• Tidak ada hasil yang ditemukan

Jumlah Kendaraan/ Number of Vehicle Nama Perusahaan/Name Establishment

N/A
N/A
Protected

Academic year: 2021

Membagikan "Jumlah Kendaraan/ Number of Vehicle Nama Perusahaan/Name Establishment"

Copied!
12
0
0

Teks penuh

(1)

Tabel : 08.01.16 Banyaknya Kendaraan Angkutan Umum Table Taksi Kota dan Angguna

Number of Taxies and Anggunas Which Got Route Lisences

2011

Potential I. T a k s i/T a x i

- Koperasi Taksi Surya (Taksi Surya) 97 97 -

-- PT. Pusaka Nuri Utama (Pusaka Nuri) 400 400 - 500

- PT Sumber Daya Alam (SDA Taksi) 29 29

-- PT Zebra Nusantara (Zebra Taksi) 417 417 - 257

- PT Super Dinamika (Super Taksi) 58 58 -

-- PT Merpati Wahana Taksi 323 323 - 350

- PT Supra Mandiri (Supra Taksi) 174 174 - 174

- PT United Auto 90 (Orenz Taksi) 219 219 -

-- PT Surabaya Arta Utama Bersama (Garuda Taksi) 300 300 - 184

- Metro Taksi 176 176 - 99 - Srikandi Taksi 157 157 - -- PT.Silver Bird 10 10 - 10 - Taksi Silver 463 463 - 439 - Citra Taksi 67 67 - 67 - Virgo Taksi 82 82 - 92

- Semesta Taksi (PT.Indo Semesta Luhur) 182 182 - 109

- Gold Taksi (PT. Uni Ratna Gading Mandala) 283 283 - 283

- Surabaya Taksi 290 290 - 400

- Pusaka Sentra Taksi 350 350 - 500

- Nurimas Taksi 55 55 - 55

- Glatik Taksi 50 50 - 50

- Bhirawa Taksi (Wahoo Roto) 55 55 - 55

- Permata Taksi 70 70 -

-- PT.Krisna Cemerlang (Chrisna Taksi) 20 20 - 17

- PT.Express Kartika Perdana (Kartika Express 71 71 - 60

- PT.Kenari Golden (Kenari Taksi) 50 50 - 50

- PT.Serasi Transportasi Nusantara (Orenz) 554 554 - 554

- PT.Prima Sarijati Agung (Primajati Taksi) 300 300 - 300

- PT.Cipaganti Citra Graha (Cipaganti) 200 200 - 200

II - Angguna 298 13 - 285

Jumlah/Total 5.800 5.515 - 5.090

(1)

Nama Perusahaan/Name Establishment SPW Potensi (2) Jumlah Kendaraan/ Number of Vehicle Operasi/ Operation Rusak/ Damage (4) (5) SPW Realisasi/ Realization (3)

(2)

Tabel : 08.01.17 Macam Trayek, Jarak dan Armada pada Bis Kota Damri Table Kind of Route, Interspace and Fleet at Damri City Bus

2011 Jarak Trayek Inter- space of Route (Km) (1) (2) 01. C Purabaya-Darmo-Indra 22,70 - - - - pura-Perak 02. E Purabaya-Darmo-Tambak - - - - -Oso Wilangun 03. E 1 Purabaya-Joyoboyo 9,45 5 3 - 8 04. F Purabaya-Kupang-R Saleh - - - - -Indrapura-T O Wilangun 05. L Ujung Baru-Rajawali- - - -T O Wilangun pura-Perak/Patas 06. P 1 Purabaya-Darmo-Indra- 22,70 12 10 - 22 07. P 2 Purabaya-Darmo-Indra- 28,15 3 5 - 8 pura-T O Wilangun/Patas 08. P 3 S Arjo-Tol Larangan,Dupak 36,00 10 5 - 15 09. P 4 Purabaya-Tol Waru,Dupak- 25,45 3 4 - 30 Perak/Patas 10. P 5 Purabaya-Tol Waru,Dupak- 21,95 3 4 - 7 Rajawali-Semut/Patas 11. P 6 Purabaya-Tol Dupak- 26,25 3 1 - 4 T O Wilangun/Patas

Sumber : Dinas Perhubungan Kota Surabaya

Source : Transportation and Communication Service of Surabaya City No Lyn Trayek/ Route (6) Damaged Jumlah/ Baik/ Good (5) Rusak Ringan/ Light Total (4) (3) Armada/Fleet Keadaan (7) Rusak Berat/ Weight (8)

(3)

Tabel : 08.01.17 Lanjutan/ Table Continued No Lyn (1) (2) 12. P 7 Purabaya-Tol Mayjen Sungkono-dupak-TO - - - - -Wilangun/Patas 13. P 8 Purabaya-Tol Waru, 26,35 14 14 - 28 Dupak-T O Wilangun/ Patas 14. KAMAL Kamal-Bangkalan- - - -Bumeh 15. CAD Cadangan - - - - -16. JND Juanda-Darmo-T Perak/ 9,75 24 1 - 25 Mini AC 17. PAC 1 P Baya-Darmo-Indrp- 22,70 22 - - 22 Perak/Patas AC 18. PAC 2 P Baya-Darmo-Indrp- 29,45 15 - - 15 TOW/Patas AC

19. PAC 4 P Baya-Tol Waru,Dupak 25,45 - - -

PAC 8 P Baya-Tol Waru,Dupak 26,35 - - -

-Sumber : Perum Damri Unit Bis Kota Surabaya Source : Surabaya City Bus Unit of Damri Company

Rusak Jarak Trayek/ Inter-space of Armada/Fleet Trayek/ Route (8) (Km) (4) (5) (6) Damaged Baik Good Route Ringan Light Jumlah/Total 332,70 114 (3) 47 184 Keadaan Weight Damaged (7) Jumlah/ Total Rusak Berat

(4)

Tabel : 08.01.18 Banyaknya Rit dan Penumpang menurut Shift Table Per Trayek Pada Bis Kota Damri

Number of Trips and Passangers by Shift at Damri City Bus

2011 No Lyn (1) (2) 01. C Purabaya-Darmo-Indra- - - - Purabaya-Perak 02. E Purabaya-Darmo-Tambak - - - -Oso Wilangun 03. E 1 Purabaya-Joyoboyo 7.200 180.000 - 180.000 04. F Purabaya-Kupang-R Saleh - - - -Indrapura-T O Wilangun 05. L Ujung Baru-Rajawali- - - - -T O Wilangun 06. P 1 Purabaya-Darmo-Indra- 25.920 - - 1.036.800 pura-Perak/Patas 07. P 2 Purabaya-Darmo-Indra- 4.320 - - 77.760 pura-T O Wilangun/ Patas 08. P 3 Sidoarjo-Tol Larangan, 1.800 - - 604.800 Dupak-Rajawali-Semut Patas 09. P 4 Purabaya-Tol Waru, 2.850 - - 991.800 Dupak, Perak/Patas 10. P 5 Purabaya-Tol Waru, 540 - - 142.560 Dupak-Rajawali-Semut/Patas 11. P 6 Purabaya-Tol Dupak- - - - -T O Wilangun/Patas

Sumber : Perum Damri Unit Bis Kota Surabaya Source : Surabaya City Bus Unit of Damri Company

Jumlah Rit/ Number of Trips (3) Jurusan/Route (6) Umum/ PLJ/MBS Public Penumpang/Passanger (7) S h i f t I & II Jumlah Penumpang/ Number of Passanger (5) (4)

(5)

Tabel : 08.01.18 Lanjutan/Continued Table (1) (2) 42.630 180.000 3.033.720 12. P 7 Purabaya-Tol Mayjen - - - -Sungkono,Dupak-T O Wilangun/Patas 13. P 8 Purabaya-Tol Waru, 2.940 - - 987.840 Dupak-T O Wilangun/ Patas 14. Kamal Kamal-Bangkalan- - - - -Bumeh 15. CAD Cadangan - - - -16. JND Juanda-Darmo-T Perak/ 5.040 - - 1.330.560 Mini AC 17. PAC 1 P Baya-Darmo-Indrp- 3.300 - - 1.702.800 Perak/Patas AC 18. PAC 2 P Baya-Darmo-Indrp- 1.800 - - 993.600 TOW/Patas AC

19. PAC 4 P Baya-Tol Waru,Dupak- - - -

-Perak/Patas AC

20. PAC 8 P Baya-Tol Waru,Dupak- - - -

-TOW/Patas AC

8.048.520 Sumber : Perum Damri Unit Bis Kota Surabaya

Source : Surabaya City Bus Unit of Damri Company

S h i f t I & II Jumlah Penumpang/ Number of PLJ/MBS Umum/ Public 55.710 180.000 Jumlah / Total (7) (3) Passanger (5) (6) (4) Trips Jurusan/Route Penumpang/Passanger

No Lyn Jumlah Rit/

(6)

Tabel : 08.01.19 Realisasi Penerimaan Uang Uji, Uang Alat, Table Retribusi & Leges

Realization of Testing Fee, Vehicle Rent, Retribution 2006 - 2011 (000 Rp) 686.655 802.145 5.771.758 7.260.558 756.918 806.375 3.225.500 4.788.793 2.883.265 798.130 3.359.603 7.040.998 2.916.084 759.730 3.038.920 6.714.734 1.729.666 973.848 4.550.188 7.253.702 5.829.693 163.587 6.170.117 12.163.397

Sumber : Dinas Perhubungan Kota Surabaya

Source : Transportation and Communication Service of Surabaya City

(2) (3) 2011 2010 2008 2007 2006 2009 Uang Uji/ Testing Fee Retri-busi/ Retri-Uang Alat/ Vehicle T a h u n/ Y e a r (4) (5) (1) butions Jumlah/ Total Renting

(7)

Tabel : 08.01.20 Banyaknya Penumpang Kereta Api yang Berangkat Table per Bulan

Monthly Train-Passangers Departure from Surabaya Station 2011 Januari/ 86.786 77.336 166.897 207.634 538.653 January Pebruari/ 75.652 79.896 154.114 85.801 395.463 February Maret/ 88.963 91.698 172.061 92.409 445.131 March April/ 86.299 90.684 169.273 91.603 437.859 April Mei/ 87.867 93.982 186.098 98.170 466.117 May Juni/ 101.522 103.256 201.315 100.528 506.621 June Juli/ 110.069 103.097 197.655 105.719 516.540 July Agustus/ 97.269 71.827 134.088 81.728 384.912 August September/ 99.816 100.596 170.068 96.156 466.636 September Oktober/ 87.568 83.806 146.941 93.721 412.036 October Nopember/ 86.312 86.867 156.380 79.957 409.516 November Desember/ 70.924 47.087 182.535 84.338 384.884 December 1.074.937 1.122.866 1.935.712 1.050.778 5.184.293 1.178.773 1.173.010 1.974.567 1.036.079 5.362.429 1.059.488 1.202.502 1.887.753 947.543 5.097.286 910.192 1.303.647 1.642.208 824.170

Sumber : Perusahaan Umum Kereta Api Daerah Operasi VIII Surabaya Source : Public Train Co , Operational Region No VIII at Surabaya

(6) Jumlah/Total 1.079.047 1.030.132 2.037.425 1.217.764 5.364.368 (1) 2007 (5) (2) (3) (4) 2009 2008 2010 Wonokromo Jumlah/ Total B u l a n/ M o n t h Pasar Turi Gubeng Kota

(8)

Tabel : 08.01.21 Banyaknya Barang yang Dimuat Kereta Api Table per Bulan (Ton)

Monthly Number of Packages Loaded on Trains 2011 B u l a n/ M o n t h (3) Januari/ 31.040 51.240 6.145 13.790 102.215 January Pebruari/ 29.080 42.970 6.140 5.705 83.895 February Maret/ 40.340 42.159 7.180 3.500 93.179 March April/ 30.100 39.710 7.805 4.460 82.075 April Mei/ 49.740 42.640 8.980 - 101.360 May Juni/ 34.000 41.404 6.990 - 82.394 June Juli/ 40.150 36.420 5.850 5.600 88.020 July Agustus/ - 50.450 4.260 3.180 57.890 August September/ 24.700 40.950 4.010 2.770 72.430 September Oktober/ 7.335 - 7.335 - 14.670 October Nopember/ - 36.650 4.440 3.660 44.750 November Desember/ 22.550 36.100 - 3.430 62.080 December

Sumber : Perusahaan Umum Kereta Api Daerah Operasi VIII Surabaya Source : Public Train Co , Operational Region No VIII at Surabaya

884.958 (2) SB Gubeng 309.035 Jumlah/ Total Wonokromo SB Kota (4) 460.693 (6) SB Pasar Turi (1) 46.095 69.135 Jumlah/Total (5)

(9)

Tabel : 08.01.22 Pertumbuhan Penumpang Kereta Api Table Menurut Stasiun Keberangkatan di Surabaya

Growth of Train Passengers of Arriving Train Station in Surabaya 2008-2011 (3) 2 0 0 7 910.192 1.303.647 1.642.208 824.170 4.680.217 2 0 0 8 1.059.488 1.202.502 1.887.753 947.543 5.097.286 2 0 0 9 1.178.773 1.173.010 1.974.567 1.036.079 5.362.429 2 0 1 0 1.074.937 1.122.866 1.935.712 1.050.778 5.184.293 2 0 1 1 1.079.047 1.030.132 2.037.425 1.217.764 5.364.368 5.302.437 5.832.157 9.477.665 5.076.334 25.688.593

Sumber : Perusahaan Umum Kereta Api Daerah Operasi VIII Surabaya Source : Public Train Co , Operational Region No VIII at Surabaya

SURABAYA DALAM ANGKA 2011

SB Pasar Turi SB Gubeng Wonokromo

Jumlah/Total (1) SB Kota Tahun/Year Jumlah/ Total 369 (6) (2) (4) (5)

(10)

Tabel : 08.01.23 Banyaknya Barang Bagasi dan Hantaran yang Table Dimuat dan Dibongkar dari Kereta Api

menurut Lokasi Stasiun

Number of Baggages and Packages Loaded and Unloaded from Train by Train Stations

2007 - 2011 (2) (3) (4) A Muat/Loaded - Kota 2.285.637 3.007.259 3.774.496 5.967.215 309.035 - Pasar Turi 5.137.672 5.619.564 5.367.166 4.742.775 460.693 - Gubeng 1.031.330 1.576.455 1.935.975 69.787 69.135 - Wonokromo 160.364 271.298 225.062 162.816 46.095 B Bongkar/Unloaded - Kota - - - - -- Pasar Turi - - - - -- Gubeng - - - - -- Wonokromo - - - - -Jumlah/Total

Sumber : Perusahaan Umum Kereta Api Daerah Operasi VIII Surabaya Source : Public Train Co , Operational Region No VIII at Surabaya

2011 884.958 2010 (6) Jumlah/Total (1) Stasiun/Station 2007 2008 (5) 10.942.593 11.302.699 -- -8.615.003 10.474.576 - -2009

(11)

Tabel : 08.01.24 Arus Penumpang dan Barang yang Dimuat dan Table Dibongkar di Pelabuhan Penyeberangan Kelas I

Ujung - Kamal menurut Jenisnya per Bulan Number of Passangers and Goods That are Loaded/ Unloaded on Ujung Kamal Crossing Post by Kind of Goods/Passanger and Month

2011 Januari/ 1.442 150.192 7.536 65.927 2.410 January Pebruari/ 1.300 140.330 6.880 56.681 2.236 February Maret/ 1.330 152.620 7.789 66.420 2.599 March April/ 1.442 142.049 8.130 64.351 2.843 April Mei/ 1.577 151.275 8.671 67.715 3.548 May Juni/ 1.471 150.964 9.290 64.988 5.622 June Juli/ 1.357 172.563 9.738 70.390 5.803 July Agustus/ 1.366 154.642 8.625 64.312 5.180 August September/ 1.539 182.514 10.173 72.062 5.065 September Oktober/ 1.507 135.314 9.088 68.973 6.066 October Nopember/ 1.276 161.471 9.193 64.853 5.685 November Desember/ 1.357 127.277 8.992 63.628 5.568 December 18.521 1.941.378 66.632 812.275 19.675 44.077 3.888.772 410.727 1.343.326 721.445 62.683 5.660.428 822.486 1.936.857 1.558.645 62.555 5.205.370 795.436 1.722.477 1.508.613 62.222 5.349.441 711.984 1.665.679 1.585.111 2010 2006 (1) (2) 2008 2007 2009 Jumlah/Total 16.964 1.821.211 104.105 Passanger Kendaraan Roda 4/ (3)

Dimuat (dari Ujung)/Loaded from Ujung

4 Wheel Vehicles Kendaraan Roda 2/ 2 Wheel Vehicles Rit/ Number of Route 790.300 52.625 Bulan/ Month Barang/ Goods(M3) (4) (5) (6) Penumpang/

(12)

Tabel: 08.01.24 Lanjutan/Continued Table Januari/ 1.439 140.061 7.829 66.423 569 January Pebruari/ 1.328 130.245 7.348 58.037 549 February Maret/ 1.335 149.488 8.192 68.213 768 March April/ 1.432 136.221 8.193 64.588 702 April Mei/ 1.574 145.345 8.703 68.033 776 May Juni/ 1.500 148.355 9.453 66.604 847 June Juli/ 1.393 174.901 10.215 68.593 889 July Agustus/ 1.345 122.312 9.294 58.486 942 August September/ 1.546 221.355 10.879 71.628 1.062 September Oktober/ 1.510 127.621 9.477 68.529 1.190 October Nopember/ 1.266 148.061 9.178 64.493 1.083 November Desember/ 1.377 126.141 9.454 64.411 1.098 December 18.484 1.997.157 74.262 818.468 6.529 44.978 3.986.087 386.239 1.380.678 257.244 62.826 5.226.925 810.579 1.768.760 493.707 62.637 4.784.201 793.666 1.597.384 502.040 62.556 4.980.140 676.857 1.551.086 672.779

Sumber : Dinas Perhubungan Propinsi Jawa Timur

Source : Transportation & Communication Dept Representatif Office of East Java 2006 2007 2008 2009 (6) (4) (3) (2) (1) 2010 Bulan/ Month (5) Barang/ Goods(M3) 2Wheel

Dibongkar (dari Kamal)/Unloaded from Kamal

Jumlah/Total 17.045 1.770.106 108.215 788.038 10.475 Vehicles Vehicles Rit/ Penumpang/ Passanger 4Wheel Kendaraan Roda2/ Kendaraan Roda4/

Gambar

Tabel :  08.01.16    Banyaknya Kendaraan Angkutan Umum Table               Taksi Kota dan Angguna
Tabel :  08.01.17    Macam Trayek, Jarak dan Armada pada Bis Kota Damri Table               Kind of Route, Interspace and Fleet at Damri City Bus
Tabel :  08.01.17   Lanjutan/ Table              Continued No    Lyn     (1) (2) 12.    P 7 Purabaya-Tol Mayjen Sungkono-dupak-TO - - - -  -Wilangun/Patas 13
Tabel :  08.01.18   Banyaknya Rit dan Penumpang menurut Shift Table               Per Trayek Pada Bis Kota Damri
+7

Referensi

Dokumen terkait

Jеnis pеnеlitian yang digunakan adalah pеnеlitian survеi yang bеrsifat pеnjеlasan (еxplanatory rеsеarch).Jumlah sampеl yang digunakan dalam pеnеlitian ini

Menjalin interaksi dengan pelanggan agar terjadi hubungan yang lebih intim adalah hal yang harus dilakukan karena komunikasi dapat menjadi jembatan penghubung

• Keadaan di mana tanah yang di pecah bahagi, dan dalam hal petak tanah dengan tingkat bawah tanah yang dikongsi, PK(HBT) hendaklah mengandungi pelan lokasi, pelan tandaan, jadual

Pada tanah Vertisol akar cendana bobot kering lebih berat pada cekaman 2 hari C2 dibanding dengan cekaman lainya baik pada umur 90 maupun 150 HST (Tabel 6) yang didukung

Pada pertemuan pertama terdapat 6 kelompok dimana terdapat 4 hingga 5 siswa dari masing-masing kelompok, pada pertemuan pertama karena masih proses adaptasi

Capaian kinerja dinas sosial Kabupaten Subang selama 5 Tahun kebelakang sangat dipengaruhi oleh dukungan anggaran untuk mendukung pencapain kinerja dinas sosial

Kepada semua penghuni blok yang berkenaan jika tidak dapat dikenalpasti pihak yang terlibat.. Menyendal pintu blok dengan Fire

Daya tampung terbesar terjadi pada Tabel Jangkauan I hal ini dikarenakan pada tabel jangkauan ini nilai R1=[0,7], sedangkan pada tabel jangkauan yang lain Tabel Jangkauan II