Slide TSP403 TSP 403 005 006 Perencanaan dan Pengendalian Proyek Konstruksi
Teks penuh
Dokumen terkait
Bahasan mencakup perencanaan proyek dengan menggunakan metoda perencanaan dan penjadwalan (Barchart, AOA, AON PERT) dan aplikasi komputer dalam manajemen proyek
In 1958, this tool was developed under the name program evaluation and review technique and later became known by its acronym, PERT1. The PERT system was adopted in its early days
This is a more significant change order that includes widening the door openings, that is, demolition of part of the masonry walls covered by drywall and painted, and installing
Project X Presentation.
• The cycle time for a scraper is the time to load, haul, dump, turn, return and turn back into position. •
The owner and contractor agree that the PROJECT WILL NOT COST THE OWNER MORE THAN A SET PRICE, THE GUARANTEED MAXIMUM. It can be a cost-plus fixed fee or percentage cost basis but
Test and inspections, other than those mentioned, that are required by the contract document will be paid for by the owner.. Extra inspection required as the result of a
Manager can (1) estimate the completion time of a project by finding the critical path, (2) identify the start and finish time for each activity for a project