RENCANA PENGEMBANGAN GRID
PULAU KECIL SOLAR PV DAN PV DIESEL
DI PROVINSI NUSA TENGGARA TIMUR
PETA PROVINSI NUSA TENGGARA TIMUR
Kotamadya
Kabupaten
Kecamatan
Desa
/Kelurahan
1
21
306
3268
Jumlah Jiwa
5.356.567
GEOGRAFIS : KEPULAUAN
NAMA PULAU TERDEPAN DI PROPINSI NUSA TENGGARA TIMUR
(Perbatasan T.leste & Australia)
Pulau Dana Rote (Kab. Rote Ndao)
Pulau Dana Sabu ( Kab. Sabu Raijua)
Pulau Manggudu (Kab. Sumba Timur)
Pulau Batek (Kab. Kupang)
AREA
KUPANG
AREA
SUMBA
AREA
FBT
AREA
FBB
SEKTOR
NTT
Tarif
Pembangkit
Unit Area
2008
2009
2010
2011
2012
2013
Kupang
120.595
122.331
130.331
176.808
243.029
269.821
Growth (%)
8,9%
1,4%
6,5%
35,7%
37,5%
11,0%
Flores Bagian Barat
58.807
60.539
65.729
89.881
127.962
145.835
Growth (%)
9,8%
2,9%
8,6%
36,7%
42,4%
14,0%
Sumba
21.037
21.581
24.341
31.866
57.449
48.348
Growth (%)
11,8%
2,6%
12,8%
30,9%
80,3%
-15,8%
Flores Bagian Timur
45.917
49.104
54.041
77.471
95.603
99.842
Growth (%)
12,7%
6,9%
10,1%
43,4%
23,4%
4,4%
Wilayah NTT
246.356
253.555
274.442
376.026
524.043
563.846
Growth (%)
10,0%
2,9%
8,2%
37,0%
39,4%
7,6%
PELANGGAN
Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016
D D D D DSISTEM RUTENG
D. MAMPU : 7,28 MW
B. MALAM : 8,47 MW
DEFISIT : -1,19 MW
SISTEM AESESA
D. MAMPU : 2,55 MW
B. MALAM : 2,29 MW
CAD. : 0,26 MW
D D D D D D D D D D D D D DSISTEM LARANTUKA
D. MAMPU : 3,70
MW
B. MALAM : 4,17 MW
DEFISIT : -0,47 MW
SISTEM ADONARA
D. MAMPU : 2,70 MW
B. MALAM : 3,39 MW
DEFISIT : -0,69 MW
SISTEM LEMBATA
D. MAMPU : 3,10 MW
B. MALAM : 2,91 MW
CAD. : 0,19 MW
SISTEM KALABAHI
D. MAMPU : 4,92 MW
B. MALAM : 4,16 MW
CAD. : 0,76 MW
SISTEM ATAMBUA
D. MAMPU : 7,60 MW
B. MALAM : 7,90 MW
DEFISIT : - 0,30 MW
SISTEM KEFAMENANU
D. MAMPU : 4,77 MW
B. MALAM : 4,41 MW
CAD. : 0,36 MW
SISTEM SO’E
D. MAMPU : 5,12 MW
B. MALAM : 5,00 MW
CAD. : 0,12 MW
SISTEM KUPANG
D. MAMPU : 49,23 MW
B. MALAM : 53,40 MW
DEFISIT : -4,17 MW
SISTEM ROTE
D. MAMPU : 3,50 MW
B. MALAM : 3,28 MW
CAD. : 0,22 MW
SISTEM SABU
D. MAMPU : 1,28 MW
B. MALAM : 1,16 MW
CAD. : 0,12 MW
SISTEM MAUMERE
D. MAMPU : 11,50 MW
B. MALAM : 10,95 MW
CAD. : 0,55 MW
SISTEM ENDE
D. MAMPU : 7,35 MW
B. MALAM : 9,49 MW
DEFISIT : -2,14 MW
SISTEM WAINGAPU
D. MAMPU : 6,35 MW
B. MALAM : 5,64 MW
CAD. : 0,71 MW
SISTEM WAIKABUBAK
+ WAITABULA
D. MAMPU : 5,32 MW
B. MALAM : 6,52 MW
DEFISIT : -1,20 MW
SISTEM BAJAWA
D. MAMPU : 5,00 MW
B. MALAM : 5,60 MW
DEFISIT : -0,60 MW
SISTEM LABUAN BAJO
D. MAMPU : 4,40 MW
B. MALAM : 4,20 MW
CAD. : 0,20 MW
AREA FBB
AREA FBT
AREA KUPANG
AREA SUMBA
SISTEM BETUN
D. MAMPU : 2,59 MW
B. MALAM : 2,39 MW
CAD. : 0,20 MW
1. Berdasarkan Pembangkit
2. Berdasarkan Area Kerja
• Pasokan energi primer didominasi bahan
bakar fosil :
59,12 % dari BBM PLTD Sewa,
20,49 % dari BBM PLTD sendiri,
13,98 % dari PLTU,
3,53 % dari PLTP,
2,80 % dari PLTM/PLTMH,
0,07 % dari PLTS
Status Komposisi Pembangkit PLN NTT ( Desember 2015)
• Pasokan Energi Listrik Berdasarkan Area
Kerja yang didominasi oleh :
1. Area Kupang : 58,28 %
2. Area FBB
: 20,07 %
3. Area FBT
: 14,44 %
4. Area Sumba : 7,21 %
2010
26,40%
2011
41,55%
2012
53,22%
2013
54,77%
2014
58,53%
Okt
2015
58,44%
2016
63,2%
2017
65,7%
2018
68,7%
2019
70,9%
2020
73,2%
~
~
PEMETAAN PER KABUPATEN
Sumba Barat Daya
57,051 KK
5,254 plg RT
66 Desa
Sumba
Barat&Tengah
37,361 KK
5,107 plg RT
53 Desa
Sumba Timur
49,549 KK
12,259 plg RT
86 Desa
Manggarai
Barat
45,706 KK
2,990 plg RT
96 Desa
Manggarai&Ma nggarai Timur112,225 KK
14,865 plg RT
175 Desa
Nagekeo
27,730 KK
5,299 plg RT
42 Desa
Ngada
29,172 KK
15,172 plg RT
36 Desa
Ende
51,716 KK
27,154 plg RT
97 Desa
Sikka
60,583 KK
22,400 plg RT
65 Desa
Flores Timur
51,560 KK
22,490 plg RT
117 Desa
Lembata
23,210 KK
8,642 plg RT
67 Desa
Alor
39,549 KK
10,354 plg RT
112 Desa
Rote Ndao
25,812 KK
7,604 plg RT
36 Desa
TTS
90,712 KK
15,071 plg RT
125 Desa
Kupang&Sabu
85,509 KK
14,625 plg RT
72 Desa
Kota Kupang
63,518 KK
56,532 plg RT
-
Belu
95,954 KK
11,782 plg RT
123 Desa
TTU
47,212 KK
10,210 plg RT
72 Desa
Proyeksi KK 2011 menurut BPS
Jml plg Rumah Tangga (III-09 Juni 2011)
KENDALA :
1
• Banyaknya KK tidak sebanding dengan banyaknya
rumah, misalnya : 2-3 KK dalam 1 rumah
2
• Pelanggan Tersambung untuk 1 kms SUTM sebanyak
: 105 pelanggan (investasi = ± Rp. 300 jt)
3
•Pelanggan Tersambung untuk 1 kms SUTR sebanyak : 104
pelanggan (investasi = ± Rp. 200 jt)
4
•Pelanggan Tersambung untuk 1 Transformator sebanyak :
174 pelanggan (investasi = ± Rp. 125 jt)
5
•Sumber daya ekomomi masyarakat (Pertanian, pedangan
tenun ikat, pabriakan es batu)
6
•Banyak daerah yang harus melintasi atau melewati
kawasan hutan yang membutuhkan proses perijinan
• Rasio Elektrifikasi s/d OKTOBER 2015
DUKUNGAN :
1
• Penguatan / Penambahan Alokasi Anggaran
2
• Kemudahan dan percepatan perijinan
3
• Komunikasi politik anggaran
RE (%)
JUML. PEL.
JUML. PEL.
JUML. PEL.
RE (%)
RE (%)
TOTAL
RT PLN
RT NON PLN
RT TOTAL
PLN
TOTAL
1
2
8=6/3
9
10
11
12=10+11
13=10/9
14=12/9
Kota Kupang
99.32
93,090
90,137
447
90,584
96.83
97.31
Kupang
55.90
69,217
33,299
2,592
35,891
48.11
51.85
Sabu Raijua
23.97
25,028
4,946
916
5,862
19.76
23.42
Timor Tengah Selatan
49.16
109,322
43,705
4,670
48,375
39.98
44.25
Timor Tengah Utara
69.25
57,132
30,309
6,600
36,909
53.05
64.60
Belu & Malaka
45.43
81,484
33,945
3,510
37,455
41.66
45.97
Alor
68.30
46,063
27,670
3,160
30,830
60.07
66.93
Rote Ndao
81.42
32,184
22,974
2,309
25,283
71.38
78.56
Ende
79.28
56,436
39,986
3,119
43,105
70.85
76.38
Ngada
97.87
33,247
26,068
2,015
28,083
78.41
84.47
Nagekeo
57.37
27,122
14,445
1,613
16,058
53.26
59.21
Manggarai
59.49
68,790
27,576
4,312
31,888
40.09
46.36
Manggarai Timur
39.94
57,311
19,116
6,892
26,008
33.36
45.38
Manggarai Barat
46.28
53,982
14,928
6,568
21,496
27.65
39.82
Sikka
66.38
68,902
39,658
3,246
42,904
57.56
62.27
Flores Timur
92.20
56,477
43,977
7,543
51,520
77.87
91.22
Lembata
75.17
30,984
17,018
4,842
21,860
54.92
70.55
Sumba Timur
50.99
51,599
21,712
3,305
25,017
42.08
48.48
Sumba Barat
42.83
21,876
7,670
692
8,362
35.06
38.22
Sumba tengah
29.75
12,859
3,302
653
3,955
25.68
30.76
Sumba Barat Daya
29.63
51,734
13,225
953
14,178
25.56
27.41
61.81
1,104,837
575,666
69,957
645,623
52.10
58.44
NUSA
TENGGARA
TIMUR
TOTAL
JUMLAH RUMAH
TANGGA
PROPINSI
KABUPATEN
TARGET
2015
REALISASI
Oct-15
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
Calendar Year
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
Total Population (10^3)
5,037
5,120
5,204
5,287
5,372
5,456
5,541
5,627
5,713
5,799
5,885
5,971
Jumlah KK (10^3)
1,104.51
1,131.61
1,158.70
1,185.52
1,212.34
1,238.60
1,264.87
1,291
1,317
1,343
1,369
1,394
- Growth Rate (%)
1.3
1.7
1.6
1.6
1.6
1.6
1.6
1.5
1.5
1.5
1.5
1.5
Growth of Total GDP (%)
5.0
5.8
6.6
7.1
7.5
8.0
6.4
6.4
6.4
6.4
6.4
6.4
Electrification Ratio (% )
55.5
57.8
63.2
65.7
68.7
70.9
73.2
76.3
79.3
82.4
85.5
88.6
Energy Sales (GWh)
702.3
772.1
851.0
941.4
1,044.2
1,156.9
1,259.3
1,369.0
1,485.2
1,608.3
1,738.6
1,876.7
- Growth Rate (%)
9.8
9.9
10.2
10.6
10.9
10.8
8.8
8.7
8.5
8.3
8.1
7.9
-- Residential
424.6
466.9
511.4
560.7
617.1
676.5
730.2
790.1
853.1
919.4
989.3
1,062.9
-- Commercial
178.9
196.8
217.6
240.8
266.5
295.5
321.2
348.3
377.0
407.3
439.2
473.0
-- Public
73.4
80.3
89.3
100.1
112.7
127.6
140.3
154.0
168.9
185.1
202.6
221.4
-- Industrial
25.4
28.0
32.7
39.8
47.9
57.3
67.6
76.5
86.2
96.5
107.6
119.4
Power Contracted (MVA)
613.6
683.6
754.1
831.6
921.3
1,012.3
1,095.9
1,191.9
1,292.7
1,398.5
1,509.8
1,626.8
-- Residential PLN
437.1
492.7
545.5
603.3
671.0
737.2
798.8
871.6
947.9
1,027.7
1,111.5
1,199.4
-- Commercial
107.5
116.1
125.6
136.0
147.2
159.4
170.7
182.4
194.6
207.3
220.6
234.5
-- Public
54.1
57.8
62.3
67.6
73.7
80.8
86.9
93.5
100.5
108.1
116.3
125.0
-- Industrial
15.0
17.1
20.6
24.6
29.4
34.9
39.5
44.4
49.6
55.3
61.4
67.9
- Growth Rate (%)
16.6
11.4
10.3
10.3
10.8
9.9
8.3
8.8
8.5
8.2
8.0
7.8
Number of Customer
730,287
778,656
864,864
919,568
982,097
1,035,550
1,090,571
1,157,658
1,226,200
1,296,153
1,367,729
1,440,939
-- Total Residential
613,354
653,818
732,100
778,839
833,364
878,767
925,688
984,649
1,045,035
1,106,822
1,170,224
1,235,241
-- Commercial
30,104
31,616
33,132
34,655
36,186
37,725
39,274
40,828
42,388
43,949
45,512
47,079
-- Public
86,692
93,084
99,492
105,931
112,400
118,907
125,453
132,022
138,615
145,214
151,822
158,445
-- Industrial
137
137
140
143
147
151
156
159
163
167
171
175
- Growth Rate (%)
15.2
6.6
11.1
6.3
6.8
5.4
5.3
6.2
5.9
5.7
5.5
5.4
Total Production (GWh)
783.8
873.6
975.4
1,088.1
1,215.0
1,346.9
1,453.0
1,566.8
1,701.9
1,844.4
1,980.1
2,132.6
Energy Requirement (GWh)
749.5
820.6
903.6
998.6
1,106.7
1,224.9
1,332.0
1,446.7
1,568.1
1,697.1
1,833.7
1,979.4
Station Use (%)
3.3
6.1
7.4
8.2
8.9
9.1
8.3
7.7
7.9
8.0
7.4
7.2
T & D Losses (%) +)
6.30
5.91
5.82
5.73
5.65
5.55
5.46
5.37
5.29
5.24
5.19
5.19
Load Factor (%)
55.4
55.1
55.2
55.3
55.3
55.4
55.5
55.5
55.6
55.7
55.7
55.8
Peak Load (MW)
161.4
180.8
201.7
224.71
250.6
277.5
299.0
322.02
349.4
378.2
405.5
436.21
============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
RENCANA PENGEMBANGAN SISTEM KELISTRIKAN PLN NTT
2016 - 2025
PERKEMBANGAN DAN TARGET ENERGY MIX PEMBANGKIT TENAGA LISTRIK
PLN WILAYAH NTT TAHUN 2015 – 2020
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2013
2014
2015
2016
2017
2018
2019
2020
URAIAN
2013
2014
2015
2016
2017
2018
2019
2020
BBM
96%
83%
80%
72%
54%
27%
16%
17%
Batubara
0%
10%
14%
16%
24%
42%
42%
38%
PLTMG
0%
0%
0%
0%
6%
11%
21%
22%
Panas Bumi
2%
4%
4%
5%
6%
7%
8%
10%
PLTA / PLTMH
2%
3%
3%
7%
8%
12%
12%
11%
PLTS
0.02%
0.05%
0.07%
0.5%
1.0%
1.3%
1.5%
1.8%
s/d
2008
s/d
2009
s/d
2011
s/d
2013
s/d
2015
2 PLTS
hybrid
(BPPT&
PEMDA)
1 PLTS on grid
(Lembata)
1 PLTS
smart grid
(Bilacenge)
6 PLTS Off grid
5 PLTS IPP On grid
94
PLTS
Off
grid
S