RENCANA/ RELISASI PENGADAAN TA 2009
*
Unit Kerja
No
Kode
Nama Paket
Estimasi
Biaya (Rp)
Estimasi
Biaya
eqv(US$)
Metode
Pengadaan
1
2
3
4
5
6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
Civil Works (Category 1)
Goods (Category 2)
Consulting Services (Category 3)
Training, Workshop (Category 4)
RIM A (Category 5)
RIM B (Category 6)
Sub Prject A1 (Category 7)
Sub Prject A2 (Category 8)
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend)
-
-Sub Total Keg Selain Cat 3 (Loan)
-
-TOTAL KEGIATAN I (Loan + Pend)
-
-TOTAL KEGIATAN II (GOI-PF/APBD)
-
0
KETERANGAN :
1 US$ = Rp. 8.500
PETUNJUK PENGISIAN
I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B
< Rp. 127,500,000
2. Comm. Driven Development (CDD) untuk pek Irigasi
< Rp. 425,000,000
3. Small Works (SW)
< Rp. 212,500,000
4. National Competitive Bidding (NCB)
< Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp
2. Pengadaan Barang (Goods) :
1. National Shopping (NS)
< Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$
2. National Competitive Bidding (NCB)
< Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :
1. Consultant Qualification Selection (CQS)
< Rp. 850,000,000
2. Quality and Cost Based Selection (QCBS)
< Rp. 3,400,000,000
3. Quality Based Selection (QBS)
< Rp. 3,400,000,000
4. Individual Consultant (IC)
< Rp. 425,000,000
Bila sudah terkontrak, agar diisi
*
dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
**
Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia,
Bila sudah terkontrak, agar diisi
paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOL
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)
(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
1. Pekerjaan Konstruksi (Civil Works) :
Status : Januari 2009
Post/ Prior
Review
Pengumum
an
Pengadaan
Pemasuka
n
Penawaran
Eval/ Nego
Penandata-nganan
Kontrak
Jangka
Waktu
Kontrak
Keterangan:
Permasalahan/
7
8
9
10
11
12
13
PETUNJUK PENGISIAN
I. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor Urut
Kolom 2
: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dst
Kolom 3
: Nama paket pekerjaan, agar ditulis setiap paket
Kolom 4
: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp
Kolom 5
: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$
Kolom 6
: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, IC
Kolom 7
: Post Review, Prior Review Kontrak I
**
, Prior Review
Kolom 8
: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Kolom 9
: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Kolom 10
: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Kolom 11
: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi
Tgl & No. Kontrak
Kolom 12
: Hari/Bulan Kalender
Kolom 13
: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi
Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)
Kolom
: 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3
: Nama paket pekerjaan, agar ditulis setiap paket
Kolom 4
: Estimasi biaya, dalam Rp
Kolom 5
: diisi (0)
Kolom 6
: Metoda Pengadaan sesuai Keppres 80/2003
Kolom 7
: diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja : Dinas PSDA Prov. Jawa Barat Status : Maret 2010
No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan
Penawaran Eval/ Nego
Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Pelaksanaan Desain Partisipatif : 94,035,000 D. I Sasak Kab. Bogor (1088 ha )
D.I Cihoe Cikumpeni kab Bogor (1486 ha0
Pelaksanaan Rehab Partisipatif : 505,890,000 D.I Cihelang Kab Cianjur (1512 ha)
D.I Cibalgung Kab. Cianjur ( 1106 ha) D.I Cipadang/Cibeleng Kab. Cianjur (1823 ha)
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Pelaksanaan Desain Partisipatif : 45,100,000 D. I Sasak Kab. Bogor (1088 ha )
D.I Cihoe Cikumpeni kab Bogor (1486 ha0
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 599,925,000 -TOTAL KEGIATAN I (Loan + Pend) 599,925,000 -TOTAL KEGIATAN II (GOI-PF/APBD) 45,100,000 0
Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja
Dinas Bina Marga & Pengairan Kab. Bekasi
Status : Maret 2010
No
Kode
Nama Paket
Biaya (Rp)
Estimasi
Estimasi
Biaya
eqv(US$)
Metode
Pengadaan
Post/ Prior
Review
Pengumuma
n
Pengadaan
Pemasukan
Penawaran
Eval/ Nego
Penandata-nganan
Kontrak
Jangka
Waktu
Kontrak
Keterangan:
Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13Tidak Ada Kegiatan Pengadaan
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1
Sub Total Keg Cat 3 (Loan + Pend)
-
-Sub Total Keg Selain Cat 3 (Loan)
-
-TOTAL KEGIATAN I (Loan + Pend)
-
-TOTAL KEGIATAN II (GOI-PF/APBD)
-
-Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja
Dinas PU Kab. Karawang
Status : Maret 2010
No
Kode
Nama Paket
Estimasi
Biaya (Rp)
Estimasi
Biaya
eqv(US$)
Metode
Pengadaan
Post/ Prior
Review
Pengumuman
Pengadaan
Pemasukan
Penawaran
Eval/ Nego
Penandata-nganan
Kontrak
Jangka Waktu
Kontrak
Keterangan:
Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Pelaksanaan Desain partisipatif :
1 CW 1
D.I Cigunung Bubut (60 ha)
20,000,000 2,353
CDD
2 CW 2
D.I Tonjong (424 ha)
20,000,000 2,353
CDD
3 CW 3
D.I Waru I/Pangkalan I-6 (421 ha)
20,000,000 2,353
CDD
4 CW 4
D.I Waru II/Pangkalan 7-16 (490 ha)
20,000,000 2,353
CDD
5 CW 5
D.I Parakan Badak (175 ha)
20,000,000 2,353
CDD
Pelaksanaan Rehab Partisipatif :
6 CW 6
D.I Lio (60 ha)
#########
11,765
CDD
7 CW 7
D.I Cigunung Bubut (60 ha)
#########
19,412
CDD
8 CW 8
D.I Tonjong (424 ha)
#########
18,235
CDD
9 CW 9
D.I Waru II/Pangkalan 7-16 (490 ha)
#########
18,235
CDD
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1
D.I Cibayat (105 ha)
75,000,000
2
D.I Ciomas
75,000,000
3
D.I Waru I/Pangkalan I-6 (421 ha)
50,000,000
Sub Total Keg Cat 3 (Loan + Pend)
-
-Sub Total Keg Selain Cat 3 (Loan)
########
79,412
TOTAL KEGIATAN I (Loan + Pend)
########
79,412
TOTAL KEGIATAN II (GOI-PF/APBD)
########
-Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja Dinas PU Kab. Purwakarta Status : Maret 2010
No Kode Nama Paket Estimasi Biaya (Rp)
Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan
Penawaran Eval/ Nego
Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 Gd 1Pelaksanaan Rehab Partisipatif :
1 CW 1 D.I Nangerang (250 ha) 60,000,000 7,059 CDD 2 CW 2 D.I Tanjung Sari (205 ha) 55,000,000 6,471 CDD 3 CW 3 D.I Cigalumpit (100 ha) 35,000,000 4,118 CDD
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
D.I Cijamban (250 ha) 58,000,000 D.I Ciburial (118 ha) 50,000,000 D.I Ciburial (118 ha) 55,000,000 D.I Cibulakan (150 ha) 50,000,000
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 150,000,000 17,647 TOTAL KEGIATAN I (Loan + Pend) 150,000,000 17,647 TOTAL KEGIATAN II (GOI-PF/APBD) 213,000,000
-Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
Goods (Category 2)
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja
Dinas PSDA & Pertambangan Kab. Cianjur
Status : Maret 2010
No
Kode
Nama Paket
Estimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode
Pengadaan
Post/ Prior
Review
Pengumuman
Pengadaan
Pemasukan
Penawaran
Eval/ Nego
Penandata-nganan Kontrak
Jangka
Waktu
Kontrak
Keterangan:
Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13I
KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1
CW
Pelaksanaan Rehab Partisipatif
300,000,000 35,294
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1
Pelaksanaan Rehab Partisipatif
60,000,000
2
Sub Total Keg Cat 3 (Loan + Pend)
-
-Sub Total Keg Selain Cat 3 (Loan)
300,000,000
35,294
TOTAL KEGIATAN I (Loan + Pend)
300,000,000
35,294
TOTAL KEGIATAN II (GOI-PF/APBD)
60,000,000
-Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
Sub Prject A2 (Category 8)
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja Dinas Bina Marga & Pengairan Kabupaten Bogor Status : Maret 2010 No Kode Nama Paket Estimasi Biaya
(Rp) Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuma n Pengadaan Pemasukan
Penawaran Eval/ Nego
Penandata-nganan Kontrak Jangka Waktu Kontrak Keterangan: Permasalahan/ 1 2 3 4 5 6 7 8 9 10 11 12 13
I
KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Desain :1 CS 2 DI Cibeet Cikumpeni 800 ha (200 ha) 100,000,000 11,765 CDD 2 CS 7 DI Cigamea 475 ha (275 ha) 100,000,000 11,765 CDD 3 CS 8 DI Situ Bala 695 ha (200 ha) 100,000,000 11,765 CDD
II
KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 300,000,000 35,294 TOTAL KEGIATAN I (Loan + Pend) 300,000,000 35,294 TOTAL KEGIATAN II (GOI-PF/APBD) -
-Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010
*
Unit Kerja : Dinas Bina Marga & Pengairan Kab. Subang
Status : Maret 2010
No
Kode
Nama Paket
Estimasi Biaya
(Rp)
Estimasi
Biaya
eqv(US$)
Metode
Pengadaan
Post/ Prior
Review
Pengumuman
Pengadaan
Pemasukan
Penawaran
Eval/ Nego
Penandata-nganan
Kontrak
Jangka
Waktu
Kontrak
Keterangan:
Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13I
KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Pelaksanaan Rehab Partisipatif
1
CW 1
D.I Cipadararingan (152 ha)
60,000,000 7,059 CDD/SKKS
2
CW 2
D.I Leuwi Tunggak (126 ha)
60,000,000 7,059 CDD/SKKS
3
CW 3
D.I Cikaliwuluh (159 ha)
60,000,000 7,059 CDD/SKKS
4
CW 4
D.I Sado (53 ha)
60,000,000 7,059 CDD/SKKS
5
CW 5
D.I Ciasem (24 ha)
60,000,000 7,059 CDD/SKKS
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1
Pelaksanaan Rehab Partisipatif :
D.I Cirenggong (52 ha)
60,000,000
Karangtomang (74 ha)
7,000,000
Cirelek (63 ha)
6,000,000
Cibulakan (67 ha)
7,000,000
Cibaregbeg (59 ha)
6,000,000
Citapen (56 ha)
6,000,000
Sub Total Keg Cat 3 (Loan + Pend)
-
-Sub Total Keg Selain Cat 3 (Loan)
300,000,000
35,294
TOTAL KEGIATAN I (Loan + Pend)
300,000,000
35,294
TOTAL KEGIATAN II (GOI-PF/APBD)
92,000,000
0
Water Resources and Irrigation Sector Management Project (WISMP) APL I
Komponen B & C
RELISASI PENGADAAN TA 2010
*
Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Februari 2010
No Kode Nama Paket Estimasi Biaya (Rp)
Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan
Penawaran Eval/ Nego
Penandata-nganan Kontrak
Jangka Waktu Kontrak
Nomor Kontrak Permasalahan/ Keterangan:
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,075,000 P3A Karya Tani Mandiri 2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000
- - - P3A Putra Mandiri 3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 37,000,000
P3A Gempar
4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,750,000 P3A Mustika Tani 5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 33,750,000
P3A Super
6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,675,000 P3A Harapan
7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr Rp 39,750,000 P3A Tunas Mekar 8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 38,500,000
P3A Harapan Maju 9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 36,450,000
P3A Bangun Jaya 10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 33,500,000
P3A Guna Mekar 11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,070,000
P3A Sakti Mekar 12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 39,500,000
P3A Giri Raharja 13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,420,000
P3A Mulya Asih 14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,660,000
P3A Sabilulungan
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr
2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr
3 Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59 TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59 TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00
Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B
RELISASI PENGADAAN TA 2010
*
Unit Kerja : Dinas Pengairan Kabupaten Sukabumi Status : Agustus 2010
No Kode Nama Paket Estimasi Biaya (Rp)
Estimasi Biaya eqv(US$) Metode Pengadaan Post/ Prior Review Pengumuman Pengadaan Pemasukan
Penawaran Eval/ Nego
Penandata-nganan Kontrak
Jangka Waktu Kontrak
Nomor Kontrak Permasalahan/ Keterangan:
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 CW 1 Rehabilitasi Jringan Irigasi D.I Cimuncang 40,075,000 4,714.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,075,000 P3A Karya Tani Mandiri 2 CW 2 Rehabilitasi Jringan Irigasi D.I Gegerbitung 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 38,500,000
- - - P3A Putra Mandiri 3 CW 3 Rehabilitasi Jringan Irigasi D.I Muara Cibodas 37,000,000 4,352.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 37,000,000
P3A Gempar
4 CW 4 Rehabilitasi Jringan Irigasi D.I Cipeundeuy 40,750,000 4,794.12 CDD/SKKS Post Review CDD/SKKS 09 August 2010 13 Sept 2010 13 Sept 2010 45 hr Rp 40,750,000 P3A Mustika Tani 5 CW 5 Rehabilitasi Jaringan irgasi DI. Cisarua Bojong 33,750,000 3,970.59 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 33,750,000
P3A Super
6 CW 6 Rehabilitasi Jaringan irgasi D.I Cicatih Nyalindung 36,675,000 4,314.71 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,675,000 P3A Harapan 7 CW 7 Rehabilitasi Jaringan irgasi D.I Tarisi 39,750,000 4,676.47 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Apr 2010 45 hr Rp 39,750,000
P3A Tunas Mekar 8 CW 8 Rehabilitasi Jaringan irgasi D.I Cikurutug 38,500,000 4,529.41 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 38,500,000
P3A Harapan Maju 9 CW 9 Rehabilitasi Jaringan irgasi D.I Cipuspa 36,450,000 4,288.24 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 36,450,000
P3A Bangun Jaya 10 CW 10 Rehabilitasi Jaringan irgasi D.I Cipanumbangan 33,500,000 3,941.18 CDD/SKKS Post Review CDD/SKKS 09 August 2010 15 Sept 2010 15 Sept 2010 45 hr Rp 33,500,000
P3A Guna Mekar 11 CW 111 Rehabilitasi Jaringan irgasi D.I Cikalong 38,070,000 4,478.82 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,070,000
P3A Sakti Mekar 12 CW 12 Rehabilitasi Jaringan irgasi D.I Warujajar 39,500,000 4,647.06 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 39,500,000
P3A Giri Raharja 13 CW 13 Rehabilitasi Jaringan irgasi D.I Ciasih 38,420,000 4,520.00 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 38,420,000
P3A Mulya Asih 14 CW.14 Rehabilitasi Jaringan irgasi D.I Ciwirana 36,660,000 4,312.94 CDD/SKKS Post Review CDD/SKKS 09 August 2010 14 Sept 2010 14 Sept 2010 45 hr Rp 36,660,000
P3A Sabilulungan
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1 Rehabiliasi Jaringan Irigasi DI Pangkalan 50,397,000 PML 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 60 hr
2 Rehabiliasi Jaringan Irigasi DI Cikakak 81,505,000 PL 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 61 hr
3 Pengadaan Jasa Konsultan Perencanaan dan Supervisi Desain irigasi Partisipatif 163,158,000 27 Mei 2010 8 Juli 2010 8 Juli 2010 28 Juli 2010 90 hr
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 527,600,000.00 62,070.59 TOTAL KEGIATAN I (Loan + Pend) 527,600,000.00 62,070.59 TOTAL KEGIATAN II (GOI-PF/APBD) 295,060,000.00
Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B