ADVANCE PROJECT SCHEDULING

WITH BAR CHART

FERDINAND FASSA

Lecture 2

(2)

OUTLINE LECTURE 2

A. REVIEW LECTURE 1 B. WHY BAR CHART C. MILESTONE\

(3)

A. REVIEW LECTURE 1

W Y LA

A R ECT…????

To reduces the uncertainty

that exists before

(4)

INTRODUCTION

A BAR CHART..???

‘‘

,

SHOWN IN A TIME-SCALED BAR LINE WITH NO LINKS

(5)

B. WHY BAR CHART..??

1. SIMPLE AND EASY TO UNDERSTAND

2. USED FOR GLOBAL CONTROL AT THE PROJECT

MANAGEMENT AND EXECUTIVE LEVEL

3. VERY USEFUL FOR MILESTONE AND SUMMARY

(6)

PREPARING BAR CHARTS

1. PROJECT MUST BE BROKEN INTO SMALLER (WBS) [NO ABSOLUTELY CORRECT OR INCORRECT WAY TO BREAK DOWN A PROJECT EXISTS]

2. DEVELOP A LIST OF ACTIVITIES THAT WILL BE SHOWN ON THE SCHEDULE

(7)

C. MILESTONE

PURPOSE: TO HIGHLIGHT THE DATES OF SIGNIFICANT EVENTS.

(SUBMISSION OF A DRAWING, SPECIFICATION, OR PURCHASE ORDER FOR CLIENT APPROVAL)

(8)

Terminology

Milestones

– Have a duration of zero

– Identify critical points in your schedule

– Shown as inverted triangle or a diamond

– Ofte used at re ie or deli ery ti es

• Or at end or beginning of phases

• Ex: Software Requirements Review (SRR)

• Ex: User Sign-off

(9)

Terminology

Example

(10)

MILESTONE NETWORKS AND SUBNETS

The concept of subnets is used when several

(11)

…Cont

The development of subnets is carried out within

the framework developed through WBS and

milestone networks

The significant operation in the development of a

subnet is planning the activities according to sets of

(12)

D. ORGANIZATIONAL RESPONSIBILITY CHART (ORC)

The prime responsibility for each work package is

assigned to an individual in the project management

(13)

PROJECT X

DEVELOP A WBS FOR A PROJECT WITH WHICH YOU ARE FAMILIAR (PROJECT X)

Planning Phase (Design and Schedule)

Organization Responsible Chart

PREPARE A LIST OF SUBNETS FOR THE PROJECT

Referensi

Dokumen terkait

Consequently, Project uses the standard Microsoft Office menu and toolbar structure and contains some of the familiar Microsoft Office tools... Sistem Menu pada

Bahasan mencakup perencanaan proyek dengan menggunakan metoda perencanaan dan penjadwalan (Barchart, AOA, AON PERT) dan aplikasi komputer dalam manajemen proyek

In 1958, this tool was developed under the name program evaluation and review technique and later became known by its acronym, PERT1. The PERT system was adopted in its early days

This is a more significant change order that includes widening the door openings, that is, demolition of part of the masonry walls covered by drywall and painted, and installing

Earthmoving process is the process of moving soil or rock from one location to another and processing it so that it meets construction requirements of location, elevation, density

To formally kick off the Engineering Design Process in accordance with the project execution plan and to ensure that key engineering strategies / philosophies are in

 WBS is a tool that defines a project and groups the projects elements in a way that helps organize and define the total work scope of

• Closing projects involves gaining stakeholder and customer acceptance of the final products and services, and bringing the project to an orderly end.. • Closing includes