• Tidak ada hasil yang ditemukan

S TE 1100106 Bibliography

N/A
N/A
Protected

Academic year: 2017

Membagikan "S TE 1100106 Bibliography"

Copied!
2
0
0

Teks penuh

(1)

58

Iqbal Dinoer Aditama, 2016

Analisis Setting Relay Diferensial pada Trafo Tenaga 60 Mva di Gardu Induk Cigereleng 150 kV / 20 kV

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu DAFTAR PUSTAKA

Bahri, Samsul. 2012. “Analisa Hubungan Singkat Satu Fasa Ketanah Untuk

Koordinasi Setting Ground Fault Relay ( GFR ) Pada Penyulang Feeder 20

Kv ( GI Batu Sangkar Feeder Tigo Jangko ).” 12(1).

Darwish, Hatem A. and Matti Lehtonen. 2009. “Current Differential Relay with a Power-Current Spectrum Blocking for Transformer Protection.” 2009 IEEE

Bucharest PowerTech: Innovative Ideas Toward the Electrical Grid of the

Future 1–7.

Dashti, Hamed and Majid Sanaye-Pasand. 2013. “Power Transformer Protection

Using a Multiregion Adaptive Differential Relay.” IEEE Transactions on Power Delivery 29(2):777–85.

Fallis, A. 2013. “Methods for Testing Transformer Differential Relays Applied to

Delta‐ Grounded Wye Transformers Using Single‐Phase Test Currents .”

Journal of Chemical Information and Modeling 53(9):1689–99.

Hasan, B. (2010). Teknik Tegangan Tinggi. Edisi 2. Bandung : Pustaka

Ramadhan.

Karyana. 2013. Pedoman Dan Petunjuk Sistem Proteksi Transmisi Dan Gardu

Induk Jawa Bali Edisi Pertama. 2013. PT.PLN( Persero).

Kasztenny, B., B. Le, and N. Fischer. 2012. “A New Multiterminal Fault Location

Algorithm Embedded in Line Current Differential Relays.” 11th IET

International Conference on Developments in Power Systems Protection

(DPSP 2012) P28–P28. Retrieved

(http://digital-library.theiet.org/content/conferences/10.1049/cp.2012.0088).

L.ek bien. 2007. “Studi Penyetelan Relai Diferensial pada Transformator PT Chevron Pacific Indonesia.” 6:41–68. Elektro-fti.

Mahanty, Rn and Pbd Gupta. 2004. “Application of RBF Neural Network to Fault Classification and Location in Transmission Lines.” IEE Proceedings-Generation, Transmission and Distribution. 151:201–12. Retrieved

(http://digital-library.theiet.org/content/journals/10.1049/ip-gtd_20040098).

Marsudi, D. (2005). Pembangkitan Energi Listrik. Jakarta : Erlangga.

(2)

58

Iqbal Dinoer Aditama, 2016

Analisis Setting Relay Diferensial pada Trafo Tenaga 60 Mva di Gardu Induk Cigereleng 150 kV / 20 kV

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

PLN (Persero).

Subari, Arkhan and Dinda Hapsari Kusumastuti. n.d. 2015. “ Setting Relay

Diferensial pada Gardu Induk Kaliwungu guna Menghindari Kegagalan

Proteksi.”e-ISSN 2407–6422, 148.17 (3).

Sutisna, U. (2011). Workshop Scanning Koordinasi Proteksi Utama dan

Cadangan Transmisi. Bandung. PT. PLN (persero).

Tofan Aryanto, and Said Sunardiyo. 2013. “Frekuensi Gangguan Terhadap Kinerja Sistem Proteksi Di Gardu Induk 150 KV Jepara.” 5(2).

Zhang, Wenkui, Qian Tan, Shihong Miao, Liangsong Zhou, and Pei Liu. 2013.

“Self-Adaptive Transformer Differential Protection.” IET Generation, Transmission & Distribution 7(1):61–68. Retrieved

(http://digital-library.theiet.org/content/journals/10.1049/iet-gtd.2011.0739).

Zulkarnaini. & Iqbal, M. (2015). Perhitungan Koordinasi Relay Proteksi OCR /

GFR Dengan Menggunakan Software Matchad Pada Trafo Daya Unit II 20

Referensi

Dokumen terkait

Gardu Induk cigereleng menggunakan 7 buah trafo yang memasok beberapa penyulang salah satunya penyulang CBU oleh karena itu diperlukan penyetelan relay yang

ANALISIS KOORDINASI RELAI DIFERENSIAL DAN RELAI OCR-GFR PADA TRAFO 7 DI GARDU INDUK CIGERELENG.. Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

4.1.4 Simulasi Setting Relay Diferensial terhadap Gangguan Internal dan Gangguan External pada Trafo Tenaga Menggunakan Software ETAP

ESTIMASI PEMBEBANAN TRANSFORMATOR GARDU INDUK GARUT 150 KV Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu..

Gardu Induk Sungguminasa terdapat satu buah trafo tenaga dengan tegangan kerja 150/20 kV. Dimana trafo tenaga tersebut berkapasitas 60 MVA. Karena pada trafo

1) Pada area trafo tenaga 1 Gardu Induk 150 KV Jepara Gangguan yang terjadi pada area trafo tenaga 1 di Gardu Induk 150 KV Jepara yang menyebabkan sistem proteksi

v ABSTRAK ASSESMENT PENGUJIAN RELE DIFFERENSIAL PADA BAY TRAFO DAYA 60 MVA #2 150/20 kV DI GARDU INDUK GANDUS PALEMBANG 2020 : xvii + 63 halaman + Gambar + Tabel + Lampiran Dwi

LAPORAN KERJA PRAKTEK PT.WILMAR NABATI GARDU INDUK 1 PELINTUNG DUMAI PROTEKSI DIFFERENTIAL RELAY TRANSFORMATOR 150 KV DAYA 60 MVA IRWANSYAH NIM.3204201309 JURUSAN TEKNIK