• Tidak ada hasil yang ditemukan

NRVA Shura Male questionnaire Final English

N/A
N/A
Protected

Academic year: 2017

Membagikan "NRVA Shura Male questionnaire Final English"

Copied!
9
0
0

Teks penuh

(1)

Male Shura questionnaire

1. Community identification

Supervisor-filled information Interviewer-filled information

Cluster code 1.8 Geo reference waypoint code

Urban ………1

Rural ………2 1.9 GPS ID code Kuchi ………3

Province 1.10 Latitude

name Range: 29.35 to 38.40 N

.

1.11 Longitude

Range: 60.31 to 75.00 E

.

1.12 Altitude (m.) Range: 200 to 4500 m.

1.6 Control and Enumeration Area

National Risk and Vulnerability Survey (NRVA) 1389-90

Afghanistan's Multi-Purpose Household Survey

1.1

1.5 1.4 1.3

District name 1.2 Residence code

Urban Nahia

1.7 Village name

2. Process monitoring

Date of interview Day Month Year

Interviewers' number

Supervisor's number 2.4 Regional Supervisor's number

Date of office editing Day Month Year

Office editor's code

Date of data entry Day Month Year

Data-entry officer code 2.5

2.7

2.8 2.6 2.3 2.1

(2)

3a. Access

3.1 What is the topographical situation of the majority Open plain ………1

of cropland used by the community? Valley ………2

Valley and hills ………3

Hills (no valley cultivation) ………4

3.2 How far is the nearest drivable road to this community? km. IF NEAREST ROAD IS IN COMMUNITY, WRITE ‘0’ 3.3 Is the closest road to your community usable by vehicles all year? Yes ………1 Go to 3.5 No ………2

3.4 During which months is the road impassable in a normal year? INTERVIEWER: CIRCLE ALL MONTHS THAT ARE MENTIONED Hamal Sawr Jawza Saratan Asad Sunbula Mizan Amrab Maws Jady Dalwa Hoot 1 2 3 4 5 6 7 8 9 10 11 12 3.5 Has there been any program for road repair or/and bridge Own community work ………1

construction in last 3 years? Government road project ………2

WFP food-for-work road improvement 3 INTERVIEWER: CIRCLE ALL ANSWERS THAT ARE MENTIONED Other food-for-work road project ………4

NSP road constuction programme ……5

NGO road consturction project …………6

Military road construction ………7

Other ………8

None ………9

3.6 Has there been a change in road access in the last 3 years? No change in road access ………1

Road access improved ………2

Road access has deteriorated …………3

3.7 What is the name of the place where this community bought their foodstuffs in the last month / the last time? 3.8 Where is this place located? In this district ………1 Go to 3.10 In neighbouring district ………2

Provincial food market ………3 Go to 3.10

3.9 What is the name of that district District name Office

and province? Province name coding

Transport type: Foot/animal Shared public Private vehicle / Bicycle transport / bus taxi

3.10 How long did it take to reach the nearest permanent If '1', If '1', If '1', If '1', food market - one way travel - by <transport type> SKIP 3.11 AND SKIP 3.11 AND SKIP 3.11 AND SKIP 3.11 AND

in the past month? FOR CODES, SEE BELOW 3.12 3.12 3.12 3.12

3.11 What was the cost of return transport to the Afghanis Afghanis Afghanis Afghanis permanent food market, including overnight

accommodation if needed, in the past month?

3.12 What is the cost of transporting 50 kg of wheat Afghanis Afghanis Afghanis Afghanis from the permanent food market to the

community in the past month?

Codes for 3.10 1= No time - market in community 4= 3 to less than 6 hours 7= Not reachable by this (Time to reach 2= Near the community - within 1 hour 5= 6 less than 12 hours means of transport food market) 3= 1 to less than 3 hours 6= 12 hours or more

(3)

3b. Access

3.13 3.14 3.15 3.16 3.17 3.18

Type of health How long does it take to How long does it take to What is the cost of one-way How long does it take What is the cost of one-way Are the following types facility reach the nearest reach the nearest <health transport from your to reach the nearest transport from your of staff present in the

<health facility> by facility> by shared/public community to this <health <health facility> by community to this <health nearest <health facility>? foot / animal in the transport in the facility> by shared/public private vehicle / taxi facility> by private vehicle /

last month? (based last month? (based transport in the last month in the last month? taxi in the last month 1=Yes on one-way travel) on one-way travel) (cost per person of one way (based on one- (cost of transportation 2=No

transportation only)? person one-way travel) only)? 3=Don't know For codes, see below For codes, see below For codes, see below

Health post (house

office or private Female midwife …1 2 3

hospital Male doctor ………1 2 3

Male nurse ………1 2 3

Private Female CHW ……1 2 3

pharmacy Male CHW ………1 2 3

Codes for 3.13, 3.14 and 3.16 1= No time - health facility in community 4= 6-12 hours

(Time to reach health facilities) 2= Near community - 2 hours or less 5= More than 12 hours

(4)

3b. Access (continued)

3.19 3.20 3.21 3.22

Type of Is a <school type> present How many public / government How many private / NGO What is the one-way distance school in the community? <school type> schools are there <school type> schools are there to the nearest <school type> (in km.),

in the community? in the community? either in or outside the community?

1=Yes IF NOT REACHABLE, WRITE '99'

2=No AND GO TO NEXT SCHOOL TYPE

Primary, 1 2 km.

co-ed/shift boys-girls

Primary, girls only 1 2 km.

Primary, boys only 1 2 km.

Lower secondary 1 2 km.

co-ed/shift boys-girls

Lower secondary 1 2 km.

school, girls only

Lower secondary 1 2 km.

(5)

4. Projects

No. 4.1 4.2

Has the following infrastucture or programme (a-n) been Under what programme was this created or completed in this community during projects activity or infrastructure financed?

in the last year? What is the main financing source

of this activity? IF ANSWER IS 'No' ('2'), SKIP QUESTION 4.2

AND CONTINUE WITH NEXT PROGGRAMME Yes No For codes, see below

a Road / bridge construction or rehabilitation ………1 1 2 1 2 3 4 5 6 7 8

b Water supply / construction of wells with hand pumps ……… 1 21 1 2 3 4 5 6 7 8

c Shelter project - for returnees ……… 1 21 1 2 3 4 5 6 7 8

d Electricity - micro-hydro, diesel generator ……… 1 21 1 2 3 4 5 6 7 8

e Micro-finance project ………1 1 2 1 2 3 4 5 6 7 8

f Drainage structures (bridges, culverts, washes,

retaining walls) ………1 1 2 1 2 3 4 5 6 7 8

g Irrigation infrastructure - improved/construction;

dams, washes, intakes, etc. ………1 1 2 1 2 3 4 5 6 7 8

h Health facility construction or rehabilitation ……… 1 21 1 2 3 4 5 6 7 8

i School construction or rehabilitation ………1 1 2 1 2 3 4 5 6 7 8

j Flood/river protection wall ………1 1 2 1 2 3 4 5 6 7 8

k Income generation project - women ………1 1 2 1 2 3 4 5 6 7 8

l Reforestation/tree nurseries / orchard/fruit tree rehabilitation1 1 2 1 2 3 4 5 6 7 8

m Literacy / vocational training ……… 1 21 1 2 3 4 5 6 7 8

n Other , specify 1 21 1 2 3 4 5 6 7 8

Codes for 4.2 (Financing) 1=Government road project or NERAP 2=NSP

3=Other cash-for-work project 4=Income-generating programme 5=Food-for-work programme 6=UN

(6)

5. Community development priorities

5.1 5.2 5.3

What is the first What is the second What is the third Development priority priority that this priority that this priority that this

community would community would community would INTERVIEWER: CIRCLE ONE ANSWER FOR like to see the like to see the like to see the

FIRST, SECOND AND THIRD Afghan Government Afghan Government Afghan Government

PRIORITY EACH address? address? address?

a Improved drinking water quantity ………1 ………1 ………1

b Improved drinking water quality ………2 ………2 ………2

c Rehabilitation of irrigation system ………3 ………3 ………3

d Repairing of local roads ………4 ………4 ………4

e Construction of new local roads ………5 ………5 ………5

f Bridge construction/rehabilitation ………6 ………6 ………6

g New/improved local health facilities for women ………7 ………7 ………7

h New/improved local health facilities for men ………8 ………8 ………8

i New/improved local health facilities for women&men ………9 ………9 ………9

j New/improved local education facilities for girls ………10 ………10 ………10

k New/improved local education facilities for boys ………11 ………11 ………11

l New/improved local education facilities for girls&boys ………12 ………12 ………12

m New/improved housing in community ………13 ………13 ………13

n Improved veterinary services ………14 ………14 ………14

o New/improved micro-credit schemes ………15 ………15 ………15

p Increased employment opportunities for women ………16 ………16 ………16

q Increased employment opportunities for men ………17 ………17 ………17

r Increased employment opportunities for women&men ………18 ………18 ………18

s Literacy training for women ………19 ………19 ………19

t Literacy training for men ………20 ………20 ………20

u Literacy training for both women&men ………21 ………21 ………21

v Vocational skills training for women ………22 ………22 ………22

w Vocational skills training for men ………23 ………23 ………23

x Vocational skills training for both women&men ………24 ………24 ………24

y Electricity provision ………25 ………25 ………25

z Reformed/improved local justice systems ………26 ………26 ………26

aa Disarmament of local militia/commanders ………27 ………27 ………27

ab Local land or housing dispute settlement mechanisms ………28 ………28 ………28

(7)

6. Calendars

6.1 INTERVIEWER: IS THIS A RURAL COMMUNITY? Yes ………1

No ………2 END

6.2 Does this community grow winter wheat? Yes ………1

No ………2 Go to 6.4

6.3 In which months are usually the following activities carried out for winter wheat? CIRCLE ALL MONTHS MENTIONED

Activity Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Irrigation system maintenance … 1 2 3 4 5 6 7 8 9 10 11 12

Land preparation ……… 1 2 3 4 5 6 7 8 9 10 11 12

Planting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Weeding ……… 1 2 3 4 5 6 7 8 9 10 11 12

Fertilizing ……… 1 2 3 4 5 6 7 8 9 10 11 12

Harvesting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Post-harvesting process ………… 1 2 3 4 5 6 7 8 9 10 11 12

6.4 Does this community grow spring wheat? Yes ………1

No ………2 Go to 6.6

6.5 In which months are usually the following activities carried out for spring wheat? CIRCLE ALL MONTHS MENTIONED

Activity Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Irrigation system maintenance … 1 2 3 4 5 6 7 8 9 10 11 12

Land preparation ……… 1 2 3 4 5 6 7 8 9 10 11 12

Planting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Weeding ……… 1 2 3 4 5 6 7 8 9 10 11 12

Fertilizing ……… 1 2 3 4 5 6 7 8 9 10 11 12

Harvesting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Post-harvesting process ………… 1 2 3 4 5 6 7 8 9 10 11 12

6.6 Does this community grow rice? Yes ………1

No ………2 Go to 6.8

6.7 In which months are usually the following activities carried out for rice? CIRCLE ALL MONTHS MENTIONED

Activity Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Irrigation system maintenance … 1 2 3 4 5 6 7 8 9 10 11 12

Land preparation ……… 1 2 3 4 5 6 7 8 9 10 11 12

Planting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Weeding ……… 1 2 3 4 5 6 7 8 9 10 11 12

Fertilizing ……… 1 2 3 4 5 6 7 8 9 10 11 12

Harvesting ……… 1 2 3 4 5 6 7 8 9 10 11 12

(8)

6.8 Does this community grow barley? Yes ………1

No ………2 Go to 6.10

6.9 In which months are usually the following activities carried out for barley? CIRCLE ALL MONTHS MENTIONED

Activity Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Irrigation system maintenance … 1 2 3 4 5 6 7 8 9 10 11 12

Land preparation ……… 1 2 3 4 5 6 7 8 9 10 11 12

Planting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Weeding ……… 1 2 3 4 5 6 7 8 9 10 11 12

Fertilizing ……… 1 2 3 4 5 6 7 8 9 10 11 12

Harvesting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Post-harvesting process ………… 1 2 3 4 5 6 7 8 9 10 11 12

6.10 Does this community grow maize? Yes ………1

No ………2 Go to 6.12

6.11 In which months are usually the following activities carried out for maize? CIRCLE ALL MONTHS MENTIONED

Activity Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Irrigation system maintenance … 1 2 3 4 5 6 7 8 9 10 11 12

Land preparation ……… 1 2 3 4 5 6 7 8 9 10 11 12

Planting ……… 1 2 3 4 5 6 7 8 9 10 11 12

Weeding ……… 1 2 3 4 5 6 7 8 9 10 11 12

Fertilizing ……… 1 2 3 4 5 6 7 8 9 10 11 12

Harvesting ……… 1 2 3 4 5 6 7 8 9 10 11 12

(9)

6.12 Can you tell me when for the men in this community there is 1=Strong activity CIRCLE ACTIVITY LEVEL strong activity, low activity or no activity for the following tasks? 2=Low activity FOR EACH MONTH

3=No activity

Task Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Agriculture own land ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Agriculture working for landlords 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Environmental works: land conservation, terracing etc.

Public works

(road maintenance etc.) …

Shepherding ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Selling products in market …… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Petty trade ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Laboring in other activities …… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

6.13 Can you tell me in which months the following food items 1=Abundantly available CIRCLE ACTIVITY LEVEL are abundantly, moderately or not available in this community? 2=Moderately available FOR EACH MONTH

3=Not available

Food item Hamal Sawr Jawza Sarat. Asad Sunb. Mizan Amrab Maws Jady Dalwa Hoot

Bread ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Fresh fruits ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Dried fruits ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Honey ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Chicken ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Lamb ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Dried meat ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Milk and dairy products ………… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Fresh vegetables ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Rice ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Maize cobs ……… 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

Referensi

Dokumen terkait

Kesimpulan penelitian ini menunjukkan bahwa perangkap Manitoba trap dengan kedua jenis modifikasi cukup efektif untuk digunakan sebagai perangkap surveilans di tempat terbuka

Untuk dapat memberitahukan nasabah tentang produk bank adalah melalui sarana promosi.Promosi merupakan kegiatan marketing mix yang terakhir.Dalam kegiatan ini

(6) Dalam hal hasil reviu laporan Gratifikasi sebagaimana dimaksud pada ayat (4) dinyatakan bahwa Gratifikasi yang diterima oleh Pelapor termasuk dalam kategori Gratifikasi yang

Modul Perkuliahan pada Program Studi Pendidikan Tata Busana FPTK UPI Bandung: Tidak

Hasilnya, penelitian menunjukan bahwa tingkat bunga BI, nilai tukar rupiah terhadap US Dollar, ROE, TATO, Leverage, penggunaan akuntan publik big four , dan kepemilikan

Apa faktor-faktor yang mempengaruhi partisipasi politik pemilih pemula dalam pemilukada Sumedang.4. Imam Yandri Al –

Setelah menganalisis data penelitian, langkah selanjutnya adalah mendeskripsikan hasil penelitian tersebut dalam bentuk tabel yang menggambarkan perbedaan

Hal ini menunjukkan bahwa Hipotesis Alternatif (Ha) yang menyatakan “Ada perbedaan yang signifikan hasil belajar siswa pada sistem pembelajaran antara metode