REKAPITULASI LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT JENDERAL CIPTA KARYA
PAKET > RP 100 JUTA
RPM PHLN TOTAL
1 Direktorat PAM 1,387,145,845 97,195,500 1,484,341,345 222,377,860 5,638,317 1,199,287,668 57,037,500 1,256,325,168 - 1,484,341,345 196 580 776 41 11 9 31 1 117 9 34 70 453 712,399,805
9 10
KONTRAKTUAL > 100 JT NON 3 4 5 6 7
FISIK FISIK TOTAL
STATUS : 31 MEI 2010, JAM 12.30 WIB
NO NAMA SATUAN KERJA
PAGU PAKET KONTRAK
SWAKELOLA +
AP BLM
RUPIAH MURNI PLN
JUMLAH PAKET DALAM PROSES PRA KONTRAK
TOTAL 1
PAKET > RP 100 JUTA
KONTRAKTUAL
≤ 100 JT
NILAI KONTRAK (Rp. x 1.000) 8
TOTAL 2
PAGU (Rp)
2 Direktorat PPLP 633,610,238 607,359,000 1,240,969,238 82,890,576 14,070,365 536,749,297 607,259,000 1,144,008,297 - 1,240,969,238 203 185 388 57 11 2 - 13 2 42 33 4 224 705,693,659 3 Direktorat Bangkim 899,323,660 24,000,000 923,323,660 81,429,789 35,261,785 782,632,086 24,000,000 806,632,086 - 923,323,660 173 521 694 81 3 2 22 14 7 29 9 93 434 323,482,347 4 Direktorat PBL 532,249,922 637,874,300 1,170,124,222 588,693,198 9,474,359 421,159,683 150,796,982 571,956,665 - 1,170,124,222 332 203 535 79 14 6 4 32 37 11 74 7 271 262,963,058 5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 488,158,022 1,058,900 73,324,090 126,873,020 200,197,110 - 689,414,032 116 3 119 27 - 2 1 1 17 - - 3 68 114,287,282 6 Setditjen Cipta Karya 114,266,503 1,000,000 115,266,503 78,280,803 490,143 35,495,557 1,000,000 36,495,557 - 115,266,503 6 14 20 5 - 1 - - - - 11 - 3 1,472,700 7 Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - - - - - - -
-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - - - - - - - -PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - - - - - - - -PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - - - - - - - -RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - - - - - - -
TOTAL 2,402,300,3005,300,429,700 7,702,730,000 1,541,830,248 65,993,869 3,048,648,381 966,966,502 4,015,614,883 2,079,291,000 7,702,730,000 1,026 1,506 2,532 290 39 22 58 61 180 91 161 177 1,453 2,120,298,851
Keterangan :
1 Penyiapan Dokumen Lelang 2 Pengumuman Lelang/Prakualifikasi 3 Penyusunan shortlist 4 Undangan Pelelangan 5 Penjelasan Pekerjaan Aanwyzing 6 Pemasukan Penawaran 7 Usulan Pemenang
8 P t P
8 Penetapan Pemenang
9 Penerbitan Surat Perintah Mulai Kerja 10 Penandatangan Kontrak
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS: 31 MEI 2010, JAM 08.00 WIB
NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN
1 Persiapan Lelang 259 Percepatan Proses Lelang
2 Proses Lelang 724 Percepatan Proses Evaluasi Penawaran
2 Proses Lelang 724 Percepatan Proses Evaluasi Penawaran
3 Sanggah Banding 34 Dilakukan evaluasi ulang
4 Tender Ulang 4 Percepatan Proses Pelelangan
5 Review DED 19 Percepatan Review DED
5 9 p
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran 30 Mengajukan pembukaan blokir
a. Loan belum efektif 15 Perincian :
1 Paket Konsultan Bali SWSP Air Minum Bali
1 Paket pengadaan peralatan Civil Works Small Scale WTP for Emergency Relief ‐ Setditjen CK
6 paket konsultan ‐ PPIP 7 paket konsultan ‐ Pamsimas
b. Menunggu Penandatanganan Loan Agreement 3 Satker PPLP Sumut (1 paket), Satker PPLP DIY (1 paket), Satker PPLP Sulsel (1 paket)
c. Tanggap Darurat 3 Tanggap darurat : 1 paket PLP, 1 paket Bangkim, 1 Paket AM Setditjen Cipta Karya
d. Revisi Kegiatan 1 1 paket pengadaan rumah dinas di Satker PAM Kalteng
e Belum tersedia dokumen RPIJM 7 Satker AM S lteng (1 Paket) Satker AM NTT (3 Paket) Satker AM Mal k Utara (3
e. Belum tersedia dokumen RPIJM 7 Satker AM Sulteng (1 Paket), Satker AM NTT (3 Paket), Satker AM Maluku Utara (3
Paket)
f. Menunggu persyaratan pembuktian BMN 1 Satker PPLP Maluku Utara (1 paket)
7 Pemindahan Lokasi 9 Mempercepat proses revisi lokasi
1,079
TOTAL
REKAPITULASI LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT JENDERAL CIPTA KARYA
RPM PHLN TOTAL
1 Direktorat Pengembangan Air Minum 1,387,145,845 97,195,500 1,484,341,345 222,377,860 5,638,317 1,199,287,668 57,037,500 1,256,325,168 - 1,484,341,345 731,947,014 48,588,500 780,535,514 663,811,305 48,588,500 712,399,805 68,135,709 - 68,135,709 TOTAL
PAGU (Rp)
RUPIAH MURNI PLN TOTAL KONTRAKTUAL
≤ 100 JT
STATUS : 31 MEI 2010, JAM 12.30 WIB
( x Rp. 1.000 )
NO NAMA SATUAN KERJA PAGU
SWAKELOLA + AP
KONTRAKTUAL > 100 JT BLM TOTAL
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM PHLN TOTAL RPM PHLN TOTAL RPM PHLN
2 Direktorat Pengembangan PLP 633,610,238 607,359,000 1,240,969,238 82,890,576 14,070,365 536,749,297 607,259,000 1,144,008,297 - 1,240,969,238 318,213,165 422,250,800 740,463,965 283,442,859 422,250,800 705,693,659 34,770,306 34,770,306- 3 Direktorat Pengembangan Permukiman 899,323,660 24,000,000 923,323,660 81,429,789 35,261,785 782,632,086 24,000,000 806,632,086 - 923,323,660 342,730,245 24,000,000 366,730,245 299,482,347 24,000,000 323,482,347 43,247,898 43,247,898- 4 Direktorat Penataan Bangunan dan Lingkungan 532,249,922 637,874,300 1,170,124,222 588,693,198 9,474,359 421,159,683 150,796,982 571,956,665 - 1,170,124,222 178,280,458 98,529,327 276,809,785 164,433,731 98,529,327 262,963,058 13,846,727 - 13,846,727 5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 488,158,022 1,058,900 73,324,090 126,873,020 200,197,110 - 689,414,032 40,684,238 77,435,020 118,119,258 36,852,262 77,435,020 114,287,282 3,831,976 - 3,831,976 6 Sekretariat Jenderal Cipta Karya 114,266,503 1,000,000 115,266,503 78,280,803 490,143 35,495,557 1,000,000 36,495,557 - 115,266,503 2,007,900 - 2,007,900 1,472,700 - 1,472,700 535,200 - 535,200 7 Program Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - -
-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - - -PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - - -PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - - -RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - - TOTAL 2,402,300,3005,300,429,700 7,702,730,000 1,541,830,248 65,993,869 3,048,648,381 966,966,502 4,015,614,883 2,079,291,000 7,702,730,000 1,613,863,020 670,803,647 2,284,666,667 1,449,495,204 670,803,647 2,120,298,851 164,367,816 - 164,367,816
DIREKTORAT JENDERAL CIPTA KARYA STATUS 31 MEI 2010 JAM 12 30 WIB
REKAPITULASI LAPORAN PELAKSANAAN BULANAN TA 2010
KEU. FISIK
(RP) % % % (RP) %
NO NAMA SATUAN KERJA
PAGU
KEUANGAN KEUANGAN
RENCANA PENYERAPAN AKHIR BULAN MEI RUPIAH MURNI PLN
STATUS : 31 MEI 2010, JAM 12.30 WIB
11:50:46 ( x Rp. 1.000 )
DEVIASI REALISASI
PHLN TOTAL
TOTAL RUPIAH
MURNI FISIK
(%)
1 Direktorat Pengembangan Air Minum 1,387,145,845 97,195,500 1,484,341,345 414,141,724 27.90 32.36 238,713,704 2,160,285 240,873,989 16.23 17.43 (173,267,735) (11.67) 2 Direktorat Pengembangan PLP 633,610,238 607,359,000 1,240,969,238 219,813,667 17.71 21.69 84,255,411 71,461,736 155,717,147 12.55 19.34 (64,096,520) (5.17) 3 Direktorat Pengembangan Permukiman 899,323,660 24,000,000 923,323,660 86,529,615 9.37 10.39 103,845,341 3,653,005 107,498,346 11.64 13.82 20,968,731 2.27 4 Direktorat Penataan Bangunan dan Lingkungan 532,249,922 637,874,300 1,170,124,222 217,863,714 18.62 36.00 61,478,482 145,488,838 206,967,320 17.69 18.66 (10,896,394) (0.93) 5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 86,864,844 12.60 12.60 42,370,900 19,122,186 61,493,086 8.92 9.29 (25,371,758) (3.68) 6 Sekretariat Jenderal Cipta Karya 114,266,503 1,000,000 115,266,503 33,719,184 29.25 30.25 24,912,145 - 24,912,145 21.61 21.71 (8,807,039) (7.64) 7 Program Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 185,952,000 8.94 8.90 8,055,000 31,520,571 39,575,571 1.90 1.21 (146,376,429) (7.04) P2KP 817 891 000 61 800 000 879 691 000 88 490 000 10 06 10 06 8 055 000 8 055 000 0 92 0 37 (80 435 000) (9 14) -P2KP 817,891,000 61,800,000 879,691,000 88,490,000 10.06 10.06 8,055,000 - 8,055,000 0.92 0.37 (80,435,000) (9.14) -PPIP 375,000,000 150,000,000 525,000,000 9,600,000 1.83 1.65 - - - - - (9,600,000) (1.83) -PAMSIMAS - 255,100,000 255,100,000 25,487,000 9.99 9.99 - 988,370 988,370 0.39 0.06 (24,498,630) (9.60) -RISE - 419,500,000 419,500,000 62,375,000 14.87 14.87 - 30,532,201 30,532,201 7.28 5.21 (31,842,799) (7.59)
5,300,429,700
2,402,300,300 7,702,730,000 1,244,884,748 16.16 20.43 273,406,621563,630,983 837,037,604 10.87 12.45 (407,847,144) (5.29) Total
9 000 000
RENCANA DAN REALISASI PENYERAPAN DITJEN CIPTA KARYA
TAHUN ANGGARAN 2010
7,702,730
7,184,918
7,702,720 8,000,000
9,000,000
5,571,570
6,538,451
6,000,000 7,000,000
H
4,303,291 4,000,000
5,000,000
A M JUTAAN RUPIA H
PAGU
2,121,673
3,133,533 3,000,000
DAL A
RENCANA
REALISASI
28 907 132,054 308,139
702,454
1,244,885
271,230 660,025 837,038 1,000,000
2,000,000
- 28,907 132,054
- 3,947 7,894 27,141 46,845 98,330 211,344 452,196 -
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
BULAN
PAGU (Rp)
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 31 MEI 2010, JAM 12.30 WIB
NO KODE
SATKERNAMA SATUAN KERJA
PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK
TOTAL
RUPIAH PLN 1 10
PAKET > RP 100 JUTA
NON
SWAKELOLA + KONTRAKTUAL KONTRAKTUAL > 100 JT BLM TOTAL 7 NILAI KONTRAK
(Rp x 1 000)
8 9
TOTAL
FISIK 2 3 4 5 6
RPM PHLN TOTAL
Satker Pusat 159,190,845 - 159,190,845 38,081,350 - 121,109,495 - 121,109,495 - 159,190,845 24 16 40 2 - - - - - - - 5 33 104,586,371
1 466178 Dit. PAM 57,090,845 57,090,845 33,194,936 - 23,895,909 - 23,895,909 - 57,090,845 20 3 23 2 21 19,066,650
2 448311 PSPAM IKK 102,100,000 102,100,000 4,886,414 - 97,213,586 - 97,213,586 - 102,100,000 4 13 17 - 5 12 85,519,721
Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 184,296,510 5,638,317 1,078,178,173 57,037,500 1,135,215,673 - 1,325,150,500 172 564 736 39 11 9 31 1 117 9 34 65 420 607,813,434 Wilayah 1 631,063,200 52,518,500 683,581,700 100,421,139 3,805,262 553,703,799 25,651,500 579,355,299 - 683,581,700 83 346 429 37 3 5 17 1 92 8 28 32 206 265,651,233
1 501380 PKPAM NAD 33 830 500 33 830 500 1 134 550 653 050 32 042 900 - 32 042 900 - 33 830 500 5 10 15 3 12 28 603 098
SATKER PLN TOTAL
MURNI 1 10
FISIK
AP BLM TOTAL 7
≤ 100 JT FISIK TOTAL 2 3 4 5 6 8 9 (Rp. x 1.000)
1 501380 PKPAM NAD 33,830,500 33,830,500 1,134,550 653,050 32,042,900 32,042,900 33,830,500 5 10 15 3 12 28,603,098
2 494931 PKPAM Sumut 53,452,000 53,452,000 2,365,300 - 51,086,700 - 51,086,700 - 53,452,000 6 30 36 - 2 34 - - 3 494993 PKPAM Sumbar 48,475,100 11,850,000 60,325,100 24,806,538 170,000 35,348,562 - 35,348,562 - 60,325,100 14 9 23 4 2 12 5 6,488,944 4 495044 PKPAM Riau 34,464,000 4,628,000 39,092,000 7,067,585 30,000 27,366,415 4,628,000 31,994,415 - 39,092,000 3 9 12 3 1 6 2 10,973,235 5 495364 PKPAM Kepri 22,954,700 22,954,700 1,524,500 189,400 21,240,800 - 21,240,800 - 22,954,700 5 12 17 - 1 16 19,410,515 6 495081 PKPAM Jambi 29,731,700 29,731,700 1,116,050 610,050 28,005,600 - 28,005,600 - 29,731,700 3 11 14 - 7 7 3,396,323 7 495260 PKPAM Bengkulu 28,912,100 28,912,100 1,579,460 215,920 27,116,720 - 27,116,720 - 28,912,100 5 17 22 - 12 10 15,404,112 8 495163 PKPAM Sumsel 54,136,100 6,444,000 60,580,100 14,815,779 40,422 45,723,899 - 45,723,899 - 60,580,100 4 10 14 1 1 12 43,402,922 9 495302 PKPAM Babel 27,183,300 27,183,300 1,629,435 723,218 24,830,647 - 24,830,647 - 27,183,300 5 11 16 - 8 4 4 3,022,054
10 495220 PKPAM L 26 497 700 26 497 700 1 614 090 400 000 24 483 610 24 483 610 26 497 700 2 8 10 10 23 133 071
10 495220 PKPAM Lampung 26,497,700 26,497,700 1,614,090 400,000 24,483,610 - 24,483,610 - 26,497,700 2 8 10 - 10 23,133,071
11 496055 PKPAM Banten 25,723,800 25,723,800 3,392,600 679,202 21,651,998 - 21,651,998 - 25,723,800 4 19 23 - 2 21 11,569,641 12 495596 PKPAM Jawa Barat 57,705,300 6,319,000 64,024,300 12,205,122 - 51,819,178 - 51,819,178 - 64,024,300 5 13 18 6 3 1 8 19,471,666 13 495684 PKPAM Jawa Tengah 89,198,300 22,901,500 112,099,800 22,914,055 - 68,444,245 20,741,500 89,185,745 - 112,099,800 4 83 87 20 67 59,927,098 14 495741 PKPAM D.I.Y 32,433,000 32,433,000 2,153,475 - 30,279,525 - 30,279,525 - 32,433,000 5 30 35 - 19 16 8,684,966 15 495817 PKPAM Jawa Timur 66,365,600 376,000 66,741,600 2,102,600 94,000 64,263,000 282,000 64,545,000 - 66,741,600 13 74 87 - 1 5 1 47 7 3 7 16 12,163,588
Wilayah 2 596,891,800 44,677,000 641,568,800 83,875,371 1,833,055 524,474,374 31,386,000 555,860,374 - 641,568,800 89 218 307 2 8 4 14 - 25 1 6 33 214 342,162,201 16 495879 PKPAM Kalbar 49,879,400 49,879,400 1,875,400 - 48,004,000 - 48,004,000 - 49,879,400 5 27 32 - 21 3 8 16,920,301 17 495920 PKPAM Kalteng 28,216,200 28,216,200 1,153,770 63,780 26,998,650 - 26,998,650 - 28,216,200 4 15 19 1 1 17 24,762,250 18 495967 PKPAM Kalsel 39,308,200 6,302,000 45,610,200 14,600,300 - 31,009,900 - 31,009,900 - 45,610,200 3 9 12 - 7 1 1 3 6,540,535 19 496002 PKPAM Kaltim 32,549,300 32,549,300 2,062,330 - 30,486,970 - 30,486,970 - 32,549,300 10 7 17 - 5 12 20,338,730 20 496112 PKPAM Sulut 28,497,584 28,497,584 1,885,473 - 26,612,111 - 26,612,111 - 28,497,584 2 12 14 - 14 22,364,089 21 496752 PKPAM Gorontalo 25,771,600 6,989,000 32,760,600 11,882,290 20,000 20,858,310 - 20,858,310 - 32,760,600 2 5 7 - 1 1 1 3 1 3,053,568 22 496174 PKPAM Sulteng 32,054,100 5,763,000 37,817,100 8,400,700 - 23,653,400 5,763,000 29,416,400 - 37,817,100 12 8 20 - 2 13 5 10,300,885 23 496240 PKPAM Sulsel 53,378,200 8,593,000 61,971,200 9,194,045 900,000 43,284,155 8,593,000 51,877,155 - 61,971,200 3 19 22 - 1 2 19 43,528,916 24 466235 PKPAM Sulbar 20,995,500 20,995,500 4,543,188 - 16,452,312 - 16,452,312 - 20,995,500 6 6 12 - 12 15,487,948 25 496313 PKPAM Sultra 27,854,400, , 27,854,400, , 1,995,975, , 349,425, 25,509,000, , - 25,509,000, , - 27,854,400, , 3 14 17 - 17 24,869,363, , 26 496441 PKPAM Bali 26,892,200 8,449,000 35,341,200 1,960,557 50,000 24,881,643 8,449,000 33,330,643 - 35,341,200 11 10 21 1 6 14 9,492,858 27 496539 PKPAM NTB 38,927,500 38,927,500 1,698,500 100,000 37,129,000 - 37,129,000 - 38,927,500 4 5 9 - 3 3 3 1,027,210 28 496582 PKPAM NTT 46,741,300 8,581,000 55,322,300 9,774,300 310,000 36,657,000 8,581,000 45,238,000 - 55,322,300 11 14 25 - 3 22 41,970,373 29 496369 PKPAM Maluku 34,558,500 34,558,500 3,370,234 - 31,188,266 - 31,188,266 - 34,558,500 2 24 26 - 26 29,121,915 30 496709 PKPAM Maluku Utara 45,377,916 45,377,916 4,876,109 - 40,501,807 - 40,501,807 - 45,377,916 5 17 22 1 12 9 12,619,898 31 496642 PKPAM Papua 36,098,000 36,098,000 1,505,600 39,850 34,552,550 - 34,552,550 - 36,098,000 4 14 18 - 18 33,638,682 32 496828 PKPAM Papua Barat 29,791,900 29,791,900 3,096,600 - 26,695,300 - 26,695,300 - 29,791,900 2 12 14 - 14 26,124,680
TOTAL 1 387 145 845 97 195 500 1 484 341 345 222 377 860 5 638 317 1 199 287 668 57 037 500 1 256 325 168 - 1 484 341 345 196 580 776 41 11 9 31 1 117 9 34 70 453 712 399 805
TOTAL 1,387,145,845 97,195,500 1,484,341,345 222,377,860 5,638,317 1,199,287,668 57,037,500 1,256,325,168 - 1,484,341,345 196 580 776 41 11 9 31 1 117 9 34 70 453 712,399,805
Keterangan : 6. Pemasukan Penawaran
1 Penyiapan Dokumen Lelang 7. Usulan Pemenang 2 Pengumuman Lelang/Prakualifikasi 8. Penetapan Pemenang
3 Penyusunan shortlist 9. Penerbitan Surat Perintah Mulai Kerja
4 Undangan Pelelangan 10. Penandatangan Kontrak
5 Penjelasan Pekerjaan Aanwyzing
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS: 31 MEI 2010
NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN
1 Persiapan Lelang 31
2 Proses Lelang 243
3 Sanggah Banding 11 1. Air Bersih Pangkalpinang (1 Paket Penyediaan PS Air Minum Bagi
Kawasan RSH/Rusunawa Kota Pangkalpinang)
SB Benar, Evaluasi Ulang
2. Satker CK Sulsel (1 Paket Pengadaan/Pemasangan Pipa PVC dan Meter Induk Lokasi Ds. Sepakat Kec. Mappideceng Kab. Luwu Utara)
SB Benar, Evaluasi Ulang
3. Satker PAM Kalsel (1 Paket Pengadaan dan Pemasangan IPA SB Benar, Evaluasi Kapasitas 20L/detik IKKTabukan Kab. Hulu Sungai Utara) Ulang
4. Satker PKPAM Bangka Belitung (6 Paket) 5. Satker PKPAM Kepri (1 Paket)
6. Satker PAM Lampung (1 Paket Sarana dan Prasarana Jiat Perpipaan)
4 Tender Ulang 1 Satker AM Lampung (1 Paket)
4 Tender Ulang 1 Satker AM Lampung (1 Paket)
5 Review DED 19 Satker AM Jateng (16 Paket), Satker AM Jabar (3 Paket)
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif 1 Satker AM Bali (1 Paket)
b M P d t L A t
b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat
d. Revisi Kegiatan 1 Satker AM Kalteng (1 Paket)
e. Belum tersedia dokumen RPIJM 7 Satker AM Sulteng (1 Paket), Satker AM NTT (3 Paket), Satker AM Maluku Utara (3 Paket)
f. Menunggu persyaratan pembuktian BMN -
7 Pemindahan Lokasi 9 Satker AM Jateng (1 Paket), Satker AM Sumbar (2 Paket), Satker AM DIY
(1 Paket), Satker AM Jabar (2 Paket), Satker AM Gorontalo (1 Paket), Satker AM Maluku Utara (2 Paket)
323
TOTAL
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 31 MEI 2010 NO SATKER/PROVINSI JML PAKET
BELUM LELANG
PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X
Rp.1000) PENJELASAN BELUM LELANG TINDAK LANJUT
1 2 1 Rehabilitasi Kantor 828,075
2 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum 2,252,166
2 4 1 Pendampingan Penyusunan Rencana Induk Pengembangan SPAM Kab/Kota (Paket 1) 300,000
2 Fasilitasi Perencanaan Teknis Pengembangan SPAM (Paket 2) 300,000 3 Studi Identifikasi Kebutuhan dan Potensi Air Baku Air Minum Provinsi Sumatera Barat (Paket 3) 460,000
4 Bantek PDAM Kota Padang Panjang (Paket 12) 300,000 Masih dalam perubahan lokasi kegiatan PENGEMBANGAN KINERJA
PENGELOLAAN AIR MINUM SUMATERA BARAT DIREKTORAT PENGEMBANGAN AIR MINUM
3 3 1 IDENTIFIKASI DAN PEMETAAN KEBUTUHAN SUMBER AIR BAKU UNTUK AIR MINUM DI KOTA SEDANG 500,000 2 PENGAD/PEMAS. PIPA INDUK AIR BAKU HDPE PN 10 DIA.500 MM PULAU PALAS KAB. INDRAGIRI HILIR 1,674,000
3 SUPERVISI PEKERJAAN PENYEDIAAN AIR MINUM KOTA KECIL DAN BANPRO PENYEHATAN PDAM/BPAB 450,000 Paket Supervisi 9 Paket @ 50 juta
4
PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM
SUMATERA SELATAN 1 1 Supervisi Pelaksanaan Program UWSSP 1,400,000 PIU UWSSP PDAM Muara Enim yang menyiapkan
kegiatan fisik baru menyiapkan dokumen lelang 5 6 1 Penyempurnaan Unit Produksi dan Unit Distribusi (AM‐Bjr‐01) di Kota Banjar 2,116,500 Ada perubahan volume ME (review RAB)
2 Konsultan Supervisi Urban Water Supply and Sanitation Project (Jbr‐Kons‐05) 1,100,000 PENGEMBANGAN KINERJA
PENGELOLAAN AIR MINUM RIAU
PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM JAWA BARAT
3 Pengembangan Prasarana dan Sarana Air Bersih di Kec. Paseh Kab. Bandung 958,756 Review desain dan penyesuaian desain dengan lokasi
4 Pengembangan Prasarana dan Sarana Air Bersih di Kec. Kapetakan Kab. Cirebon 5,612,140 Review desain dan penyesuaian desain dengan lokasi
5 Pembangunan Prasarana dan Sarana Air Minum di Kec. Sawangan Kota Depok 502,700 Pergantian lokasi (RSH baru akan dibangun tahun 2011)
6 Pengembangan SPAM IKK di Kec. Sindang Barang Kab. Cianjur 3,399,512 Pergantian lokasi karena kelembagaan pengelola belum siap tahun ini
PENGEMBANGAN KINERJA JAWA BARAT
6 20 1 01 KOTA TEGAL 374,193 Koordinasi dengan PDAM mengenai rincian data
barang yang dibutuhkan
2 06 KOTA SEMARANG 1,800,000 Sedang dilakukan revisi DIPA
3 02 BANTEK‐BRS.01‐ME Kab. Brebes 773,058 Review desain untuk mekanikal elektrik
4 03 BANTEK‐JPR.01‐ME Kec. Pecangakan, Kab. Jepara 128,623 Review desain untuk mekanikal elektrik 5 04 BANTEK‐PWR.02‐ME Kec.Bendung Boro II, Kab. Purworejo 322,201 Review desain untuk mekanikal elektrik
6 DS. MERDEN KEC. PURWONEGORO KAB. BANJARNEGARA 270,256 Revisi desain
7 01. MBR‐KDS.06‐ME KEC. UNDAAN KAB. KUDUS 128,623 Review desain untuk mekanikal elektrik
8 02. MBR‐SRG.03‐ME KEC. SIDOHARJO, KAB. SRAGEN 134,937 Review desain untuk mekanikal elektrik
PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM JAWA TENGAH
8 02. MBR SRG.03 ME KEC. SIDOHARJO, KAB. SRAGEN 134,937 Review desain untuk mekanikal elektrik 9 02. MBR‐SRG.04‐ME KEC. SIDOHARJO, KAB. SRAGEN 1,049,449 Review desain untuk mekanikal elektrik
10 KEC. PLUPUH KAB. SRAGEN 6,889,414 Penggunaan sumber air ditolak penduduk, lokasi
dipindah ke Kab. Klaten sesuai komitmen Pemda 11 04 PKPAM‐SLG.02‐ME KEC. TINGKIR, KOTA SALATIGA (SUMUR TEGALSARI) 128,623 Review desain untuk mekanikal elektrik 12 04 PKPAM‐SLG.03‐ME KEC. TINGKIR, KOTA SALATIGA (SUMUR TEGALSARI) 191,246 Review desain untuk mekanikal elektrik 13 04 PKPAM‐SLG.06‐ME KEC. TINGKIR, KOTA SALATIGA (SUMUR TEGALSARI) 113,168 Review desain untuk mekanikal elektrik 14 04 PKPAM‐SLG.07‐ME KEC. TINGKIR, KOTA SALATIGA (SUMUR TEGALSARI) 195,536 Review desain untuk mekanikal elektrik
15 05 PKPAM UNG 04 ME KEC TENGARAN KAB SEMARANG 128 623 R i d i t k k ik l l kt ik
15 05 PKPAM‐UNG.04‐ME KEC. TENGARAN, KAB. SEMARANG 128,623 Review desain untuk mekanikal elektrik 16 05 PKPAM‐UNG.05‐ME KEC. TENGARAN, KAB. SEMARANG 171,996 Review desain untuk mekanikal elektrik 17 06 PKPAM‐JPR.05‐ME KEC. NALUMSARI, KAB. JEPARA 128,634 Review desain untuk mekanikal elektrik 18 07 PKPAM‐KDL.03‐ME KEC. RINGINARUM, KAB. KENDAL 168,069 Review desain untuk mekanikal elektrik 19 07 PKPAM‐KDL.04‐ME KEC. RINGINARUM, KAB. KENDAL 183,106 Review desain untuk mekanikal elektrik
20 KEC. KEBONARUM KAB. KLATEN 5,669,968 Review desain
7 PENGEMBANGAN KINERJA 1 1 Perbaikan Rumah Dinas 350,000 Sedan proses revisi tanda bintang
PENGELOLAAN AIR MINUM KALIMANTAN TENGAH
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT PENGEMBANGAN AIR MINUM
8 PENGEMBANGAN KINERJA 1 1 Consultant For Bali Southtern Water Supply Project 8,449,000 Loan belum efektif
PENGELOLAAN AIR MINUM BALI
STATUS : 31 MEI 2010
NO SATKER/PROVINSI
JML PAKET BELUM LELANG
PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X
Rp.1000) PENJELASAN BELUM LELANG TINDAK LANJUT
9 3 1 Fasilitasi Perencanaan Teknik Pengembangan SPAM 2,905,000
2 Fasilitasi Pembentukan Kelembagaan Penyelenggaraan SPAM Perdesaan dan IKK 300,000
3 Pengawasan/Supervisi Konstruksi 101,200
PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM NAD
41 53,208,772
TOTAL