• Tidak ada hasil yang ditemukan

Lampiran IV Perda Perubahan 2012

N/A
N/A
Protected

Academic year: 2017

Membagikan "Lampiran IV Perda Perubahan 2012"

Copied!
70
0
0

Teks penuh

(1)

Lampiran IV Perda Perubahan

Hal. 1

PROVINSI JAWA BARAT

REKAPITULASI PERUBAHAN BELANJA MENURUT URUSAN PEMERINTAHAN DAERAH, ORGANISASI, PROGRAM, KEGIATAN DAN JENIS BELANJA

TAHUN ANGGARAN 2012

KODE

REKENING

URUSAN PEMERINTAHAN DAERAH

SEBELUM PERUBAHAN

SETELAH PERUBAHAN

TAMBAH / (KURANG)

BELANJA PEGAWAI

BELANJA BARANG

DAN JASA

BELANJA MODAL

JUMLAH

BELANJA PEGAWAI

BELANJA BARANG

DAN JASA

BELANJA MODAL

JUMLAH

( Rp )

%

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1

URUSAN WAJIB 320,998,851,694.80 1,519,006,211,380.93 1,180,862,330,423.28 3,020,867,393,499.00 385,419,220,351.99 1,658,804,039,674.00 1,207,136,396,208.00 3,251,359,656,233.99 230,492,262,734.99 7.63

1 01

Pendidikan 22,317,928,071.00 197,495,151,358.50 40,219,075,000.00 260,032,154,429.50 25,344,505,860.00 239,454,011,045.50 64,989,200,000.00 329,787,716,905.50 69,755,562,476.00 26.83

1 01 01

Dinas Pendidikan 22,317,928,071.00 197,495,151,358.50 40,219,075,000.00 260,032,154,429.50 25,344,505,860.00 239,454,011,045.50 64,989,200,000.00 329,787,716,905.50 69,755,562,476.00 26.83

1 01 01 01

Program Wajib Belajar Pendidikan Dasar 4,996,569,000.00 139,488,255,500.00 - 144,484,824,500.00 5,046,769,000.00 153,730,828,700.00 - 158,777,597,700.00 14,292,773,200.00 9.89

1 01 01 01 01 PEMBINAAN OLAHRAGA PENDIDIKAN DASAR 972,950,000.00 4,064,449,500.00 - 5,037,399,500.00 996,000,000.00 4,041,399,500.00 - 5,037,399,500.00 -

-1 01 01 01 02 PENINGKATAN AKSES DAN MUTU PENDIDIKAN DASAR 788,519,000.00 52,541,656,000.00 - 53,330,175,000.00 795,569,000.00 67,193,815,000.00 - 67,989,384,000.00 14,659,209,000.00 27.49 1 01 01 01 03 PENYELENGGARAAN LOMBA DAN FESTIVAL PENDIDIKAN DASAR 1,306,300,000.00 3,437,322,000.00 - 4,743,622,000.00 1,306,300,000.00 3,437,322,000.00 - 4,743,622,000.00 - -1 01 01 01 04 REVITALISASI SARANA PRASARANA PENDIDIKAN DASAR 167,950,000.00 50,434,825,000.00 - 50,602,775,000.00 245,150,000.00 49,991,189,200.00 - 50,236,339,200.00 (366,435,800.00) (0.72)

1 01 01 01 05 PENGEMBANGAN SSN-SBI SD DAN SMP DI JAWA BARAT 988,250,000.00 27,464,503,000.00 - 28,452,753,000.00 931,150,000.00 27,521,603,000.00 - 28,452,753,000.00 -

-1 01 01 01 06 FASILITASI PENYELENGGARAAN SEKOLAH MENENGAH PERTAMA TERBUKA

210,000,000.00 775,075,000.00 - 985,075,000.00 210,000,000.00 775,075,000.00 - 985,075,000.00 -

-1 01 01 01 07 BANTUAN OPERASIONAL SEKOLAH (BOS) PROVINSI DAN PUSAT UNTUK JENJANG PENDIDIKAN DASAR

562,600,000.00 770,425,000.00 - 1,333,025,000.00 562,600,000.00 770,425,000.00 - 1,333,025,000.00 -

-1 01 01 02

Program Pendidikan Menengah dan Tinggi 3,197,825,000.00 13,021,135,250.00 24,075,000,000.00 40,293,960,250.00 4,129,045,000.00 30,187,415,250.00 48,850,000,000.00 83,166,460,250.00 42,872,500,000.00 106.40

1 01 01 02 01 Pembinaan dan Pengembangan SMA/SMK RSSN/SSN/RSBI Jawa Barat

473,950,000.00 1,734,415,250.00 - 2,208,365,250.00 1,103,900,000.00 2,039,465,250.00 - 3,143,365,250.00 935,000,000.00 42.34 1 01 01 02 02 PENINGKATAN KUALITAS, AKSESIBILITAS DAN RELEVANSI SMK

DI JAWA BARAT

1,198,100,000.00 6,606,100,000.00 - 7,804,200,000.00 1,472,250,000.00 22,720,895,000.00 - 24,193,145,000.00 16,388,945,000.00 210.00 1 01 01 02 03 PENDIDIKAN SDM TERAMPIL BIDANG KEAHLIAN TEKNOLOGI

TEKSTIL

282,000,000.00 1,218,000,000.00 - 1,500,000,000.00 273,000,000.00 1,227,000,000.00 - 1,500,000,000.00 -

-1 01 01 02 05 Pengadaan Tanah Dalam Rangka Penegerian Unsika Kabupaten Karawang, Poltek Kota Sukabumi, Unsil Kota Tasikmalaya dan Unswagati Kota Cirebon

26,775,000.00 789,425,000.00 24,075,000,000.00 24,891,200,000.00 50,850,000.00 990,350,000.00 48,850,000,000.00 49,891,200,000.00 25,000,000,000.00 100.44

1 01 01 02 10 PENINGKATAN KUALITAS DAN PRODUKTIVITAS SMA 1,217,000,000.00 2,673,195,000.00 - 3,890,195,000.00 1,229,045,000.00 3,209,705,000.00 - 4,438,750,000.00 548,555,000.00 14.10

1 01 01 03

Program Pendidikan Non Formal 697,050,000.00 1,601,826,250.00 - 2,298,876,250.00 697,050,000.00 1,601,826,250.00 - 2,298,876,250.00 -

-1 01 01 03 01 Pengembangan Layanan PAUD 44,400,000.00 267,776,250.00 - 312,176,250.00 44,400,000.00 267,776,250.00 - 312,176,250.00 -

-1 01 01 03 02 Kegiatan Peningkatan Mutu Kursus dan Kelembagaan 245,300,000.00 478,150,000.00 - 723,450,000.00 245,300,000.00 478,150,000.00 - 723,450,000.00 -

-1 01 01 03 03 PENINGKATAN LAYANAN PENDIDIKAN MASYARAKAT DAN GENDER

407,350,000.00 855,900,000.00 - 1,263,250,000.00 407,350,000.00 855,900,000.00 - 1,263,250,000.00 -

-1 01 01 04

Program Pendidikan Luar Biasa 546,585,000.00 4,230,147,500.00 13,399,375,000.00 18,176,107,500.00 546,585,000.00 4,235,022,500.00 13,394,500,000.00 18,176,107,500.00 -

-1 01 01 04 01 Peningkatan Kesejahteraan Pendidik, Tenaga Kependidikan dan Pengembangan Kurikulum PKPLK

243,035,000.00 1,771,625,000.00 - 2,014,660,000.00 243,035,000.00 1,771,625,000.00 - 2,014,660,000.00 -

-1 01 01 04 02 PENGEMBANGAN SARANA DAN PRASARANA SLB JAWA BARAT 47,400,000.00 1,236,512,500.00 13,399,375,000.00 14,683,287,500.00 47,400,000.00 1,241,387,500.00 13,394,500,000.00 14,683,287,500.00 - -1 01 01 04 03 PENINGKATAN BINA PROMOSI DAN KOMPETENSI SISWA PK

DAN PLK

256,150,000.00 1,222,010,000.00 - 1,478,160,000.00 256,150,000.00 1,222,010,000.00 - 1,478,160,000.00 -

-1 01 01 05

Program Manajemen Pelayanan Pendidikan 5,332,072,500.00 9,452,006,300.00 - 14,784,078,800.00 6,563,172,500.00 12,010,746,300.00 - 18,573,918,800.00 3,789,840,000.00 25.63

1 01 01 05 01 PENYEBARLUASAN INFORMASI PROGRAM PEMBANGUNAN BIDANG PENDIDIKAN

- 1,264,360,000.00 - 1,264,360,000.00 - 1,644,360,000.00 - 1,644,360,000.00 380,000,000.00 30.05

1 01 01 05 02 PENINGKATAN DAN PENGEMBANGAN ASRAMA BINA SISWA SMA PLUS CISARUA (EKS YAYASAN DARMALOKA )

2,270,262,500.00 1,554,737,500.00 - 3,825,000,000.00 2,270,262,500.00 1,554,737,500.00 - 3,825,000,000.00 -

-1 01 01 05 03 PENINGKATAN KOMPETENSI PENDIDIK DAN TENAGA KEPENDIDIKAN PENDIDIKAN KEJURUAN

512,000,000.00 820,410,000.00 - 1,332,410,000.00 512,000,000.00 820,410,000.00 - 1,332,410,000.00 -

-1 01 01 05 04 Kegiatan Pelatihan Keahlian Teknis Pendidik dan Tenaga Kependidikan Sekolah Menengah Kejuruan

210,350,000.00 1,053,475,000.00 - 1,263,825,000.00 210,350,000.00 1,053,475,000.00 - 1,263,825,000.00 -

-1 01 01 05 07 Kegiatan Peningkatan Kesejahteraan Guru di Jawa Barat 294,000,000.00 474,400,000.00 - 768,400,000.00 294,000,000.00 474,400,000.00 - 768,400,000.00 -

-1 01 01 05 15 KEGIATAN PEMILIHAN GURU, KEPALA DAN PENGAWAS SLB BERDEDIKASI TAHUN 2012

184,600,000.00 688,450,000.00 - 873,050,000.00 184,600,000.00 688,450,000.00 - 873,050,000.00 -

(2)

Lampiran IV Perda Perubahan

Hal. 2

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 01 01 05 18 KEGIATAN PELATIHAN, KUALIFIKASI PENDIDIK, TENAGA KEPENDIDIKAN DAN PROGRAM HIBAH KOMPETITIF INSTITUSI (PHK-I) T.A. 2012

944,000,000.00 1,890,550,800.00 - 2,834,550,800.00 2,201,500,000.00 4,042,890,800.00 - 6,244,390,800.00 3,409,840,000.00 120.30

1 01 01 05 19 KEGIATAN PEMILIHAN PENDIDIK, TENAGA KEPENDIDIKAN BERPRESTASI, BERDEDIKASI TAHUN 2012

414,900,000.00 833,468,000.00 - 1,248,368,000.00 388,500,000.00 859,868,000.00 - 1,248,368,000.00 -

-1 01 01 05 21 REVITALISASI SIM DINAS PENDIDIKAN PROVINSI JAWA BARAT 501,960,000.00 166,340,000.00 - 668,300,000.00 501,960,000.00 166,340,000.00 - 668,300,000.00 -

-1 01 01 05 22 PENDAMPING PENYELENGGARAAN UJIAN NASIONAL PENDIDIKAN DASAR DAN PENDIDIKAN MENENGAH

- 705,815,000.00 - 705,815,000.00 - 705,815,000.00 - 705,815,000.00 -

-1 01 01 29

Program Perencanaan Pengendalian dan Pengawasan

Pembangunan Daerah

129,276,000.00 230,168,812.50 - 359,444,812.50 129,276,000.00 230,168,812.50 - 359,444,812.50 -

-1 01 01 29 32 OPTIMALISASI PERENCANAAN, PENGENDALIAN DAN PENGAWASAN PEMBANGUNAN PENDIDIKAN

129,276,000.00 230,168,812.50 - 359,444,812.50 129,276,000.00 230,168,812.50 - 359,444,812.50 -

-1 01 01 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 537,520,000.00 2,863,277,880.00 - 3,400,797,880.00 994,006,800.00 3,482,663,580.00 - 4,476,670,380.00 1,075,872,500.00 31.64

1 01 01 59 01 PENINGKATAN KESEJAHTRAAN DAN KEMAMPUAN APARTUR SEKRETARIAT DAN SMK EKS YAYASAN DARMALOKA DINAS PENDIDIKAN PROVINSI JAWA BARAT TA.2012

487,520,000.00 2,564,942,880.00 - 3,052,462,880.00 944,006,800.00 3,184,328,580.00 - 4,128,335,380.00 1,075,872,500.00 35.25

1 01 01 59 02 PENINGKATAN KESEJAHTERAAN DAN KEMAMPUAN APARATUR PADA BALAI PELATIHAN PENDIDIK DAN TENAGA KEPENDIDIKAN PENDIDIKAN UMUM (BPPTK-PU) DINAS PENDIDIKAN PROVINSI JAWA BARAT

- 74,750,000.00 - 74,750,000.00 - 74,750,000.00 - 74,750,000.00 -

-1 01 01 59 04 Peningkatan Kesejahteraan & Kemampuan Aparatur pada Balai Pelatihan Pendidik dan Tenaga Kependidikan Pendidikan Luar Biasa (BPPTK-PLB) Dinas Pendididkan Prov. Jabar

- 54,000,000.00 - 54,000,000.00 - 54,000,000.00 - 54,000,000.00 -

-1 01 01 59 05 Peningkatan Kinerja dan Kemampuan Aparatur BPPTKPK - 90,180,000.00 - 90,180,000.00 - 90,180,000.00 - 90,180,000.00 -

-1 01 01 59 07 PENINGKATAN KESEJAHTERAAN DAN KEMAMPUAN APARATUR PADA BALAI PENGEMBANGAN BAHASA DAERAH DAN KESENIAN DINAS PENDIDIKAN PROVINSI JAWA BARAT TAHUN ANGGARAN 2012

50,000,000.00 79,405,000.00 - 129,405,000.00 50,000,000.00 79,405,000.00 - 129,405,000.00 -

-1 01 01 60

Program Pelayanan Administrasi Perkantoran 6,322,668,571.00 7,046,485,544.00 - 13,369,154,115.00 6,237,739,560.00 10,354,206,331.00 - 16,591,945,891.00 3,222,791,776.00 24.11

1 01 01 60 01 PENYELENGGARAAN ADMINISTRASI PERKANTORAN PADA SEKRETARIAT DINAS PENDIDIKAN PROVINSI JAWA BARAT DAN SMK EKS YAYASAN DARMALOKA TAHUN 2012

6,294,748,571.00 6,124,476,104.50 - 12,419,224,675.50 6,209,819,560.00 9,432,196,891.50 - 15,642,016,451.50 3,222,791,776.00 25.95

1 01 01 60 02 Penyelenggaraan Administrasi Perkantoran pada Balai Pelatihan Pendidik dan Tenaga Kependidikan Pendidikan Umum (BPPTK-PU) di Lingkungan Dinas Pendidikan provinsi Jawa Barat Tahun Anggaran 2012

13,200,000.00 212,898,846.50 - 226,098,846.50 13,200,000.00 212,898,846.50 - 226,098,846.50 -

-1 01 01 60 04 Penyelenggaraan Administrasti Perkantoran pada Balai Pelatihan Pendidik dan Tenaga Kependidikan Pendidikan Luar Biasa (BPPTK-PLB) di Lingkungan Dinas Pendidikan Prov Jabar

- 175,981,346.00 - 175,981,346.00 - 175,981,346.00 - 175,981,346.00 -

-1 01 01 60 05 Program Pelayanan Administrasi Perkantoran BPPTKPK - 108,605,400.00 - 108,605,400.00 - 108,605,400.00 - 108,605,400.00 -

-1 01 01 60 06 Penyediaan Jasa Komunikasi,Listrik dan Air BPPTKPK - 276,000,000.00 - 276,000,000.00 - 276,000,000.00 - 276,000,000.00 -

-1 01 01 60 07 PENYELENGGARAAN ADMINISTRASI PERKANTORAN PADA BALAI PENGEMBANGAN BAHASA DAERAH DAN KESENIAN DINAS PENDIDIKAN PROVINSI JAWA BARAT TAHUN ANGGARAN 2012

14,720,000.00 148,523,847.00 - 163,243,847.00 14,720,000.00 148,523,847.00 - 163,243,847.00 -

-1 01 01 61

Program Peningkatan Sarana dan Prasarana Aparatur 49,400,000.00 497,575,000.00 2,744,700,000.00 3,291,675,000.00 49,400,000.00 497,575,000.00 2,744,700,000.00 3,291,675,000.00 -

-1 01 01 61 02 REVITASLISASI BALAI PELATIHAN PENDIDIK DAN TENAGA KEPENDIDIKAN PENDIDIKAN UMUM (BPPTK-PU) TAHUN ANGGARAN 2012

32,000,000.00 67,075,000.00 675,600,000.00 774,675,000.00 32,000,000.00 67,075,000.00 675,600,000.00 774,675,000.00 -

-1 01 01 61 03 REVITALISASI SARANA DAN PRASARANA APARATUR PADA BALAI PELATIHAN PENDIDIK DAN TENAGA KEPENDIODIKAN PLB

- - 518,000,000.00 518,000,000.00 - - 518,000,000.00 518,000,000.00 -

-1 01 01 61 05 REVITALISASI SARANA DAN PRASARANA SEKRETARIAT DINAS PENDIDIKAN PROVINSI JAWA BARAT TAHUN ANGGARAN 2012

2,400,000.00 23,500,000.00 312,100,000.00 338,000,000.00 2,400,000.00 23,500,000.00 312,100,000.00 338,000,000.00 - -1 01 01 61 07 REVITALISASI SARANA PRASARANA BALAI PENGEMBANGAN

BAHASA DAERAH DAN KESENIAN

15,000,000.00 - 685,000,000.00 700,000,000.00 15,000,000.00 - 685,000,000.00 700,000,000.00 -

-1 01 01 61 08 Revitalisasi Sarana dan Prasarana BPPTKPK - 407,000,000.00 554,000,000.00 961,000,000.00 - 407,000,000.00 554,000,000.00 961,000,000.00 -

(3)

-Lampiran IV Perda Perubahan

Hal. 3

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 01 01 62 01 PEMELIHARAAN SARANA DAN PRASARANA PERKANTORAN PADA SEKRETARIAT DAN SMK EKS YAYASAN DARMALOKA DINAS PENDIDIKAN PROVINSI JAWA BARAT TAHUN ANGGARAN 2012

15,000,000.00 3,063,130,000.00 - 3,078,130,000.00 15,000,000.00 3,063,130,000.00 - 3,078,130,000.00 -

-1 01 01 62 02 Pemeliharaan Sarana dan Prasarana Aparatur pada Balai Pelatihan Pendidik dan Tenaga Kependidikan Pendidikan Umum (BPPTK-PU) Tahun Anggaran 2012

- 300,201,274.00 - 300,201,274.00 - 300,201,274.00 - 300,201,274.00 -

-1 01 01 62 04 Pemeliharaan Sarana dan Prasarana Aparatur pada Balai Pelatihan Pendidik dan Tenaga Kependididkan Pendidikan Luar Biasa (BPPTK-PLB) Tahun Anggaran 2012

- 341,851,274.00 - 341,851,274.00 - 341,851,274.00 - 341,851,274.00 -

-1 01 01 62 05 Pemeliharaan Sarana Prasarana Kantor BPPTKPK - 983,240,000.00 - 983,240,000.00 - 983,240,000.00 - 983,240,000.00 -

-1 01 01 62 07 PEMELIHARAAN SARANA DAN PRASARANA PERKANTORAN PADA BALAI PENGEMBANGAN BAHASA DAERAH DAN KESENIAN DINAS PENDIDIKAN PROVINSI JAWA BARAT TAHUN ANGGARAN 2012

9,720,000.00 233,201,274.00 - 242,921,274.00 9,720,000.00 233,201,274.00 - 242,921,274.00 -

-1 01 01 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

19,803,000.00 38,158,500.00 - 57,961,500.00 19,803,000.00 38,158,500.00 - 57,961,500.00 -

-1 01 01 66 51 Evaluasi dan Pelaporan Internal Dinas Pendidikan 19,803,000.00 38,158,500.00 - 57,961,500.00 19,803,000.00 38,158,500.00 - 57,961,500.00 -

-1 01 01 73

Program Pengembangan Nilai Budaya 464,439,000.00 14,104,491,000.00 - 14,568,930,000.00 906,939,000.00 18,163,776,000.00 - 19,070,715,000.00 4,501,785,000.00 30.90

1 01 01 73 01 PENINGKATAN MUTU GURU MATA PELAJARAN BAHASA, SASTRA, AKSARA DAN KESENIAN DAERAH

263,925,000.00 2,068,000,000.00 - 2,331,925,000.00 590,025,000.00 2,795,270,000.00 - 3,385,295,000.00 1,053,370,000.00 45.17 1 01 01 73 02 Pasanggiri dan Apresiasi Bahasa, Sastra, dan Seni Daerah 152,200,000.00 484,805,000.00 - 637,005,000.00 259,500,000.00 723,580,000.00 - 983,080,000.00 346,075,000.00 54.33 1 01 01 73 03 Koordinasi dan Fasilitasi Pengembangan Bahasa, Sastra, dan Seni

Daerah

48,314,000.00 11,551,686,000.00 - 11,600,000,000.00 57,414,000.00 14,644,926,000.00 - 14,702,340,000.00 3,102,340,000.00 26.74

1 02

Kesehatan 93,306,537,848.80 213,624,267,433.00 114,708,956,504.20 421,639,761,786.00 92,946,792,441.99 228,083,093,400.00 110,726,714,054.20 431,756,599,896.19 10,116,838,110.19 2.40

1 02 01

Dinas Kesehatan 44,730,809,000.00 118,613,587,193.00 9,715,803,000.00 173,060,199,193.00 42,738,093,000.00 119,755,310,193.00 9,635,775,750.00 172,129,178,943.00 (931,020,250.00) (0.54)

1 02 01 06

Program Upaya Kesehatan 309,900,000.00 1,857,800,000.00 - 2,167,700,000.00 490,860,000.00 2,876,182,000.00 13,900,000.00 3,380,942,000.00 1,213,242,000.00 55.97

1 02 01 06 01 PENINGKATAN PERILAKU HIDUP BERSIH DAN SEHAT (PHBS) 5,200,000.00 282,300,000.00 - 287,500,000.00 7,800,000.00 1,349,700,000.00 - 1,357,500,000.00 1,070,000,000.00 372.17

1 02 01 06 02 PROGRAM HIBAH KOMPETENSI INSTITUSI (PHKI) 36,000,000.00 114,000,000.00 - 150,000,000.00 36,000,000.00 114,000,000.00 - 150,000,000.00 -

-1 02 01 06 03 SOSIALISASI DAN UPAYA KESEHATAN DAMPAK ASAP ROKOK TERHADAP KESEHATAN MASYARAKAT

7,700,000.00 492,300,000.00 - 500,000,000.00 600,000.00 178,162,000.00 - 178,762,000.00 (321,238,000.00) (64.25)

1 02 01 06 04 Pendukung Pelayanan bagi masyarakat miskin diluar quota jamkesmas

102,000,000.00 213,200,000.00 - 315,200,000.00 90,000,000.00 225,200,000.00 - 315,200,000.00 -

-1 02 01 06 05 Promosi Kesehatan dan Pemberdayaan Masyarakat BKPM 13,250,000.00 56,750,000.00 - 70,000,000.00 13,250,000.00 56,750,000.00 - 70,000,000.00 -

-1 02 01 06 06 Peningkatan Pelayanan Kesehatan Rujukan 70,850,000.00 154,150,000.00 - 225,000,000.00 268,310,000.00 392,270,000.00 - 660,580,000.00 435,580,000.00 193.59

1 02 01 06 07 PENINGKATAN PELAYANAN KIA, UKS, DAN LANSIA 46,875,000.00 278,125,000.00 - 325,000,000.00 46,875,000.00 278,125,000.00 - 325,000,000.00 -

-1 02 01 06 08 PEMANTAUAN, PENCEGAHAN DAN PENANGGULANGAN KURANG GIZI

- 70,000,000.00 - 70,000,000.00 - 85,000,000.00 13,900,000.00 98,900,000.00 28,900,000.00 41.29

1 02 01 06 10 Peningkatan Pengawasan dan Pengendalian, Penggunaan Obat secara Rasional, Peredaran Sediaan Farmasi, Kosalkes dan Mamin

18,200,000.00 116,800,000.00 - 135,000,000.00 18,200,000.00 116,800,000.00 - 135,000,000.00 -

-1 02 01 06 11 Peningkatan Kualitas Pelayanan Kesehatan Dasar 9,825,000.00 80,175,000.00 - 90,000,000.00 9,825,000.00 80,175,000.00 - 90,000,000.00 -

-1 02 01 07

Program Manajemen Pelayanan Kesehatan 285,697,000.00 1,171,803,000.00 - 1,457,500,000.00 264,347,000.00 1,326,378,000.00 - 1,590,725,000.00 133,225,000.00 9.14

1 02 01 07 13 Pemeriksaan Sarana Kesehatan dalam rangka Sertifikasi - 335,000,000.00 - 335,000,000.00 - 414,675,000.00 - 414,675,000.00 79,675,000.00 23.78

1 02 01 07 14 Akreditasi dan Sertifikasi Sarana Pelayanan Kesehatan. 189,400,000.00 235,600,000.00 - 425,000,000.00 167,400,000.00 257,600,000.00 - 425,000,000.00 -

-1 02 01 07 15 Monev Bantuan Keuangan Pembangunan Bidang Kesehatan 7,432,000.00 117,568,000.00 - 125,000,000.00 7,432,000.00 117,568,000.00 - 125,000,000.00 -

-1 02 01 07 16 Pengembangan Sistem Informasi Kesehatan 3,000,000.00 132,000,000.00 - 135,000,000.00 3,000,000.00 132,000,000.00 - 135,000,000.00 -

-1 02 01 07 17 Peningkatan Kapasitas BLK Sebagai Centre of Excellent Pelayanan Penunjang Diagnostik dan Kesehatan Masyarakat

33,785,000.00 76,215,000.00 - 110,000,000.00 33,785,000.00 76,215,000.00 - 110,000,000.00 -

-1 02 01 07 18 PENYUSUNAN REGULASI DAN MANAJEMEN PENGELOLAAN JAMINAN PEMELIHARAAN KESEHATAN MASYARAKAT

40,000,000.00 100,000,000.00 - 140,000,000.00 40,000,000.00 104,550,000.00 - 144,550,000.00 4,550,000.00 3.25

1 02 01 07 19 Pengendalian dan Evaluasi Perencanaan Teknis Dan Pembangunan Kesehatan

12,080,000.00 175,420,000.00 - 187,500,000.00 12,730,000.00 223,770,000.00 - 236,500,000.00 49,000,000.00 26.13

1 02 01 08

Program Pencegahan dan Penanggulangan Penyakit

Menular

344,750,000.00 1,415,250,000.00 - 1,760,000,000.00 344,750,000.00 1,415,250,000.00 - 1,760,000,000.00 -

-1 02 01 08 21 Pencegahan dan Pengendalian Penyakit Menular dan Tidak Menular

(4)

-Lampiran IV Perda Perubahan

Hal. 4

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 02 01 08 22 Peningkatan Sistem Kewaspadaan Dini Bencana dan Kesehatan Matra

30,600,000.00 119,400,000.00 - 150,000,000.00 30,600,000.00 119,400,000.00 - 150,000,000.00 -

-1 02 01 08 23 Pencegahan Penyakit - Penyakit yang Dapat Dicegah Dengan Imunisasi (PD3I)

27,500,000.00 122,500,000.00 - 150,000,000.00 27,500,000.00 122,500,000.00 - 150,000,000.00 -

-1 02 01 08 24 SURVEILANS PENYAKIT DAN PENANGGULANGAN KEJADIAN LUAR BIASA

39,400,000.00 100,600,000.00 - 140,000,000.00 39,400,000.00 100,600,000.00 - 140,000,000.00 -

-1 02 01 08 25 Pelayanan Kesehatan Kerja yang Prima dan Komprehensif 35,850,000.00 14,150,000.00 - 50,000,000.00 35,850,000.00 14,150,000.00 - 50,000,000.00 -

-1 02 01 08 26 Peningkatan Upaya Kesehatan Lingkungan 18,400,000.00 131,600,000.00 - 150,000,000.00 18,400,000.00 131,600,000.00 - 150,000,000.00 -

-1 02 01 09

Program Peningkatan Sarana dan Prasarana Pelayanan

Kesehatan

356,800,000.00 94,938,508,693.00 600,978,500.00 95,896,287,193.00 369,200,000.00 94,955,598,693.00 600,728,500.00 95,925,527,193.00 29,240,000.00 0.03

1 02 01 09 28 Pengadaan alat Kesehatan Puskesmas Berfungsi PONED 7,800,000.00 26,038,487,193.00 - 26,046,287,193.00 7,800,000.00 26,038,487,193.00 - 26,046,287,193.00 -

-1 02 01 09 30 Pendamping Pengembangan Gedung dan Revitalisasi Puskesmas Berfungsi PONED

29,000,000.00 471,000,000.00 - 500,000,000.00 41,400,000.00 533,200,000.00 - 574,600,000.00 74,600,000.00 14.92

1 02 01 09 32 Pemenuhan Sarana dan Prasarana Rumah Sakit 38,850,000.00 63,961,150,000.00 - 64,000,000,000.00 38,850,000.00 63,961,150,000.00 - 64,000,000,000.00 -

-1 02 01 09 33 Peningkatan Pelayanan Kesehatan di BKKM 3,000,000.00 506,390,000.00 490,610,000.00 1,000,000,000.00 3,000,000.00 506,390,000.00 490,610,000.00 1,000,000,000.00 - -1 02 01 09 34 Peningkatan Layanan Kesehatan BKPM Cirebon 249,250,000.00 730,400,000.00 20,350,000.00 1,000,000,000.00 249,250,000.00 735,960,000.00 20,100,000.00 1,005,310,000.00 5,310,000.00 0.53 1 02 01 09 35 Pengembangan Pelayanan Laboratorium Kesehatan 28,900,000.00 3,231,081,500.00 90,018,500.00 3,350,000,000.00 28,900,000.00 3,180,411,500.00 90,018,500.00 3,299,330,000.00 (50,670,000.00) (1.51)

1 02 01 10

Program Sumber Daya Kesehatan 42,941,880,000.00 6,107,920,000.00 - 49,049,800,000.00 40,637,354,000.00 5,834,886,000.00 - 46,472,240,000.00 (2,577,560,000.00) (5.25)

1 02 01 10 36 Peningkatan Kualitas Kompetensi Tenaga Kesehatan 778,560,000.00 1,121,440,000.00 - 1,900,000,000.00 773,160,000.00 1,077,766,000.00 - 1,850,926,000.00 (49,074,000.00) (2.58) 1 02 01 10 37 PENINGKATAN KUANTITAS DAN KUALITAS SDM KESEHATAN 42,119,690,000.00 2,760,110,000.00 - 44,879,800,000.00 39,820,564,000.00 2,530,750,000.00 - 42,351,314,000.00 (2,528,486,000.00) (5.63) 1 02 01 10 40 Ketersediaan, Pemerataan Keterjangkauan & Mutu Sediaan

Farmasi, Kosalkes dan Mamin

43,630,000.00 2,226,370,000.00 - 2,270,000,000.00 43,630,000.00 2,226,370,000.00 - 2,270,000,000.00 -

-1 02 01 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 193,200,000.00 1,540,261,000.00 - 1,733,461,000.00 333,000,000.00 1,479,471,000.00 - 1,812,471,000.00 79,010,000.00 4.56

1 02 01 59 47 PENINGKATAN KINERJA DAN KEMAMPUAN APARATUR DINAS KESEHATAN PROVINSI JAWA BARAT

158,400,000.00 1,024,575,000.00 - 1,182,975,000.00 255,400,000.00 927,575,000.00 - 1,182,975,000.00 -

-1 02 01 59 48 Peningkatan Kesejahteraan dan Kemampuan Aparatur Bapelkes Dinas Kesehatan Provinsi Jawa Barat

9,000,000.00 187,050,000.00 - 196,050,000.00 18,600,000.00 173,450,000.00 - 192,050,000.00 (4,000,000.00) (2.04)

1 02 01 59 49 Peningkatan Kesejahteraan dan Kemampuan Aparatur BLK Dinas Kesehatan Provinsi Jawa Barat

6,600,000.00 105,000,000.00 - 111,600,000.00 18,800,000.00 126,000,000.00 - 144,800,000.00 33,200,000.00 29.75

1 02 01 59 50 Peningkatan Kinerja dan Kemampuan Aparatur BKKM 12,000,000.00 117,240,000.00 - 129,240,000.00 21,400,000.00 131,490,000.00 - 152,890,000.00 23,650,000.00 18.30 1 02 01 59 51 Peningkatan Kesejahetaraan dan Kemampuan Aparatur BKPM

Provinsi Jawa Barat

7,200,000.00 106,396,000.00 - 113,596,000.00 18,800,000.00 120,956,000.00 - 139,756,000.00 26,160,000.00 23.03

1 02 01 60

Program Pelayanan Administrasi Perkantoran 71,096,000.00 4,466,897,000.00 - 4,537,993,000.00 71,096,000.00 4,598,897,000.00 - 4,669,993,000.00 132,000,000.00 2.91

1 02 01 60 52 PELAYANAN ADMINISTRASI PERKANTORAN DINAS KESEHATAN - 2,232,045,000.00 - 2,232,045,000.00 - 2,364,045,000.00 - 2,364,045,000.00 132,000,000.00 5.91

1 02 01 60 53 Penyelenggaraan Administrasi Perkantoran Bapelkes Dinas Kesehatan Provinsi Jawa Barat

- 432,121,000.00 - 432,121,000.00 - 432,121,000.00 - 432,121,000.00 -

-1 02 01 60 54 Penyelenggaraan Administrasi Perkantoran BLK Dinas Kesehatan Provinsi Jawa Barat

13,000,000.00 828,041,000.00 - 841,041,000.00 13,000,000.00 828,041,000.00 - 841,041,000.00 -

-1 02 01 60 55 PenyelenggaraanAdministrasi Perkantoran BKKM 46,096,000.00 272,710,000.00 - 318,806,000.00 46,096,000.00 272,710,000.00 - 318,806,000.00 -

-1 02 01 60 56 Penyelenggaraan Administrasi Perkantoran BKPM Provinsi Jawa Barat

12,000,000.00 701,980,000.00 - 713,980,000.00 12,000,000.00 701,980,000.00 - 713,980,000.00 -

-1 02 01 61

Program Peningkatan Sarana dan Prasarana Aparatur 46,785,000.00 825,670,500.00 9,114,824,500.00 9,987,280,000.00 48,735,000.00 977,220,500.00 9,021,147,250.00 10,047,102,750.00 59,822,750.00 0.60

1 02 01 61 41 PENINGKATAN SARANA DAN PRASARANA KANTOR DINAS KESEHATAN

11,645,000.00 196,655,000.00 3,271,100,000.00 3,479,400,000.00 11,645,000.00 196,655,000.00 3,307,600,000.00 3,515,900,000.00 36,500,000.00 1.05 1 02 01 61 42 PENINGKATAN SARANA DAN PRASARANA GUDANG DINAS

KESEHATAN

15,390,000.00 171,110,000.00 2,813,500,000.00 3,000,000,000.00 15,390,000.00 171,110,000.00 2,813,500,000.00 3,000,000,000.00 - -1 02 01 61 43 Revitalisasi BKPM Cirebon 5,150,000.00 131,700,000.00 863,150,000.00 1,000,000,000.00 5,150,000.00 130,600,000.00 776,972,750.00 912,722,750.00 (87,277,250.00) (8.73) 1 02 01 61 44 Revitalisasi Bapelkes Dinas Kesehatan Provinsi Jawa Barat 8,850,000.00 90,325,500.00 648,674,500.00 747,850,000.00 8,850,000.00 134,575,500.00 565,024,500.00 708,450,000.00 (39,400,000.00) (5.27) 1 02 01 61 45 Revitalisasi BLK Dinas Kesehatan Provinsi Jawa Barat 3,600,000.00 6,000,000.00 990,400,000.00 1,000,000,000.00 5,550,000.00 111,400,000.00 883,050,000.00 1,000,000,000.00 -

-1 02 01 61 46 Revitalisasi BKKM 2,150,000.00 229,880,000.00 528,000,000.00 760,030,000.00 2,150,000.00 229,880,000.00 528,000,000.00 760,030,000.00 -

-1 02 01 61 47 Peningkatan Sarana dan Prasarana Aparatur - - - 3,000,000.00 147,000,000.00 150,000,000.00 150,000,000.00 100.00

(5)

-Lampiran IV Perda Perubahan

Hal. 5

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 02 01 62 57 PEMELIHARAAN SARANA DAN PRASARANA PERKANTORAN DINAS KESEHATAN PROVINSI JAWA BARAT

135,900,000.00 3,763,145,000.00 - 3,899,045,000.00 135,900,000.00 3,763,145,000.00 - 3,899,045,000.00 -

-1 02 01 62 58 Pemeliharaan Sarana dan Prasarana Perkantoran Bapelkes Dinas Kesehatan Provinsi Jawa Barat

10,250,000.00 656,423,000.00 - 666,673,000.00 10,250,000.00 656,423,000.00 - 666,673,000.00 -

-1 02 01 62 59 Pemeliharaan Sarana dan Prasarana Perkantoran Pada BLK 3,900,000.00 631,160,000.00 - 635,060,000.00 3,900,000.00 631,160,000.00 - 635,060,000.00 -

-1 02 01 62 60 Pemeliharaan Sarana dan Prasarana Kantor BKKM 1,950,000.00 347,850,000.00 - 349,800,000.00 - 349,800,000.00 - 349,800,000.00 -

-1 02 01 62 61 Pemeliharaan Sarana dan Prasarana Aparatur BKPM Provinsi Jawa Barat

- 769,600,000.00 - 769,600,000.00 - 769,600,000.00 - 769,600,000.00 -

-1 02 01 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

28,701,000.00 121,299,000.00 - 150,000,000.00 28,701,000.00 121,299,000.00 - 150,000,000.00 -

-1 02 01 66 62 Perencanaan, Evaluasi dan Pelaporan Internal Dinas Kesehatan Provinsi Jawa Barat

28,701,000.00 121,299,000.00 - 150,000,000.00 28,701,000.00 121,299,000.00 - 150,000,000.00 -

-1 02 02

Rumah Sakit Jiwa 2,325,216,000.00 20,074,846,900.00 14,328,096,000.00 36,728,158,900.00 2,341,826,000.00 19,282,991,923.00 12,896,737,800.00 34,521,555,723.00 (2,206,603,177.00) (6.01)

1 02 02 06

Program Upaya Kesehatan 251,900,000.00 2,676,584,000.00 94,516,000.00 3,023,000,000.00 251,900,000.00 2,676,584,000.00 94,516,000.00 3,023,000,000.00 -

-1 02 02 06 01 Peningkatan Pelayanan Kesehatan Jiwa 155,000,000.00 713,000,000.00 - 868,000,000.00 155,000,000.00 713,000,000.00 - 868,000,000.00 -

-1 02 02 06 02 Peningkatan Terapi dan Rehabilitasi Pasien NAPZA 48,000,000.00 337,000,000.00 - 385,000,000.00 48,000,000.00 337,000,000.00 - 385,000,000.00 -

-1 02 02 06 03 Peningkatan Rehabilitasi Pasien Mental 37,000,000.00 338,484,000.00 94,516,000.00 470,000,000.00 37,000,000.00 338,484,000.00 94,516,000.00 470,000,000.00 - -1 02 02 06 04 Peningkatan Pengetahuan dan Penanggulangan Dampak Merokok

Pada Pasien Keswa

11,900,000.00 1,288,100,000.00 - 1,300,000,000.00 11,900,000.00 1,288,100,000.00 - 1,300,000,000.00 -

-1 02 02 07

Program Manajemen Pelayanan Kesehatan 12,450,000.00 2,166,640,000.00 231,910,000.00 2,411,000,000.00 25,000,000.00 2,095,753,200.00 290,246,800.00 2,411,000,000.00 -

-1 02 02 07 01 Pelaksanaan Tata Kelola RS Sesuai Standar BLUD 2,725,000.00 108,275,000.00 - 111,000,000.00 25,000,000.00 86,000,000.00 - 111,000,000.00 -

-1 02 02 07 02 Pengembangan Sistem Informasi RS 9,725,000.00 93,365,000.00 231,910,000.00 335,000,000.00 - 44,753,200.00 290,246,800.00 335,000,000.00 -

-1 02 02 07 03 Peningkatan Penyebarluasan Informasi Keswamas dan NAPZA - 35,000,000.00 - 35,000,000.00 - 35,000,000.00 - 35,000,000.00 -

-1 02 02 07 04 Peningkatan Pemeliharaan Jaminan Kesehatan Masyarakat (JPKM) Provinsi Jawa Barat

- 1,930,000,000.00 - 1,930,000,000.00 - 1,930,000,000.00 - 1,930,000,000.00 -

-1 02 02 09

Program Peningkatan Sarana dan Prasarana Pelayanan

Kesehatan

78,640,000.00 9,083,935,000.00 9,120,225,000.00 18,282,800,000.00 78,640,000.00 8,489,998,475.00 9,194,225,000.00 17,762,863,475.00 (519,936,525.00) (2.84)

1 02 02 09 01 Penyediaan Obat- obatan 6,150,000.00 3,293,850,000.00 - 3,300,000,000.00 6,150,000.00 3,132,057,000.00 - 3,138,207,000.00 (161,793,000.00) (4.90)

1 02 02 09 02 Kegiatan Penyediaan Bahan Pelayanan Terapi 11,470,000.00 1,406,330,000.00 - 1,417,800,000.00 11,470,000.00 1,406,330,000.00 - 1,417,800,000.00 -

-1 02 02 09 03 Penyediaan Perlengkapan Pasien - 687,550,000.00 72,450,000.00 760,000,000.00 - 613,550,000.00 146,450,000.00 760,000,000.00 -

-1 02 02 09 04 Kegiatan Penyediaaan Makanan dan Minuman Pasien dan Petugas Khusus

27,925,000.00 2,667,075,000.00 - 2,695,000,000.00 27,925,000.00 2,308,931,475.00 - 2,336,856,475.00 (358,143,525.00) (13.29) 1 02 02 09 05 Kegiatan Peningkatan dan Pemeliharaan alat

kesehatan/kedokteran dan sanitasi Rumah Sakit

10,095,000.00 899,980,000.00 549,925,000.00 1,460,000,000.00 10,095,000.00 899,980,000.00 549,925,000.00 1,460,000,000.00 -

-1 02 02 09 06 Pembangunan Gedung Rawat Inap VIP 6,400,000.00 33,450,000.00 860,150,000.00 900,000,000.00 6,400,000.00 33,450,000.00 860,150,000.00 900,000,000.00 -

-1 02 02 09 07 Pembangunan Gedung Arsip Kesehatan 3,900,000.00 28,100,000.00 718,000,000.00 750,000,000.00 3,900,000.00 28,100,000.00 718,000,000.00 750,000,000.00 -

-1 02 02 09 08 Pembangunan Gedung Pelayanan Rawat Jalan Satu Atap 12,700,000.00 67,600,000.00 6,919,700,000.00 7,000,000,000.00 12,700,000.00 67,600,000.00 6,919,700,000.00 7,000,000,000.00 -

-1 02 02 10

Program Sumber Daya Kesehatan 1,835,171,000.00 344,829,000.00 - 2,180,000,000.00 1,763,171,000.00 416,829,000.00 - 2,180,000,000.00 -

-1 02 02 10 01 Peningkatan Kualitas SDM Kesehatan RS Jiwa Provinsi Jawa Barat 118,350,000.00 281,650,000.00 - 400,000,000.00 118,350,000.00 281,650,000.00 - 400,000,000.00 -

-1 02 02 10 02 Peningkatan Mutu Pelayanan 1,716,821,000.00 63,179,000.00 - 1,780,000,000.00 1,644,821,000.00 135,179,000.00 - 1,780,000,000.00 -

-1 02 02 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 67,000,000.00 313,950,000.00 - 380,950,000.00 144,000,000.00 429,650,000.00 - 573,650,000.00 192,700,000.00 50.58

1 02 02 59 01 Peningkatan Kesejahteraan dan Kemampuan Aparatur 67,000,000.00 313,950,000.00 - 380,950,000.00 144,000,000.00 429,650,000.00 - 573,650,000.00 192,700,000.00 50.58

1 02 02 60

Program Pelayanan Administrasi Perkantoran 28,000,000.00 1,374,156,900.00 - 1,402,156,900.00 28,000,000.00 1,374,156,900.00 - 1,402,156,900.00 -

-1 02 02 60 01 Kegiatan Penyelenggaraan Administrasi Perkantoran 28,000,000.00 1,374,156,900.00 - 1,402,156,900.00 28,000,000.00 1,374,156,900.00 - 1,402,156,900.00 -

-1 02 02 61

Program Peningkatan Sarana dan Prasarana Aparatur 27,415,000.00 648,950,000.00 4,881,445,000.00 5,557,810,000.00 21,075,000.00 545,010,000.00 3,317,750,000.00 3,883,835,000.00 (1,673,975,000.00) (30.12)

1 02 02 61 01 Kegiatan penyediaan sarana prasarana serta peralatan kantor pada RS Jiwa

17,165,000.00 616,150,000.00 3,124,495,000.00 3,757,810,000.00 15,625,000.00 512,210,000.00 3,229,975,000.00 3,757,810,000.00 - -1 02 02 61 02 Pembangunan Gedung Mess Kesehatan 10,250,000.00 32,800,000.00 1,756,950,000.00 1,800,000,000.00 5,450,000.00 32,800,000.00 87,775,000.00 126,025,000.00 (1,673,975,000.00) (93.00)

1 02 02 62

Program Pemeliharaan Sarana dan Prasarana Aparatur 19,200,000.00 3,421,242,000.00 - 3,440,442,000.00 24,600,000.00 3,210,450,348.00 - 3,235,050,348.00 (205,391,652.00) (5.97)

1 02 02 62 01 Kegiatan Pemeliharaan Sarana dan Prasarana Kantor 19,200,000.00 3,421,242,000.00 - 3,440,442,000.00 24,600,000.00 3,210,450,348.00 - 3,235,050,348.00 (205,391,652.00) (5.97)

1 02 02 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

(6)

-Lampiran IV Perda Perubahan

Hal. 6

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 02 02 66 01 Perencanaan, Evaluasi dan Pelaporan Internal Rumah Jiwa 5,440,000.00 44,560,000.00 - 50,000,000.00 5,440,000.00 44,560,000.00 - 50,000,000.00 -

-1 02 03

Rumah Sakit Paru 1,133,425,000.00 19,661,966,050.00 26,422,209,693.00 47,217,600,743.00 1,177,325,000.00 19,847,928,450.00 26,422,209,693.00 47,447,463,143.00 229,862,400.00 0.49

1 02 03 06

Program Upaya Kesehatan - 3,000,000,000.00 - 3,000,000,000.00 - 3,000,000,000.00 - 3,000,000,000.00 -

-1 02 03 06 01 Peningkatan Pelayanan Kesehatan Masyarakat Miskin Jawa Barat Non Jamkesmas

- 3,000,000,000.00 - 3,000,000,000.00 - 3,000,000,000.00 - 3,000,000,000.00 -

-1 02 03 07

Program Manajemen Pelayanan Kesehatan 225,000,000.00 212,250,000.00 - 437,250,000.00 225,000,000.00 212,250,000.00 - 437,250,000.00 -

-1 02 03 07 01 Pelaksanaan Akreditasi Rumah Sakit 225,000,000.00 212,250,000.00 - 437,250,000.00 225,000,000.00 212,250,000.00 - 437,250,000.00 -

-1 02 03 09

Program Peningkatan Sarana dan Prasarana Pelayanan

Kesehatan

609,900,000.00 10,951,077,000.00 26,275,734,693.00 37,836,711,693.00 609,900,000.00 10,951,077,000.00 26,275,734,693.00 37,836,711,693.00 - -1 02 03 09 01 Peningkatan dan Perluasan Fungsi Rumah Sakit Paru Provinsi 49,200,000.00 4,195,144,000.00 5,755,656,000.00 10,000,000,000.00 49,200,000.00 4,195,144,000.00 5,755,656,000.00 10,000,000,000.00 -

-1 02 03 09 02 Obat/Bahan Kimia dan Alat Kesehatan dan Kedokteran 13,050,000.00 3,986,950,000.00 - 4,000,000,000.00 13,050,000.00 3,986,950,000.00 - 4,000,000,000.00 -

-1 02 03 09 03 Penyediaan Bahan Perlengkapan Pasien 21,750,000.00 7,750,000.00 1,871,278,693.00 1,900,778,693.00 21,750,000.00 7,750,000.00 1,871,278,693.00 1,900,778,693.00 -

-1 02 03 09 04 Peningkatan dan Pemeliharaan Alat Kesehatan dan Kedokteran 5,400,000.00 494,600,000.00 - 500,000,000.00 5,400,000.00 494,600,000.00 - 500,000,000.00 -

-1 02 03 09 05 Penyediaan Mamin Pasien dan Pegawai Dilingkungan Beresiko Tinggi

8,700,000.00 1,548,800,000.00 - 1,557,500,000.00 8,700,000.00 1,548,800,000.00 - 1,557,500,000.00 -

-1 02 03 09 06 Penyediaan Fasilitas Pelayanan Kesehatan 504,750,000.00 710,650,000.00 4,109,600,000.00 5,325,000,000.00 504,750,000.00 710,650,000.00 4,109,600,000.00 5,325,000,000.00 - -1 02 03 09 07 Peningkatan Pelayanan Kesehatan Paru 7,050,000.00 7,183,000.00 14,539,200,000.00 14,553,433,000.00 7,050,000.00 7,183,000.00 14,539,200,000.00 14,553,433,000.00 -

-1 02 03 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 258,625,000.00 393,250,000.00 - 651,875,000.00 302,525,000.00 484,450,000.00 - 786,975,000.00 135,100,000.00 20.72

1 02 03 59 01 Peningkatan Kesejahteraan dan Kemampuan Aparatur Rumah Sakit

258,625,000.00 393,250,000.00 - 651,875,000.00 302,525,000.00 484,450,000.00 - 786,975,000.00 135,100,000.00 20.72

1 02 03 60

Program Pelayanan Administrasi Perkantoran 6,450,000.00 2,137,216,300.00 - 2,143,666,300.00 6,450,000.00 2,317,216,300.00 - 2,323,666,300.00 180,000,000.00 8.40

1 02 03 60 01 Penyelenggaraan Administrasi Perkantoran pada Rumah Sakit Paru

6,450,000.00 1,777,216,300.00 - 1,783,666,300.00 6,450,000.00 1,777,216,300.00 - 1,783,666,300.00 -

-1 02 03 60 02 Penyediaan Jasa Komunikasi, Listrik dan Air - 360,000,000.00 - 360,000,000.00 - 540,000,000.00 - 540,000,000.00 180,000,000.00 50.00

1 02 03 61

Program Peningkatan Sarana dan Prasarana Aparatur 24,000,000.00 959,375,000.00 146,475,000.00 1,129,850,000.00 24,000,000.00 959,375,000.00 146,475,000.00 1,129,850,000.00 -

-1 02 03 61 01 Penyediaan Sarana dan Prasarana Kantor dan Rumah Tangga 24,000,000.00 959,375,000.00 146,475,000.00 1,129,850,000.00 24,000,000.00 959,375,000.00 146,475,000.00 1,129,850,000.00 -

-1 02 03 62

Program Pemeliharaan Sarana dan Prasarana Aparatur 9,450,000.00 1,968,950,000.00 - 1,978,400,000.00 9,450,000.00 1,883,712,400.00 - 1,893,162,400.00 (85,237,600.00) (4.31)

1 02 03 62 01 Pemeliharaan Sarana dan Prasarana Kantor 9,450,000.00 1,968,950,000.00 - 1,978,400,000.00 9,450,000.00 1,883,712,400.00 - 1,893,162,400.00 (85,237,600.00) (4.31)

1 02 03 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

- 39,847,750.00 - 39,847,750.00 - 39,847,750.00 - 39,847,750.00 -

-1 02 03 66 01 Perencanaan Evaluasi dan Pelporan Internal Rumah Sakit Paru - 39,847,750.00 - 39,847,750.00 - 39,847,750.00 - 39,847,750.00 -

-1 02 04

Rumah Sakit Umum Daerah Al Ihsan 45,117,087,848.80 55,273,867,290.00 64,242,847,811.20 164,633,802,950.00 46,689,548,441.99 69,196,862,834.00 61,771,990,811.20 177,658,402,087.19 13,024,599,137.19 7.91

1 02 04 06

Program Upaya Kesehatan - 7,000,000,000.00 - 7,000,000,000.00 - 10,500,000,000.00 - 10,500,000,000.00 3,500,000,000.00 50.00

1 02 04 06 01 Pelayanan Kesehatan Bagi Masyarakat Jawa Barat - 7,000,000,000.00 - 7,000,000,000.00 - 10,500,000,000.00 - 10,500,000,000.00 3,500,000,000.00 50.00

1 02 04 07

Program Manajemen Pelayanan Kesehatan 155,062,500.00 1,564,788,762.00 357,000,000.00 2,076,851,262.00 153,762,500.00 1,707,348,762.00 357,000,000.00 2,218,111,262.00 141,260,000.00 6.80

1 02 04 07 02 Pengelolaan Kesehatan Lingkungan di RSUD Al Ihsan 2,100,000.00 276,604,270.00 - 278,704,270.00 800,000.00 419,164,270.00 - 419,964,270.00 141,260,000.00 50.68

1 02 04 07 03 Pemasaran Pelayanan Kesehatan Medical Check Up 148,012,500.00 351,987,500.00 - 500,000,000.00 148,012,500.00 351,987,500.00 - 500,000,000.00 -

-1 02 04 07 04 Pemasaran Pelayanan Kesehatan Kepada Masyarakat - 735,612,500.00 - 735,612,500.00 - 735,612,500.00 - 735,612,500.00 -

-1 02 04 07 05 Pengadaan Sistem Manajemen Informasi Rumah Sakit (SIM-RS) 4,950,000.00 200,584,492.00 357,000,000.00 562,534,492.00 4,950,000.00 200,584,492.00 357,000,000.00 562,534,492.00 -

-1 02 04 09

Program Peningkatan Sarana dan Prasarana Pelayanan

Kesehatan

141,300,000.00 33,935,620,761.00 62,434,042,811.20 96,510,963,572.20 146,475,000.00 44,108,554,785.00 59,963,185,811.20 104,218,215,596.20 7,707,252,024.00 7.99 1 02 04 09 06 Pembangunan Gedung Apotek, Rekam Medik dan Pendaftaran

Rawat Jalan (Pengembangan)

9,300,000.00 45,931,000.00 4,444,769,000.00 4,500,000,000.00 9,300,000.00 45,931,000.00 188,988,000.00 244,219,000.00 (4,255,781,000.00) (94.57) 1 02 04 09 07 Pengadaan Sarana dan Prasarana Pengembangan Stroke Unit,

ICCU, NICU, Renal Unit dan Hight Care Unit Anak

10,050,000.00 9,760,000.00 10,497,950,019.00 10,517,760,019.00 10,050,000.00 9,760,000.00 10,497,950,019.00 10,517,760,019.00 - -1 02 04 09 08 Pengadaan Sarana Dan Prasarana Pengembangan Bedah Central 4,350,000.00 5,630,000.00 2,068,813,308.00 2,078,793,308.00 4,350,000.00 5,630,000.00 2,068,813,308.00 2,078,793,308.00 - -1 02 04 09 09 Kegiatan Pengadaan Sarana Dan Prasarana Pengembangan

Radiologi, Laboratorium, Farmasi, Gizi, Rehab Medik Dan Alat Medis Keperawatan

41,100,000.00 37,440,000.00 11,017,281,732.00 11,095,821,732.00 41,100,000.00 37,440,000.00 11,017,281,732.00 11,095,821,732.00 -

-1 02 04 09 10 Kegiatan Pengadaan Sarana Dan Prasarana Pengembangan Rawat Jalan, Rawat Inap Dan Gawat Darurat

15,300,000.00 22,520,000.00 5,150,380,000.00 5,188,200,000.00 15,300,000.00 22,520,000.00 5,150,380,000.00 5,188,200,000.00 - -1 02 04 09 11 Kegiatan Pengadaan Sarana Dan Prasarana Pengembangan

IPSRS, Loundry.

(7)

-Lampiran IV Perda Perubahan

Hal. 7

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 02 04 09 12 Pembangunan Gedung Maskin lantai 3 (Pengembangan) 10,800,000.00 45,192,000.00 6,444,008,000.00 6,500,000,000.00 10,800,000.00 45,192,000.00 244,737,000.00 300,729,000.00 (6,199,271,000.00) (95.37) 1 02 04 09 13 Kegiatan Pengadaan Sarana Dan Prasarana Pengembangan

Pasien Maskin

9,300,000.00 9,810,000.00 1,580,890,000.00 1,600,000,000.00 9,300,000.00 9,810,000.00 1,580,890,000.00 1,600,000,000.00 - -1 02 04 09 14 Kegiatan Pengadaan Sarana Dan Prasarana Pelayanan Kesehatan 7,050,000.00 5,630,000.00 13,344,424,352.20 13,357,104,352.20 12,225,000.00 16,260,000.00 21,328,619,352.20 21,357,104,352.20 8,000,000,000.00 59.89 1 02 04 09 15 Pengadaan Alat-alat Kedokteran Dalam Rangka Penanggulangan

Dampak Penggunaan Tembakau

4,950,000.00 5,630,000.00 4,989,420,000.00 5,000,000,000.00 4,950,000.00 5,630,000.00 4,989,420,000.00 5,000,000,000.00 - -1 02 04 09 16 Peningkatan Kuantitas, Kualitas dan Fungsi Sarana dan Prasarana

Pelayanan Kesehatan

15,000,000.00 33,725,557,761.00 - 33,740,557,761.00 15,000,000.00 43,887,861,785.00 - 43,902,861,785.00 10,162,304,024.00 30.12

1 02 04 10

Program Sumber Daya Kesehatan 121,050,000.00 2,585,079,487.00 - 2,706,129,487.00 121,050,000.00 2,585,079,487.00 - 2,706,129,487.00 -

-1 02 04 10 17 Peningkatan Kualitas dan Kesejahteraan Pegawai Administrasi, Medis dan Paramedis

121,050,000.00 2,585,079,487.00 - 2,706,129,487.00 121,050,000.00 2,585,079,487.00 - 2,706,129,487.00 -

-1 02 04 59

Program Peningkatan Kapasitas Sumber Daya Aparatur - 492,175,000.00 - 492,175,000.00 152,000,000.00 296,750,000.00 - 448,750,000.00 (43,425,000.00) (8.82)

1 02 04 59 18 Peningkatan Kesejahteraan dan Kemampuan Aparatur (PNS) - 492,175,000.00 - 492,175,000.00 152,000,000.00 296,750,000.00 - 448,750,000.00 (43,425,000.00) (8.82)

1 02 04 60

Program Pelayanan Administrasi Perkantoran 44,673,775,348.80 4,968,170,565.00 - 49,641,945,913.80 46,090,360,941.99 5,271,097,085.00 - 51,361,458,026.99 1,719,512,113.19 3.46

1 02 04 60 19 Penyelenggaraan Administrasi Perkantoran 3,600,000.00 3,053,070,000.00 - 3,056,670,000.00 4,850,000.00 3,139,290,000.00 - 3,144,140,000.00 87,470,000.00 2.86 1 02 04 60 20 Penyelenggaraan Administrasi Perkantoran Operasional RSUD Al

Ihsan (Belanja Pegawai Non PNS)

44,670,175,348.80 1,915,100,565.00 - 46,585,275,913.80 46,085,510,941.99 2,131,807,085.00 - 48,217,318,026.99 1,632,042,113.19 3.50

1 02 04 61

Program Peningkatan Sarana dan Prasarana Aparatur 13,200,000.00 9,070,000.00 1,451,805,000.00 1,474,075,000.00 13,200,000.00 9,070,000.00 1,451,805,000.00 1,474,075,000.00 -

-1 02 04 61 21 Pengadaan Sarana dan Prasarana Aparatur 13,200,000.00 9,070,000.00 1,451,805,000.00 1,474,075,000.00 13,200,000.00 9,070,000.00 1,451,805,000.00 1,474,075,000.00 -

-1 02 04 62

Program Pemeliharaan Sarana dan Prasarana Aparatur 12,700,000.00 4,568,962,715.00 - 4,581,662,715.00 12,700,000.00 4,568,962,715.00 - 4,581,662,715.00 -

-1 02 04 62 22 Pemeliharaan Sarana dan Prasarana Kantor - 995,008,000.00 - 995,008,000.00 - 995,008,000.00 - 995,008,000.00 -

-1 02 04 62 23 Pemeliharaan Sarana Dan Prasarana Aparatur (Tenaga Adm, Medis dan Paramedis)

12,700,000.00 3,573,954,715.00 - 3,586,654,715.00 12,700,000.00 3,573,954,715.00 - 3,586,654,715.00 -

-1 02 04 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

- 150,000,000.00 - 150,000,000.00 - 150,000,000.00 - 150,000,000.00 -

-1 02 04 66 24 Perencanaan, Evaluasi dan Pelaporan Internal RSUD Al Ihsan - 90,000,000.00 - 90,000,000.00 - 90,000,000.00 - 90,000,000.00 -

-1 02 04 66 25 Kegiatan Audit Keuangan RSUD Al Ihsan BLUD - 60,000,000.00 - 60,000,000.00 - 60,000,000.00 - 60,000,000.00 -

-1 03

Pekerjaan Umum 64,727,071,725.00 197,737,988,895.01 491,292,103,531.00 753,757,164,151.01 67,094,638,200.00 228,659,447,507.63 476,112,381,369.11 771,866,467,076.74 18,109,302,925.73 2.40

1 03 01

Dinas Bina Marga 33,311,672,550.00 154,939,080,070.00 403,018,425,331.00 591,269,177,951.00 35,275,566,225.00 183,401,753,982.63 397,863,914,269.11 616,541,234,476.74 25,272,056,525.73 4.27

1 03 01 16

Program Pembangunan Jalan dan Jembatan 237,378,000.00 10,294,305,042.00 391,592,441,331.00 402,124,124,373.00 249,102,000.00 9,169,577,100.00 390,864,084,549.11 400,282,763,649.11 (1,841,360,723.89) (0.46)

1 03 01 16 01 PERENCANAAN TEKNIS JALAN DAN JEMBATAN PROVINSI JAWA BARAT

6,447,000.00 437,078,000.00 - 443,525,000.00 6,447,000.00 437,078,000.00 - 443,525,000.00 -

-1 03 01 16 02 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN I

20,844,000.00 137,196,000.00 14,185,034,800.00 14,343,074,800.00 26,418,000.00 181,622,000.00 14,708,700,275.00 14,916,740,275.00 573,665,475.00 4.00 1 03 01 16 03 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN II

25,050,000.00 137,350,000.00 5,949,604,400.00 6,112,004,400.00 25,050,000.00 137,350,000.00 4,892,133,000.00 5,054,533,000.00 (1,057,471,400.00) (17.30) 1 03 01 16 04 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN III

35,490,000.00 101,260,000.00 32,364,602,500.00 32,501,352,500.00 35,490,000.00 101,260,000.00 26,708,524,292.04 26,845,274,292.04 (5,656,078,207.96) (17.40) 1 03 01 16 05 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN IV

27,060,000.00 143,835,000.00 17,126,386,000.00 17,297,281,000.00 27,060,000.00 143,835,000.00 15,082,259,882.07 15,253,154,882.07 (2,044,126,117.93) (11.82) 1 03 01 16 06 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN V

15,930,000.00 144,070,000.00 4,528,469,200.00 4,688,469,200.00 15,930,000.00 144,070,000.00 3,848,100,000.00 4,008,100,000.00 (680,369,200.00) (14.51) 1 03 01 16 07 PENINGKATAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN VI

47,400,000.00 97,039,900.00 57,352,254,157.00 57,496,694,057.00 53,550,000.00 165,889,900.00 59,715,725,000.00 59,935,164,900.00 2,438,470,843.00 4.24 1 03 01 16 08 PEMBANGUNAN / PENINGKATAN JALAN STRATEGIS DI

PROVINSI JAWA BARAT

31,428,000.00 218,572,000.00 260,086,090,274.00 260,336,090,274.00 31,428,000.00 218,572,000.00 265,908,642,100.00 266,158,642,100.00 5,822,551,826.00 2.24 1 03 01 16 09 PENGAWASAN TEKNIS JALAN DAN JEMBATAN PROVINSI

TERSEBAR DI JAWA BARAT

27,729,000.00 8,877,904,142.00 - 8,905,633,142.00 27,729,000.00 7,639,900,200.00 - 7,667,629,200.00 (1,238,003,942.00) (13.90)

1 03 01 17

Program Rehabilitasi/Pemeliharaan Jalan dan Jembatan 32,152,852,550.00 126,723,565,098.00 900,760,000.00 159,777,177,648.00 32,967,972,225.00 148,663,765,952.63 887,193,000.00 182,518,931,177.63 22,741,753,529.63 14.23

1 03 01 17 10 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN I

25,844,000.00 8,145,766,000.00 150,000,000.00 8,321,610,000.00 25,844,000.00 7,480,610,120.00 150,000,000.00 7,656,454,120.00 (665,155,880.00) (7.99) 1 03 01 17 11 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN I

(8)

-Lampiran IV Perda Perubahan

Hal. 8

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 03 01 17 12 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN II

24,300,000.00 8,894,863,000.00 150,000,000.00 9,069,163,000.00 24,300,000.00 7,985,595,000.00 138,533,000.00 8,148,428,000.00 (920,735,000.00) (10.15) 1 03 01 17 13 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN II

4,019,515,250.00 8,143,806,750.00 - 12,163,322,000.00 4,019,515,250.00 8,143,806,750.00 - 12,163,322,000.00 -

-1 03 01 17 14 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN III

10,650,000.00 17,213,397,748.00 150,000,000.00 17,374,047,748.00 42,000,000.00 32,195,181,347.26 150,000,000.00 32,387,181,347.26 15,013,133,599.26 86.41 1 03 01 17 15 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN III

9,606,009,000.00 15,123,263,000.00 - 24,729,272,000.00 9,606,009,000.00 15,123,263,000.00 - 24,729,272,000.00 -

-1 03 01 17 16 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN IV

34,500,000.00 10,504,439,900.00 150,000,000.00 10,688,939,900.00 48,000,000.00 12,007,695,710.37 150,000,000.00 12,205,695,710.37 1,516,755,810.37 14.19 1 03 01 17 17 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN IV

3,803,353,500.00 8,274,926,500.00 - 12,078,280,000.00 4,321,530,500.00 9,256,749,500.00 - 13,578,280,000.00 1,500,000,000.00 12.42 1 03 01 17 18 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN V

32,160,000.00 11,054,342,000.00 150,000,000.00 11,236,502,000.00 32,160,000.00 9,421,785,000.00 147,900,000.00 9,601,845,000.00 (1,634,657,000.00) (14.55) 1 03 01 17 19 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN V

4,106,375,800.00 10,259,860,200.00 - 14,366,236,000.00 4,221,502,600.00 10,144,733,400.00 - 14,366,236,000.00 -

-1 03 01 17 20 REHABILITASI JALAN DAN JEMBATAN PROVINSI DI BPJ WILAYAH PELAYANAN VI

18,600,000.00 4,938,599,000.00 150,760,000.00 5,107,959,000.00 29,400,000.00 12,860,211,000.00 150,760,000.00 13,040,371,000.00 7,932,412,000.00 155.30 1 03 01 17 21 PEMELIHARAAN JALAN DAN JEMBATAN PROVINSI DI BPJ

WILAYAH PELAYANAN VI

4,723,030,000.00 11,359,850,000.00 - 16,082,880,000.00 4,881,755,875.00 11,201,124,125.00 - 16,082,880,000.00 -

-1 03 01 18

Program Peningkatan Sarana dan Prasarana Kebinamargaan 2,200,000.00 19,639,000.00 178,161,000.00 200,000,000.00 2,200,000.00 19,639,000.00 178,161,000.00 200,000,000.00 -

-1 03 01 18 22 PENGADAAN PERALATAN JALAN DAN PENGADAAN KOMPONEN JEMBATAN BAILLEY

2,200,000.00 19,639,000.00 178,161,000.00 200,000,000.00 2,200,000.00 19,639,000.00 178,161,000.00 200,000,000.00 -

-1 03 01 19

Program Inspeksi Kondisi Jalan dan Jembatan 30,702,000.00 1,750,298,000.00 6,400,000,000.00 8,181,000,000.00 30,702,000.00 6,230,298,000.00 1,920,000,000.00 8,181,000,000.00 -

-1 03 01 19 23 PENYUSUNAN SISTEM INFORMASI DAN DATA BASE LEGER JALAN

- 43,000,000.00 - 43,000,000.00 - 43,000,000.00 - 43,000,000.00 -

-1 03 01 19 24 SOSIALISASI PELAKSANAAN PEMBANGUNAN 10,896,000.00 589,104,000.00 6,400,000,000.00 7,000,000,000.00 10,896,000.00 5,069,104,000.00 1,920,000,000.00 7,000,000,000.00 -

-1 03 01 19 25 PEMBINAAN PEMANFAATAN JALAN - 200,000,000.00 - 200,000,000.00 - 200,000,000.00 - 200,000,000.00 -

-1 03 01 19 26 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI BPJ WILAYAH PELAYANAN I

1,116,000.00 41,884,000.00 - 43,000,000.00 1,116,000.00 41,884,000.00 - 43,000,000.00 -

-1 03 01 19 27 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI WILAYAH PELAYANAN II

900,000.00 42,100,000.00 - 43,000,000.00 900,000.00 42,100,000.00 - 43,000,000.00 -

-1 03 01 19 28 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI WILAYAH PELAYANAN III

450,000.00 42,550,000.00 - 43,000,000.00 450,000.00 42,550,000.00 - 43,000,000.00 -

-1 03 01 19 29 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI WILAYAH PELAYANAN IV

3,240,000.00 39,760,000.00 - 43,000,000.00 3,240,000.00 39,760,000.00 - 43,000,000.00 -

-1 03 01 19 30 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI WILAYAH PELAYANAN V

4,320,000.00 38,680,000.00 - 43,000,000.00 4,320,000.00 38,680,000.00 - 43,000,000.00 -

-1 03 01 19 31 FASILITASI PEMANFAATAN JALAN DAN RUANG PENGAWASAN JALAN DI WILAYAH PELAYANAN VI

4,380,000.00 38,620,000.00 - 43,000,000.00 4,380,000.00 38,620,000.00 - 43,000,000.00 -

-1 03 01 19 32 PENGUMPULAN DATA KONDISI JALAN UNTUK BAHAN PENYUSUNAN PROGRAM

5,400,000.00 594,600,000.00 - 600,000,000.00 5,400,000.00 594,600,000.00 - 600,000,000.00 -

-1 03 01 19 33 PELAKSANAAN PENGUJIAN TANAH DAN BAHAN JALAN - 80,000,000.00 - 80,000,000.00 - 80,000,000.00 - 80,000,000.00 -

-1 03 01 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 221,550,000.00 1,077,797,500.00 - 1,299,347,500.00 348,600,000.00 1,249,397,500.00 - 1,597,997,500.00 298,650,000.00 22.98

1 03 01 59 34 PENINGKATAN KESEJAHTERAAN DAN KEMAMPUAN APARATUR DINAS BINA MARGA PROVINSI JAWA BARAT

221,550,000.00 1,077,797,500.00 - 1,299,347,500.00 348,600,000.00 1,249,397,500.00 - 1,597,997,500.00 298,650,000.00 22.98

1 03 01 60

Program Pelayanan Administrasi Perkantoran - 3,282,909,930.00 - 3,282,909,930.00 - 3,472,909,930.00 - 3,472,909,930.00 190,000,000.00 5.79

1 03 01 60 35 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DINAS BINA MARGA PROVINSI JAWA BARAT

- 1,984,109,930.00 - 1,984,109,930.00 - 2,174,109,930.00 - 2,174,109,930.00 190,000,000.00 9.58

1 03 01 60 36 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DI BPJ WILAYAH PELAYANAN I

- 219,906,918.00 - 219,906,918.00 - 219,906,918.00 - 219,906,918.00 -

-1 03 01 60 37 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DI BPJ WILAYAH PELAYANAN II

- 214,402,516.00 - 214,402,516.00 - 214,402,516.00 - 214,402,516.00 -

-1 03 01 60 38 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DI BPJ WILAYAH PELAYANAN III

(9)

-Lampiran IV Perda Perubahan

Hal. 9

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 03 01 60 39 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DI BPJ WILAYAH PELAYANAN IV

- 207,522,013.00 - 207,522,013.00 - 207,522,013.00 - 207,522,013.00 -

-1 03 01 60 40 PENYELENGGARAAN ADMINISTRASI PERKANTORAN BPJ WILAYAH PELAYANAN V

- 214,402,516.00 - 214,402,516.00 - 214,402,516.00 - 214,402,516.00 -

-1 03 01 60 41 PENYELENGGARAAN ADMINISTRASI PERKANTORAN DI BPJ WILAYAH PELAYANAN VI

- 219,906,918.00 - 219,906,918.00 - 219,906,918.00 - 219,906,918.00 -

-1 03 01 61

Program Peningkatan Sarana dan Prasarana Aparatur 26,990,000.00 4,689,900,000.00 3,849,063,000.00 8,565,953,000.00 26,990,000.00 4,505,501,000.00 3,916,475,720.00 8,448,966,720.00 (116,986,280.00) (1.37)

1 03 01 61 42 PENGADAAN SARANA DAN PRASARANA APARATUR DI LINGKUNGAN DINAS BINA MARGA PROVINSI JAWA BARAT

2,150,000.00 478,490,000.00 2,085,313,000.00 2,565,953,000.00 2,150,000.00 391,990,000.00 2,171,813,000.00 2,565,953,000.00 - -1 03 01 61 43 PENINGKATAN SARANA DAN PRASARANA APARATUR DI BPJ

WILAYAH PELAYANAN I

- 701,100,000.00 298,900,000.00 1,000,000,000.00 - 701,100,000.00 298,900,000.00 1,000,000,000.00 -

-1 03 01 61 44 PENINGKATAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN II

3,300,000.00 660,600,000.00 336,100,000.00 1,000,000,000.00 3,300,000.00 635,093,000.00 334,762,720.00 973,155,720.00 (26,844,280.00) (2.68) 1 03 01 61 45 PENINGKATAN SARANA DAN PRASARANA APARATUR DI BPJ

WILAYAH PELAYANAN III

3,900,000.00 640,700,000.00 355,400,000.00 1,000,000,000.00 3,900,000.00 640,700,000.00 355,400,000.00 1,000,000,000.00 - -1 03 01 61 46 PENINGKATAN SARANA DAN PRASARANA APARATUR DI BPJ

WILAYAH PELAYANAN IV

6,540,000.00 584,360,000.00 409,100,000.00 1,000,000,000.00 6,540,000.00 584,360,000.00 409,100,000.00 1,000,000,000.00 - -1 03 01 61 47 PENINGKATAN SARANA DAN PRASARANA APARATUR BPJ

WILAYAH PELAYANAN V

3,300,000.00 775,450,000.00 221,250,000.00 1,000,000,000.00 3,300,000.00 703,058,000.00 203,500,000.00 909,858,000.00 (90,142,000.00) (9.01) 1 03 01 61 48 PENINGKATAN SARANA DAN PRASARANA APARATUR DI BPJ

WILAYAH PELAYANAN VI

7,800,000.00 849,200,000.00 143,000,000.00 1,000,000,000.00 7,800,000.00 849,200,000.00 143,000,000.00 1,000,000,000.00 -

-1 03 01 62

Program Pemeliharaan Sarana dan Prasarana Aparatur - 3,241,065,500.00 - 3,241,065,500.00 - 3,241,065,500.00 - 3,241,065,500.00 -

-1 03 01 62 49 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DINAS BINA MARGA PROVINSI JAWA BARAT

- 2,446,065,500.00 - 2,446,065,500.00 - 2,446,065,500.00 - 2,446,065,500.00 -

-1 03 01 62 50 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN I

- 145,000,000.00 - 145,000,000.00 - 145,000,000.00 - 145,000,000.00 -

-1 03 01 62 51 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN II

- 125,000,000.00 - 125,000,000.00 - 125,000,000.00 - 125,000,000.00 -

-1 03 01 62 52 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN III

- 155,000,000.00 - 155,000,000.00 - 155,000,000.00 - 155,000,000.00 -

-1 03 01 62 53 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN IV

- 100,000,000.00 - 100,000,000.00 - 100,000,000.00 - 100,000,000.00 -

-1 03 01 62 54 PEMELIHARAAN SARANA DAN PRASARANA APARATUR BPJ WILAYAH PELAYANAN V

- 125,000,000.00 - 125,000,000.00 - 125,000,000.00 - 125,000,000.00 -

-1 03 01 62 55 PEMELIHARAAN SARANA DAN PRASARANA APARATUR DI BPJ WILAYAH PELAYANAN VI

- 145,000,000.00 - 145,000,000.00 - 145,000,000.00 - 145,000,000.00 -

-1 03 01 66

Program Peningkatan Pengembangan Sistem Pelaporan

Capaian Kinerja dan Keuangan

- 97,600,000.00 - 97,600,000.00 - 97,600,000.00 - 97,600,000.00 -

-1 03 01 66 56 PERENCANAAN, EVALUASI DAN PELAPORAN INTERNAL ORGANISASI PERANGKAT DAERAH

- 97,600,000.00 - 97,600,000.00 - 97,600,000.00 - 97,600,000.00 -

-1 03 01 72

Program Penanggulangan Bencana Alam Dan Perlindungan

Masyarakat

640,000,000.00 3,762,000,000.00 98,000,000.00 4,500,000,000.00 1,650,000,000.00 6,752,000,000.00 98,000,000.00 8,500,000,000.00 4,000,000,000.00 88.89 1 03 01 72 57 PENANGGULANGAN BENCANA 640,000,000.00 3,762,000,000.00 98,000,000.00 4,500,000,000.00 1,650,000,000.00 6,752,000,000.00 98,000,000.00 8,500,000,000.00 4,000,000,000.00 88.89

1 03 02

Dinas Pengelolaan Sumber Daya Air 31,415,399,175.00 42,798,908,825.00 88,273,678,200.00 162,487,986,200.00 31,819,071,975.00 45,257,693,525.00 78,248,467,100.00 155,325,232,600.00 (7,162,753,600.00) (4.41)

1 03 02 20

Program Pengembangan dan Pengelolaan Jaringan Irigasi,

Rawa dan Jaringan Pengairan Lainnya

24,947,101,900.00 21,502,563,300.00 58,554,936,200.00 105,004,601,400.00 24,944,536,700.00 20,076,054,500.00 55,662,076,100.00 100,682,667,300.00 (4,321,934,100.00) (4.12)

1 03 02 20 01 Supervisi Konstruksi Irigasi Di Jawa Barat 2,100,000.00 938,977,500.00 - 941,077,500.00 2,100,000.00 865,037,000.00 - 867,137,000.00 (73,940,500.00) (7.86)

1 03 02 20 02 Perencanaan Detail Rehabilitasi Jaringan Irigasi Di Jawa Barat 39,126,000.00 447,449,000.00 - 486,575,000.00 39,126,000.00 438,429,000.00 - 477,555,000.00 (9,020,000.00) (1.85) 1 03 02 20 03 Pemantauan dan Pengembangan Potensi O&P Jaringan Irigasi Di

Jawa Barat

16,150,000.00 1,272,435,000.00 - 1,288,585,000.00 16,150,000.00 1,201,157,000.00 - 1,217,307,000.00 (71,278,000.00) (5.53)

1 03 02 20 04 Optimalisasi Kegiatan Sumber Daya Air Di Jawa Barat 10,400,000.00 278,900,000.00 - 289,300,000.00 10,400,000.00 278,900,000.00 - 289,300,000.00 -

(10)

Lampiran IV Perda Perubahan

Hal. 10

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 03 02 20 09 Pengelolaan Jaringan Irigasi Wilayah Sungai Cimanuk-Cisanggarung

5,890,865,000.00 1,919,907,000.00 6,660,000,000.00 14,470,772,000.00 5,892,107,000.00 1,955,670,300.00 6,328,944,900.00 14,176,722,200.00 (294,049,800.00) (2.03) 1 03 02 20 10 Pengelolaan Jaringan Irigasi Wilayah Sungai Citanduy 1,881,732,000.00 2,658,875,000.00 1,188,000,000.00 5,728,607,000.00 1,881,732,000.00 2,461,431,000.00 1,545,764,000.00 5,888,927,000.00 160,320,000.00 2.80 1 03 02 20 11 Pengelolaan Jaringan Irigasi Wilayah Sungai Ciwulan-Cilaki 4,294,740,000.00 3,800,337,100.00 3,332,143,000.00 11,427,220,100.00 4,294,740,000.00 3,504,737,100.00 2,922,528,300.00 10,722,005,400.00 (705,214,700.00) (6.17) 1 03 02 20 12 Pembangunan Bendung Waru Di Kabupaten Karawang 3,650,000.00 175,966,200.00 9,941,222,000.00 10,120,838,200.00 3,650,000.00 175,966,200.00 9,941,222,000.00 10,120,838,200.00 - -1 03 02 20 13 Pembangunan Bendung Suplesi Leuwikadu Di Kabupaten

Sukabumi

11,816,200.00 93,740,000.00 3,128,763,800.00 3,234,320,000.00 11,816,200.00 93,740,000.00 3,128,763,800.00 3,234,320,000.00 - -1 03 02 20 14 Rehabilitasi Jaringan Irigasi di Jawa Barat (DAK) 238,608,000.00 961,392,000.00 17,508,447,000.00 18,708,447,000.00 234,800,800.00 648,036,400.00 14,576,857,700.00 15,459,694,900.00 (3,248,752,100.00) (17.37)

1 03 02 21

Program Pengembangan, Pengelolaan dan Konservasi

Sungai, Danau dan Sumber Daya Air Lainnya

5,742,966,275.00 8,701,069,525.00 16,523,380,000.00 30,967,415,800.00 5,977,761,275.00 9,436,576,025.00 15,730,034,000.00 31,144,371,300.00 176,955,500.00 0.57 1 03 02 21 01 Perencanaan Umum Sumber Daya Air Bidang Sungai, Danau dan

Sumber Air Lainnya Di Jawa Barat

11,700,000.00 2,407,137,500.00 - 2,418,837,500.00 11,700,000.00 2,356,166,000.00 - 2,367,866,000.00 (50,971,500.00) (2.11) 1 03 02 21 02 Pengawasan dan Pengendalian Pemanfaatan Air Permukaan dan

Tanah Negara

55,200,000.00 253,175,000.00 - 308,375,000.00 55,200,000.00 253,175,000.00 - 308,375,000.00 -

-1 03 02 21 03 Pengaturan Sempadan Sumber Air Di Jawa Barat 168,020,000.00 205,240,000.00 - 373,260,000.00 168,020,000.00 205,240,000.00 - 373,260,000.00 -

-1 03 02 21 04 Peningkatan Penerbitan Saran Teknis Air Permukaan dan Pemanfaatan Pemakaian Tanah Negara Di Jawa Barat

9,000,000.00 273,348,000.00 - 282,348,000.00 9,000,000.00 273,348,000.00 - 282,348,000.00 -

-1 03 02 21 05 Dukungan Percepatan Pembangunan Waduk Jatigede Di Kabupaten Sumedang

236,625,000.00 1,694,532,500.00 13,730,000,000.00 15,661,157,500.00 374,125,000.00 2,048,332,500.00 13,738,000,000.00 16,160,457,500.00 499,300,000.00 3.19 1 03 02 21 06 Dukungan Pembangunan Waduk Sadawarna Kab. Subang 27,300,000.00 873,600,000.00 1,056,200,000.00 1,957,100,000.00 10,800,000.00 658,650,000.00 - 669,450,000.00 (1,287,650,000.00) (65.79) 1 03 02 21 07 Pemberdayaan Lembaga Koordinasi dan Kerjasama Pengelolaan

Sumber Daya Air dan irigasi

128,500,000.00 422,500,000.00 - 551,000,000.00 128,500,000.00 422,500,000.00 - 551,000,000.00 -

-1 03 02 21 08 Perencanaan Detail Situ, Waduk dan Sungai Di Jawa Barat 74,826,000.00 243,275,000.00 - 318,101,000.00 76,521,000.00 341,580,000.00 - 418,101,000.00 100,000,000.00 31.44

1 03 02 21 09 Pengelolaan Situ-Situ Wilayah Sungai Ciliwung-Cisadane 480,000,000.00 94,848,000.00 - 574,848,000.00 480,000,000.00 94,848,000.00 - 574,848,000.00 -

-1 03 02 21 10 Pengelolaan Situ-Situ Wilayah Sungai Cisadea-Cibareno 395,818,800.00 78,667,700.00 - 474,486,500.00 395,818,800.00 78,667,700.00 - 474,486,500.00 -

-1 03 02 21 11 Pengelolaan Situ-Situ Wilayah Sungai Citarum 398,857,700.00 86,036,100.00 - 484,893,800.00 398,857,700.00 86,036,100.00 - 484,893,800.00 -

-1 03 02 21 12 Pengelolaan Situ-Situ Wilayah Sungai Cimanuk-Cisanggarung 564,000,000.00 86,000,000.00 - 650,000,000.00 564,000,000.00 86,000,000.00 - 650,000,000.00 -

-1 03 02 21 13 Pengelolaan Situ-Situ Wilayah Sungai Citanduy 403,731,000.00 96,269,000.00 - 500,000,000.00 403,731,000.00 96,269,000.00 - 500,000,000.00 -

-1 03 02 21 14 Pengelolaan Situ-Situ Wilayah Sungai Ciwulan-Cilaki 446,187,150.00 53,812,850.00 - 500,000,000.00 446,187,150.00 53,812,850.00 - 500,000,000.00 -

-1 03 02 21 15 Perbaikan dan Pemeliharaan Sungai Wilayah Sungai Citarum 37,046,000.00 65,829,000.00 941,850,000.00 1,044,725,000.00 37,046,000.00 65,829,000.00 804,249,000.00 907,124,000.00 (137,601,000.00) (13.17) 1 03 02 21 16 Perbaikan dan Pemeliharaan Sungai Wilayah Sungai

Ciwulan-Cilaki

15,127,000.00 23,337,000.00 795,330,000.00 833,794,000.00 15,127,000.00 23,337,000.00 715,535,000.00 753,999,000.00 (79,795,000.00) (9.57)

1 03 02 21 17 Manajemen DAS Balai PSDA Wilayah Sungai Ciliwung-Cisadane 123,984,000.00 144,577,500.00 - 268,561,500.00 123,984,000.00 144,577,500.00 - 268,561,500.00 -

-1 03 02 21 18 Manajemen DAS Balai PSDA Wilayah Sungai Cisadea-Cibareno 346,710,000.00 126,290,000.00 - 473,000,000.00 363,260,000.00 348,740,000.00 61,000,000.00 773,000,000.00 300,000,000.00 63.42

1 03 02 21 19 Manajemen DAS Balai PSDA Wilayah Sungai Citarum 417,000,000.00 83,000,000.00 - 500,000,000.00 417,000,000.00 83,000,000.00 - 500,000,000.00 -

-1 03 02 21 20 Manajemen DAS Balai PSDA Wilayah Sungai Cimanuk-Cisanggarung

360,000,000.00 204,237,000.00 - 564,237,000.00 360,000,000.00 204,237,000.00 - 564,237,000.00 -

-1 03 02 21 21 Manajemen DAS Balai PSDA Wilayah Sungai Citanduy 243,000,000.00 60,691,000.00 - 303,691,000.00 243,000,000.00 60,691,000.00 - 303,691,000.00 -

-1 03 02 21 22 Manajemen DAS Balai PSDA Wilayah Sungai Ciwulan-Cilaki 378,000,000.00 47,000,000.00 - 425,000,000.00 378,000,000.00 47,000,000.00 - 425,000,000.00 -

-1 03 02 21 23 Perbaikan dan Pemeliharan Sungai Wilayah Sungai Cimanuk-Cisanggarung

422,333,625.00 577,666,375.00 - 1,000,000,000.00 422,333,625.00 577,666,375.00 - 1,000,000,000.00 -

-1 03 02 21 24 Pengelolaan dan Analisis Data Hidrologi Jawa Barat - 500,000,000.00 - 500,000,000.00 - 500,000,000.00 - 500,000,000.00 -

-1 03 02 21 25 WISMP-2 dan Pendamping Hibah APBD Dinas PSDA Provinsi Jawa Barat

- - - - 31,500,000.00 148,418,000.00 99,751,000.00 279,669,000.00 279,669,000.00 100.00

1 03 02 21 26 WISMP-2 dan Pendamping Hibah APBD Balai PSDA WS. CIsadea-Cibareno

- - - - 64,050,000.00 178,455,000.00 311,499,000.00 554,004,000.00 554,004,000.00 100.00

1 03 02 22

Program Pengendalian Banjir dan Pengamanan Pantai 61,000,000.00 307,800,000.00 6,631,200,000.00 7,000,000,000.00 - - - - (7,000,000,000.00) (100.00)

1 03 02 22 01 Pembebasan Lahan Citarum Hulu 61,000,000.00 307,800,000.00 6,631,200,000.00 7,000,000,000.00 - - - - (7,000,000,000.00) (100.00)

1 03 02 54

Program Pengembangan Komunikasi, Informasi, Media

Massa dan Pemanfaatan Teknologi Informasi

1,695,000.00 375,560,000.00 - 377,255,000.00 1,695,000.00 375,560,000.00 - 377,255,000.00 -

-1 03 02 54 01 Pengelolaan Sistem Database dan Informasi Sumber Daya Air di Jawa Barat

- 277,255,000.00 - 277,255,000.00 - 277,255,000.00 - 277,255,000.00 -

(11)

-Lampiran IV Perda Perubahan

Hal. 11

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 03 02 59

Program Peningkatan Kapasitas Sumber Daya Aparatur 50,852,000.00 1,402,431,000.00 - 1,453,283,000.00 134,302,000.00 1,357,061,000.00 - 1,491,363,000.00 38,080,000.00 2.62

1 03 02 59 01 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Dinas PSDA Provinsi Jawa Barat

18,000,000.00 941,300,000.00 - 959,300,000.00 89,050,000.00 870,250,000.00 - 959,300,000.00 -

-1 03 02 59 02 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Ciliwung-Cisadane

25,227,000.00 108,020,000.00 - 133,247,000.00 25,227,000.00 108,020,000.00 - 133,247,000.00 -

-1 03 02 59 03 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Cisadea-Cibareno

- 56,000,000.00 - 56,000,000.00 - 56,000,000.00 - 56,000,000.00 -

-1 03 02 59 04 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Citarum

7,625,000.00 80,875,000.00 - 88,500,000.00 20,025,000.00 106,555,000.00 - 126,580,000.00 38,080,000.00 43.03

1 03 02 59 05 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Cimanuk-Cisanggarung

- 70,011,000.00 - 70,011,000.00 - 70,011,000.00 - 70,011,000.00 -

-1 03 02 59 06 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Citanduy

- 59,075,000.00 - 59,075,000.00 - 59,075,000.00 - 59,075,000.00 -

-1 03 02 59 07 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai PSDA WS. Ciwulan-Cilaki

- 67,200,000.00 - 67,200,000.00 - 67,200,000.00 - 67,200,000.00 -

-1 03 02 59 08 Peningkatan Kesejahteraan dan Kemampuan Aparatur Kantor Balai Data dan Informasi Sumber Daya Air

- 19,950,000.00 - 19,950,000.00 - 19,950,000.00 - 19,950,000.00 -

-1 03 02 60

Program Pelayanan Administrasi Perkantoran 63,540,000.00 5,748,494,000.00 - 5,812,034,000.00 63,540,000.00 5,748,494,000.00 - 5,812,034,000.00 -

-1 03 02 60 01 Penyelenggaraan Administrasi Perkantoran Dinas PSDA Provinsi Jawa Barat

59,940,000.00 3,013,608,500.00 - 3,073,548,500.00 59,940,000.00 3,013,608,500.00 - 3,073,548,500.00 -

-1 03 02 60 02 Pelayanan Administrasi Perkantoran Balai PSDA WS. Ciliwung-Cisadane

- 442,162,000.00 - 442,162,000.00 - 442,162,000.00 - 442,162,000.00 -

-1 03 02 60 03 Pelayanan Administrasi Perkantoran Balai PSDA WS. Cisadea-Cibareno

- 237,599,000.00 - 237,599,000.00 - 237,599,000.00 - 237,599,000.00 -

-1 03 02 60 04 Pelayanan Administrasi Perkantoran Balai PSDA WS. Citarum - 204,750,000.00 - 204,750,000.00 - 204,750,000.00 - 204,750,000.00 -

-1 03 02 60 05 Pelayanan Administrasi Perkantoran Balai PSDA WS. Cimanuk-Cisanggarung

- 438,849,500.00 - 438,849,500.00 - 438,849,500.00 - 438,849,500.00 -

-1 03 02 60 06 Pelayanan Administrasi Perkantoran Balai PSDA WS. Citanduy - 213,560,000.00 - 213,560,000.00 - 213,560,000.00 - 213,560,000.00 -

-1 03 02 60 07 Pelayanan Administrasi Perkantoran Balai PSDA WS. Ciwulan-Cilaki

- 236,550,000.00 - 236,550,000.00 - 236,550,000.00 - 236,550,000.00 -

-1 03 02 60 08 Pelayanan Administrasi Perkantoran Balai Data dan Informasi Sumber Daya Air

- 215,015,000.00 - 215,015,000.00 - 215,015,000.00 - 215,015,000.00 -

-1 03 02 60 09 Sosialisasi Pelaksanaan Pembangunan 3,600,000.00 746,400,000.00 - 750,000,000.00 3,600,000.00 746,400,000.00 - 750,000,000.00 -

-1 03 02 61

Program Peningkatan Sarana dan Prasarana Aparatur 16,950,000.00 263,500,000.00 6,524,162,000.00 6,804,612,000.00 16,950,000.00 264,400,000.00 6,725,357,000.00 7,006,707,000.00 202,095,000.00 2.97

1 03 02 61 01 Peningkatan Sarana dan Prasarana Aparatur Dinas PSDA Provinsi Jawa Barat

- 10,400,000.00 785,712,000.00 796,112,000.00 - 10,400,000.00 785,712,000.00 796,112,000.00 -

-1 03 02 61 02 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS. Ciliwung-Cisadane

5,450,000.00 42,400,000.00 780,150,000.00 828,000,000.00 5,450,000.00 42,400,000.00 780,150,000.00 828,000,000.00 - -1 03 02 61 03 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS.

Cisadea-Cibareno

3,300,000.00 4,500,000.00 842,200,000.00 850,000,000.00 3,300,000.00 4,500,000.00 842,200,000.00 850,000,000.00 -

-1 03 02 61 04 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS. Citarum

- 56,350,000.00 764,650,000.00 821,000,000.00 - 56,350,000.00 764,650,000.00 821,000,000.00 -

-1 03 02 61 05 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS. Cimanuk-Cisanggarung

- 3,600,000.00 780,400,000.00 784,000,000.00 - 3,600,000.00 780,400,000.00 784,000,000.00 -

-1 03 02 61 06 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS. Citanduy

2,350,000.00 14,100,000.00 947,050,000.00 963,500,000.00 2,350,000.00 15,000,000.00 962,050,000.00 979,400,000.00 15,900,000.00 1.65 1 03 02 61 07 Peningkatan Sarana dan Prasarana Aparatur Balai PSDA WS.

Ciwulan-Cilaki

3,900,000.00 2,050,000.00 994,050,000.00 1,000,000,000.00 3,900,000.00 2,050,000.00 1,180,245,000.00 1,186,195,000.00 186,195,000.00 18.62 1 03 02 61 08 Peningkatan Sarana dan Prasarana Aparatur Balai Data dan

Informasi Sumber Daya Air

1,950,000.00 130,100,000.00 629,950,000.00 762,000,000.00 1,950,000.00 130,100,000.00 629,950,000.00 762,000,000.00 -

-1 03 02 62

Program Pemeliharaan Sarana dan Prasarana Aparatur 111,000,000.00 2,858,321,300.00 - 2,969,321,300.00 111,000,000.00 2,858,321,300.00 - 2,969,321,300.00 -

-1 03 02 62 01 Pemeliharaan Sarana dan Prasarana Aparatur Dinas PSDA Provinsi Jawa Barat

9,000,000.00 2,045,677,300.00 - 2,054,677,300.00 9,000,000.00 2,045,677,300.00 - 2,054,677,300.00 -

-1 03 02 62 02 Pemeliharaan Sarana dan Prasarana Aparatur Balai PSDA WS. Ciliwung-Cisadane

(12)

-Lampiran IV Perda Perubahan

Hal. 12

DAN JASA

DAN JASA

1

2

3

4

5

6 = 3 + 4 + 5

7

8

9

10 = 7 + 8 + 9

11 = 10 - 6

12

1 03 02 62 03 Pemeliharaan Sarana dan Prasarana Aparatur Balai PSDA WS. Cisadea-Cibareno

30,000,000.00 117,630,000.00 - 147,630,000.00 30,000,000.00 117,630,000.00 - 147,630,000.00 -

-1 03 02 62 04 Pemeliharaan Sarana dan Prasarana Aparatur Balai PSDA WS. Citarum

- 61,880,000.00 - 61,880,000.00 - 61,880,000.00 - 61,880,000.00 -

-1 03 02 62 05 Pemeliharaan Sarana dan Prasarana Aparatur Balai PSDA WS. Cimanuk-Cisanggarung

- 192,900,000.00 - 192,900,000.00 - 192,900,000.00 - 192,900,000.00 -

-1 03 02 62 0

Referensi

Dokumen terkait

Lampiran III PERDA Hal... Lampiran III PERDA

10 Lampiran III PERDA... 12 Lampiran

10 Lampiran III PERDA... 12 Lampiran

Lampiran III PERDA Hal... Lampiran III PERDA

Lampiran II PERDA Hal... Lampiran II PERDA

PERUBAHAN KEDUA ATAS PERDA KOTA BIMA NOMOR 3 TAHUN 2008 TENTANG PEMBENTUKAN, SUSUNAN, KEDUDUKAN, TUGAS POKOK DAN FUNGSI DINAS-DINAS DAERAH KOTA BIMA. BAGAN

RINCIAN STANDAR BIAYA UMUM PENDIDIKAN DAN PELATIHAN PROVINSI KALIMANTAN TIMUR TAHUN 2013 ( RENCANA PERUBAHAN TARIF LAMPIRAN PERDA NO.1 TAHUN 2012 )A. DIKLAT PRAJABATAN GOLONGAN I,

Uraian Lebih lanjut Perubahan Anggaran Pendapatan dan Belanja Daerah sebagaimana dimaksud dalam pasal 1, tercantum dalam Lampiran yang merupakan bagian yang tidak