• Tidak ada hasil yang ditemukan

REST AREA JALAN TOL SEMARANG SOLO - Diponegoro University | Institutional Repository (UNDIP-IR)

N/A
N/A
Protected

Academic year: 2018

Membagikan "REST AREA JALAN TOL SEMARANG SOLO - Diponegoro University | Institutional Repository (UNDIP-IR)"

Copied!
2
0
0

Teks penuh

(1)

66 DAFTAR PUSTAKA

ARCH3230. (2012, November 12). Cross Ventilation According to Kwok. Retrieved from Systems, Sites and Building ARCH 3230: https://arch3230samanthaweiser.wordpress.com/2012/11/12/cross-ventilation-according-to-kwok/

Chiara, J. d. (1980). Time-Saver Standards for Building Types 2nd Edition. McGraw-Hill Companies. Cholis, N. (2014). d'Fitting Factory Oulet, Cibubur Square. Retrieved from Mapio:

http://mapio.net/a/110717584/

Fachrudin, F. (2016, Juli 4). Tol Brebes Timur Jadi "Neraka" Pemudik, Ini Dia Penyebabnya. Retrieved Januari 5, 2017, from Kompas.com:

http://nasional.kompas.com/read/2016/07/04/15261211/tol.brebes.timur.jadi.neraka.pemudik .ini.dia.penyebabnya.

Fitra, S. (2015, April 17). Tol Trans Jawa Akan Beroperasi 2018. Retrieved Desember 24, 2016, from KATADATA: http://katadata.co.id/berita/2015/04/17/tol-trans-jawa-akan-beroperasi-2018 GoogleEarth. (2016).

KEPUTUSAN MENTERI PERMUKIMAN DAN PRASARANA WILAYAH Nomor 353/KPTS/M/2001 Tentang Ketentuan Teknik, Tata Cara Pembangunan dan Pemeliharaan Jalan Tol

KEPUTUSAN MENTERI PERMUKIMAN DAN PRASARANA WILAYAH Nomor 354/KPTS/M/2001 Tentang Kegiatan Operasi Jalan Tol

Ipank. (2013, Februari 25). Cibubur Square, Sejenak Melepas Penat. Retrieved from Wisata Jakarta: http://jakarta.panduanwisata.id/jakarta-timur/cibubur-square-sejenak-melepas-penat/ Iqbal, M. (2015). Air Bersih. Retrieved from Repository Unimal:

http://repository.unimal.ac.id/488/4/AIR%20BERSIH.pdf

Jefri. (2016). ATM OCBC NISP Rest Area Cibubur Square. Retrieved from Google Street View. Laksmi, N. (2011, Januari 18). Rehat Sejenak - Rest Area Cibubur Makin Lengkap Berbagai Outlet.

Retrieved Oktober 19, 2016, from Kompasiana:

http://www.kompasiana.com/noorhanilaksmi/rehat-sejenak-rest-area-cibubur-makin-lengkap-berbagai-outlet_55006ce8a333111773510be1

Neufert, E. (2002). Data Arsitek Jilid 2. Jakarta: Erlangga.

Oktriyanto, D. (2016). Masjid di Lantai Tertinggi Rest Area Cibubur. Retrieved from Mapio: http://mapio.net/a/110717584/

Panggabean, R. (2016, Juli 4). Sampah Berserakan di Tol Pejagan. Retrieved Desember 24, 2016, from Metro TV News: http://foto.metrotvnews.com/view/2016/07/04/551795/sampah-berserakan-di-tol-pejagan

Punk, B. (2016, Agustus). Lawson Station. Retrieved from Google Street View.

Setyarso, S. B. (2017). SPBU Pertamina Rest Area Cibubur. Retrieved from Google Street View.

(2)

67

Street View. (2015)

Street View. (2016)

(2016). Trans Marga Jateng.

Tata Cara Penentuan Lokasi Tempat Istirahat di Jalan Bebas Hambatan No. 037/T/BM/1999

Lampiran No. 15 KEPUTUSAN DIREKTUR JENDERAL BINA MARGA No. 76/KPTS/Db/1999 Tanggal 20 Desember 1999

udizulist. (2011). Front Rest Area. Retrieved from Mapio: http://mapio.net/a/110717584/ Wicaksana, W. (2016). SPBU Pertamina Rest Area Cibubur. Retrieved from Google Street View. Wikimapia. (2017)

Referensi

Dokumen terkait

Menteri Permukiman Dan Prasarana Wilayah Republik Indonesia, Jakarta, 2004.. Keputusan Presiden Republik

Kata kunci : Jembatan, prategang, pilar dinding, pondasi bored pile, jalan tol,

Rekapitulasi Perhitungan Biaya Operasi Kendaraan Berdasarkan Kecepatan Rata-Rata di Jalan Tol Yang Diperoleh Untuk Setiap Tahun Kenaikan Tarif Tol ... Rekapitulasi Perhitungan

Maksud dan tujuan penyusunan Tugas Akhir ini adalah untuk mengevaluasi tarif tol berdasarkan Biaya Operasi Kendaraan ( BOK ) ketiga bagian jalan tol, yaitu Seksi A, Seksi B, Seksi

Untuk meningkatkan pelayanan bagi pengguna jalan tol dan untuk memenuhi standardisasi jalan tol, yakni tipe jalan pada jalan tol harus menggunakan 4/2 D (4 Lajur 2 Arah

Keputusan Menteri Negara Perumahan dan Permukiman Nomor 10/KPTS/M/1999 Tentang Kebijakan dan Strategi Pembangunan Rumah Susun.. Mu

Secara administratif Kabupaten Semarang terbagi menjadi 19 kecamatan, 27. kelurahan dan 208

Dasar pendekatan ini bertumpu pada pelaku kegiatan, jenis aktivitas, proses. aktivitas, jenis fasilitas, kapasitas dan