(1)

LOGO

Bandung, 1 Februari 2011

Badan Litbang, Kementerian Pekerjaan Umum

RAPAT KOORDINASI PUSAT

(2)

Pelaksanaan Kegiatan

Tahun 2010

(3)

Sumber : Seluruh Satker di Lingkungan Puslitbang SDA

Progress Keuangan 2010

Kumulatif Per 31 Desember 2010 (SPM)

Pagu

Deviasi

Sisa

(Rp)

(Rp)

(%)

(Rp)

(%)

(%)

(Rp)

1 2 3 4 5 6 7 8 9

1 Puslitbang SDA

54,993,182,000

54,993,182,000

100.00

52,567,540,000

95.59

-4.41

2,425,642,000

2 Balai Irigasi

9,393,179,000

9,393,179,000

100.00

8,361,723,000

89.02

-10.98

1,031,456,000

3 Balai Sabo

9,089,731,000

9,089,731,000

100.00

8,763,076,000

96.41

-3.59

326,655,000

4 Balai Pantai

6,049,927,000

6,049,927,000

100.00

5,975,513,000

98.77

-1.23

74,414,000

5 Balai Sungai

11,079,277,000

11,079,277,000

100.00

9,814,847,000

88.59

-11.41

1,264,430,000

6 Balai Rawa

3,333,041,000

3,333,041,000

100.00

2,692,711,000

80.79

-19.21

640,330,000

7 Loka Pantai

10,009,102,000

10,009,102,000

100.00

8,986,058,000

89.78

-10.22

1,023,044,000

103,947,439,000

103,947,439,000

100.00

97,161,468,000

93.47

-6.53

6,785,971,000

No

Satker

Rencana

Progress Keuangan

(4)

Kumulatif Per 31 Desember 2010

Sumber : Seluruh Satker di Lingkungan Puslitbang SDA

Rp

%

Rp

%

1 2 3 5 6 4 8 9 10 11

1 11622323

PUSLITBANG SDA

54,993,182,000

-

54,993,182,000

52,567,540,000

95.59

52,567,540,000

95.59

2 11279842

BALAI IRIGASI

9,393,179,000

-

9,393,179,000

8,361,723,000

89.02

8,361,723,000

89.02

3 11279860

BALAI SABO

9,089,731,000

-

9,089,731,000

8,763,076,000

96.41

8,763,076,000

96.41

4 11576981

BALAI PANTAI

6,049,927,000

-

6,049,927,000

5,975,513,000

98.77

5,975,513,000

98.77

5 11636846

BALAI SUNGAI

11,079,277,000

-

11,079,277,000

9,814,847,000

88.59

9,814,847,000

88.59

6 11636850

BALAI RAWA

3,333,041,000

-

3,333,041,000

2,692,711,000

80.79

2,692,711,000

80.79

7 11636867

LOKA PANTAI

10,009,102,000

-

10,009,102,000

8,986,058,000

89.78

8,986,058,000

89.78

103,947,439,000

-

103,947,439,000

97,161,468,000

93.47

97,161,468,000

93.47

SKPA

Total

No Kode

Satker

Dokumen

Pagu DIPA

e - Monitoring

REALISASI KEUANGAN

(SPM)

REALISASI KEUANGAN

(SP2D)

DIPA + Revisi

(5)

Sumber : e-monitoring

Grafik Penyerapan Keuangan, TA 2010

(6)

Sumber :

e-monitoring & e-procurement Plus

PAGU

(x Rp. 1000)

JUMLAH

(Rp)

JUMLAH

TERKONTRAK

(Rp)

SISA KONTRAK

(Rp)

JUMLAH

(Rp)

1 PUSLITBANG SDA

9,528,239,000

34 - - 34

8,754,773,894

766,186,000

-

-

2 BALAI IRIGASI

1,117,485,000

4 - - 4 1,065,873,800 2,074,300

-

-

3 BALAI SABO

880,640,000

4 - - 4 831,470,000 49,170,000

-

-

4 BALAI PANTAI

664,970,000

3 - - 3 644,070,000 10,270,000

-

-

5 BALAI SUNGAI

3,317,925,000

17 - - 17 3,051,826,000 144,595,000

-

-

6 BALAI RAWA

- - - - - -

-

-

-

7 LOKA PANTAI

7,598,117,000

2 - - 2 6,555,558,000 886,559,000

-

-

23,107,376,000

64 - - 64 20,903,571,694 1,858,854,300 - -

TOTAL

NO

SATKER

TOTAL

PELELANGAN

PAKET

(7)

Peningkatan jumlah akreditasi lab (3 Lab

terakreditasi)

Laboratorium Balai Lingkungan Keairan

Laboratorium Balai Hidraulika dan Geoteknik

Keairan

Laboratorium Balai Hidrologi

(8)

JATIBARANG DAM JATIBARANG DAM JATIBARANG DAMJATIBARANG DAMJATIBARANG DAMJATIBARANG DAMJATIBARANG DAMJATIBARANG DAMJATIBARANG DAM

1. Pramuka 1. Pramuka 1. Pramuka1. Pramuka1. Pramuka1. Pramuka1. Pramuka1. Pramuka1. Pramuka 2. Kreo

2. Kreo 2. Kreo 2. Kreo 2. Kreo 2. Kreo 2. Kreo 2. Kreo 2. Kreo Mundingan Mundingan MundinganMundinganMundinganMundinganMundinganMundinganMundingan

3. u/s Confluence 3. u/s Confluence 3. u/s Confluence3. u/s Confluence3. u/s Confluence3. u/s Confluence3. u/s Confluence3. u/s Confluence3. u/s Confluence Kreo kripik Kreo kripik Kreo kripikKreo kripikKreo kripikKreo kripikKreo kripikKreo kripikKreo kripik

5. Up Stream 5. Up Stream 5. Up Stream5. Up Stream5. Up Stream5. Up Stream5. Up Stream5. Up Stream5. Up Stream Simongan Simongan SimonganSimonganSimonganSimonganSimonganSimonganSimongan

4. u/s Confluence 4. u/s Confluence 4. u/s Confluence4. u/s Confluence4. u/s Confluence4. u/s Confluence4. u/s Confluence4. u/s Confluence4. u/s Confluence Garang Kreo Garang Kreo Garang KreoGarang KreoGarang KreoGarang KreoGarang KreoGarang KreoGarang Kreo

6. River Mouth 6. River Mouth 6. River Mouth6. River Mouth6. River Mouth6. River Mouth6. River Mouth6. River Mouth6. River Mouth

Medono Medono MedonoMedonoMedonoMedonoMedonoMedonoMedono

12 12 12121212121212

Gilisari Gilisari GilisariGilisariGilisariGilisariGilisariGilisariGilisari Mijen Mijen MijenMijenMijenMijenMijenMijenMijen

10 10 10101010101010

Gonoharjo Gonoharjo GonoharjoGonoharjoGonoharjoGonoharjoGonoharjoGonoharjoGonoharjo

8 8 8888888 9 9 9999999 Pongangan Pongangan PonganganPonganganPonganganPonganganPonganganPonganganPongangan

Gn.Pati Gn.Pati Gn.PatiGn.PatiGn.PatiGn.PatiGn.PatiGn.PatiGn.Pati

5 5 5555555 6 6 6666666 Sumur Sumur SumurSumurSumurSumurSumurSumurSumur Jurang Jurang JurangJurangJurangJurangJurangJurangJurang Jatibarang Jatibarang JatibarangJatibarangJatibarangJatibarangJatibarangJatibarangJatibarang

7 7 7777777

Simongan Simongan SimonganSimonganSimonganSimonganSimonganSimonganSimongan

11 11 11111111111111 2 2 2222222 Lempuyangan Lempuyangan LempuyanganLempuyanganLempuyanganLempuyanganLempuyanganLempuyanganLempuyangan Nyat Nyono Nyat Nyono Nyat NyonoNyat NyonoNyat NyonoNyat NyonoNyat NyonoNyat NyonoNyat Nyono

3 3 3333333

Karangjati Karangjati KarangjatiKarangjatiKarangjatiKarangjatiKarangjatiKarangjatiKarangjati

4 4 4444444

Srondol Srondol SrondolSrondolSrondolSrondolSrondolSrondolSrondol

1 1 1111111

LEGEND LEGEND LEGENDLEGENDLEGENDLEGENDLEGENDLEGENDLEGEND

0 2,5 kilometers

Rainfall Sta Rainfall Sta Rainfall StaRainfall StaRainfall StaRainfall StaRainfall StaRainfall StaRainfall Sta Climate Sta Climate Sta Climate StaClimate StaClimate StaClimate StaClimate StaClimate StaClimate Sta Water Level Sta Water Level Sta Water Level StaWater Level StaWater Level StaWater Level StaWater Level StaWater Level StaWater Level Sta

Master Station

BBWSPJ

Master Station Master Station Master StationMaster StationMaster StationMaster StationMaster StationMaster StationMaster Station

110

Telemetry System

Peramalan Banjir dan Kekeringan

Alokasi Air

Perencanaan, Pelaksanaan dan

OP Infrastruktur SDA

(9)
(10)

WADUK BAWAH TANAH

www.thaiobayashi.co.th

TEKNOLOGI SUMBER DAYA AIR UNTUK PENYEDIAAN AIR PULAU KECIL

MENANGGULANGI INTRUSI AIR LAUT

PHOTO BY J-GREEN/ 2004 CROSS SECTION BY SOBIRIN/ DPKLTS/ 2004

PUMPING WELL

UNDERGROUND DAM OF TUKAD KETES

UNDERGROUND RESERVOIR

UPSTREAM SITE NEEDS

CONSERVATION ACTIVITY

(11)

LOGO

Elements of an ASR scheme (single well system)

(12)

Pelaksanaan Kegiatan

Tahun 2011

(13)

KEGIATAN PUSLITBANG SUMBER DAYA AIR

KELOMPOK

KEGIATAN

KONSERVASI SDA

PENGENDALIAN

DAYA RUSAK AIR

PENDAYAGUNAAN

(14)

LOGO

REKAPITULASI DIPA TAHUN ANGGARAN 2011

NO SATKER

PAGU DANA BLOKIR

B. PEGAWAI

B.BARANG

B.MODAL JUMLAH PAGU B.BARANG B.MODAL JUMLAH

BLOKIR OPERASIONAL NON OPERASIONAL 1 Puslitbang SDA 12,038,886 6,401,838 43,095,792 16,205,623 77,742,139 3,309,995 592,050 3,902,045 2 Balai Irigasi 2,905,365 1,686,959 4,004,819 1,908,674 10,505,817 - 150,000 150,000 3 Balai Pantai 1,521,335 865,595 5,181,674 1,390,655 8,959,259 459,726 255,350 715,076 4 Balai Sungai 2,193,857 1,933,054 6,611,264 4,051,062 14,789,237 1,618,200 2,212,772 3,830,972 5 Balai Sabo 2,824,079 1,495,439 5,580,409 655,670 10,555,597 - 250,000 250,000 6 Balai Rawa 560,205 784,015 3,661,356 1,919,852 6,925,428 646,340 472,085 1,118,425 7 Loka Pantai 288,378 522,022 1,971,164 12,793,520 15,575,084 - - -TOTAL 22,332,105 13,688,922 70,106,478 38,925,056 145,052,561 6,034,261 3,932,257 9,966,518

(15)

LOGO

REKAPITULASI PENGHEMATAN DIPA

TAHUN ANGGARAN 2011

OPERASIONAL NON OPERASIONAL OPERASIONAL NON OPERASIONAL 1 12,038,886,000 6,401,838,000 40,578,947,000 18,722,468,000 77,742,139,000 3,309,995,000 592,050,000 3,902,045,000 627,220,000 12,038,886,000 6,401,838,000 36,018,159,000 17,400,462,000 71,859,345,000 2 2,905,365,000 1,686,959,000 4,004,819,000 1,908,674,000 10,505,817,000 - 150,000,000 150,000,000 150,000,000 2,905,365,000 1,686,959,000 4,004,819,000 1,908,674,000 10,505,817,000 3 1,521,335,000 865,595,000 5,181,674,000 1,390,655,000 8,959,259,000 459,726,000 255,350,000 715,076,000 255,350,000 1,521,335,000 865,595,000 4,524,441,000 1,390,655,000 8,302,026,000 4 2,193,857,000 1,933,054,000 6,611,264,000 4,051,062,000 14,789,237,000 1,618,200,000 2,212,772,000 3,830,972,000 2,634,543,000 2,193,857,000 1,933,054,000 6,611,264,000 2,854,633,000 13,592,808,000 5 2,824,079,000 1,495,439,000 5,580,409,000 655,670,000 10,555,597,000 - 250,000,000 250,000,000 250,000,000 2,824,079,000 1,495,439,000 4,956,801,000 655,670,000 9,931,989,000 6 560,205,000 784,015,000 3,661,356,000 1,919,852,000 6,925,428,000 646,340,000 472,085,000 1,118,425,000 560,304,000 560,205,000 784,015,000 3,125,320,000 1,897,767,000 6,367,307,000 7 Loka Pantai 288,378,000 522,022,000 1,971,164,000 12,793,520,000 15,575,084,000 - - - - 288,378,000 522,022,000 1,699,245,000 12,793,520,000 15,303,165,000 22,332,105,000 13,688,922,000 67,589,633,000 41,441,901,000 145,052,561,000 6,034,261,000 3,932,257,000 9,966,518,000 4,477,417,000 22,332,105,000 13,688,922,000 60,940,049,000 38,901,381,000 135,862,457,000 JUMLAH PAGU Balai Sabo Balai Rawa TOTAL PEMANFAATAN KEMBALI/ BUKA BINTANG

PAGU SETELAH EXERCISE PENGHEMATAN

B. PEGAWAI B.BARANG B.MODAL Puslitbang SDA Balai Irigasi Balai Pantai Balai Sungai

B.MODAL JUMLAH PAGU B.BARANG B.MODAL JUMLAH BLOKIR NO SATKER

PAGU DANA BLOKIR

B. PEGAWAI

(16)

LOGO

TARGET 2011

Akreditasi Laboratorium

Penambahan 3 Lab.

Teknologi

Penambahan 2 Teknologi

Teknologi Banjir Perkotaan

Teknologi Reservoir Bawah Tanah)

Prototipe

Pembuatan 3 Prototipe

Pengembangan Teknologi Bangunan Penangkap Sedimen Dan

Lahan Basah Buatan

Pengembangan Teknologi Telemetring Peralatan Hidrologi

Pengembangan Tekno Sabo Dalam Pengendalian Daya Rusak

Air Pada DAS Rawan Aliran Lumpur (Studi Kasus Dataran

(17)

LOGO

KEGIATAN UNGGULAN 2011

Mikro Irigasi

Teknologi Revitalisasi Bangunan Air Utama

Pengendalian Banjir Perkotaan

Upaya untuk mendukung Rencana Aksi Nasional

(18)

LOGO

Lokasi Penerapan :

Nusa Tenggara Barat

(19)

LOGO

(20)

LOGO

Sistem Polder

Teknologi Pengendali Banjir yang cocok untuk

kota-kota dekat pantai

SISTEM POLDER UNTUK MENGATASI BANJIR PERKOTAAN

BERBASIS PARTISIPASI MASYARAKAT

(21)

LOGO

Energi Gelombang Laut

PERUBAHAN

POLA ARUS

LAUT

(22)

LOGO

RECIEVER

SERVER

TRANSMITTER

AQUISISI

DATA

MAIN OFFICE

PONSEL PROVIDER

VIA

SMS

Pihak Terkait

TELEMETRING

Kualitas Air

Tekanan Air

Pori

Patok Geser

Patok

Setlement

(23)

LOGO

KERJASAMA PUSLITBANG SDA

1.

DOISP (Dam Operational Improvement and Safety Project)

BHGK

, HITA

2.

JWRSS (Java Water Resources Strategy Study)

BHGK

,

LK

, HITA

3.

KBT (Kanal Banjir Timur)

BHGK

,

LK

, HITA

4.

IFAS (Integrated Flood Analysis System)

HITA

5.

4 Parties (BMKG, PUSAIR, DELTARES, KMNI)

HITA

6.

Jakarta Resilient Toward a Coastal Defence Strategy

Pantai

,

BHGK

7.

JEWSM (Jakarta Early Warning System and Monitoring)

HITA

8.

Andritz Hydro (Optimizing the Potentials of Hydro Power Embedded

in the Water Resources Infrastructures in Indonesia)

BHGK

, HITA

9.

Penyediaan Air Baku Jawa Timur (Umbulan)

HITA

10.

K-Water

LK

, HITA

(24)

LOGO

AGENDA KEGIATAN 2011

Workshop for Practical O & M of Water Resources

Facilities

20 – 21 Januari 2011, Balai Sungai

Preparation of the Joint Cooperation Program (JCP)

2010 – 2015

23 Januari 2011

Kick off JCP

Februari/Maret 2011

Rangkaian Acara Kolokium Puslitbang SDA

14 – 17 Maret 2011

(25)

LOGO

CATATAN

Bidang / Bagian / Balai & Loka Agar Segera

mempersiapkan

Bahan

untuk

Pelaksanaan

Open

House

Batas Akhir Penerimaan Makalah Kolokium

18 Februari 2011

Bidang / Bagian / Balai & Loka Agar Segera

Menyampaikan

Kegiatan-kegiatan

yang

akan

dilakukan pada TA.2011 Bahan-bahan tersebut akan

digabungkan

untuk

menjadi

Kalender

Kegiatan

(26)

Sumber :

e-monitoring & e-procurement Plus

1

PUSLITBANG SDA

18,525,474,350

32 3 - 29

2

BALAI IRIGASI

1,768,365,000

5 - - 5

3

BALAI SABO

535,000,000

3 - - 3

4

BALAI PANTAI

1,817,225,000

4 - - 4

5

BALAI SUNGAI

6,865,497,000

27 - - 27

6

BALAI RAWA

2,492,705,800

5 - - 5

7

LOKA PANTAI

11,929,075,000

4 1 - 3

43,933,342,150

80 4 - 76

NO

PAGU

SATKER

TOTAL

PELELANGAN

TOTAL

PAKET

PROSES

LELANG

SELESAI

(TERKONTRAK)

SISA

(27)

LOGO

Pengadaan Barang/Jasa TA 2011

(full e-procurement)

Sumber :

www.pu.go.id

Lelang full e-proc urement

Tanggal Nilai Mulai Akhir

1 Puslitbang SDA Jasa Pelayanan Internet 419,100,000 Rp 18 - 26 Januari 2011 Aanwijzing 2 Puslitbang SDA

Honor Satpam Rp 388,966,000 20 - 29 Desember 2010 Pengumuman Pemenang 3 Puslitbang SDA Honor Cleaning Service 475,200,000 Rp 20 - 29 Desember 2010 Pengumuman Pemenang 4 Loka Pantai Pengawasan

Pembangunan Gedung Lab. Teknik Pantai

225,000,000 Rp 21 Desember 2010 - 03 Januari 2011 Undangan Peserta lulus kualifikasi Kontrak No Satker Nama Paket Pagu Dana Pengumuman

(28)

LOGO

SUMBER DAYA MANUSIA

Eksisting

CPNS (Rencana)

Bagian Tata Usaha

: 38 Orang

: 5 Orang

Bidang Proker

: 15 Orang

: 2 Orang

Bidang Standis

: 25 Orang

: 3 Orang

Bidang SDK

: 12 Orang

: 2 Orang

Balai BHGK

: 46 Orang

: 13 Orang

Balai HITA

: 57 Orang

: 8 Orang

Balai LK

: 40 Orang

: 3 Orang

Balai Irigasi

: 61 Orang

: 4 Orang

Balai Sungai

: 41 Orang

: 11 Orang

Balai Sabo

: 63 Orang

: 3 Orang

Balai Pantai

: 28 Orang

: 2 Orang

Balai Rawa

: 10 Orang

: 4 Orang

Loka Pantai

: 5 Orang

: 3 Orang

Total

: 441 Orang

: 63 Orang = 504 orang

(29)

LOGO

Pembinaan CPNS

Jumlah

: 63 orang

Waktu

: 7 - 14 Februari

Pembekalan

: - Pusat Litbang SDA

- Inovasi Iptek

- Dinamika Berfikir

- Budaya Kerja

- Karier

Pelatihan

Kuestioner

Asesmen

(30)

LOGO

SMM dan REFORMASI BIROKRASI

Lounching SMM

: 9 Fembuari 2011

Sosialisasi dan Pendampingan Impl. : `1 – 25 Febr 201

Pelatihan Audit

: 7 - 11 Maret 2011

Pelaksanaan Audit Internal

: 4 – 8 April 2011

Tindakan Perbaikan Audit Internal

: 11 – 13 April 2011

Rapat Tinjauan Manajemen

: 5 Mei 2011

Pengajuan Sertfikasi

: 6 - 9 Mei 2011

Audit Eksternal Tahap 1

: 18 – 19 Mei 2011

Audit ksternal Tahap 2

: 6 – 17 Juni 2011

Pemantauan proses

: 4 – 15 Juli 2011

Penyerahan 9001 : 2008

: Juli 2011

(31)

Gambar

Grafik Penyerapan Keuangan, TA 2010

Referensi

Dokumen terkait

jamii kwa madhumuni ya mawasiliano kati yao TUKI (1981) inatoa maana ya lugha kuwa, “lugha ni mpangilio wa sauti na maneno unaoleta maana ambao hutumiwa na watu wa taifa au

!alah satu bentuk peman)aatan singkong sebagai bahan pangan yaitu diolah menjadi opak singkong. Opak singkong merupakan $emilan khas &ndonesia yang sangat tradisional yang

 Lumpur Lapindo Brantas yang memiliki densitas dan viskositas masing-masing 2.5 g/cc dan 5 cp akan dipindahkan dari Porong-Sidoarjo (sumber lumpur) menuju 2 buah Sungai (A dan

Reviu sendiri adalah prosedur penelusuran angka-angka dalam laporan keuangan, permintaan keterangan, dan analitik yang harus menjadi dasar memadai bagi Inspektorat

Pada ikan ukuran rerata berat 91,86 g/ekor ini aktivitas protease dijumpai tinggi pada usus depan dengan buffer dalam suasana asam hingga netral, dan umumnya aktivitas

Undang-undang Nomor 23 Tahun 1997 tentang Pengeloalaan Lingkungan Hidup telah mengamanatkan terdapat setiap usaha dan kegitan yang menimbulkan Dampak besar penting