• Tidak ada hasil yang ditemukan

Directory UMM :Journals:Journal of Health Economics:Vol20.Issue3.May2001:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Journals:Journal of Health Economics:Vol20.Issue3.May2001:"

Copied!
2
0
0

Teks penuh

(1)

Journal of Health Economics 20 (2001) 459–460

Erratum

Erratum to “Uncertain lifetime, life protection,

and the value of life saving”

[Journal of Health Economics 19 (2000) 341–367]

Isaac Ehrlich

Department of Economics Fronczak Hall, North Campus, State University of New York at Buffalo, Buffalo, NY 14260, USA

The publisher regrets the following errors which appeared in the above mentioned article: p. 344. Insert “density” in two places:

Line 7 from top should read: andf(t) represents the conditional probability density of the occurrence of death att,

Line 12 from top should read:j(t)>0 stands for the “endowed” conditional probability density of mortality.

*Note: most of the following corrections concern the symbol for a rate of time change of a given variable. These should be printed by inserting a diminutive 0 directly above the

variable, not as a superscript, as inj0below.

p. 344, line 3 below equation (2.1) should be “orj0(t)≡dj(t)/dt> 0” [i.e., notj0(t)]

p. 346, line 1 below equation (3.1) should be “whereA0 (t)≡dA(t)/dt” [i.e., notA0(t)]

p. 347, equation (3.6) two changes:

First symbol should beI0∗(t) notI0∗(t) Last symbol should bev0∗(t) notv0∗(t)

p. 348 insert on line 4 to line 5 from top after “positive”:. . . positive (unlessfbecomes sufficiently large with age), because of the incentive to defer all consumer spending (see below), the first term is indeterminate except

p. 348, equation (3.7): last symbol in second line should bef0∗

(t) notf0(t).

PII of original article: S0167-6296(99)00030-2.

Tel:+1-716-45-2121; fax:+1-716-645-2127.

E-mail address:[email protected] (I. Ehrlich).

(2)

460 I. Ehrlich / Journal of Health Economics 20 (2001) 459–460

p. 348, in the line at the bottom, “given survival to timet,;” should be “given survival to timet;”. i.e., delete the comma aftert.

p. 349 footnote 4 third line from top: insert parenthesis around J/JA, i.e., the last term

should be “=2cI−(J/JA)” [not J/JA].

p. 351, the line right below equation (4.2) should be: “subject to (2.1), (4.1),. . .”

p. 352, equation (3.7a): last symbol should bef0∗

(t) notf0∗(t). p. 354, equation (5.4):

The symbolD¯ should be changed toboth on the first line (the top of the integral sign) and on the second line after the round parenthesis.

The term “U(Z(s), h(s))ds” inside the integral sign on the first line should be changed to U(Z(s))ds

p. 355, equation (5.7) third line: the expression should be B= ∗ ∈(0, (A1(t )+L(t )),

[The symbol after the equal sign should be∈, notε.]

p. 356, equation (5.12), first integral sign after the equal is missing t. It should be

=exp−D

t x(u)du

not D

.

p. 358, footnote 12, line 4 from top. There is an unnecessary space left between (1+(1+q)−(k/d)and (f(u)n(u)(l/d))). There should be no such space [i.e., the expression should be (1+(1+q)−(k/d)(f(u)n(u))(l/d))].

p. 366 Appendix.

The line corresponding to key variable w(t) (14th symbol from top) should be: w0(t)

Referensi

Dokumen terkait

Investor berkeinginan untuk mengetahui apakah usaha tersebut layak didirikan atau tidak ditinjau dari aspek pasar, aspek teknis, aspek hukum, dan aspek keuangana.

Guna melakukan Pembuktian Dokumen Kualifikasi atas Penawaran yang disampaikan oleh Perusahaan Saudara dan diharapkan perusahaan membawa kelengkapan Administrasi

Mahasiswa diharapkan dapat menjelaskan konsep stimulasi dan intervensi anak berkebutuhan khusus (ABK), mengidentifikasi dan mengasesmen ABK,.. mengembangkan dan melaksanakan

[r]

Setia TerangBersinar.Manfaat dari Praktek Kerja Lapangan adalah dapat mengetahui manajemen penetasan yang baik dan sesuai dengan standar operasional produk untuk

menunjukkan secara parsial work-to-family conflict berpengaruh positif dan signifikan terhadap stres kerja, work-to-family conflict berpengaruh negatif dan

Dalam rangka evaluasi dokumen penawaran dan kualifikasi untuk paket Pekerjaan Perencanaan Pembangunan Jembatan / Box Culvert Tersebar 2 pada Dinas Pekerjaan Umum Kabupaten

Adapun hasil Pemberian Penjelasan sebagaimana terlampir dalam LPSE.. Palembang, 25