RENCANA/ RELISASI PENGADAAN TA 2009

*

Unit Kerja

No

Kode

Nama Paket

Estimasi

Biaya (Rp)

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

1

2

3

4

5

6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Civil Works (Category 1)

Goods (Category 2)

Consulting Services (Category 3)

Training, Workshop (Category 4)

RIM A (Category 5)

RIM B (Category 6)

Sub Prject A1 (Category 7)

Sub Prject A2 (Category 8)

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

(2)

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

-

-TOTAL KEGIATAN I (Loan + Pend)

-

-TOTAL KEGIATAN II (GOI-PF/APBD)

-

0

KETERANGAN :

1 US$ = Rp. 8.500

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B

< Rp. 127,500,000

2. Comm. Driven Development (CDD) untuk pek Irigasi

< Rp. 425,000,000

3. Small Works (SW)

< Rp. 212,500,000

4. National Competitive Bidding (NCB)

< Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

2. Pengadaan Barang (Goods) :

1. National Shopping (NS)

< Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

2. National Competitive Bidding (NCB)

< Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :

1. Consultant Qualification Selection (CQS)

< Rp. 850,000,000

2. Quality and Cost Based Selection (QCBS)

< Rp. 3,400,000,000

3. Quality Based Selection (QBS)

< Rp. 3,400,000,000

4. Individual Consultant (IC)

< Rp. 425,000,000

Bila sudah terkontrak, agar diisi

*

dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

**

Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia,

Bila sudah terkontrak, agar diisi

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOL

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

1. Pekerjaan Konstruksi (Civil Works) :

(3)

Status : Januari 2009

Post/ Prior

Review

Pengumum

an

Pengadaan

Pemasuka

n

Penawaran

Eval/ Nego

Penandata-nganan

Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

7

8

9

10

11

12

13

(4)

PETUNJUK PENGISIAN

I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor Urut

Kolom 2

: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst

Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket

Kolom 4

: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp

Kolom 5

: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$

Kolom 6

: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC

Kolom 7

: Post Review, Prior Review Kontrak I

**

, Prior Review

Kolom 8

: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Kolom 9

: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Kolom 10

: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Kolom 11

: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi

Tgl & No. Kontrak

Kolom 12

: Hari/Bulan Kalender

Kolom 13

: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi

Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)

Kolom

: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3

: Nama paket pekerjaan, agar ditulis setiap paket

Kolom 4

: Estimasi biaya, dalam Rp

Kolom 5

: diisi (0)

Kolom 6

: Metoda Pengadaan sesuai Keppres 80/2003

Kolom 7

: diisi (–)

(5)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas PSDA Prov. Jawa Barat Status : Maret 2010

No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan

Penawaran Eval/ Nego

Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Desain Partisipatif : 94,035,000 D. I Sasak Kab. Bogor (1088 ha )

D.I Cihoe Cikumpeni kab Bogor (1486 ha0

Pelaksanaan Rehab Partisipatif : 505,890,000 D.I Cihelang Kab Cianjur (1512 ha)

D.I Cibalgung Kab. Cianjur ( 1106 ha) D.I Cipadang/Cibeleng Kab. Cianjur (1823 ha)

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Pelaksanaan Desain Partisipatif : 45,100,000 D. I Sasak Kab. Bogor (1088 ha )

D.I Cihoe Cikumpeni kab Bogor (1486 ha0

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 599,925,000 -TOTAL KEGIATAN I (Loan + Pend) 599,925,000 -TOTAL KEGIATAN II (GOI-PF/APBD) 45,100,000 0

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

(6)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja

Dinas Bina Marga & Pengairan Kab. Bekasi

Status : Maret 2010

No

Kode

Nama Paket

Biaya (Rp)

Estimasi

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuma

n

Pengadaan

Pemasukan

Penawaran

Eval/ Nego

Penandata-nganan

Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

Tidak Ada Kegiatan Pengadaan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

-

-TOTAL KEGIATAN I (Loan + Pend)

-

-TOTAL KEGIATAN II (GOI-PF/APBD)

-

-Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

(7)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja

Dinas PU Kab. Karawang

Status : Maret 2010

No

Kode

Nama Paket

Estimasi

Biaya (Rp)

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuman

Pengadaan

Pemasukan

Penawaran

Eval/ Nego

Penandata-nganan

Kontrak

Jangka Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Desain partisipatif :

1 CW 1

D.I Cigunung Bubut (60 ha)

20,000,000 2,353

CDD

2 CW 2

D.I Tonjong (424 ha)

20,000,000 2,353

CDD

3 CW 3

D.I Waru I/Pangkalan I-6 (421 ha)

20,000,000 2,353

CDD

4 CW 4

D.I Waru II/Pangkalan 7-16 (490 ha)

20,000,000 2,353

CDD

5 CW 5

D.I Parakan Badak (175 ha)

20,000,000 2,353

CDD

Pelaksanaan Rehab Partisipatif :

6 CW 6

D.I Lio (60 ha)

#########

11,765

CDD

7 CW 7

D.I Cigunung Bubut (60 ha)

#########

19,412

CDD

8 CW 8

D.I Tonjong (424 ha)

#########

18,235

CDD

9 CW 9

D.I Waru II/Pangkalan 7-16 (490 ha)

#########

18,235

CDD

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1

D.I Cibayat (105 ha)

75,000,000

2

D.I Ciomas

75,000,000

3

D.I Waru I/Pangkalan I-6 (421 ha)

50,000,000

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

########

79,412

TOTAL KEGIATAN I (Loan + Pend)

########

79,412

TOTAL KEGIATAN II (GOI-PF/APBD)

########

-Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

(8)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja Dinas PU Kab. Purwakarta Status : Maret 2010

No Kode Nama Paket Estimasi Biaya (Rp)

Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan

Penawaran Eval/ Nego

Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

Pelaksanaan Rehab Partisipatif :

1 CW 1 D.I Nangerang (250 ha) 60,000,000 7,059 CDD 2 CW 2 D.I Tanjung Sari (205 ha) 55,000,000 6,471 CDD 3 CW 3 D.I Cigalumpit (100 ha) 35,000,000 4,118 CDD

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

D.I Cijamban (250 ha) 58,000,000 D.I Ciburial (118 ha) 50,000,000 D.I Ciburial (118 ha) 55,000,000 D.I Cibulakan (150 ha) 50,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 150,000,000 17,647 TOTAL KEGIATAN I (Loan + Pend) 150,000,000 17,647 TOTAL KEGIATAN II (GOI-PF/APBD) 213,000,000

-Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Goods (Category 2)

(9)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja

Dinas PSDA & Pertambangan Kab. Cianjur

Status : Maret 2010

No

Kode

Nama Paket

Estimasi Biaya

(Rp)

Estimasi Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuman

Pengadaan

Pemasukan

Penawaran

Eval/ Nego

Penandata-nganan Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I

KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1

CW

Pelaksanaan Rehab Partisipatif

300,000,000 35,294

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1

Pelaksanaan Rehab Partisipatif

60,000,000

2

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

300,000,000

35,294

TOTAL KEGIATAN I (Loan + Pend)

300,000,000

35,294

TOTAL KEGIATAN II (GOI-PF/APBD)

60,000,000

-Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Sub Prject A2 (Category 8)

(10)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja Dinas Bina Marga & Pengairan Kabupaten Bogor Status : Maret 2010 No Kode Nama Paket Estimasi Biaya

(Rp) Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuma n Pengadaan Pemasukan

Penawaran Eval/ Nego

Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13

I

KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Desain :

1 CS 2 DI Cibeet Cikumpeni 800 ha (200 ha) 100,000,000 11,765 CDD 2 CS 7 DI Cigamea 475 ha (275 ha) 100,000,000 11,765 CDD 3 CS 8 DI Situ Bala 695 ha (200 ha) 100,000,000 11,765 CDD

II

KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 300,000,000 35,294 TOTAL KEGIATAN I (Loan + Pend) 300,000,000 35,294 TOTAL KEGIATAN II (GOI-PF/APBD) -

-Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

(11)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas Bina Marga & Pengairan Kab. Subang

Status : Maret 2010

No

Kode

Nama Paket

Estimasi Biaya

(Rp)

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuman

Pengadaan

Pemasukan

Penawaran

Eval/ Nego

Penandata-nganan

Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I

KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Rehab Partisipatif

1

CW 1

D.I Cipadararingan (152 ha)

60,000,000 7,059 CDD/SKKS

2

CW 2

D.I Leuwi Tunggak (126 ha)

60,000,000 7,059 CDD/SKKS

3

CW 3

D.I Cikaliwuluh (159 ha)

60,000,000 7,059 CDD/SKKS

4

CW 4

D.I Sado (53 ha)

60,000,000 7,059 CDD/SKKS

5

CW 5

D.I Ciasem (24 ha)

60,000,000 7,059 CDD/SKKS

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1

Pelaksanaan Rehab Partisipatif :

D.I Cirenggong (52 ha)

60,000,000

Karangtomang (74 ha)

7,000,000

Cirelek (63 ha)

6,000,000

Cibulakan (67 ha)

7,000,000

Cibaregbeg (59 ha)

6,000,000

Citapen (56 ha)

6,000,000

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

300,000,000

35,294

TOTAL KEGIATAN I (Loan + Pend)

300,000,000

35,294

TOTAL KEGIATAN II (GOI-PF/APBD)

92,000,000

0

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

(12)

RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Februari 2010

No Kode Nama Paket Estimasi Biaya (Rp)

Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan

Penawaran Eval/ Nego

Penandata-nganan Kontrak

Jangka Waktu Kontrak

Nomor Kontrak Permasalahan/ Keterangan:

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,075,000 P3A Karya Tani Mandiri 2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000

- - - P3A Putra Mandiri 3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 37,000,000

P3A Gempar

4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,750,000 P3A Mustika Tani 5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 33,750,000

P3A Super

6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,675,000 P3A Harapan

7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr Rp 39,750,000 P3A Tunas Mekar 8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 38,500,000

P3A Harapan Maju 9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 36,450,000

P3A Bangun Jaya 10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 33,500,000

P3A Guna Mekar 11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,070,000

P3A Sakti Mekar 12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 39,500,000

P3A Giri Raharja 13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,420,000

P3A Mulya Asih 14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,660,000

P3A Sabilulungan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr

2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr

3 Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59 TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59 TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00

Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B

(13)

RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Agustus 2010

No Kode Nama Paket Estimasi Biaya (Rp)

Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan

Penawaran Eval/ Nego

Penandata-nganan Kontrak

Jangka Waktu Kontrak

Nomor Kontrak Permasalahan/ Keterangan:

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,075,000 P3A Karya Tani Mandiri 2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000

- - - P3A Putra Mandiri 3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 37,000,000

P3A Gempar

4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,750,000 P3A Mustika Tani 5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 33,750,000

P3A Super

6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,675,000 P3A Harapan 7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr Rp 39,750,000

P3A Tunas Mekar 8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 38,500,000

P3A Harapan Maju 9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 36,450,000

P3A Bangun Jaya 10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 33,500,000

P3A Guna Mekar 11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,070,000

P3A Sakti Mekar 12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 39,500,000

P3A Giri Raharja 13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,420,000

P3A Mulya Asih 14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,660,000

P3A Sabilulungan

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr

2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr

3 Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59 TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59 TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00

Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B

(14)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas PU Kab. Bandung

Status : Maret 2010

No

Kode

Nama Paket

Estimasi Biaya

(Rp)

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuma

n

Pengadaan

Pemasukan

Penawaran

Eval/

Nego

Penandata-nganan Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

Pelaksanaan Rehab Partisipatif

1 CW 1

D.I Citarik (200 ha)

150,000,000 17,647

2 CW 2

D.I Cikalong (150 ha)

110,000,000 12,941

3 CW 3

D.I Gunung Karung (150 ha)

115,000,000 13,529

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Pelaksanaan Rehab Partisipatif

D.I Cibodas Ciwidey

100,000,000

D.i Ciranjang

100,000,000

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

375,000,000

44,118

TOTAL KEGIATAN I (Loan + Pend)

375,000,000

44,118

TOTAL KEGIATAN II (GOI-PF/APBD)

200,000,000

0

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Sub Prject A2 (Category 8)

(15)

RENCANA/ RELISASI PENGADAAN TA 2010

*

Unit Kerja : Dinas PU Kab. Bandung Barat

Status : Maret 2010

No

Kode

Nama Paket

Estimasi Biaya

(Rp)

Estimasi

Biaya

eqv(US$)

Metode

Pengadaan

Post/ Prior

Review

Pengumuma

n

Pengadaan

Pemasukan

Penawaran

Eval/ Nego

Penandata-nganan Kontrak

Jangka

Waktu

Kontrak

Keterangan:

Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 Gd 1

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1

Pelaksanaan Desain Partisipatif

50,000,000

Sub Total Keg Cat 3 (Loan + Pend)

-

-Sub Total Keg Selain Cat 3 (Loan)

-

-TOTAL KEGIATAN I (Loan + Pend)

-

-TOTAL KEGIATAN II (GOI-PF/APBD)

50,000,000

0

Water Resources and Irrigation Sector Management Project (WISMP) APL I

Komponen B & C

Referensi

Dokumen terkait

perubahan atau kesalahan harga yang kecil pada carried trafik memberikan perubahan yang besar pada harga offered trafik sehingga kesalahan ukur yang kecil pada harga carried

Rajah di sebelah kanan ialah grid petak yang terdiri daripada 6×6 petak segi empat sama , dalam grid petak terdapat 49 titik persilangan, terdapat sejumlah ________ segi

Hasil dari beberapa penelitian menunjukkan bahwa metode 5S ini merupakan metode yang efektif dan efisien untuk digunakan dalam meningkatkan kinerja perusahaan

Menurut Hudojo (1984:7), penerapan metode penemuan dalam pembelajaran mempunyai beberapa keuntungan seperti dipaparkan berikut ini. 1) Siswa ikut berpartisipasi secara

melakukan pembelajaran pada Kompetensi Dasar (KD) yang sama dengan metode ceramah dan tanya jawab, dan melakukan post tes atau penilaian. Sedangkan obyek dalam penulisan ini

Namun, tidak terdapat hubungan yang signifikan antara kontribusi asupan protein dari luar asrama dengan persen lemak tubuh (p&gt;0.05).Kesimpulan: Terdapat hubungan

Kinerja sasaran “Tertib administrasi penyelenggaraan pemerintahan umum, otonomi daerah, dan kerja sama” dengan indikator “Persentase dinamika penyelenggaraan

Lingkar dada jantan paling tinggi pada Kambing Muara (85.50 ± 17.68 cm) berbeda nyata (P&lt;0.05) jika dibandingkan dengan kelima sub populasi kambing lainnya, kemudian disusul