• Tidak ada hasil yang ditemukan

Selanjutnya

N/A
N/A
Protected

Academic year: 2017

Membagikan "Selanjutnya "

Copied!
18
0
0

Teks penuh

(1)

A.I.D. LOAN NO. 497-T-066E

A.I.D. LOAN NO. 497-V-097

AMENDMENT NO. 2 TO

LOAN AGREEMENT

BETWEEN THE

REPUBLIC OF INDONESIA

AND THE

UNITED STATES OF AMERICA

FOR

WESTERN UNIVERSITIES AGRICULTURAL EDUCATION

PROJECT

(2)

Dated:

September

29, 1987

This AMENDMENT NO. 2, is entered into between the REPUBLIC OF

INDONESIA ("Borrower") and the UNITED STATES OF AMERICA, acting

through the AGENCY FOR INTERNATIONAL DEVELOPMENT ("A. I.D. ").

WHEREAS, the Borrower and A.I.D. entered into a Western

Universities Agricultural Education Project Loan Agreement

designated as A.I.D. Loan No. 497-T-066 on May 20, 1981, which was

amended on July 26, 1985 ("Loan Agreement"), whereby A. I.D. agreed

to lend to the Borrower up to Twelve Million Four Hundred Fifty

Thousand United States ("U.S.") Dollars ($12,450,000) ("Loan"); and

WHEREAS, the Borrower and A.I.D. desire to amend the Loan

Agreement to add an additional Two Million Five Hundred Eighty Four

Thousand United States Dollars ($2,584,000), revise the Project

Assistance Completion Date, and to substitute a new Amplified

Project Description and Financial Plan;

NOW THEREFORE, the Borrower and A.I.D. hereby agree as follows:

1.

The first paragraph of Section 3.1. of the Loan Agreement is

revised to read as follows:

"Section 3.1.

The Loan.

To assist the Borrower to meet the

costs of carrying out the Project, A.I.D., pursuant to the Foreign

Assistance Act of 1961, as amended, agrees to lend to the Borrower

under the terms of this Agreement not to exceed Fifteen Million

Thirty Four Thousand United States ("U.S.") Dollars ($15,034,000)

(3)

2.

The Project Assistance Completion Date set forth in section

3.3.(a) of the Loan Agreement is revised to read: "May 31, 1991."

3.

A revised Annex I, Amplified Project Description, and

Financial Plan, is attached as Annex I to this Amendment.

4.

Except as amended herein, the Loan Agreement is ratified,

confirmed and continued in full force and effect in accordance with

all of its terms.

IN WITNESS WHEREOF, the Republic of Indonesia and the United

States of America, each acting through its respective duly

authorized representative, have caused this Amendment No. 2 to be

signed in their names and delivered as of the date first written

above.

REPUBLIC OF INDONESIA

Signed

Moeslim Sja'ron1

Acting Director General

for Foreign Economic Relations

Department of Foreign Affairs

UNITED STATES OF AMERICA

Signed

David

N.

Merrill

Director

(4)

AMPLIFIED PROJECT DESCRIPTION

Western Universities Agricultural Education (497-0297)

The Western Universities Agricultural Education Project is composed of two phases. Phase one was initiated in 1981 as a five year project to strengthen the faculties of agriculture and related disciplines in the eleven BKS-B (Association of Western Universities) institutions (North Sumatra University, Andalas University, Sriwijaya University, Syiah Kuala University, University of Riau, University of Jambi, Tanjungpura

University, Bengkulu University, University of Lampung, !KIP/Medan and !KIP/Padang. The University of Kentucky was designated as the

implementing U.S. institution.

Phase I was funded at approximately $18.0 million, of which the AID contribution totalled $9.85 million ($3.9 million in grant and $5.95 million in loan). Major AID financed inputs to the project include long term graduate level training in the United States; long and short term technical assistance; support to in-country staff development activities; and library text and reference materials. The Government of Indonesia

(GOI) financed inputs include operational support for project activities; graduate level training in Indonesia; staff and logistical support for the U.S. technical assistance team; and "in-kind" contribution of staff and facilities.

I. Project Description A. Project Goal and Purpose

Phase II will maintain the same goal as Phase I, i.e., to improve Indonesia's ability to feed its people and provide increasing social and economic welfare for the rural population. In support of GOI efforts to expand and improve the technical manpower base, the project will focus its efforts and resources on continuing to strengthen the cooperating BKS-B institutions in the Provinces of Sumatra and West Kalimantan.

Cognizant of assistance being provided to some of these

institutions by other donors, and building on the progress made during Phase I, the Project will, in Phase II, intensify resident technical assistance at the University of Syiah Kuala, the University of Lampung, the University of Riau and the University of Bengkulu. Continued English language training support will be provided to the Universities of Jamb!, Bengkulu, Tanjungpura, Sriwijaya, Riau and Lampung. The University of North Sumatra will receive one year of English support.

(5)

All of the BKS-B institutions will continue to participate in the networks, short courses and participant training opportunities. The intent of the project is to remain as responsive as possible to the needs of the BKS-B universities, as reflected by their current levels of

development and the external resources available to them.

The project purpose is to improve the capabilities of the institutions to contribute more effectively to agriculture and rural development by assisting the Director General of Higher Education (DGHE) to 1) upgrade staff and improve curricula, materials and instructional methods to produce better trained graduates and 2) develop, organize, carry out and expand programs of faculty research.

At the completion of the project, it is expected that the

universities' educational programs will be substantially strengthened as indicated by a significant number of staff having been upgraded through appropriate study programs; the development of improved curricula; the increasing use of class outlines, subject matter syllabi, texts,

supplementary readings and more appropriate teaching methods. This, in turn, will result in the preparation of better trained, higher quality graduates.

The research function will be significantly strengthened in Phase II by the return of an increasing number of faculty members with graduate degrees, more resident technical assistance advisors, the opportunity for a limited number of Ph.D. candidates to conduct their dissertation

research in Indonesia, the availability of a limited number of research internships for recently returned faculty, and increased availability of laboratory equipment.

'

B. Project Outputs (resulting from Phase II resources)

The first and most important output of the project continues to be better trained professional staff in the agricultural sciences and

supporting basic sciences. As a result of AID-provided resources,

approximately 170 MS and 32 PhD degrees will be earned by participants in the US, plus one PhD in a joint US-Indonesian "Sandwich" program. In addition opportunities are enhanced for approximately 20 women lecturers to obtain advanced degrees in Indonesia. As estimated 137 graduates degree will be earned by staff attending Indonesian institutions under GOI funding.

The second major output will be improvement in the quality of instruction at the undergraduate (S-1) level in agriculture and related basic sciences. Faculty returning with advanced degrees will be

(6)

WUAE/APD I.3

A third output is the continued establishment of faculty networks. Four networks are currently operating, with three more currently being planned. During Phase II, additional networks will be established in response to identified interests and needs. These networks represent an effective means of continuing staff development and program improvement by bringing together top specialists in selected fields from among the participating institutions for the purpose of identifying key problems within their disciplines and mounting systematic efforts to address these.

The fourth output is the development and presentation of

specialized short courses. These are directly related to the activities of the networks, respond to specific needs, and represent an effective and efficient means of in-service training.

The fifth output of this project is an expanded and improved research program directly relevant to the development needs of Indonesia. Such a research program is also vitally important to improving university curricula and course content. Increasingly, the results of the research will be disseminated through research pamphlets, published papers, and journal articles, as well as presentations at seminars and symposia.

The sixth output will be continued upgrading of teaching aids, laboratory equipment, and library resources needed to improve

instructional and research programs. Provision of needed equipment and related supplies is a major GO! contribution, but will be supplemented in selected priority areas with project loan funds. Such equipment and supplies are essential to support the teaching and research programs of returning faculty and the work of U.S. resident technical assistance teams.

A seventh output of the project is improved university and faculty planning, organization and administration. One tangible product will be preparation of specific faculty staffing plans for the next 5 to 10

years. By identifying and prioritizing staffing needs, these plans will serve as guides for staff recruitment and upgrading.

An eighth output of the project will be a strengthened, more "institutionalized" BKS-B, which will provide the organization and resources required to continue many important project-initiated and consortium-wide activities (e.g., short courses, networks, joint research) after completion of the project in August, 1990.

C. Project Components

1. Education and Training

The primary focus of this project in Phase II will be the

(7)

specific emphasis will be placed on expanding and improving undergraduate curricula and instruction. Initiating relevant research projects in order to meet better the needs of the community and region are

complementary to the emphasis on improved teaching.

It is increasingly recognized that achieving the needed

improvements in teaching and research will require strengthening of the supporting basic sciences (including laboratory facilities and

equipment), library resources and services, teaching materials and

methodology, university planning and administration, and English language programs.

Formal Education: In order to upgrade the skills of as many staff members as possible, a wide variety of education and training

opportunities are provided both abroad and in Indonesia. (On an exceptional basis, third country training will be considered.) The overseas training involves primarily Ph.D. and M.S. or M.A. degree programs in fields related to agriculture, the basic sciences and

selected supporting areas. Technical non-degree studies in the U.S. or third countries and intensive short courses in Indonesia will also be provided. An alternative training model that will be explored at the Ph.D. level is the "sandwich program." Under this model, the participant having completed basic course work in Indonesia, will attend a U.S.

university for approximately one year to take specific advanced courses. He/she will then return to the Indonesian university to complete the degree. In conjunction with graduate study in the U.S. participants may also participate in specialized short courses, workshops, and on-the-job training (OJT) opportunities offered by various universities, the U.S. Department of Agriculture and other government agencies, agribusinesses and the International Agriculture Research Centers (IARCs).

In-Country Research Opportunities: As part of graduate education and training programs, most participants will be required to complete a major research project. Most Ph.D. research will be conducted in the United States. However, in certain carefully selected cases, it will be desirable for participants who have completed their graduate course work and comprehensive examinations to return to Indonesia to collect data for their research and dissertations. For those approved by AID and the DGHE to conduct their field research in Indonesia, provision will be made using loan funds according to prescribed and approved budgets to finance the travel to Indonesia, research costs while in-country and return to the U.S. institution for the purpose of completing the dissertation. In exceptional cases, and when specifically provided for within the AID approval, loan funds may be used to meet the costs of in-country travel and maintenance for periods when research is being conducted away from the participants' home institutions, for example at the Inter-University Centers.

Selecting Participants for U.S. Graduate Study: The general

criteria and procedures established for Phase I remain valid and these or a modified version thereof, as agreed to by the PSC will be used in

(8)

WAE/APD

All participant screening committees are to include representatives from the Directorate General of Higher Education, AID, the BKS-B, and the University of Kentucky.

Spouse Training Grant funds of $120,000 have been committed to support the training of selected spouses of participants. This support will have two principal benefits. First, it will lessen the reluctance of otherwise viable candidates to undertake degree training in the U.S. due to the separation factor. Second, useful skills and experiences will be provided through training spouses, the vast majority of whom will be women. Program guidelines will be established jointly by AID and the GOI

to indicate the types of training allowed and conformance to development goals required prior to funding for any spouse training being approved.

Short Courses: Most of the short courses in Phase II will be organized and presented in Indonesia, where they can be tailored to specific conditions and needs. A survey will be undertaken to identify short course needs and determine priorities. To the greatest extent possible, short courses will be integrated into the expanding network activities.

2. English Language Training

In Phase I, a three tier approach was instituted for English language training. In Tier I, lecturers received English training at their home institutions at the beginning and intermediate levels. In Tier II, these participants attended an intensive course in Palembang for training at the intermediate and advanced levels. In Tier· III,

participants surpassing a TOEFL score of 475 left for the U.S. and

subsequently received an average of two months additional training in the U.S.

In Phase II, the English training program will continue to give first priority to meeting the needs and objectives of the WAE Project. (However, as resources allow and excess capacity is available, candidates for non-WAE funded overseas training programs may also participate.) Actions will be taken to continue improving the programs especially at

the Tier I and Tier II levels so that participants are better prepared in all the English language skills prior to leaving Indonesia. More

experienced TEFL teachers with an M.A. or the equivalent from the U.S. or from other English speaking countries will be utilized. The following staffing pattern is suggested.

For Tier I at:

University of Lampung 1 M.A. TEFL Specialist for two years.

University of Bengkulu 1 M.A. TEFL Specialist plus University of Jambi 1 English Aide for two years University of Tanjungpura Aide for two years.

University of Riau 1 English Aide for two years.

(9)

For Tier II, at the University of Sriwijaya there will be one English Language Coordinator for two years and two M.A. TEFL specialists for four years. In addition there will be one English aide at the University of North Sumatra for one year."

Since project participants selected for study abroad will have to depart Indonesia no later than the end of 1988 and due to funding

limitations, technical assistance support of the English training program will terminate the end of 1988. In addition to staff, project funds will be available for the purchase of textbooks and other needed instructional materials and teaching aides.

3. Research

As the number of faculty members with advanced degrees increases among the BKS-B universities, so should the research activities at these institutions. This is hindered, however by inadequate facilities and equipment; lack of funding support for researchers including both funds for research needs and honorarium; inadequate access to scientific

journals and other research materials and to colleagues with similar research interests; and lack of incentives provided by the respective universities.

The following are approaches which are planned under the project to reduce these constraints:

a. Equipment: Under Phase II, the GOI will provide funds for basic laboratory equipment in the universities which will receive intensified assistance, as part of their program to equip laboratories nation wide. A small amount of loan funds will also be allocated to supplement this basic equipment. b. Direct Research Support: Mechanisms for providing adequate

funding support to qualified and interested faculty members to participate in research activities will be developed during Phase II.

Such mechanisms could include:

1) Direct support on a competitive basis, to recently returned graduate degree holders (from Indonesian or overseas institutions) for a period of 1-3 years.

Guidelines for awarding these funds will be established, and the administration of the funding will reside with the Central Project Office. The research network, or a team of recognized outside specialists, will be utilized as an advisory group to the CPO.

(10)

WUAE/APD

grant program. Potential recipients of the matching grant research funds include all lecturers working in areas which WUAE is endeavoring to strengthen. Utilizing the research network, priority research areas will be identified for use of these funds.

3) Establishment of collaborative research projects between BKS-B institutions and Agency for Agricultural Research and Development, and the interchange of research

scientists between these institutions.

4) Provision for a limited number of returned participants with M.S. or Ph.D. degrees to receive project-funded research internships to serve directly as members of the project technical assistance teams assigned to Indonesian universities. Those individuals selected as Research Interns must meet criteria to be established by the CPO with the advice of the Policy Steering Committee (PSC). c. Publications, Research Materials: In Phase II, loan funds

will be provided to assist in procuring and maintaining subscriptions to a number of professional journals -- the composition to be determined by the needs and priorities of the particular BKS-B institution. Working through the library network, a system of exchange and sharing of accession lists among the BKS-B libraries will be established, and a mechanism for mailing requested articles worked out.

d. Incentives: Project grant funds are provided as incentives for staff to engage in meaningful research. Grant funds are being utilized due to the experimental nature of the

incentives program. Should the program prove successful, it is expected that it will be made part of the DGHE supported research program. Such incentives may include:

1. An annual awards program which will recognize excellence in published research among BKS-B institutions. The assessment of the quality of published research could be carried out by the research network (or a special

committee thereof) or by a special outside panel of specialists.

2. Support for travel to international professional meetings to present papers.

3. One semester or one year research sabbaticals, to work with colleagues at another Indonesian university, at an Inter-University Center, or to support full-time research at their home institutions.

(11)

4. Networks

During Phase I of the project, the network concept has been

established as a viable approach to strengthening faculty capabilities. These networks bring together, on a regular basis, individuals from the BKS-B institutions representing various disciplinary areas to accomplish specific tasks. After being formally established with PSC approval, the networks engage in solving specific problems related to their disciplines.

During Phase II, on-going networks will continue and be expanded. Closer integration with the program of intensive in-country short courses will be promoted.

5. Commodity Support

The project will be supported through the procurement of

commodities essential to carrying out project activities and achieving project objectives. Major categories of commodities may include, but not be limited to: laboratory equipment, laboratory supplies, books,

reference works, and journals, including microfiche materials, audio-visual equipment, reproduction equipment, data processing

equipment, teaching program materials, an experiment station equipment.

The selection of appropriate commodities will be based on

consultations with the Rector, vice-rectors, and appropriate deans and faculty members. Requests for commodities will be reviewed and

consolidated by the Central Project Office before being reviewed to the Project Steering Committee. Agreed upon commodity lists will be

forwarded to USAID/Indonesia for approval and determination of appropriate procurement methods.

6. Participant Aftercare

During Phase II a substantial number of project funded participants will be returning from the U.S. with M.S. and PhD. degrees. "Aftercare" refers to the ways and means whereby these faculty members may be most quickly integrated into their respective universities and faculty

assignments and effectively engaged in teaching and research activities. Accomplishing this is a priority aspect during Phase II.

Project activities directly related to aftercare have been discussed in previous sections on education and training, technical research, and networks. More specifically, these include:

(12)

WUAE/APD

b. Participation in on-going and future networks, and the short course program;

c. The opportunity for a limited number of participants to do their graduate research in Indonesia. This will provide a basis for their re-entry and quick involvement in a continuing research program;

d. Provision for a limited number of returned faculty members with graduate degrees to receive project-funded Research Internships to serve directly as members of the project technical assistance teams on one year appointments;

e. The increased availability and improvement of classroom

equipment and teaching aids, laboratory equipment, and library resources.

7. Strengthening BKS-B and its Member Institutions

All of the institutions associated with the WUAE project are

members of the BKS-B consortium. The presidency of the consortium shifts to a different rector periodically through an elective process. Under the BKS-B umbrella, the Indonesian Executive Secretary of the WUAE project has assumed major responsibility for organizing short courses, assisting in the setting up of networks and arranging for their periodic meetings, as well as staying abreast of WUAE project/BKS-B activities. In Phase II, it is important that provision be made to insure the effective continuation of these and similar activities such as

collaborative research projects and BKS-B wide public service efforts beyond the completion of this project. In order to accomplish this, Phase II of the project will provide a limited amount of funding (in consultation with the DGHE) to support activities which assist BKS-B in institutionalizing its role and responsibilities in continuing the development of the member institutions and fostering a relationship between the universities and thier client societies. GOI funds will be allocated through the budgets of the BKS-B universities to establish a BKS-B Central Office and hire an Executive Secretary and one or two secretarial/administrative staff. The Executive Secretary will be directly responsible to the President of the BKS-B and its appointed governing body. Initial financing of on-going BKS-B activities related to the WUAE project (e.g. networks and short courses) will continue to be funded directly through the project. However, since it will be necessary for the GOI eventually to assume this financial obligation, GOI funds will increase over the life of the project commensurate with the gradual phase-out of AID funds. The target of this cost sharing scheme is that by the end of the WUAE project, funding of BKS-B activities initiated with project assistance will be completely institutionalized within the

GOI.

(13)

II. Project Responsibilities

Field administration of Phase II of the project will continue to be carried out through the Central Project Office in Palembang by the Chief of Party, assisted by an Administrative Officer and a part time

bookkeeper. Responsibility for the GO! counterpart funds will reside in the Office of Finance and Budget at the University of Sriwijaya.

An Indonesian Project Director, Associate Director, and Executive Secretary will assist in day to day administration and decision making. This will be supplemented through the participation of a Project Steering Committee, already established in Phase I, which will provide broad

policy guidance. The PSC will be composed of the Directorate General or his designee, the Executive Secretary of the Agricultural Consortium

(KIP), the USAID project manager, the Chairman and/or Vice Chairman of BKS/Barat, the Project Director, and the Contract Chief-of-Party. The Director General or his designee will chair the PSC, which will meet at least twice annually.

The PSC will establish the overall policy framework within which the Project Director and Chief-of-Party are to carry out implementation activities of the project. PSC responsibilities will also include an annual evaluation of the project, approving annual plans of work, approving contractor's technical assistance nominations, and reviewing participant selection. A less formal, but equally important, function will be to serve as a sounding board and advisory body to provide

guidance as requested in the solution of problems encountered in program design and implementation. The members of the PSC will also provide liaison with their respective organizations to assure that project activities are consistent with GO! and A.I.D. policy guidelines and do not duplicate activities of other projects and programs.

The Chief-of-Party of the contract team will function as a counterpart to the Project Director and will be responsible for

supervising all Contractor Personnel. This position should be filled by a senior faculty member from the contracting institution who has had prior administrative and professional experience in project

implementation of an institution-building nature in a developing country. The Indonesian Assistant Director and Contractor team members

should be senior faculty members who have significant university research and teaching experience. They will have responsibility for managing the networks approved by the Project Steering Committee within their

technical expertise, and designing/evaluating short courses and

non-degree traineeships. Occasionally, they may also be called upon to teach courses.

Under Phase II of the project, it is expected that the University of Kentucky will continue to provide the technical assistance and

(14)

WUAE/APD

International Education Specialists (IES), English Teaching Aides and short-term consultants (of both Indonesia and U.S. nationality). The IES category will include a limited number of research associates who will be expected to focus their developmental inputs primarily on rsearch

activities rather than teaching and curriculum development. It will also include more highly qualified TESL specialists in addition to the English Teaching Aides.

For the BKS-B universities receiving intensified technical assistance, teams will be comprised to meet the specific needs of the recipient institution. Flexibility in the assignment of these teams must be maintained in order to address changing needs during Phase II. These team members, although assigned to a specific institution, will also be expected to share their expertise with other BKS-B institutions through participation in the networks, technical short courses and occasional short-term consultancies. In addition, short-term consultants both from the U.S. and Indonesia will be provided as needed, in areas which are not represented by the long-term team members. Such areas may include

research organization and management; laboratory design, organization and management; curriculum design, etc.

The senior advisor assigned to a particular BKS-B institution will also serve as team leader of the technical assistance team assigned to that institution under the overall supervison of the Chief-of-Party. These team leaders will accept a substantial amount of responsibility for the detailed planning and implementation of technical assistance

activities at each insitution, with the assistance of the

Chief-of-Party. It is expected that the senior advisor will interact in planning of activities with the Dean of the appropriate faculty and with the Rector and Vice Rector as needed.

III. Monitoring and Evaluation

The monitoring and evaluation procedures initiated in Phase I will be continued. These consist of Annual Reviews, an External Review and continuous monitoring of activities.

A. Annual Review

The project will be reviewed, in the 12th, 36th, and 48th project months of Phase II by a team composed of one representative each of the Directorate General of Higher Education, the BKS-B, the Project Director, USAID and the Contract Team. These reviews will be concerned primarily with the progress of the project in terms of quality, quantity, and

timeliness of the inputs provided and outputs derived, and to insure that the project is operating in ways consistent with the overall goal and purpose statements. It is anticipated that the BKS-B representative, prior to the review, will have made a concerted effort to solicit the views and recommendations of the participating institutions and will reflect their inputs in the review. Special attention will be given to

(15)

the intensified technical assistance provided to the selected

universities to ascertain that these major inputs are being obsorbed and utilized productively at these locations. Modifications, as needed and agreed to, will be based upon these reviews.

So that DGHE may also evaluate the portion of the project being carried out in the U.S., adequate funding is provided to permit two representatives to travel annually to the U.S. for a period of

approximately 10 days. This trip will be scheduled in conjunction with the special 3 to 4 day project seminars to be held at the University of Kentucky.

B. External Review

In approximately the 25th month of Phase II, an in-depth review will be undertaken with team members selected by the PSC. Those selected will be knowledgeable and experienced with respect to

institution-building, agricultural education, and technical assistance in developing nations; the U.S. land-grant university system; and USAID evaluation procedures regarding projects of this nature. The nature of this review will be determined jointly by USAID and the PSC. Funds for this review will be included in the project funding.

IV. Cost Estimates and Financial Plan

A. U.S. and GOI Cost Sharing

US assistance under the project will provide funds for participants (long and short term plus supporting research funds), tuition,

maintenance costs, fees, health insurance, books, supplies and travel costs to and from US universities. The GOI will assume responsibility for travel costs within Indonesia, salaries, exit fees and any additional costs required prior to departure. These same cost sharing arrangements will be followed for any "sandwich" programs which take place.

Technical Assistance (TA) will be funded by a grant from AID and shall include salaries, international travel, support costs and benefits, and support of "spouse" participants in the United States. AID loan funds will be used to provide all in-country TA per diem for both long and short term TA as well as maintenance and upkeep of all TA housing, utilities and furnishings expect as noted below. The GOI shall provide all rent monies, if needed, and the support and upkeep of the housing complex at Sriwijaya. AID loan funds can be used to provide all staff support for official business to in-country TA. It is acknowledged that there may be a minimum of cost-sharing or overlapping of the above

(16)

a

Wl.JAE/APD

The initial purchase of commodities will be provided by AID loan funds (with the exception of basic laboratory equipment which will be provided by the GOI to the institutions of intensification under this project), with maintenance and supply costs being assumed by the GOI.

In the following Illustrative Financial Plan, "Local University Support (LUS)" is composed of networking activities, short courses, English language training, and the aftercare program. It is anticipated and understood that loan funds may be used to cover the bulk of these programs, especially those of a non-recurring nature such as all costs associated with the short courses. These short course costs include all development and delivery costs of the course materials, supplies, per diem and travel for the participants. It is anticipated that both the GOI and AID will provide financial support to the networking activities. However loan funds may be used to fund networking activities and per diem and travel costs of the representatives upon request. The major

components of aftercare program consists of "reentry" programs for returned participants and the research program. Loan funds will be utilized with a portion of GOI matching funds for research. General BKS-B support costs will be borne by the GOI.

Under the in-country intensive English program, TA and materials and supplies will be supported from loan funds. It is expected that the GOI will provide per diem and travel of the participants, operating

expenses and staff salaries. However AID is prepared to supplement funds for per diem and travel of participants, if such is needed, to support project activities.

International loan funded procurement of goods and services under the project will be solicited from firms or individuals in Code 941, Indonesia and the United States. Grant funded procurement of goods and services will be solicited from firms or individuals in Indonesia and the United States. Goods and services funded by the project will be procured

on a competitive basis, advertised in Indonesia as well as abroad for international procurement. Indonesian firms will be eligible to bid for all local and international procurement.

B. Funding Flow

Given the inter-twined nature of the funding within each of the components of the project between the GOI and the U.S., a smooth flow of both AID and GOI DIP funds is required if implementation is to proceed as planned. In order to ensure the timely availability of funds for short courses, networking activities, the Intensive English Program at UNSRI, BKS operational support costs and travel for long term participants, GOI DIP funding should be made available to the Central Project Office via the Higher Education Project Development Office (PPPT) of UNSRI. This will ensure that funds are available for participants from the

universities when required, and allows flexibility in transporting participants, establishing short courses and networking activities, and coordinating all aspects of the program from the central administrative

(17)

a

office without having to rely upon outside support from the participating universities. Funds for the "aftercare" program will also be directed to the Central Project Office. In-country per diem and travel costs for long term T.A. will also be administered from the CPO. Other funds, such as staff salaries, operating expenses, support for T.A. housing,

furnishings, and utilities, costs of supplies, maintenance, and commodities will be included in the DIP budgets of the participating universities.

C. Illustrative Financial Plan

Disbursement will be handled in compliance with the Joint Decree of the Minister of Finance and the Minister of State for National

Development Planning/Chairman of Bappenas No. 48/KMK.012/1987 dated Kep.004/Ket/I/1987

January 27, 1987, based on details to be determined between USAID and the GOI. Disbursement procedures for various project activities, consistent with the details determined between USAID and the GOI above, will be agreed upon by PIL.

The financial plan contained in Attachment I is illustrative and changes may be made to it by representatives of the parties named in this project agreement without formal amendment to the Agreement if such

changes do not cause (1) A.I.D.'s contribution to exceed the amount specified in the text of the Agreement, or (2) the cooperating Country's contribution to be less than the amount specified in Section 3.2 of the Agreement •

(18)

..

CATEGORY

1. Participant Training 2. Teclnical Assistance 3. Local Univ. Support 4. Commodities

5. Project Operaticns 6. Evaluaticn/Audit 7. Contingency

TOTALS

セ@

, WESTERN UNIVERSITIES AGRICULTURE EDUCATION PROJECT No. 497-0297

REVISED CURRENT BUDGET PLUS NEW OBLIGATION SUMMARY COST ESTIMATES - PHASES I & II

(U.S. $000)

i t

\ !

I

A I D

II

A I D

I

I

I

I Cumulative Obligaticns 11 Obligaticns

I

AID TOTAL

I

GOI

I

PROJECT

I

thru FY 87 11 This Agreement

I

Revised Budget

I

TOTAL

I

TOTAL

I

GRANT

I

LOAN 11 GRANT

I

LOAN

I

GRANT

I

LOAN

I

I

I

I

9, 729 11

I

2,584

I

12,390

I

6,371

I

18, 761

I

I

11

I

I

I

I

I

8,922

I

20 11

I

I

8,922 10

I

900

I

9,832

I

I

11

I

I

I

I

I

157

I

977 11

I

I

157 900

I

4,643

I

5,700

I

I

11

I

I

I

I

I

I

690 11

I

I

1,055

I

4,825

I

5,880

I

I

11

I

I

I

I

I

I

746 11

I

I

636

I

1,761

I

2,397

I

I

II

I

I

I

I

I

I

200 11

I

I

167 43

I

-

I

210

I

I

11

I

I

I

I

I

321

I

88 11

I

I

154

I

213

I

367

I

I

11

I

I

I

I

I

9,400

I

12,450 11

I

2,584

I

9,400

I

15,034

I

18, 713

I

43,147

I

I

II

I

I

I

I

I

>

rt rt tu

n

l

::I

Referensi

Garis besar

Dokumen terkait

Apabila dalam suatu transaksi atau akad yang dilakukan sesuai dengan prinsip-prinsip syariah dan dituangkan dalam suatu akta notariil yang dibuat Notaris, maka para

Berkenaan dengan hal tersebut, dengan hormat kami mengundang saudara untuk dapat mengikuti Rapat Pembuktian Kualifikasi dan Klarifikasi teknis Harga/Biaya, Semua

Pemakaian media pembelajaran dalam proses belajar mengajar dapat membangkitkan keinginan dan minat yang baru, membangkitkan motivasi dan rangsangan kegiatan belajar, dan

Sebagai kelanjutan dari proses pengumuman ini, akan diterbitkan Surat Penunjukan Penyedia Barang/Jasa dan Surat Perintah Kerja.. Demikian untuk diketahui dan

Setelah Mao tewas bersama pandangan Marxist garis kerasnya, pemerintahan komunis di Cina memberi kebebasan yang lebih besar bagi Islam dan kaum Muslim.. Tetapi, diskriminasi

Apersepsi : guru membahas materi yang sebelumnya, guru bertanya siapakah yang sudah bisa mengurangkan suatu pecahan4. Bagimana cara menyelesaikan soal campuran

As the other, we discuss the link to check out and also download and install the soft file ebook A Vampire In Versailles By Jenni Wiltz So, you could not bring the printed publication

 Jika tidak lengkap mengerjakan TP, maka diperbolehkan mengikuti tes awal tetapi nilai TP adalah nol (0)1.  Dilarang Mengerjakan TP di area gedung TPB, bila diketemukan ada