• Tidak ada hasil yang ditemukan

RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL DI PROVINSI NUSA TENGGARA TIMUR

N/A
N/A
Protected

Academic year: 2021

Membagikan "RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL DI PROVINSI NUSA TENGGARA TIMUR"

Copied!
31
0
0

Teks penuh

(1)

RENCANA PENGEMBANGAN GRID

PULAU KECIL SOLAR PV DAN PV DIESEL

DI PROVINSI NUSA TENGGARA TIMUR

(2)

PETA PROVINSI NUSA TENGGARA TIMUR

Kotamadya

Kabupaten

Kecamatan

Desa

/Kelurahan

1

21

306

3268

Jumlah Jiwa

5.356.567

GEOGRAFIS : KEPULAUAN

(3)

NAMA PULAU TERDEPAN DI PROPINSI NUSA TENGGARA TIMUR

(Perbatasan T.leste & Australia)

Pulau Dana Rote (Kab. Rote Ndao)

Pulau Dana Sabu ( Kab. Sabu Raijua)

Pulau Manggudu (Kab. Sumba Timur)

Pulau Batek (Kab. Kupang)

(4)
(5)

AREA

KUPANG

AREA

SUMBA

AREA

FBT

AREA

FBB

SEKTOR

NTT

Tarif

Pembangkit

Unit Area

2008

2009

2010

2011

2012

2013

Kupang

120.595

122.331

130.331

176.808

243.029

269.821

Growth (%)

8,9%

1,4%

6,5%

35,7%

37,5%

11,0%

Flores Bagian Barat

58.807

60.539

65.729

89.881

127.962

145.835

Growth (%)

9,8%

2,9%

8,6%

36,7%

42,4%

14,0%

Sumba

21.037

21.581

24.341

31.866

57.449

48.348

Growth (%)

11,8%

2,6%

12,8%

30,9%

80,3%

-15,8%

Flores Bagian Timur

45.917

49.104

54.041

77.471

95.603

99.842

Growth (%)

12,7%

6,9%

10,1%

43,4%

23,4%

4,4%

Wilayah NTT

246.356

253.555

274.442

376.026

524.043

563.846

Growth (%)

10,0%

2,9%

8,2%

37,0%

39,4%

7,6%

PELANGGAN

(6)

Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016

D D D D D

SISTEM RUTENG

D. MAMPU : 7,28 MW

B. MALAM : 8,47 MW

DEFISIT : -1,19 MW

SISTEM AESESA

D. MAMPU : 2,55 MW

B. MALAM : 2,29 MW

CAD. : 0,26 MW

D D D D D D D D D D D D D D

SISTEM LARANTUKA

D. MAMPU : 3,70

MW

B. MALAM : 4,17 MW

DEFISIT : -0,47 MW

SISTEM ADONARA

D. MAMPU : 2,70 MW

B. MALAM : 3,39 MW

DEFISIT : -0,69 MW

SISTEM LEMBATA

D. MAMPU : 3,10 MW

B. MALAM : 2,91 MW

CAD. : 0,19 MW

SISTEM KALABAHI

D. MAMPU : 4,92 MW

B. MALAM : 4,16 MW

CAD. : 0,76 MW

SISTEM ATAMBUA

D. MAMPU : 7,60 MW

B. MALAM : 7,90 MW

DEFISIT : - 0,30 MW

SISTEM KEFAMENANU

D. MAMPU : 4,77 MW

B. MALAM : 4,41 MW

CAD. : 0,36 MW

SISTEM SO’E

D. MAMPU : 5,12 MW

B. MALAM : 5,00 MW

CAD. : 0,12 MW

SISTEM KUPANG

D. MAMPU : 49,23 MW

B. MALAM : 53,40 MW

DEFISIT : -4,17 MW

SISTEM ROTE

D. MAMPU : 3,50 MW

B. MALAM : 3,28 MW

CAD. : 0,22 MW

SISTEM SABU

D. MAMPU : 1,28 MW

B. MALAM : 1,16 MW

CAD. : 0,12 MW

SISTEM MAUMERE

D. MAMPU : 11,50 MW

B. MALAM : 10,95 MW

CAD. : 0,55 MW

SISTEM ENDE

D. MAMPU : 7,35 MW

B. MALAM : 9,49 MW

DEFISIT : -2,14 MW

SISTEM WAINGAPU

D. MAMPU : 6,35 MW

B. MALAM : 5,64 MW

CAD. : 0,71 MW

SISTEM WAIKABUBAK

+ WAITABULA

D. MAMPU : 5,32 MW

B. MALAM : 6,52 MW

DEFISIT : -1,20 MW

SISTEM BAJAWA

D. MAMPU : 5,00 MW

B. MALAM : 5,60 MW

DEFISIT : -0,60 MW

SISTEM LABUAN BAJO

D. MAMPU : 4,40 MW

B. MALAM : 4,20 MW

CAD. : 0,20 MW

AREA FBB

AREA FBT

AREA KUPANG

AREA SUMBA

SISTEM BETUN

D. MAMPU : 2,59 MW

B. MALAM : 2,39 MW

CAD. : 0,20 MW

(7)

1. Berdasarkan Pembangkit

2. Berdasarkan Area Kerja

• Pasokan energi primer didominasi bahan

bakar fosil :

59,12 % dari BBM PLTD Sewa,

20,49 % dari BBM PLTD sendiri,

13,98 % dari PLTU,

3,53 % dari PLTP,

2,80 % dari PLTM/PLTMH,

0,07 % dari PLTS

Status Komposisi Pembangkit PLN NTT ( Desember 2015)

• Pasokan Energi Listrik Berdasarkan Area

Kerja yang didominasi oleh :

1. Area Kupang : 58,28 %

2. Area FBB

: 20,07 %

3. Area FBT

: 14,44 %

4. Area Sumba : 7,21 %

(8)

2010

26,40%

2011

41,55%

2012

53,22%

2013

54,77%

2014

58,53%

Okt

2015

58,44%

2016

63,2%

2017

65,7%

2018

68,7%

2019

70,9%

2020

73,2%

(9)

~

~

PEMETAAN PER KABUPATEN

Sumba Barat Daya

57,051 KK

5,254 plg RT

66 Desa

Sumba

Barat&Tengah

37,361 KK

5,107 plg RT

53 Desa

Sumba Timur

49,549 KK

12,259 plg RT

86 Desa

Manggarai

Barat

45,706 KK

2,990 plg RT

96 Desa

Manggarai&Ma nggarai Timur

112,225 KK

14,865 plg RT

175 Desa

Nagekeo

27,730 KK

5,299 plg RT

42 Desa

Ngada

29,172 KK

15,172 plg RT

36 Desa

Ende

51,716 KK

27,154 plg RT

97 Desa

Sikka

60,583 KK

22,400 plg RT

65 Desa

Flores Timur

51,560 KK

22,490 plg RT

117 Desa

Lembata

23,210 KK

8,642 plg RT

67 Desa

Alor

39,549 KK

10,354 plg RT

112 Desa

Rote Ndao

25,812 KK

7,604 plg RT

36 Desa

TTS

90,712 KK

15,071 plg RT

125 Desa

Kupang&Sabu

85,509 KK

14,625 plg RT

72 Desa

Kota Kupang

63,518 KK

56,532 plg RT

-

Belu

95,954 KK

11,782 plg RT

123 Desa

TTU

47,212 KK

10,210 plg RT

72 Desa

Proyeksi KK 2011 menurut BPS

Jml plg Rumah Tangga (III-09 Juni 2011)

(10)

KENDALA :

1

• Banyaknya KK tidak sebanding dengan banyaknya

rumah, misalnya : 2-3 KK dalam 1 rumah

2

• Pelanggan Tersambung untuk 1 kms SUTM sebanyak

: 105 pelanggan (investasi = ± Rp. 300 jt)

3

•Pelanggan Tersambung untuk 1 kms SUTR sebanyak : 104

pelanggan (investasi = ± Rp. 200 jt)

4

•Pelanggan Tersambung untuk 1 Transformator sebanyak :

174 pelanggan (investasi = ± Rp. 125 jt)

5

•Sumber daya ekomomi masyarakat (Pertanian, pedangan

tenun ikat, pabriakan es batu)

6

•Banyak daerah yang harus melintasi atau melewati

kawasan hutan yang membutuhkan proses perijinan

• Rasio Elektrifikasi s/d OKTOBER 2015

DUKUNGAN :

1

• Penguatan / Penambahan Alokasi Anggaran

2

• Kemudahan dan percepatan perijinan

3

• Komunikasi politik anggaran

RE (%)

JUML. PEL.

JUML. PEL.

JUML. PEL.

RE (%)

RE (%)

TOTAL

RT PLN

RT NON PLN

RT TOTAL

PLN

TOTAL

1

2

8=6/3

9

10

11

12=10+11

13=10/9

14=12/9

Kota Kupang

99.32

93,090

90,137

447

90,584

96.83

97.31

Kupang

55.90

69,217

33,299

2,592

35,891

48.11

51.85

Sabu Raijua

23.97

25,028

4,946

916

5,862

19.76

23.42

Timor Tengah Selatan

49.16

109,322

43,705

4,670

48,375

39.98

44.25

Timor Tengah Utara

69.25

57,132

30,309

6,600

36,909

53.05

64.60

Belu & Malaka

45.43

81,484

33,945

3,510

37,455

41.66

45.97

Alor

68.30

46,063

27,670

3,160

30,830

60.07

66.93

Rote Ndao

81.42

32,184

22,974

2,309

25,283

71.38

78.56

Ende

79.28

56,436

39,986

3,119

43,105

70.85

76.38

Ngada

97.87

33,247

26,068

2,015

28,083

78.41

84.47

Nagekeo

57.37

27,122

14,445

1,613

16,058

53.26

59.21

Manggarai

59.49

68,790

27,576

4,312

31,888

40.09

46.36

Manggarai Timur

39.94

57,311

19,116

6,892

26,008

33.36

45.38

Manggarai Barat

46.28

53,982

14,928

6,568

21,496

27.65

39.82

Sikka

66.38

68,902

39,658

3,246

42,904

57.56

62.27

Flores Timur

92.20

56,477

43,977

7,543

51,520

77.87

91.22

Lembata

75.17

30,984

17,018

4,842

21,860

54.92

70.55

Sumba Timur

50.99

51,599

21,712

3,305

25,017

42.08

48.48

Sumba Barat

42.83

21,876

7,670

692

8,362

35.06

38.22

Sumba tengah

29.75

12,859

3,302

653

3,955

25.68

30.76

Sumba Barat Daya

29.63

51,734

13,225

953

14,178

25.56

27.41

61.81

1,104,837

575,666

69,957

645,623

52.10

58.44

NUSA

TENGGARA

TIMUR

TOTAL

JUMLAH RUMAH

TANGGA

PROPINSI

KABUPATEN

TARGET

2015

REALISASI

Oct-15

(11)

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

Calendar Year

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

Total Population (10^3)

5,037

5,120

5,204

5,287

5,372

5,456

5,541

5,627

5,713

5,799

5,885

5,971

Jumlah KK (10^3)

1,104.51

1,131.61

1,158.70

1,185.52

1,212.34

1,238.60

1,264.87

1,291

1,317

1,343

1,369

1,394

- Growth Rate (%)

1.3

1.7

1.6

1.6

1.6

1.6

1.6

1.5

1.5

1.5

1.5

1.5

Growth of Total GDP (%)

5.0

5.8

6.6

7.1

7.5

8.0

6.4

6.4

6.4

6.4

6.4

6.4

Electrification Ratio (% )

55.5

57.8

63.2

65.7

68.7

70.9

73.2

76.3

79.3

82.4

85.5

88.6

Energy Sales (GWh)

702.3

772.1

851.0

941.4

1,044.2

1,156.9

1,259.3

1,369.0

1,485.2

1,608.3

1,738.6

1,876.7

- Growth Rate (%)

9.8

9.9

10.2

10.6

10.9

10.8

8.8

8.7

8.5

8.3

8.1

7.9

-- Residential

424.6

466.9

511.4

560.7

617.1

676.5

730.2

790.1

853.1

919.4

989.3

1,062.9

-- Commercial

178.9

196.8

217.6

240.8

266.5

295.5

321.2

348.3

377.0

407.3

439.2

473.0

-- Public

73.4

80.3

89.3

100.1

112.7

127.6

140.3

154.0

168.9

185.1

202.6

221.4

-- Industrial

25.4

28.0

32.7

39.8

47.9

57.3

67.6

76.5

86.2

96.5

107.6

119.4

Power Contracted (MVA)

613.6

683.6

754.1

831.6

921.3

1,012.3

1,095.9

1,191.9

1,292.7

1,398.5

1,509.8

1,626.8

-- Residential PLN

437.1

492.7

545.5

603.3

671.0

737.2

798.8

871.6

947.9

1,027.7

1,111.5

1,199.4

-- Commercial

107.5

116.1

125.6

136.0

147.2

159.4

170.7

182.4

194.6

207.3

220.6

234.5

-- Public

54.1

57.8

62.3

67.6

73.7

80.8

86.9

93.5

100.5

108.1

116.3

125.0

-- Industrial

15.0

17.1

20.6

24.6

29.4

34.9

39.5

44.4

49.6

55.3

61.4

67.9

- Growth Rate (%)

16.6

11.4

10.3

10.3

10.8

9.9

8.3

8.8

8.5

8.2

8.0

7.8

Number of Customer

730,287

778,656

864,864

919,568

982,097

1,035,550

1,090,571

1,157,658

1,226,200

1,296,153

1,367,729

1,440,939

-- Total Residential

613,354

653,818

732,100

778,839

833,364

878,767

925,688

984,649

1,045,035

1,106,822

1,170,224

1,235,241

-- Commercial

30,104

31,616

33,132

34,655

36,186

37,725

39,274

40,828

42,388

43,949

45,512

47,079

-- Public

86,692

93,084

99,492

105,931

112,400

118,907

125,453

132,022

138,615

145,214

151,822

158,445

-- Industrial

137

137

140

143

147

151

156

159

163

167

171

175

- Growth Rate (%)

15.2

6.6

11.1

6.3

6.8

5.4

5.3

6.2

5.9

5.7

5.5

5.4

Total Production (GWh)

783.8

873.6

975.4

1,088.1

1,215.0

1,346.9

1,453.0

1,566.8

1,701.9

1,844.4

1,980.1

2,132.6

Energy Requirement (GWh)

749.5

820.6

903.6

998.6

1,106.7

1,224.9

1,332.0

1,446.7

1,568.1

1,697.1

1,833.7

1,979.4

Station Use (%)

3.3

6.1

7.4

8.2

8.9

9.1

8.3

7.7

7.9

8.0

7.4

7.2

T & D Losses (%) +)

6.30

5.91

5.82

5.73

5.65

5.55

5.46

5.37

5.29

5.24

5.19

5.19

Load Factor (%)

55.4

55.1

55.2

55.3

55.3

55.4

55.5

55.5

55.6

55.7

55.7

55.8

Peak Load (MW)

161.4

180.8

201.7

224.71

250.6

277.5

299.0

322.02

349.4

378.2

405.5

436.21

============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========

RENCANA PENGEMBANGAN SISTEM KELISTRIKAN PLN NTT

2016 - 2025

(12)
(13)
(14)
(15)

PERKEMBANGAN DAN TARGET ENERGY MIX PEMBANGKIT TENAGA LISTRIK

PLN WILAYAH NTT TAHUN 2015 – 2020

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2013

2014

2015

2016

2017

2018

2019

2020

URAIAN

2013

2014

2015

2016

2017

2018

2019

2020

BBM

96%

83%

80%

72%

54%

27%

16%

17%

Batubara

0%

10%

14%

16%

24%

42%

42%

38%

PLTMG

0%

0%

0%

0%

6%

11%

21%

22%

Panas Bumi

2%

4%

4%

5%

6%

7%

8%

10%

PLTA / PLTMH

2%

3%

3%

7%

8%

12%

12%

11%

PLTS

0.02%

0.05%

0.07%

0.5%

1.0%

1.3%

1.5%

1.8%

(16)

s/d

2008

s/d

2009

s/d

2011

s/d

2013

s/d

2015

2 PLTS

hybrid

(BPPT&

PEMDA)

1 PLTS on grid

(Lembata)

1 PLTS

smart grid

(Bilacenge)

6 PLTS Off grid

5 PLTS IPP On grid

94

PLTS

Off

grid

(17)

S

PENGEMBANGAN PLTS DI PLN WILAYAH NTT

S S S S S S S S S S S S S S

PLTS IPP ON GRID

ATAMBUA

KAP. 1 MWp

PLTS OFF GRID

PURA - ALOR

KAP. 175 KWp

PLTS OFF GRID

WINI

KAP. 60 KWp

PLTS OFF GRID

NULE - ALOR

KAP. 250 KWp

PLTS ON GRID

LEMBATA

KAP. 200 KWp

PLTS IPP ON GRID

MAUMERE

KAP. 1 MWp

PLTS IPP ON GRID

LABUAN BAJO

KAP. 1 MWp

PLTS OFF GRID

SOLOR BARAT

KAP. 275 KWp

PLTS IPP ON GRID

ENDE

KAP. 1 MWp

PLTS ON GRID

BILACENGE

KAP. 500 KWp

PLTS IPP ON GRID

SUMBA TIMUR

KAP. 1 MWp

PLTS IPP ON GRID

KUPANG

KAP. 5 MWp

PLTS OFF GRID

SEMAU

KAP. 450 KWp

PLTS OFF GRID

RAIJUA

KAP. 150 KWp

PLTS OFF GRID

NEMBERALA

KAP. 50 KWp

PLTS ON GRID

SALURA

KAP. 150 KWp

S

BEROPERASI

RENCANA

(18)
(19)

L/O/G/O

PT PLN (PERSERO) WILAYAH NTT

(20)

www.themegallery.com

LATAR BELAKANG

PROSES PEMBANGUNAN PLTS IPP KUPANG 5 MWP

1

2

EVALUASI PEMBEBANAN PLTS IPP KUPANG

3

HASIL PRODUKSI PLTS IPP KUPANG

4

HAL-HAL YANG DIPERHATIKAN PENGOPERASIAN PLTS

KESIMPULAN DAN SARAN

5

IMPLEMENTASI P2MS

(21)

www.themegallery.com

Proses Pembangunan PLTS IPP Kupang 5 MWp

No

Kegiatan

Pelaksana

Aktual

Ket

1

Penetapan pemenang

EBTKE

24-Jan-14

2

Penugasan Pembelian Tenaga Listrik Kepada PT

PLN (Persero)

MESDM

20-Okt-14

3

Pengurusan Izin-izin yang dibutuhkan (Status Tanah,

Izin Lokasi, Izin Lingkungan, dll)

PT LEN

4

Studi Interkoneksi PLTS IPP Kupang 5 MWp

PT LEN

5

Rekomendasi Studi Interkoneksi PLTS IPP Kupang

5 MWp

PT PLN Wil NTT 21-Nov-14

6

Izin Usaha Penyedian Tenaga Listrik Sementara

untuk PT Len

DJK

03-Des-14

7

Izin Prinsip Pembelian Tenaga Listrik PLTS IPP

Kupang 5 MWp

DIREKSI PLN 22-Des-14

8

Penyerahan Jaminan Pelaksanaan Tahap I

PT LEN

22-Des-14

9

TTD Perjanjian Pembelian Energi Listrik

PT PLN NTT –

PT LEN

09-Jan-15

10 Ujicoba Operasi dengan Sistem Kupang

PT PLN NTT –

PT LEN

08-Des-15

(22)

www.themegallery.com

1. Asumsi Interpolasi Dari 20 kW Menjadi 5 MW

Perbedaan output daya

selama 1 menit dapat

mencapai 44.4%

Pada sistem 5 MW, perbedaan

ini setara dengan fluktuasi

sebesar 2,22 MW dalam waktu

1 menit

Dimungkinkan adanya

perubahan yang lebih besar

Hal-hal yang harus diperhatikan Pada Pengoperasian

PLTS IPP Kupang 5 MWp

(23)

www.themegallery.com

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 PLTU BOLOK 13,410 13,400 13,500 13,700 13,420 13,520 13,340 13,500 13,550 13,650 13,500 13,240 13,500 13,500 13,200 13,200 13,100 13,050 13,200 13,380 13,500 13,300 13,000 13,420 PLTD KUANINO - - - - 1,200 1,200 - - 2,200 2,200 2,200 2,200 2,200 -PLTS TENAU 2,000 2,300 2,300 2,500 2,300 2,300 2,300 2,500 2,300 2,500 2,100 3,300 2,100 3,200 2,200 2,000 2,300 4,400 4,500 4,500 4,500 4,500 4,100 4,300 PLTD SEWA 25,823 25,289 22,401 21,262 21,285 20,085 20,048 20,425 23,030 23,176 23,150 23,090 23,663 23,591 24,650 25,900 27,110 28,565 30,750 30,750 30,750 30,750 26,647 26,359 PLTS IPP KUPANG - - - - 1,000 1,200 900 1,800 2,600 2,300 4,300 3,400 2,900 1,200 700 - - - -TOTAL BEBAN 41,233 40,989 38,201 37,462 37,005 35,905 36,688 37,625 39,780 41,126 41,350 41,930 43,563 43,691 44,150 43,500 43,210 46,015 50,650 50,830 50,950 50,750 45,947 44,079 FREKUENSI (HZ) 50.07 50.13 50.11 50.03 50.03 50.10 50.18 50.22 50.11 50.00 50.23 50.31 50.11 50.17 50.21 49.81 50.22 49.99 49.81 50.00 49.88 50.01 50.01 49.83

BEBAN SISTEM KUPANG pada TANGGAL 19 DESEMBER 2015

DM : 46,1 MW

BP Siang : 43,9 MW

BT Siang : 37,2 MW

Beban

Waktu

PLTS

PLTU

PLTD SEWA

(24)

www.themegallery.com

Evaluasi Pembebanan PLTS IPP KUPANG 5 MWp

Tanggal, 19 Desember 2015

Waktu P ( KW ) F ( Hz ) KET 6:00 278 50.10 5 MWp 6:15 352 50.10 5 MWp 6:30 690 50.10 5 MWp 6:45 1,003 50.10 5 MWp 7:00 1,300 50.20 5 MWp 7:15 914 50.20 5 MWp 7:30 2,210 50.20 5 MWp 7:45 1,800 50.20 5 MWp 8:00 1,300 50.20 5 MWp 8:15 1,200 50.20 5 MWp 8:30 900 50.10 5 MWp 8:45 635 50.10 5 MWp 9:00 937 50.10 5 MWp 9:15 1,700 50.10 5 MWp 9:30 2,100 50.10 5 MWp 9:45 2,100 50.10 5 MWp 10:00 2,600 50.10 5 MWp 10:15 2,600 50.20 5 MWp 10:30 2,600 50.00 5 MWp 10:45 4,000 50.00 5 MWp 11:00 4,200 50.20 5 MWp 11:15 4,600 50.20 5 MWp 11:30 4,200 50.30 5 MWp 11:45 4,200 50.10 5 MWp 12:00 3,500 50.20 5 MWp 12:15 4,100 50.10 5 MWp 12:30 4,100 50.20 5 MWp 12:45 4,200 50.20 5 MWp 13:00 4,200 50.20 5 MWp 13:15 3,900 50.10 5 MWp 13:30 3,900 50.10 5 MWp 13:45 3,800 50.20 5 MWp 14:00 3,400 50.30 5 MWp 14:15 2,000 50.10 5 MWp 14:30 1,500 49.80 5 MWp 14:45 2,520 50.20 5 MWp 15:00 3,300 50.30 5 MWp 15:15 2,130 50.20 5 MWp 15:30 1,850 50.10 5 MWp 15:45 1,210 50.20 5 MWp 16:00 1,820 50.30 5 MWp 16:15 936 49.90 5 MWp 16:30 916 50.00 5 MWp 16:45 880 50.00 5 MWp 17:00 705 50.10 5 MWp 17:15 418 50.20 5 MWp 17:30 278 50.10 5 MWp

Catatan :

- DM : 46,1 MW

- BP Siang : 43,9 MW

- BT Siang : 37,2 MW

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 19 Des. 2015

- Total Produksi : 27.540 kWh

- Radiasi Matahari : 5,5 kWh/m

2

/hari

(25)

www.themegallery.com

Catatan :

- DM : 52,25 MW

- BP Siang : 50,60 MW

- BT Siang : 40,11 MW

Waktu P ( KW ) F ( Hz ) KET 6:00 2 MWp 6:15 2 MWp 6:30 2 MWp 6:45 150 50.20 2 MWp 7:00 232 50.30 2 MWp 7:15 350 50.30 2 MWp 7:30 450 50.20 2 MWp 7:45 572 50.00 2 MWp 8:00 789 50.10 2 MWp 8:15 907 50.10 2 MWp 8:30 988 49.90 2 MWp 8:45 1,079 50.20 2 MWp 9:00 1,167 50.00 2 MWp 9:15 1,234 50.10 2 MWp 9:30 1,337 50.10 2 MWp 9:45 1,339 50.10 2 MWp 10:00 1,371 50.00 2 MWp 10:15 1,448 50.20 2 MWp 10:30 1,482 50.10 2 MWp 10:45 1,529 50.10 2 MWp 11:00 1,584 50.10 2 MWp 11:15 1,590 50.10 2 MWp 11:30 1,604 50.00 2 MWp 11:45 1,620 50.00 2 MWp 12:00 1,648 50.00 2 MWp 12:15 1,629 50.20 2 MWp 12:30 1,653 50.20 2 MWp 12:45 1,653 50.10 2 MWp 13:00 1,576 50.10 2 MWp 13:15 1,595 50.10 2 MWp 13:30 1,546 50.10 2 MWp 13:45 1,512 50.10 2 MWp 14:00 1,449 50.00 2 MWp 14:15 1,393 50.00 2 MWp 14:30 1,313 50.00 2 MWp 14:45 1,308 50.00 2 MWp 15:00 1,256 49.90 2 MWp 15:15 1,220 50.00 2 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 20 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m

2

/hari

- Jadi dalam setahun : 3,687 MWh

Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp

Tanggal, 20 Januari 2016

(26)

www.themegallery.com

Catatan :

- DM : 52,25 MW

- BP Siang : 50,60 MW

- BT Siang : 40,11 MW

Waktu P ( KW ) F ( Hz ) KET 6:00 2 MWp 6:15 2 MWp 6:30 2 MWp 6:45 164 50.40 2 MWp 7:00 229 50.30 2 MWp 7:15 317 50.20 2 MWp 7:30 450 50.00 2 MWp 7:45 583 49.90 2 MWp 8:00 688 50.10 2 MWp 8:15 800 50.00 2 MWp 8:30 900 50.10 2 MWp 8:45 1,010 50.00 2 MWp 9:00 1,100 50.00 2 MWp 9:15 1,176 50.00 2 MWp 9:30 1,258 50.00 2 MWp 9:45 1,336 50.10 2 MWp 10:00 1,423 50.20 2 MWp 10:15 1,486 50.10 2 MWp 10:30 1,806 50.30 2 MWp 10:45 1,853 50.20 2 MWp 11:00 1,827 50.00 2 MWp 11:15 1,750 50.10 2 MWp 11:30 596 50.10 2 MWp 11:45 1,820 50.30 2 MWp 12:00 1,010 50.20 2 MWp 12:15 1,902 50.10 2 MWp 12:30 1,823 50.00 2 MWp 12:45 1,822 50.00 2 MWp 13:00 1,829 50.20 2 MWp 13:15 649 50.20 2 MWp 13:30 450 50.00 2 MWp 13:45 1,543 50.10 2 MWp 14:00 640 49.80 2 MWp 14:15 1,553 50.00 2 MWp 14:30 1,470 49.90 2 MWp 14:45 1,796 50.00 2 MWp 15:00 1,495 49.90 2 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 21 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m

2

/hari

- Jadi dalam setahun : 3,687 MWh

Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp

Tanggal, 21 Januari 2016

(27)

www.themegallery.com

Proyeksi Produksi PLTS KUPANG 5 MWp

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 19 Des. 2015

- Total Produksi : 27.540 kWh

- Radiasi Matahari : 5,5 kWh/m

2

/hari

- Jadi dalam setahun : 9,914 MWh

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 20 Jan. 2016

- Total Produksi : 11.027 kWh

- Radiasi Matahari : 5,54 kWh/m

2

/hari

- Jadi dalam setahun : 3,986 MWh

Evaluasi Produksi kWh dalam 1 Tahun

Sesuai Data Tgl 21 Jan. 2016

- Total Produksi : 10.261 kWh

- Radiasi Matahari : 5,12 kWh/m

2

/hari

(28)

www.themegallery.com

Total Produksi Bulan Januari 2016 : 231,834 KWH

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

PRODUKSI

(29)

www.themegallery.com

Kesimpulan dan Saran PLTS IPP Kupang 5 MWp

Pengoperasian PLTS IPP Kupang 5

MWp tercapai apa bila sistem Kupang

pada siang hari tidak mengalami

pemadaman bergilir.

Pembangkit pada sistem Kupang

harus memenuhi N-1, sehingga PLTS

5 MWp dapat dioperasikan secara

optimal.

Diusulkan untuk menjaga keandalan

sistem Kupang pada saat cuaca

mendung harus mempunyai back up

daya (batere)

(30)

www.themegallery.com

(31)

Referensi

Dokumen terkait

Berdasarkan perbincangan diatas berkaitan isu kecerdasan emosi yang mempengaruhi gejala delinkuensi dalam kalangan remaja, pembolehubah-pembolehubah yang berkaitan dengan

Etika merupakan suatu ilmu yang membahas perbuatan baik dan buruk manusia sejauh yang dapat dipahami oleh pikiran manusia.Dan etika profesi terdapat suatu kesadaran

ukositis oral didefinisikan sebagai suatu lesi eritem dan ulserasi di mukosa oral yang terjadi pada pasien dengan kanker yang dira3at dengan kemoterapi dan4atau radiasi di daerah

Beasiswa PPA wajib melampirkan fotokopi transkrip nilai dengan Indeks Prestasi Kumulatif (IPK) paling rendah 3,00 yang disahkan oleh pimpinan perguruan tinggi. Bantuan Biaya

1) Pendataan Sasaran Ibu Hamil (Baseline data); 2) Perencanaan kebutuhan tablet Fe (zat besi); 3) Pengadaan dan pendistrubusian tablet Fe; 4) Penggandaan Buku Pedoman dan Juknis;

Kemudian manajemen persediaan adalah bahan atau barang yang disimpan yang akan digunakan untuk memenuhi tujuan tertentu, misalnya untuk digunakan dalam proses produksi

Sedangkan pada tahun kedua, pemberian 300 g N/tanamanltahun nyata meningkatkan konsentarsi N pada kulit buah dibandingkan kontrol, tetapi tidak berbeda nyata

Reaksi sikloadisi yang paling umum adalah siklisasi [4π + 2π] yang dikenal sebagai reaksi Diels-Alder!. Dalam terminologi Diels-Alder, dua reaktan disebut sebagai diena