Perancangan dan Implementasi Sistem Informasi
Penentuan Begin Inventory (BI) pada PT. Genba Multi
Mineral
1)Irnawati Susanti, 2)Agustinus Fritz Wijaya Program Studi Sistem Informasi
Fakultas Teknologi Informasi Universitas Kristen Satya Wacana
Jl. Diponegoro 52-60 Salatiga
Email: ¹) 682009044@student.uksw.edu, ²) agustinus.fritz@gmail.com
Abstract
PT.Genba Multi Minerals can not be separated from the activities of the purchase and use of goods, spare parts or tools supporting other activities, in this case the warehouse that will handle the event. Processing of the data warehouse section still done manually where all of the data is recorded in the book of registers. This study will make use of information systems inventory Begin Inventory (BI) and Prototyping methods. System can provide stock information goods have reached the point of minimum inventory,the processinventoryin the purchasing process still takes a long time because of within the supplier and the company's far locations inventory reports and used reports of goods.
Keywords : Stock, Begin Inventory
Abstrak
PT.Genba Multi Mineral tidak lepas dari kegiatan pembelian dan pemakaian barang, sparepart ataupun alat penunjang kegiatan yang lain, dalam hal ini bagian gudang yang akan menangani kegiatan tersebut. Pengolahan data dibagian gudang masih dilakukan secara manual yang mana semua data dicatat dibuku register. Penelitian ini akan membuat sistem informasi persediaan barang menggunakan Begin Inventory(BI) dan metode prototyping. Sistem ini dapat memberikan informasi stock barang yang sudah mencapai titik minimum persediaan,proses persediaan barang yang dalam proses pembeliannya masih membutuhkan waktu yang cukup lama karena jarak antara supplier dan lokasi perusahaan yang jauh, laporan persediaan barang dan laporan pemakaian barang.
Keywords : Stock, Begin Inventory
1)
Mahasiswa Fakultas Teknologi Informasi Jurusan Sistem Informasi, Universitas Kristen Satya Wacana Salatiga.
2)