L
L
i
i
s
s
t
t
o
o
f
f
P
P
l
l
a
a
n
n
n
n
e
e
d
d
P
P
r
r
i
i
o
o
r
r
i
i
t
t
y
y
E
E
x
x
t
t
e
e
r
r
n
n
a
a
l
l
L
L
o
o
a
a
n
n
s
s
a
a
n
n
d
d
G
G
r
r
a
a
n
n
t
t
s
s
(
(D
D
RP
R
PP
P
H
H
LN
L
N
)
)
2
2
0
0
1
1
0
0
M
Miinniissttrryy ooff NNaatitioonnaall DDeevveellooppmmeenntt PPllaannnniinngg// N
Naattiioonnaall DDeevveellooppmmeenntt PPllaannnniinngg AAggeennccyy
-- i --
Foreword
In the process of planning external loans and grants, the Government has compiled the Planned Priority List of External Loans and Grants or Daftar Rencana Prioritas Pinjaman dan/atau Hibah Luar Negeri (DRPPHLN). The requirements for compiling the DRPPHLN 2010 (Green Book 2010) are stipulated in Government Regulation Number 2 of 2006 on Procedure for Procurement and Forwarding of External Loans and in the Regulation of the Minister of National Development Planning/Chairman of Bappenas Number PER.005/M.PPN/06/2006 on Procedure for Planning and Submitting of Proposal and for Evaluating Projects that are Financed by External Loans/Grants.
The development project proposals listed in the Green Book have been evaluated through the process of the readiness of the projects and have been indicated the source of fund from development partners.
The 2010 Green Book contains 74 proposed projects in the total amount of USD 2.76 billion, consisting of 23 Project Assistance in the total amount of USD 2.41 billion and 51 technical assistance in the amount of USD 0.35 billion. These proposals originate from ministries/state agencies (68 projects), local government (1 project , and state‐owned enterprises 5 projects).
With the publishing of the 2010 Green Book, it is expected that the planning and management of projects that are financed by external loans and/or grants could be maximized the effectiveness of utilization of its aid in supporting development.
February, 2011
Minister for National Development Planning/
Chairman of the National Development Planning Agency,
- iii -
LIST OF PROJECT AND TECHNICAL ASSISTANCE
Meteorology, Climatology, and Geophysics Agency
1. Capacity Development for Vulnerability Assessment ... 3
Statistics Indonesia Agency
2. Institutional Capacity Building - Change and Reform for the Development of Statistics ... 7 3. KTF Support for Statistical Capacity Building ... 9
Bank Indonesia
4. Capacity Development for Supporting Industry Development: Credit Guarantee
System ... 13
Ministry of Home Affairs
5. Support to Indonesia's National Program for Community Empowerment... 17
Ministry of Energy and Mineral Resources
6. Electric Power and Energy Policy (Long Term Expert) ... 21 7. Integrated Electricity Safety Development and Application Program (IESDAP) ... 22 8. Support for Realization of the Energy Manager Program... 23
Ministry of Forestry
9. Forest and Climate Change Program - FORCLIME (Technical Cooperation) ... 27 10. Indonesia UN-REDD (United Nation Collaborative Programme on Reducing Emissions
from Deforestation and Forest Degradation) National Joint Programme ... 29 11. Strategy for Strengthening Biodiversity Conservation through Appropriate National
Park Management and Human Resource Development ... 31 12. Strengthening Community - Based Forest and Watershed Management in Indonesia ... 33 13. Wood Biomass Energy Development Model ... 35
Ministry of Marine Affairs and Fisheries
14. Regional Fisheries Livelihoods Programme (RFLP) for South and Southeast Asia... 39
Ministry of Health
15. Strengthening of Teaching Hospitals in Indonesia ... 43
Ministry of Finance
List of Project and Technical Assistance
- iv -
17. Extension of Existing Long Term Expert (Assistance for Bapepam-LK in Capital and
Financial Institution Development Policy) ...48
18. Strengthening Indonesia's Capital Market ...49
Coordinating Ministry for Economic Affairs 19. Individual Expert on Economic Development ...53
20. Partnership for Economic Governance...54
21. Project on Capacity Development for Trade-Related Administrator ...56
Ministry of Environment 22. Capacity Development for Developing National Greenhouse Gas (GHG) Inventories ...61
Ministry of Foreign Affairs 23. Human Resources Development and International Relations Studies ...65
Ministry of Public Works Directorate General of Highways 24. Construction of Kendari Bridge ...69
25. Development of Cileunyi-Sumedang-Dawuan Toll Road - Phase I ...70
26. Padang By-Pass Capacity Expansion...71
27. Tayan Bridge Construction ...73
28. Toll Road Development of Medan-Kualanamu ...74
29. Toll Road Development of Solo – Kertosono – Phase I (Stage Colomadu - Karanganyar and Stage Saradon - Kertosono) ...75
Directorate General of Human Settlements 30. Indonesian Water and Sanitation Program, Sub program D: Sanitation Pilots ...79
31. Rural Infrastructure Support – PNPM III ...81
32. Small Scale Water Treatment Plants for Emergency Relief ...83
33. Mainstreaming PNPM Mandiri...84
34. Supporting Water Operators Partnership in Indonesia (WOPs) ...85
35. TA for Metropolitan Sanitation Management and Health Project ...87
Directorate General of Water Resources 36. Jakarta Urgent Flood Mitigation Project (JUFMP) ...91
37. Capacity Development and Institutional Strengthening in the Water Resources Sector ...94
38. Project for the Urgent Reconstruction on East Pump Station of Pluit in Jakarta ...96
39. Study on Optimalization of Waterway Development for Karian Multipurpose Dam ...98
List of Project and Technical Assistance
- v - Ministry of National Education
41. Development and Upgrading of State University of Semarang (UNNES) Project ... 105
42. Counterpart Training on Educational Administration ... 107
43. Education Sector Analytical and Capacity Development Partnership ... 108
44. Higher Education Policy Advisor ... 110
45. Primary and Secondary Education Planning ... 111
46. Study on Optimalization of Treatment on Waste from Palm Oil Industry and Production of Bio Energy and Bio Fertilizer ... 112
Ministry of Trade 47. Trade Cooperation Facility ... 117
Ministry of Transportation Directorate General of Land Transportation 48. Project for Study on Jabodetabek Public Transportation Policy Implementation Strategy in Republic Indonesia ... 121
Directorate General of Sea Transportation 49. Indonesian Ship Reporting System ... 125
50. The Project of Enhancement Vessel Traffic System (VTS) in Malacca and Singapore Strait ... 127
51. Vessel Traffic Services (VTS) System for Northern Part of Malacca Strait ... 129
52. Master Plan Study on Port Development and Logistics in Greater Jakarta Metropolitan Area ... 131
53. Replacement of Aids to Navigation Damaged by the Tsunami Incident ... 132
Directorate General of Civil Aviation 54. Airport Security System Improvement ... 137
55. The Master Plan Study on the Multiple Airport Development for Jakarta Metropolitan Area ... 138
Directorate General of Railway 56. Procurement of Track Material and Turn-out ... 143
Ministry of Agriculture 57. Emerging Infectious Disease ... 147
List of Project and Technical Assistance
- vi -
59. Coastal Protection and Management Policy Addressing on Climate Change Impact in
Indonesia ...153
60. Democracy and Governance Programs in Indonesia ...155
61. Indonesia Low Carbon Development Plan (ILCDP): National and Local Level Policy Advise ...159
62. Indonesia Slum Alleviation Policy and Action Plan (SAPOLA) ...161
63. Low Carbon Development Strategy Project by Integrating NAMA with MRV and NAPA into National Development Planning and Training for Development Planning dealing with Climate Change ...163
64. People-Centered Development Programme ...165
65. Preparatory Assistance for Indonesia Climate Change Trust Fund (Prep-ICCTF) ...167
66. Support for Economic Analysis for Development in Indonesia ...170
Indonesian Institute of Science 67. Animal Husbandry Technology and Practice Improvement to Accelerate Meat and Milk Production (Meat-Milk Pro) ...173
National Public Procurement Agency 68. Strengthening National Public Procurement Processes ...179
Local Government of Riau Province 69. Southern Pekanbaru Water Supply Project ...183
PT PERTAMINA 70. Geothermal Total Project Development in Lahendong, Unit 5&6 (2x20 MW)...187
71. Geothermal Total Project Development in Lumut Balai, Unit 1&2 (2x55 MW) ...189
72. Geothermal Total Project Development in Ulu Belu, Unit 3&4 (2x55 MW) ...191
State Electricity Company 73. Parit Baru Coal Fueled Steam Power Plant (2x50 MW) ...195
1
Meteorology, Climatology, and Geophysics
Agency
3
GBP1-03-07501-1001-085002
1. Project Title : Capacity Development for Vulnerability Assessment 2. Project Type : Technical Assistance
3. Executing Agency : Meteorology, Climatology, and Geophysics Agency 4. Implementing Agency : Meteorology, Climatology, and Geophysics Agency 5. Duration : 48 months
6. Location : DKI Jakarta
7. Objectives
To increase the capacity of the key ministries and local governments to formulate climate change policy and programs.
8. Scope of Projects
a. Improvement of basic capacity of vulnerability assessment of the Meteorology, Climatology, and Geophysics Agency/Badan Meteorologi, Klimatologi, dan Geofisika (BMKG) and related institutions concerned;
b. Improvement of the capacity of BMKG and related institutions on the use of climate change projection and verification;
c. Improvement of the capacity of BMKG and related institutions on the assessment of adaptive capacity;
d. Establishment of the implementation structure for vulnerability assessment based on collaboration among institutions concerned.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Assessment of basic capacity of vulnerability assessment
DKI Jakarta Meteorology, Climatology, and Geophysics Agency b. Climate change projection and verification
c. Assessment of adaptive capacity d. Establishment of the implementation
structure for vulnerability assessment
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Meteorology, Climatology, and Geophysics Agency
- 1,200 - 1,200 JICA
4
GBP1-03-07501-1001-085002
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
300 300 300 300 1,200
12. Funding Allocations
Activities
Categories (US $ 000) Services
Construct-ions Goods Trainings Others a. Assessment of basic capacity
of vulnerability assessment b. Climate change projection
and verification c. Assessment of adaptive
capacity
d. Establishment of the
implementation structure for vulnerability assessment
Total *) Data not available
13. Project References :
5
Statistics Indonesia Agency
7
GBP1-03-05401-0800-09-10-074009
1. Project Title : Institutional Capacity Building - Change and Reform for the Development of Statistics
2. Project Type : Project Assistance
3. Executing Agency : Statistics Indonesia Agency 4. Implementing Agency : Statistics Indonesia Agency 5. Duration : 60 months
6. Location : Nationwide
7. Objectives
a. To improve the quality of accuracy of statistics;
b. To improve information communication technology capacity; c. To improve human resources development;
d. To improve institutional arrangement.
8. Scope of Projects
a. Improvement of quality of statistics;
b. Investment in Information and Communication Technology (ICT) infrastructure and information management;
c. Human resource capacity development;
d. Institutional arrangement and project management.
9. Activities
Activities Implementation
Locations
Project Implementation Units a. Improving statistical quality
b. Enhancement of ICT platform and information management
c. Human capacity development d. Institutional arrangements
e. Establish integrated Enterprise Resource Planning (ERP) system
Nationwide Statistics Indonesia Agency
10. Funding Source Implementing
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
8
GBP1-03-05401-0800-09-10-074009
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Improving statistical
quality
26,872.27 16,373.74
b. Enhancement of ICT platform and information management
21,754.00 5,266.00
c. Human capacity development
2,988.25 1,207.78
d. Institutional arrangements
5,487.96
e. Other cost 3,050.00
Total 35,348.48 21,754.00 17,581.52 8,316.00
13. Project References :
9
GBT1-06-05500-1001-068482
1. Project Title : KTF Support for Statistical Capacity Building 2. Project Type : Technical Assistance
3. Executing Agency : Statistics Indonesia Agency 4. Implementing Agency : Statistics Indonesia Agency 5. Duration : 30 months
6. Location : Nationwide
7. Objectives
a. To support the implementation of planning and requirement for Statistical Capacity Building (STATCAP) Project;
b. To conduct capacity building for Statistics Indonesia Agency/Badan Pusat Statistik (BPS) information system and dissemination.
8. Scope of Projects a. Consultant services; b. Training and study visit.
9. Activities
Activities Implementation Locations Project Implementation Units a. Expert dispatch Nationwide Statistical Capacity Building -
Change and Reform in Development of Statistics (STATCAP-CERDAS) b. Training and incremental
operating costs
10. Funding Source Implementing
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
10
GBT1-06-05500-1001-068482
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Consultant service
b. Contingency
255
45 c. Training and study visit
d. Incremental operating costs
45
5
Total 255 45 50
13. Project References :
13
GBT1-02-11300-1001-064041
1. Project Title : Capacity Development for Supporting Industry Development: Credit Guarantee System
2. Project Type : Technical Assistance 3. Executing Agency : Bank Indonesia 4. Implementing Agency : Bank Indonesia 5. Duration : 12 months 6. Location : DKI Jakarta
7. Objectives
a. To learn from other countries experience in developing regional credit guarantee system; b. To enhance the knowledge and skill about credit guarantee system for Small and Medium
Enterprises (SMEs) including the mechanism, procedure, and management;
c. To conduct the implementation of regional credit guarantee system in Indonesia, which can function to overcome the lack of SME s collateral.
8. Scope of Projects
Expert dispatch, training, and exposure study.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Training: credit guarantee system and its implementation in Indonesia
DKI Jakarta Directorate of Credit, Rural Banks, and Micro, Small, and Medium Enterprises (MSMEs) b. Exposure study on credit guarantee system
to learn about the environment where it best works
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate of Credit, Rural Banks and MSME
- 918 - 918 JICA
Total - 918 - 918
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
14
GBT1-02-11300-1001-064041
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others Technical assistance 918
Total 918
13. Project References :
15
Ministry of Home Affairs
17
GBT1-01-05502-1001-073091
1. Project Title : Support to Indonesia's National Program for Community Empowerment
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Home Affairs 4. Implementing Agency : Ministry of Home Affairs 5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
a. To reinforce the government s managements system for the national scale-up of National Program for Community Empowerment/Program Nasional Pemberdayaan Masyarakat
(PNPM);
b. To promote the scale-up of two large pilot programs within PNPM that will reinforce and complement the block grant transfers.
8. Scope of Projects
a. Capacity building for local government;
b. Provision of block grant for the community through pilot program within PNPM i.e. PNPM Generasi.
9. Activities
Activities Implementation Locations Project Implementation Units a. Provision of block grant to
the community
127 selected sub-districts Central and districts level b. Local government capacity
building
Central level and local level for selected provinces and districts
Central level
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Community and Village Empowerment, Ministry of Home Affairs
- 34,190 - 34,190 AusAid
Directorate General of Community and Village Empowerment, Ministry of Home Affairs, and Bappenas
- 5,850 - 5,850
Total - 40,040 - 40,040
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
18
GBT1-01-05502-1001-073091
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Provision of block grant to
the community
34,190
b. Community and Local government capacity building
5,850
Total 34,190 5,850
13. Project References :
19
Ministry of Energy and Mineral Resources
21
GBT1-03-02000-1001-066071
1. Project Title : Electric Power and Energy Policy (Long Term Expert) 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Directorate General of Electricity, Ministry of Energy and Mineral Resources
5. Duration : 24 months 6. Location : DKI Jakarta
7. Objectives
To prepare a more detailed regulation for the implementation of 10,000 MW program through technical experts in assisting and supervising the implementation of electricity development in Indonesia.
8. Scope of Projects
a. Preparing planning strategies and policies in the electricity and energy sector; b. Providing suggestions and advice in improving the electrification program;
c. Developing a program in the utilization of new and renewable energy sources and energy conservation;
d. Conducting studies and research to solve the emerging energy issues.
9. Activities
Activities Implementation Locations Project Implementation Units Long term expert Jakarta Directorate General of Electricity
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Electricity - 371 - 371 JICA
Total - 371 - 371
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
150 221 371
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Long term expert 371
Total 371
13. Project References :
22
GBP1-03-02000-1001-066068
1. Project Title : Integrated Electricity Safety Development and Application Program (IESDAP)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Directorate General of Electricity, Ministry of Energy and Mineral Resources
5. Duration : 15 months 6. Location : Nationwide 7. Objectives
To evaluate present situation on electricity safety at household and to set up electricity safety plan.
8. Scope of Projects
a. Implementation of integrated electricity safety;
b. Safety improvement of household installation and distribution network system; c. Capacity building and development for human resources;
d. Capacity building for regulatory; e. Electrical fire disasters reduction. 9. Activities
Activities Implementation Locations Project Implementation Units Technical assistance Jakarta Directorate General of Electricity 10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Electricity - 2,570 - 2,570 JICA
Total - 2,570 - 2,570
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
2,000 570 2,570
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Technical assistance 2,570
Total 2,570
13. Project References :
23
GBT1-03-02000-1001-066589
1. Project Title : Support for Realization of the Energy Manager Program 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Directorate General of Electricity, Ministry of Energy and Mineral Resources
5. Duration : 24 months 6. Location : Nationwide
7. Objectives
a. To promote the efficient energy use of building and factory through Energy Manager Program on Energy Conservation;
b. To enhance the capacity for energy management and energy manager certification training.
8. Scope of Projects
a. Preparing organizational and institutional arrangement;
b. Development of rules, procedures, and training design for the Energy Manager (EM); c. Preparing training of trainers (TOT) for EM certification training.
9. Activities
Activities Implementation Locations Project Implementation Units Energy manager program Nationwide Directorate General of Electricity 10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Electricity - 1,650 - 1,650 JICA
Total - 1,650 - 1,650
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
750 900 1,650
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Energy manager program 1,650
Total 1,650
13. Project References :
25
Ministry of Forestry
27
GBT1-04-02904-1001-075013
1. Project Title : Forest and Climate Change Program - FORCLIME (Technical Cooperation)
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Forestry
4. Implementing Agency : a. Directorate General of Forest Protection and Nature Conservation, Ministry of Forestry
b. Directorate General of Forestry Planning, Ministry of Forestry 5. Duration : 48 months
6. Location : Jakarta, East Kalimantan, West Kalimantan, and Central Kalimantan
7. Objectives
Implementing rules and regulation about the framework, approaches, methodologies and services in term of conservation promotion and sustainable development and reduction of greenhouse gases due to deforestation and forest degradation in some selected areas in Kalimantan.
8. Scope of Projects
a. Facilitating strategic planning and forestry policy;
b. Implementing a strategic planning for sustainable forest management; c. Development of nature conservation in the area of Heart of Borneo (HoB).
9. Activities
Activities Implementation Locations Project Implementation Units
a. Building institutions framework at provincial and district level
b. Implementation of sustainable forest management for consensus holder
Jakarta, East Kalimantan, West Kalimantan, and Central Kalimantan
Ministry of Forestry
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Ministry of Forestry - 812.83 - 812.83 Germany
(GIZ)
Total - 812.83 - 812.83
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
28
GBT1-04-02904-1001-075013
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Building institutions
framework at provincial and district level b. Implementation of
sustainable forest
management for consensus holder
568.95 81.30 162.58
Total 568.95 81.30 162.58
13. Project References :
29
GBT1-04-02904-1002-075013
1. Project Title : Indonesia UN-REDD (United Nation Collaborative Programme on Reducing Emissions from Deforestation and Forest Degradation) National Joint Programme
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Forestry
4. Implementing Agency : Directorate General of Forestry Planning, Ministry of Forestry 5. Duration : 30 months
6. Location : North Sulawesi, Central Sulawesi, Gorontalo, and other provinces
7. Objectives
To support the Government of Indonesia in attaining REDD-Readiness
8. Scope of Projects
a. Strengthening stakeholders at vertical and horizontal levels, from national to grass root and vice versa;
b. Providing linkages between national, provincial, and district level for technical implementation of REDD.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Strengthening
multi-stakeholders participation and consensus at national level
Aceh, Jambi, Central Kalimantan, Central Sulawesi, and Papua
National Council on Climate Change/Dewan Nasional Perubahan Iklim (DNPI) Land Use and Land Use Change and Forestry (LULUCF) Working Group and the MoF or Climate Change Working Group b. Capacity building to implement
REDD at decentralized level
Central Sulawesi, Gorontalo, and North Sulawesi
-
c. Demonstration of establishing a Reference Emission Level (REL), measuring, reporting, and verification (MRV) and fair payment system based on the national REDD architecture
- District Government
stakeholders such as the DPRD, Bappeda, Forestry Services, Agriculture, and Rural Advisory Services
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Ministry of Forestry - 5,600 - 5,600 UNDP
30
GBT1-04-02904-1002-075013
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
2,000 2,000 1,600 5,600
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Strengthening
multi-stakeholders participation and consensus at national level.
b. Capacity building to implement REDD at decentralized levels. c. Demonstration of
establishing a REL, MRV and fair payment systems based on the national REDD architecture.
1,680 1,120 2,800
Total 1,680 1,120 2,800
13. Project References :
31
GBT1-04-02900-1001-065085
1. Project Title : Strategy for Strengthening Biodiversity Conservation through Appropriate National Park Management and Human Resource Development
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Forestry 4. Implementing Agency : Ministry of Forestry 5. Duration : 32 months
6. Location : Gunung Halimun Salak National Park, West Java
7. Objectives
To enhance collaborating management in the national parks in Indonesia
8. Scope of Projects
Enhancement of Center for Forestry Education and Training (CFET) equipped with sufficient capacity for conducting training on collaborative management of national parks.
9. Activities
Activities Implementation
Locations
Project Implementation Units a. Training course on collaborative
management of national parks. b. Operational structure to implement the
training course
c. Capacity building for planning and management of the training course
Center for Forestry Education and Training and Gunung Halimun Salak National Park
Center for Forestry Education and Training
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Center for Forestry Education and Training
- 1,170.25 - 1,170.25 JICA
Total - 1,170.25 - 1,170.25
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
32
GBT1-04-02900-1001-065085
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Training course on
collaborative management of national parks.
b. Operational structure to implement the training course
c. Capacity building for planning and management of the training course
117.02 234.05 117.03 702.15
Total 117.02 234.05 117.03 702.15
13. Project References :
33
GBT1-04-02900-1002-065085
1. Project Title : Strengthening Community - Based Forest and Watershed Management in Indonesia
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Forestry
4. Implementing Agency : Directorate General of Land Rehabilitation and Social Forestry, Ministry of Forestry
5. Duration : 60 months
6. Location : Central Sulawesi, Central Kalimantan, West Kalimantan, Central Java, Lampung, East Nusa Tenggara, West Nusa Tenggara, and North Sumatera
7. Objectives
a. To improve life chances and livelihood opportunities through enhanced Government commitment to the Millennium Development Goals (MDGs), institutional support for achieving the MDGs with a special focus on HIV/AIDS;
b. To improve environmental living conditions and sustainable use of energy and establishment of sustainable living conditions in the targeted provinces in Indonesia.
8. Scope of Projects
Comprehensive framework and effective action plans for regional environment management developed and implemented in priority district and provinces with critical environment, natural resource management, and poverty reduction challenges that resulted in improved environmental quality and equitable access to natural resources among the poor, leading to improve livelihood:
a. Establishment of functional management group for Community-Based Forest and Watershed Management (CBFWM);
b. Capacity building;
c. Development of local participatory of CBFWM; d. Provide government incentive to promote CBFWM.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Watershed management
b. Watershed critical land rehabilitation c. HKm planning and development d. HR planning, development and
institutionalization e. Non Timber Forest Product
(NTFP)/Hasil Hutan Bukan Kayu
(HHBK) use development
Central Sulawesi, Central Kalimantan, West Kalimantan, Central Java, Lampung, East Nusa Tenggara, West Nusa Tenggara, and North Sumatra
34
GBT1-04-02900-1002-065085
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Land Rehabilitation and Social Forestry
- 7,000 41,000 48,000 GEF/
UNDP
Total - 7,000 41,000 48,000
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
9,600 9,600 9,600 9,600 9,600 48,000
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Watershed management
b. Watershed critical land rehabilitation
c. HKm planning and development
d. HR planning, development, and institutionalization e. NTFP use development
Total 10,000 24,000 12,000 2,000
13. Project References :
35
GBT1-04-02900-1003-065085
1. Project Title : Wood Biomass Energy Development Model 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Forestry
4. Implementing Agency : Directorate General of Production Forest Management, Ministry of Forestry
5. Duration : 36 months
6. Location : Banjar District and Pangkalan Bun District
7. Objectives
a. To provide management skills and engineering techniques through a pilot project of wood pellet plant with forest biomass;
b. To increase community's livelihood and to reduce poverty by providing job opportunities through a pilot tree plantation project and the construction of the pellet plant;
c. To promote Green Village (landmark) which shows the demonstration of Low Carbon Society and a community center in the project area, Indonesia;
d. To increase the capacity of the officials and relevant personnel related to wood biomass energy in the Ministry of Forestry Indonesia;
e. To prepare countermeasures for climate change, mitigating green house gas (GHG) through forest biomass.
8. Scope of Projects a. First Phase
1) Project sites for the wood pellet plant and pilot plantation; 2) Planning and construction for the wood pellet plant;
3) Establishment of the cluster for the resident's plantation and planning to gather biomass for pellet manufacturing;
b. Second Phase
1) Establishment of the wood pellet plant and pilot plantation;
2) Capacity building for pellet plant management and engineering techniques; 3) Resident's cluster program and biomass (wood chips and debris) supply system; 4) Development of bio energy and green villages (community center), which are related
to Green Growth and Climate Change with GHG for landmark in the area; c. Third Phase
1) Establishment of a local development system through the wood pellet plant, wood biomass development, transport and usage;
2) Advertising of the project with the community Center and Green Village (land mark) for Forestry cooperation between Korea and Indonesia;
36
GBT1-04-02900-1003-065085
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Establishment of a wood pellet plant in pilot scale in the project site and the supply of equipment and materials for the plant
b. Resident's cluster for the tree plantation, which is an essential factor for the implementation of the project
c. Experts dispatch to support human resources and organizations for the implementation of the project
d. Providing training program for the Government officials and experts who are expected to work in pellet production and tree plantation
Banjar District and Pangkalan Bun District
Directorate General of Production Forest Management
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of
Production Forest Management
- 4,000 400 4,400 Korea
(KOICA)
Total - 4,000 400 4,400
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
1,100 1,100 1,100 1,100 4,400
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Establishment of a wood
pellet plant in pilot scale b. Resident's cluster for the tree
plantation c. Experts dispatch d. Providing of the training
1,100 2,200 1,100
Total 1,100 2,200 1,100
13. Project References :
37
Ministry of Marine Affairs and Fisheries
39
GBP1-04-03200-1001-065124
1. Project Title : Regional Fisheries Livelihoods Programme (RFLP) for South and Southeast Asia
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Marine Affairs and Fisheries
4. Implementing Agency : Directorate General of Capture Fisheries - Ministry of Marine Affairs and Fisheries
5. Duration : 48 months
6. Location : East Nusa Tenggara Province
7. Objectives
Strengthening capacity among participating small-scale fishing communities and their supporting institutions towards improved livelihoods and sustainable fisheries resources management
8. Scope of Projects
Capacity building for fishing communities in the field of fisheries management, safety at sea and ashore, fisheries post-harvest and marketing, alternative income opportunities and microfinance.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. co-management mechanisms for sustainable utilization of fishery resources;
Kupang
Directorate General of Capture Fisheries b. measures to improve safety and reduce
vulnerability for fisher communities; c. measures to improve the quality of fishery
products and market chains;
d. diversification of income opportunities for fisher communities;
e. facilitating the access to microfinance services for fishers, processors, and vendors;
f. regional sharing of knowledge in supporting livelihood development and reduced vulnerability for fisher communities and of sustainable fisheries resource management
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Capture Fisheries
- 2,424 - 2,424 FAO
40
GBP1-04-03200-1001-065124
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
213 637 589 587 398 2,424
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
a. Staff and professional 172
b. Consultants 384
c. Contracts 400
d. Travel 290
e. Training 300
f. Goods procurement 493
g. Technical support services 3
h. General operating 102
i. Miscellaneous 280
Total 784 493 300 847
13. Project References :
41
Ministry of Health
43
GBP1-05-02400-0700-08-09-10-061124
1. Project Title : Strengthening of Teaching Hospitals in Indonesia 2. Project Type : ProjectAssistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : Directorate General for Medical Care (DGMC), Ministry of Health 5. Duration : 36 months
6. Locations :
a. Dr. Zainoel Abidin Hospital, Aceh; b. H. Adam Malik Hospital, Medan; c. Dr. Mohammad Hoesin Hospital,
Palembang;
d. RSAB Harapan Kita, Jakarta;
e. Jantung Harapan Kita Hospital, Jakarta; f. Persahabatan Hospital, Jakarta;
g. Dr. Ciptomangunkusumo Hospital, Jakarta;
h. Dr. Soeradji Tirtonegoro Hospital, Klaten;
i. Sanglah Hospital, Denpasar;
j. Prof. Dr. R.D. Kandou Hospital, Manado; k. Andi Makkasau Hospital, Pare-Pare.
7. Objectives
To strengthen the operating theaters and intensive care units in 11 (eleven) teaching hospitals that provides quality care in the region.
8. Scope of Projects
Provision of adequate medical equipment and trained doctors for improving targeted hospitals in Indonesia.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Procurement of medical equipment, installation, testing and commissioning
11 teaching hospitals
Ministry of Health b. Training
c. Operation and maintenance
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Directorate General of Community
Empowerment, Ministry of Home affairs
14,000 - 3,500 17,500 Finland
44
GBP1-05-02400-0700-08-09-10-061124
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
10,000 4,000 3,500 17,500
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Procurements of
medical equipment
12,600
b. Renovation of hospital facilities
3,500
c. Trainings program 560
d. Maintenances 840
Total 840 3,500 12,600 560
13. Project References :
45
Ministry of Finance
47
GBT1-06-01500-1001-064144
1. Project Title : Advisor for Economic, Fiscal, and Financial Affairs 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Finance
4. Implementing Agency : Fiscal Policy Office, Ministry of Finance 5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
Enhancing Fiscal Policy Office FPO s researchers capacity of various matters related to FPO s core tasks such as revenue policy, budget policy, macroeconomic monitoring and surveillance, fiscal risk management, and international cooperation.
8. Scope of Projects
Policy advices and coordination of technical cooperation.
9. Activities
Activities Implementation Locations Project Implementation Units Expert dispatch DKI Jakarta Center for International Cooperation Policy
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Center for International Cooperation Policy
- 200 - 200 JICA
Total - 200 - 200
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
100 100 - - - 200
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Expert dispatch 200
Total 200
13. Project References :
48
GBT1-06-01500-1002-064144
1. Project Title : Extension of Existing Long Term Expert (Assistance for Bapepam-LK in Capital and Financial Institution Development Policy) 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Finance
4. Implementing Agency : Indonesia Capital Market and Financial Institution Supervisory Agency
5. Duration : 12 months 6. Location : DKI Jakarta
7. Objectives
To formulate long-term plans related to the financing of SMEs through the capital markets and Non-Bank Financial Institutions (NBFIs) that will be included in the Master Plan of the Indonesia Capital Market and Financial Institution Supervisory Agency/Badan Pengawas Pasar Modal dan Lembaga Keuangan (Bapepam-LK).
8. Scope of Projects
Technical advisory - Long Term Expert
9. Activities
Activities Implementation Locations Project Implementation Units Expert dispatch DKI Jakarta Indonesia Capital Market and Financial
Institution Supervisory Agency
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total Indonesia Capital Market and Financial
Institution Supervisory Agency
- 110 - 110 JICA
Total - 110 - 110
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
110 110
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Expert dispatch 110
Total 110
13. Project References :
49
GBT1-06-01500-1003-064144
1. Project Title : Strengthening Indonesia's Capital Market 2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Finance
4. Implementing Agency : Indonesia Capital Market and Financial Institution Supervisory Agency
5. Duration : 21 months 6. Location : DKI Jakarta
7. Objectives
a. To increase the financial and operational autonomy of the Indonesia Capital Market and Financial Institution Supervisory Agency/Badan Pengawas Pasar Modal dan Lembaga Keuangan (Bapepam-LK);
b. To create more demands and supplies for capital market products including developing securitized market in order to enhance market liquidity;
c. To reduce the risk of Non-Bank Financial Institutions of being used as conduits for money laundering in the form of regulations, supervision (capacity, enforcement powers, and sanctions), and capacity for compliance need to be strengthened to achieve parity with the banking sector by improving adequate enforcement capacity;
d. To protect investors safety in the event of broker default;
e. To raise Indonesia s economic growth rate and enhancing the economy s resilience.
8. Scope of Projects
a. Enhancement of regulatory framework and capacity building;
b. Identification and development of the next medium-term action planfor Bapepam-LK; c. Identification and development of the key medium-term initiatives for PT Sarana
Multigriya Finansial (for mortgage insurance), Finance Companies and Guarantee Bureau, and General Insurance Association of Indonesia;
d. Supporting the implementation of selected reform programs.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Consultants b. Equipment
c. Training, seminars, and conferences d. Miscellaneous administration and
support e. Office facilities f. Contingencies
DKI Jakarta, overseas
50
GBT1-06-01500-1003-064144
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Bapepam-LK - 1,500 - 1,500 ADB
Total - 1,500 - 1,500
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
750 750 1,500
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Consultants
b. Equipment
c. Training, seminars, and conferences
d. Miscellaneous administration and support
e. Office facilities f. Contingencies
1,500
Total 1,500
13. Project References :
51
Coordinating Ministry for Economic Affairs
53
GBT1-02-03501-1001-074099
1. Project Title : Individual Expert on Economic Development 2. Project Type : Technical Assistance
3. Executing Agency : Coordinating Ministry for Economic Affairs
4. Implementing Agency : Deputy of Infrastructure and Regional Development, Coordinating Ministry for Economic Affairs
5. Duration : 12 months 6. Location : DKI Jakarta
7. Objectives
To establish a coherent infrastructure development policy to support economic growth.
8. Scope of Projects
Provision of an advisor for the Deputy of Infrastructure and Regional Development, Coordinating Ministry for Economic Affairs.
9. Activities
Activities Implementation Locations Project Implementation Units Expert dispatch DKI Jakarta Deputy of Infrastructure and Regional
Development
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Deputy of Infrastructure and Regional Development
- 253 - 253 JICA
Total - 253 - 253
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
253 253
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others
Expert dispatch 253
Total 253
13. Project References :
54
GBT1-02-03501-1002-074099
1. Project Title : Partnership for Economic Governance 2. Project Type : Technical Assistance
3. Executing Agency : Coordinating Ministry for Economic Affairs
4. Implementing Agency : a. Deputy of International Economic and Financial Cooperation, Coordinating Ministry for Economic Affairs;
b. Ministry of Finance; c. Ministry of Trade;
d. Ministry of National Development Planning/National Development Planning Agency (Bappenas);
e. Other relevant ministries/agencies. 5. Duration : 36 months
6. Location : Nationwide
7. Objectives
a. To improve the quality of the Government of Indonesia s economic management;
b. To strengthen governmental capability for policy formulation, coordination, and implementation in areas affecting the national budget and macroeconomic performance; c. To promote the economic growth and poverty reduction.
8. Scope of Projects
a. Providing support to the selected areas of economic management;
b. Providing qualified and strategic inputs that are useful for government policy makers; c. Providing a positive impact on setting the budget and macroeconomic policies of
Indonesia involving the relevant key institutions;
d. Building internal capacity for policy formulation, coordination, and implementation in the strategic areas.
9. Activities
Activities Implementation
Locations
Project Implementation Units a. Improving the capacity of core economic
institutions for policy development, coordination, and implementation. b. Improving capacity for development and
supervision of financial institutions and capital market.
c. Improving capacity for development and implementation of trade policy.
d. More efficient management of public finance. e. Improving tax administration
Nationwide Deputy of International Economic and
55
GBT1-02-03501-1002-074099
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Deputy of International Economic and Financial Cooperation
- 31,100 - 31,100 AusAid
Total - 31,100 - 31,100
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
10,000 10,000 11,000 31,100
12. Funding Allocations *)
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Improving the capacity of core
economic institutions for policy development, coordination, and implementation. b. Improving capacity for
development and supervision of financial institutions and capital market.
c. Improving capacity for development and implementation of trade policy.
d. More efficient management of public finance.
e. Improving tax administration Total
*) Data not available
13. Project References :
56
GBT1-02-03501-1003-074099
1. Project Title : Project on Capacity Development for Trade-Related Administrator 2. Project Type : Technical Assistance
3. Executing Agency : Coordinating Ministry for Economic Affairs
4. Implementing Agency : Deputy for Trade and Industry Coordination, Coordinating Ministry for Economic Affairs
5. Duration : 24 months 6. Location : DKI Jakarta
7. Objectives
a. To improve business environment on international trade related laws and regulations by promoting risk management and its facilitation;
b. To increase the business compliance to regulations by the improved dialogue among government agencies and trade communities;
c. To enforce international trade policy and to enhance transparency and certainty of business by the improved coordination among government agencies in Indonesia;
d. To support Indonesian trade competitiveness to face ASEAN blueprint community and global competition.
8. Scope of Projects
a. Analysis, discussion, action plans, facilitation and coordination; b. Consultation with experts;
c. Training.
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Working group for regulatory review on trade-related laws and regulations.
Review trade-related laws and regulations
Analyze and update the contents, and renew the functions of database for trade-related laws and regulations.
Revise the maintenance structure and monitor its updated contents.
Conduct public relations activities of the database on website basis.
DKI Jakarta Deputy for Trade and Industry Coordination
b. Working group for improvement of export and import related procedures
Review trade-related procedures
57
GBT1-02-03501-1003-074099
Activities Implementation
Locations
Project Implementation
Units c. Working group for improvement of legal systems
for trade promotion
Grasp the needs of private trade-related sectors regarding legal systems for trade promotion
Discuss the creation of new legal systems
DKI Jakarta Deputy for Trade and Industry Coordination
d. Working group for improvement of dialogue mechanism between the Government of Indonesia and private trade-related sectors
Promote dialogue between the Government of Indonesia and private trade-related sectors e. Joint Coordination Committee
Monitor the status of each working group activities and evaluate them
Grasp problems regarding cooperation among trade-related ministries, and remedy the situation
Discuss the public relations strategy, and conduct public relations activities for the achievements of the project
Discuss the framework of Indonesian side after the completion of the project f. Trainings, seminars, and workshops
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Deputy for Trade and Industry Coordination
- 3,160 - 3,160 JICA
Total - 3,160 - 3,160
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
58
GBT1-02-03501-1003-074099
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others Technical Assistance 3,160
Total 3,160
13. Project References :
59
Ministry of Environment
61
GBT1-04-04300-1001-065586
1. Project Title : Capacity Development for Developing National Greenhouse Gas (GHG) Inventories
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Environment 4. Implementing Agency : Ministry of Environment 5. Duration : 60 months
6. Location : DKI Jakarta
7. Objectives
a. To formulate climate change policies based on the sound information and approaches; b. To improve the accuracy and reliability of GHG inventories for each sector
8. Scope of Projects
a. Preparing national Greenhouse Gas (GHG) inventories;
b. Enhancement of the capacity of Ministry of Environment to periodically and systematically collect and compile data necessary for national GHG inventories;
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Design of national system of national GHG inventories
DKI Jakarta Ministry of Environment b. Capacity building for data collecting and
compiling
c. Capacity building for the improvement of data accuracy and reliability
10. Funding Source
Implementing Agency Funding (US $ 000) Source
Loan Grant Local Total
Ministry of Environment - 3,000 - 3,000 JICA
Total - 3,000 - 3,000
11. Disbursement Plan
Disbursement Plan (US $ 000)
Total
1st 2nd 3rd 4th 5th
62
GBT1-04-04300-1001-065586
12. Funding Allocations
Activities Categories (US $ 000)
Services Constructions Goods Trainings Others a. Design of national system
of national GHG inventories
1,200 800 1,000
b. Capacity building for data collecting and compiling c. Capacity building for the
improvement of data accuracy and reliability
Total 1,200 800 1,000
13. Project References :