on the initial functional program and broad concept approach. Usually by this time, the site and program have been approved. Initially, the owner may guess at the amount of budget available which .gure may be low due to a

lack of up-to-date cost advice. Then after initial design concepts, consultants prepare an order of magnitude estimate comprised of an elemental summary and based on a rough cost per square metre. This enables veri.cation of the order of magnitude bu

re.ection of a

program and building envelope on a particular site. This often results in a modi.cation of the budget or program, or both. The accuracy of this estimate is generally +/

accurate depending on the complexity of the projec

construction on green.eld site or a renovation. The cost consultant should provide advice on design and pricing allowances for items not yet known, as well as risk allowances. In.ation due to the length of time for working

duration of construction should also be included in the unit rates. This estimate should contain the following contingencies: design, pricing, bid, construction, escalation, and scope. This estimate usually forms the bas

the consultant.

Class C Estimate

This is a schematic design (construction documents) development estimate, where the program is set; the consultants have provided plans, elevations, sections, and an approximate palette of materials, as well as a concept design to allow form and spaces, and the design is generally completed up to 33%. The cost consultant can now measure drawings more accurately for an elemental estimate which can provide a framework to modify or re.ne parts of the design. There may be as many as three or more concept designs that require comparative costing.

From the documentation and information provided, where possible quantities of all major elements are assessed and measured and priced at rates co

particular project under stipulated lump sum form of contract. The estimate is a

determination of the fair market value for the construction of the project, not a prediction of the low bid.

Owners and project managers need to c

as well as the cost considerations of the cost estimate. These should be reviewed with the cost consultant along with the remainder of the cost report.

Class B Estimate

Konstruksi Pusat Bahan Ajar dan eLearning

http://www.mercubuana.ac.id

estimate is generally an estimate based on the initial functional program and broad concept approach. Usually by this time, the site and program have been approved. Initially, the owner may guess at the amount of budget available which .gure may be low

date cost advice. Then after initial design concepts, consultants prepare an order of magnitude estimate comprised of an elemental summary and based on a rough cost per square metre. This enables veri.cation of the order of magnitude bu

program and building envelope on a particular site. This often results in a modi.cation of the budget or program, or both. The accuracy of this estimate is generally +/

accurate depending on the complexity of the project and whether the project is new construction on green.eld site or a renovation. The cost consultant should provide advice on design and pricing allowances for items not yet known, as well as risk allowances. In.ation due to the length of time for working document production, as well as the duration of construction should also be included in the unit rates. This estimate should contain the following contingencies: design, pricing, bid, construction, escalation, and scope. This estimate usually forms the basis of an agreement between the owner and

This is a schematic design (construction documents) development estimate, where the program is set; the consultants have provided plans, elevations, sections, and an

ette of materials, as well as a concept design to allow form and spaces, and the design is generally completed up to 33%. The cost consultant can now measure drawings more accurately for an elemental estimate which can provide a framework to

e parts of the design. There may be as many as three or more concept designs that require comparative costing.

From the documentation and information provided, where possible quantities of all major elements are assessed and measured and priced at rates considered competitive for the particular project under stipulated lump sum form of contract. The estimate is a

determination of the fair market value for the construction of the project, not a prediction

Owners and project managers need to carefully read the exclusions and inclusions list, as well as the cost considerations of the cost estimate. These should be reviewed with the cost consultant along with the remainder of the cost report.

estimate is generally an estimate based on the initial functional program and broad concept approach. Usually by this time, the site and program have been approved. Initially, the owner may guess at the amount of budget available which .gure may be low

date cost advice. Then after initial design concepts, consultants prepare an order of magnitude estimate comprised of an elemental summary and based on a rough cost per square metre. This enables veri.cation of the order of magnitude budget, as a

program and building envelope on a particular site. This often results in a modi.cation of the budget or program, or both. The accuracy of this estimate is generally +/- 20 to 30%

t and whether the project is new construction on green.eld site or a renovation. The cost consultant should provide advice on design and pricing allowances for items not yet known, as well as risk allowances.

document production, as well as the duration of construction should also be included in the unit rates. This estimate should contain the following contingencies: design, pricing, bid, construction, escalation, and

is of an agreement between the owner and

This is a schematic design (construction documents) development estimate, where the program is set; the consultants have provided plans, elevations, sections, and an

ette of materials, as well as a concept design to allow form and spaces, and the design is generally completed up to 33%. The cost consultant can now measure drawings more accurately for an elemental estimate which can provide a framework to

e parts of the design. There may be as many as three or more concept

From the documentation and information provided, where possible quantities of all major nsidered competitive for the particular project under stipulated lump sum form of contract. The estimate is a

determination of the fair market value for the construction of the project, not a prediction

arefully read the exclusions and inclusions list, as well as the cost considerations of the cost estimate. These should be reviewed with

(6)

This is a construction document est

dimensioning from computer generated drawings and systems with mechanical and electrical. Generally,

weight are all determined. The ou available. The initial Class B estimate is

which depending on the project can be at 50%, 66% or 95%.

Class A Estimate

This estimate can only be produced afte

complete and a minimum of two weeks following the completion of drawings is required to prepare the estimate. This estimate is of su.cient quality and reliability as to warrant approval from the owner to proceed with t

component design and takes into account all project objectives and deliverables. It requires that project systems be designed and speci.ed to completion based on a realistic construction schedule and accurate m

.nal estimate before tender call. Typically, the total forecast is presented in an elemental format or trade format and includes all actual associated fees and costs and carries an expected degree of accuracy of

conditions, non-standard materials, and nonstandard designs can a.ect this accuracy. There are some exceptional and unique projects which are politically prominent, historic, or of an unusual complexity whose

This is a construction document estimate based on working drawings and more detailed from computer generated drawings and systems with preliminary plans for mechanical and electrical. Generally, such items as structural grid, element sizes, and

are all determined. The outline speci.cations of all systems and materials are available. The initial Class B estimate is upgraded from 33% during design development,

depending on the project can be at 50%, 66% or 95%.

This estimate can only be produced after the construction documents are 100%

complete and a minimum of two weeks following the completion of drawings is required to prepare the estimate. This estimate is of su.cient quality and reliability as to warrant approval from the owner to proceed with tender, as it is based on detailed systems and component design and takes into account all project objectives and deliverables. It requires that project systems be designed and speci.ed to completion based on a realistic construction schedule and accurate material and labour costs. As such, it is the .nal estimate before tender call. Typically, the total forecast is presented in an elemental format or trade format and includes all actual associated fees and costs and carries an expected degree of accuracy of 5% to 10%. The number of bidders, the market

standard materials, and nonstandard designs can a.ect this accuracy. There are some exceptional and unique projects which are politically prominent, historic, or of an unusual complexity whose Class A estimate may vary by more than 10%.

working drawings and more detailed preliminary plans for such items as structural grid, element sizes, and

and materials are upgraded from 33% during design development,

r the construction documents are 100%

complete and a minimum of two weeks following the completion of drawings is required to prepare the estimate. This estimate is of su.cient quality and reliability as to warrant

ender, as it is based on detailed systems and component design and takes into account all project objectives and deliverables. It requires that project systems be designed and speci.ed to completion based on a

aterial and labour costs. As such, it is the .nal estimate before tender call. Typically, the total forecast is presented in an elemental format or trade format and includes all actual associated fees and costs and carries an

5% to 10%. The number of bidders, the market

standard materials, and nonstandard designs can a.ect this accuracy. There are some exceptional and unique projects which are politically prominent, historic,

(7)

2013

7

Rekayasa Biaya Konstruksi Budi Susetyo

Konstruksi Pusat Bahan Ajar dan eLearning

(8)

Daftar Pustaka

1. Barrie, Donald. S dan Boyd C. Paulson, ManajemenKonstruksiProfesional, terjemahan - PenerbitErlangga , 1992.

2. Hendrickson, Project Management for Construction, Web Version, 2003 3. Ritz, George J, Total Construction Project Management, Mc. Graw 4. Soeharto, Iman, ManajemenProyek

Jilid 2-Edisi 2, PenerbitErlangga

Daftar Pustaka

Barrie, Donald. S dan Boyd C. Paulson, ManajemenKonstruksiProfesional, PenerbitErlangga , 1992.

Hendrickson, Project Management for Construction, Web Version, 2003 Ritz, George J, Total Construction Project Management, Mc. Graw Soeharto, Iman, ManajemenProyek-DariKonseptualSampaiOperasional,

PenerbitErlangga, 1999

Barrie, Donald. S dan Boyd C. Paulson, ManajemenKonstruksiProfesional,

Hendrickson, Project Management for Construction, Web Version, 2003

Ritz, George J, Total Construction Project Management, Mc. Graw-Hill Int’L, 1994 DariKonseptualSampaiOperasional, Jilid 1 dan

(9)

2013

9

Rekayasa Biaya Konstruksi Budi Susetyo

Konstruksi Pusat Bahan Ajar dan eLearning

Referensi

Dokumen terkait

Dalam Meningkatkan Kemampuan Membaca Al-Quran Pada Anak Usia Dini.. Universitas Pendidikan Indonesia | repository.upi.edu

Bila ditemukan dugaan serius pelanggaran kejujuran dan moralitas Peneliti, dengan bantuan anggota Peneliti senior (anggota ad hoc MPEP) sebagai narasumber dalam bidang

Disimping itu juga kewajiban moral dan kepercayaan wajib pajak berkorelasi dalam membentuk kepatuhan sukarela wajib pajak (voluntary tax compliance), oleh karena itu

Negara berkembang dalam menangani perubahan iklim juga masuk dalam. negosiasi

jawaban responden sesuai dengan kriteria yang telah ditetapkan.. Menentukan bobot nilai untuk setiap kemungkinan pada setiap item variabel penelitian dengan menggunakan skala

Sehingga sebagai akibatnya seringkali timbul berbagai permasalahan dalam pelaksanaan dalam gadai tanah, salah satunya adalah masalah dalam jaminan kepastian hukum suatu perjanjian

Hasil penelitian menunjukkan bahwa perlakuan tingkat salinitas air penyiraman menurunkan pertumbuhan tanaman turi dan lamtoro yang dicerminkan oleh tinggi tanaman namun

[r]